    Hardware Integrity Validation (C76-C85) Rev-01 Page 1 of 7

    ON-SITE REPAIR INSTRUCTIONS

    Hardware Integrity Validation

    Product Calisto, Calisto 2S/Ns C76 C85 (10620 and up)

    NOTICE:The following document contains six sections, 1.0 Electronic Board Verification, 2.0Power Supply Source Validation, 3.0 Power Supply Input Validation, 4.0 Power Switch

    Validation, 5.0 Thermal Fuse Validation and 6.0 Power Supply Validation.

    TIME REQUIRED: - 15 minutes

    TOOLS NEEDED: - 3/8" flat screwdriver- Multimeter measuring up to 300VAC and up to 25 VDC

    CAUTION

    Please follow the procedure carefully to prevent any accidents. The monitor

    must be powered on to determine any malfunction. For this reason, electricalshocks are highly possible.

    Make sure the door is closed when you are not working directly on themonitor.

    Make sure the electrical tools and equipment you use are properly insulated.

    To prevent yourself from being the unintentional path to ground, make surethe monitor is well grounded.

  • 8/12/2019 Hardware Integrity Validation C76-C85 2

    2/7

    Hardware Integrity Validation (C76-C85) Rev-01 Page 2 of 7

    1.0 ELECTRONIC BOARD VERIFICATION

    NOTICE:

    At this step a validation that theCalisto is working properly will be made.

    Check the status of the LEDs on the electronic board assembly.

    LED ACTIVITY Power LED Always ONCell I/O LED Always ONCPU LED Blinking

    If the LEDs do not behave as described above, please follow the steps in the next sections.

    PowerLED(13.2V)

    CPULED

    CELL I/OLED

  • 8/12/2019 Hardware Integrity Validation C76-C85 2

    3/7

    Hardware Integrity Validation (C76-C85) Rev-01 Page 3 of 7

    2.0 POWER SUPPLY SOURCE VALIDATION

    NOTICE:

    At this step a validation that theCalisto receives enough power and also that the power supply

    is working properly will be made.

    Please refer to the figure below for the correct installation of the power cord. Note that, besidesAC

    NEUTRAL andAC LIVE, a third feed line must be provided, the EARTH line.

    Using a multimeter set on voltage measurement, measure the voltage between pin 1 and pin 2 of the

    TB2 connector, see image above. The voltage must be in a range of 100 V AC and 240 V AC.

    V

  • 8/12/2019 Hardware Integrity Validation C76-C85 2

    4/7

    Hardware Integrity Validation (C76-C85) Rev-01 Page 4 of 7

    3.0 POWER SWITCH VALIDATION

    NOTICE:

    At this step the integrity of the rocker switch will be validated.

    1. Power onCalisto (if not already done).

    2. Be sure that the main fuse is functional, see Section 3.0.

    3. Measure the voltage between pin 3 of TB7 connector and pin 1 of TB3 connector then

    measure the voltage between pin 4 of TB7 connector and pin 2 of TB3 connector.

    Both voltages must be in a range of 100 V AC and 240 V AC. If its not the case then please, contact

    Morgan Schaffer at [email protected] the code Rocker switch replacement.

    VV

  • 8/12/2019 Hardware Integrity Validation C76-C85 2

    5/7

    Hardware Integrity Validation (C76-C85) Rev-01 Page 5 of 7

    4.0 THERMAL FUSE VALIDATION

    NOTICE:

    At this step the integrity of the thermal fuse will be validated.

    1. Power onCalisto (if not already done).

    2. Check the continuity between pin 1 and pin 2 of the TB7 connector. See figure below:

    If there is no continuity then please, contact Morgan Schaffer at [email protected]

    with the code Thermal fuse replacement.

  • 8/12/2019 Hardware Integrity Validation C76-C85 2

    6/7

    Hardware Integrity Validation (C76-C85) Rev-01 Page 6 of 7

    5.0 POWER SUPPLY INPUT VALIDATION

    NOTICE:

    At this step the integrity of the power supply input will be validated. The goal is to test the

    functionality of the main fuse.

    1. Power onCalisto (if not already done).

    2. Measure the voltage between pin 1 and pin 2 of the TB8 connector. See figure below:

    If there is no voltage then please, contact Morgan Schaffer at [email protected]

    the code main fuse replacement.

    V

  • 8/12/2019 Hardware Integrity Validation C76-C85 2

    7/7

    Hardware Integrity Validation (C76-C85) Rev-01 Page 7 of 7

    6.0 POWER SUPPLY VALIDATION

    NOTICE:

    At this step the integrity of the internal Power Supply will be validated.

    1. Power onCalisto (if not already done).

    2. Using a multimeter set on V DC, measure the voltage between the two pins of the J11 connector

    (see figure below). The voltage should be between 13.1 and 13.25 VDC and steady.

    If the voltage is under 12 V, or is not steady, it means that the power supply is no longer valid

    and in this case contact Morgan Schaffer at [email protected] the code Power

    supply replacement.

    J11 Connector

    Position 2 on J11