HAITI EARTHQUAKE HAITI EARTHQUAKE HAITI EARTHQUAKE HAITI EARTHQUAKE
ASCE/TCLEE ASCE/TCLEE RECONNAISSANCE PROJECTRECONNAISSANCE PROJECT
ASCE/TCLEE ASCE/TCLEE RECONNAISSANCE PROJECTRECONNAISSANCE PROJECT
Presented by:Presented by:
William Bruin, P.EPrincipal Engineer
Halcrow Inc., Oakland
William Bruin, P.EPrincipal Engineer
Halcrow Inc., Oakland&
Alex AugustinAssistant Civil Engineer
&Alex Augustin
Assistant Civil EngineerAssistant Civil EngineerCalifornia State Lands Commission (MFD)
Assistant Civil EngineerCalifornia State Lands Commission (MFD)
Haiti Earthquake ReconnaissanceHaiti Earthquake ReconnaissanceHaiti Earthquake ReconnaissanceHaiti Earthquake Reconnaissance
February 28 to March 6, 2010 February 28 to March 6, 2010y Two Groups: ASCE TCLEE and EERI 11 Lifeline Engineering Professionals P t T
y Two Groups: ASCE TCLEE and EERI 11 Lifeline Engineering Professionals P t T Ports Team:
Stu WernerSeismic Systems
Ports Team: Stu Werner
Seismic Systems Nason McCullough
CH2M-Hill William Bruin
Nason McCulloughCH2M-Hill
William Bruin William BruinHalcrow
Alex AugustinCSLC
William BruinHalcrow
Alex AugustinCSLCCSLCCSLC
January 12 2010 M7 0 Haiti EarthquakeJanuary 12 2010 M7 0 Haiti EarthquakeJanuary 12, 2010 M7.0 Haiti EarthquakeJanuary 12, 2010 M7.0 Haiti Earthquake
Previous Major Earthquakes: Previous Major Earthquakes: June 3, 1770 1860
Date: January 12 2010
June 3, 1770 1860
Date: January 12 2010 Date: January 12, 2010 Earthquake Magnitude: 7.0 Location: Port-au-Prince
Date: January 12, 2010 Earthquake Magnitude: 7.0 Location: Port-au-Prince Hypocenter: ~ 6 miles Impacted Population: ~ 3,000,000 Death Toll to Date: ~ 300 000
Hypocenter: ~ 6 miles Impacted Population: ~ 3,000,000 Death Toll to Date: ~ 300 000 Death Toll to Date: ~ 300,000 Injured: ~ 300,000 Death Toll to Date: ~ 300,000 Injured: ~ 300,000
Modified Mercali Intensity (MMI)
Port Sites InvestigatedPort Sites InvestigatedPort Sites Investigated Port Sites Investigated
Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)
National Port Regulators National Port Regulators g Owns & Operates Port of Port-au-Prince In process of becoming Regulators only
g Owns & Operates Port of Port-au-Prince In process of becoming Regulators only Port of Port-au-Prince
Largest and Busiest Container Port/
Port of Port-au-Prince Largest and Busiest Container Port
/1,200 containers/day170,000 TEU/year
Construction 1978 1980
1,200 containers/day170,000 TEU/year
Construction 1978 1980 Construction 1978-1980 Construction 1978-1980
Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)
Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)
Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)
Authorité Portuaire Nationale (APN)Condition Before Earthquake
Authorité Portuaire Nationale (APN)Condition Before EarthquakeCondition Before Earthquake Condition Before Earthquake
APN in process of Retrofitting both facilities APN in process of Retrofitting both facilitiesp g Actual Condition Unknown (Assumed Poor) 18-in. Square Pre-stressed Concrete Piles
p g Actual Condition Unknown (Assumed Poor) 18-in. Square Pre-stressed Concrete Piles Balanced Battered Pile Configuration Supported Gantry Container Crane, 2 mobile cranes
C f S S
Balanced Battered Pile Configuration Supported Gantry Container Crane, 2 mobile cranes
C f S S Configuration Similar to U.S Configuration Similar to U.S
Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)What Really Happened?
Authorité Portuaire Nationale (APN)What Really Happened?
Very Large Lateral Spreading
Liquefaction & qTranslation of
Wharf
Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)North Wharf Warehouse DamageNorth Wharf Warehouse Damage
Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)South Pier ConditionSouth Pier Condition
Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)Authorité Portuaire Nationale (APN)South Pier Inspection
Authorité Portuaire Nationale (APN)South Pier Inspection
Authorité Portuaire Nationale (APN)North Wharf Conclusion
Authorité Portuaire Nationale (APN)North Wharf ConclusionNorth Wharf ConclusionNorth Wharf Conclusion
Severe Structural Condition prior to earthquake Severe Structural Condition prior to earthquakep q Was not designed for Inertial and kinematic loads
p q Was not designed for Inertial and kinematic loads
MOT Sites InvestigatedMOT Sites InvestigatedMOT Sites InvestigatedMOT Sites Investigated
Cimenterie National - Cement Plant(Break Bulk)(Break Bulk)
Moulins d’Haiti - Flour Mill(Break Bulk)
Terminaux Varreaux(MOT & Break Bulk)
Autorité Portuaire Nationale APNAutorité Portuaire Nationale - APN (Container & Break Bulk)
Thor Terminal - formerly Shell(MOT)(MOT)
MOT Observations – SettlementMOT Observations – Settlement
30 Drown
with
~12 in.of Differential Settlement @
collapse
Photos Courtesy of CWO Lowell Schrader
@Foot of Pier
MOT Observations - PipingMOT Observations - Piping
Severely Corroded Line Breaks withLine Breaks with~12 in. of Settlement
MOT Observations - SettlementMOT Observations - Settlement
Pier
Mole
Mole
MOT Observations – Lateral SpreadingMOT Observations – Lateral Spreading
Pier
~6-ft Settlement of Mole @ Foot of Pier
Tank Farm ObservationsTank Farm ObservationsElephantElephant Foot Buckle and Rupture of Tank Bottom
Underground Pipeline Leak
Leaking Valve
Rupture @ Weld
Full, unanchored tank rocked, buckled
Full, unanchored tank rocked, buckled
Tank Farm ObservationsTank Farm Observations
Tank Shell BucklingBuckling
T k Sh llTank Shell Buckling
Anchorage ObservationsAnchorage ObservationsAnchorage ObservationsAnchorage Observations
15 000 gal Diesel Tank 15 000 gal Diesel Tank
Missing Anchor
15,000 gal. Diesel Tank Partially Anchored
(4 of 8 installed)A h U lift
15,000 gal. Diesel Tank Partially Anchored
(4 of 8 installed)A h U lift Anchor Uplift
Anchor Pullout Some anchorage better
Anchor Uplift Anchor Pullout
Some anchorage betterthan nothingthan nothing Photos Courtesy of Eduardo Fierro
Haiti Lessons LearnedHaiti Lessons LearnedHaiti Lessons LearnedHaiti Lessons Learned
Liquefaction & lateral spreading caused significant Liquefaction & lateral spreading caused significant Liquefaction & lateral spreading caused significant structural damage Consider kinematic loads in design
Liquefaction & lateral spreading caused significant structural damage Consider kinematic loads in design
Structural condition impacts performance Wharf-to-shore transition critical - piping/utilities/access
A h d t k / i t f d ll
Structural condition impacts performance Wharf-to-shore transition critical - piping/utilities/access
A h d t k / i t f d ll Anchored tanks/equipment performed well Maintained piping performed well Post-event response plans are critical
Anchored tanks/equipment performed well Maintained piping performed well Post-event response plans are critical Post-event response plans are critical Post-event response plans are critical