© GxPi 2012 2
Agenda
Mark Stevens, Operations Director and Phil Harrison, Computer Systems Compliance Consultant at GxPi, will discuss:
Basic approach to validating an EDMS
Focussing validation effort to areas of greatest risk in both implementation and use
Introducing GxPi’s view of Lean Compliance
Working smart – application of Lean Compliance to EDMS validation
© GxPi 2012 3
Introductions
Mark Stevens – Mark graduated as a chemical engineer and entered the pharmaceutical and biopharmaceutical industries in 1994, since then he has been involved with engineering design, project management, systems implementation, compliance, strategic planning, business process improvement and delivering performance improvements to organisations and quality systems.
Phil Harrison – Phil graduated as a chemist, originally working within the fine chemicals industry before moving to the pharmaceutical industry in 1991. Since then, he has worked within Information Systems, Quality and Compliance roles within global pharmaceutical organisations. He has been involved with the implementation and use of EDMS with GMP and R&D environments.
© GxPi 2012 4
GxPi Overview
“We simplify complex process and technology environments to deliver our customers’
compliance and quality goals in their regulatory framework.
We achieve this through a combination of Services and Products that transfer our expertise
to our customers”.
Validating an EDMS – the lean and simply compliant way
Basic Approach to
Validating an EDMS
March 2012
© GxPi 2012 6
Basic Approach to Validating an EDMS
What does validation mean?
Computer System Validation can be defined as “Establishing documented evidence which provides a high degree of assurance that a Computerised System will consistently and reliably meet its pre-determined user requirements”. (FDA and other similar definitions)
Why do we need to validate an EDMS?
Because it will help to ensure that the system does what we want it to do!
Because we have to! - Validation is a regulatory requirement, if we are using the EDMS to support Good Practice (GxP) processes in the Life Sciences industry, e.g.
21 CFR Part 11 – Electronic Records and Signatures
Annex 11 of the European GMP Guide
How do we validate an EDMS?
Use defined processes within your organisation.
Use published guidance, e.g. GAMP 5 (Good Automated Manufacturing Practice)
Refine or tailor the approach to suit your specific use of an EDMS.
© GxPi 2012 7
Computerised Systems in Context (from PICS Good Practices Guide)
Operating Environment (other systems, people, equipment and procedures)
Computerised System
Controlled Function or Process
Computer System
Software
Hardware
SOPs
Equipment
People
© GxPi 2012 9
Components of an EDMS - terminology
Infrastructure Sometimes used to refer just to hardware, networks and servers Often includes the software needed to manage networks and
servers such as Operating Systems Infrastructure needs to be “qualified, as distinct from “validated” Infrastructure control varies widely across different organisations
It can take a lot of effort to put this in place first time around
Base Software or Middleware Software that is needed for the application to work, but does not
need to be fully validated every time E.g. SharePoint, Oracle, Documentum
EDMS Application Software
The software you will use to manage your documents, that gives functionality for reviewing, reading, signing etc. Can be configured to meet specific requirements May be installed on server(s) and/or on individual client PCS
© GxPi 2012 10
Infrastructure Qualification - example
Qualification means :
Product tested against known ‘standard’ components OS versions Browser versions MOSS & SQL versions
All to specific service pack level
Infrastructure change control following qualification including: Service Pack patching Desktop control
Qualification enables x-docs™ to be ‘certified’ for use in a specific environment
© GxPi 2012 11
Categorisation of Software - GAMP Categories
Category 1 – Infrastructure Software
(Category 2 – no longer used in GAMP 5 - was previously “Firmware” in GAMP version 4).
Category 3 – Non-configured Products
Category 4 – Configured Products
Category 5 – Custom Applications
(GAMP 5 – A Risk-Based Approach to Compliant GxP Computerised Systems)
So where does an EDMS fit into these categories?
Typically, EDMS application software will now be category 4, but supported by
software in categories 1 and 3.
© GxPi 2012 12
Example “V-Model for” for Software Validation
Unit Specification
Design Specification
Functional Requirements
User Requirements
User Acceptance
Testing
System Testing
Unit Testing
Integration Testing
Coding
© GxPi 2012 13
Key Deliverables needed for Validation of an EDMS
User Requirements Specification Functional Specification Design Specifications Code Reviews Test Plans, Scripts and Reports – probably
at more than one level of testing e.g. Unit, Integration, System and User Acceptance
Traceability Matrix Qualification of Infrastructure Qualification of Test and Live
environments Procedure for operational use of the
system Procedures for Support and Maintenance
of the system, including Change Control, Incident and Problem Management (CAPA)
User training records Eventual decommissioning plans
Validation Plan
Validation Report
Operational Procedures
Validating an EDMS – the lean and simply compliant way
Focussing Validation Effort on
areas of Greatest Risk
March 2012
© GxPi 2012 15
Validation Approach for an EDMS – User Requirements
As for validation of any information system, the starting point must be to understand and define the user requirements
Be aware of how documents are actually used within the organisation e.g. will paper or electronic copies be used in practice, or both?
Which aspects of document management are most important to your organisation? Is it just version control, or more?
What is the nature of the actual documents you want to manage in this way – may not all be straightforward MS Word .doc files
Be aware of the value of Electronic Signatures for distributed organisations, once all have confidence that it works. Remember training and guidance will be needed first!
Ensure that the new system reflects the actual business processes
Where are your documents stored now? Will migration or uploading of documents into the new system be part of the your EDMS project, and how will you want to verify or test this?
© GxPi 2012 16
Important messages!
• Define your key User Requirements and hence your User Acceptance Testing as early as possible!
• Make the appropriate resource commitment for project management and system ownership in order to be successful, irrespective of size of organisation.
© GxPi 2012 17
Risk Based Approach - Examples
Which of your requirements are associated with the greatest level of risk when you use the EDMS?
Focus your testing on the functionality associated with high-risk requirements
For example, if this is the first application using Electronic Records and Signatures to be introduced in an organisation, then ER/ES functionality may be an area to focus on.
Is infrastructure is already qualified and subject to rigorous change control?
How good is the existing Quality Management System and the procedures for computer system validation? The risk may be higher of this is the first system to undergo formal validation.
You can reduce the risk by buying Commercial Off The Shelf software (COTS) – relying on the experience of your vendors
© GxPi 2012 18
Risk Based Approach - Examples
Basic document management functionality such as version control, may already have been thoroughly tested by the vendor. But, how important is version control to your Business?
Focus on any configuration, or coding, that is unique to your organisation, in preference to details that are already widely used elsewhere.
You may not need too much attention on middleware, other than confirming correct installation and versions.
Use past experience e.g. if previous projects have seen variations between Test and Live environments, make sure that your EDMS Test Environment is equivalent to the Live environment, via careful installation qualification.
GAMP guidance makes a clear distinction between responsibilities of the “Regulated Company” and the “Supplier”. If the supplier is trusted, and has been audited, it should be acceptable to rely on more of their testing and documentation.
Validating an EDMS – the lean and simply compliant way
Introducing GxPi’s view of
Lean Compliance
March 2012
© GxPi 2012 20
Introducing GxPi’s view of Lean Compliance
Introducing GxPi’s view of Lean Compliance
What do we mean by Lean Compliance?
How to apply a Lean Compliance methodology?
© GxPi 2012 21
Introducing GxPi’s view of Lean Compliance
Lean Compliance - the process of enhancement and measuring performance of the key quality, compliance and validation attributes whilst identifying and eliminating non-essential elements from the activities of your business
Biggest benefits will tend to be through the elimination of waste – this is where the focus should be
Value-adding Activity that transforms or adds value to the
quality / compliance operation
Make as effective as
possible
Business Value Activity that does not add value but is
necessary to the business
Reduce and Minimise
Waste Activity that uses resources but creates no
value
Eliminate and Prevent
Summary of function value categorisation
© GxPi 2012 22
Introducing GxPi’s view of Lean Compliance
EDMS Lean Compliance – some practical ideas Risk Assessment – carry out this exercise properly! Just because something was important
and tested in a historical instance, does it actually need to be done this time?
Avoiding duplication of effort through risk assessment (GAMP5) model – select an appropriate supplier, complete due diligence and clearly specify your requirements of them
Identifying what components of the EDMS are essential to be bespoke and which can adopt standard functionality offered by the customer (non-value adding)
Validation test plan – structure validation testing to use SOPs as principal source of instruction rather than labour-intensive preparation of test scripts. Manage the overall project and deliverables to suit this
Trace Matrix – spending the time to set up the index from user requirements at the start of the project and maintaining this will save considerable time and effort later on in the process
User testing should be focussed around the validation of processes and operation of the system. Let supplier do the functional system testing – and provide evidence that this has taken place
© GxPi 2012 23
Example “V-Model for” for Software Validation
Unit Specification
Design Specification
Functional Requirements
User Requirements
User Acceptance
Testing
System Testing
Unit Testing
Integration Testing
Coding
Use standardised functionality and minimise bespoke design
Use vendor testing package
Focus on processes and operations
© GxPi 2012 24
Introducing GxPi’s view of Lean Compliance
EDMS Lean Compliance – some further thoughts
Is a key project within any business
Focus on key areas of risk, such as software provider testing, requirements
specification and how the application transfers between different infrastructures
Identify all areas of project that need to be controlled / validated, such as data migration etc.
Project plan for the retirement and decommissioning of any legacy systems
Plan the project, migration and switch-over to avoid the need to maintain duplicate systems
If the EDMS does not offer the ‘basic’ compliance / functionality you would expect, is it a solution that should be considered?
© GxPi 2012 26
Conclusions
Changing type of EDMS application software means a reduced level of validation is required by the end user IF project implemented correctly
Correct use of risk-based approach will reduce validation burden
Need to have a suitable QMS in place in order to validate an EDMS
Lean compliance – look to use standard functionality where possible. Use supplier testing as part of validation and avoidance of duplicated or non value-adding effort
Hosting, such as x-docs™ Server, further reduces validation effort and cost of implementation
GxPi has a wealth of experience and resource available across the full range of CSV applications