Green Transport and the Carbon Market. Making the connection. September 2011

Green Transport and the Carbon Market. Making the connection. September 2011

Embed Size (px)

Citation preview

Page 1: Green Transport and the Carbon Market. Making the connection. September 2011

Green Transport and the Carbon Market.Making the connection.

September 2011

Page 2: Green Transport and the Carbon Market. Making the connection. September 2011

© 2011 Deloitte Touche Tohmatsu Limited

The Agenda

• The Carbon Market

• State of Energy Report - City of Joburg

• Rea Vaya BRT and the Carbon Market

• Other Initiatives – SANERI’s Green Transport Centre

2

Page 3: Green Transport and the Carbon Market. Making the connection. September 2011

1. The Carbon Market

3

Page 4: Green Transport and the Carbon Market. Making the connection. September 2011

© 2010 Deloitte Touche Tohmatsu Limited

Climate Change & its effectsKyoto Protocol

• 5,2% reduction of 1990 levels betweens 2008 & 2012

• Developed Countries have to reduce to meet reduction target

• Developing Countries can reduce and get carbon credit income

‒ Assist developed countries to meet their targets

4

Page 5: Green Transport and the Carbon Market. Making the connection. September 2011

© 2010 Deloitte Touche Tohmatsu Limited.

Carbon Market

5Source: World Bank. State and Trends of the Carbon Market. 2011

Page 6: Green Transport and the Carbon Market. Making the connection. September 2011

© 2011 Deloitte Touche Tohmatsu Limited

CDM Process

Project Idea Note (PIN)

Letter of No Objection (LoNo)

Designated National Authority

(DNA)

CDM Executive Board (CDM EB)

Project Developer

Designated Operational Entity

(DOE)

Project Developer

Designated National Authority

(DNA)

Project Design Document (PDD)

Document DecisionBody

Optional

Project Registration Validation

Project Idea

?

Designated Operational Entity

(DOE)

Host Country Rules

Verification of actual

reductions

Letter of Approval (LoA)

6

Page 7: Green Transport and the Carbon Market. Making the connection. September 2011

© 2010 Deloitte Touche Tohmatsu Limited

Some Requirements for a Carbon Project

• Project with ER potential

BE - PE = ER

• 10 Methodologies

Bus Rapid Transit

Emission Reduction by low-greenhouse emission vehicles

Introduction of bio-CNG in transportation

• Additionality

Greater emission reductions will be a direct result of the project activity

• Sustainable Development

Economic

Social

Environmental

7

• Types

Compliance Market

Voluntary Market

Page 8: Green Transport and the Carbon Market. Making the connection. September 2011

2. State of Energy Report – City of Joburg

8

Page 9: Green Transport and the Carbon Market. Making the connection. September 2011

© 2011 Deloitte Touche Tohmatsu Limited

State of Energy Report – City of Joburg

9Source: State of Energy Report - City of Joburg 2008

Page 10: Green Transport and the Carbon Market. Making the connection. September 2011

3. Rea Vaya BRT and the Carbon Market

10

Page 11: Green Transport and the Carbon Market. Making the connection. September 2011

© 2011 Deloitte Touche Tohmatsu Limited

Rea Vaya and the Carbon Market

• Largest public transport project undertaken by the City

• Plan is to “roll out 122 km mainline BRT corridors served by 150 stations and 250 km formal feeder-routes...enabling access to 80% of City’s residents”.

• Voluntary market – VCS

• Over 380,000 CO2e p/a

11

Page 12: Green Transport and the Carbon Market. Making the connection. September 2011

4. Other initiatives

12

Page 13: Green Transport and the Carbon Market. Making the connection. September 2011

© 2011 Deloitte Touche Tohmatsu Limited

SANERI’s Green Transport Centre & Others

• Vehicle conversion to alternative fuels such as:

‒LPG

‒CNG

‒LNG

‒Bio ethanol

‒Bio diesel

‒Electricity

• Gautrain

13

Page 14: Green Transport and the Carbon Market. Making the connection. September 2011

© 2011 Deloitte Touche Tohmatsu Limited

Contact Details

Sizwe KuzwayoAssistant ManagerDeloitte | Sustainability & Climate [email protected] 209 6872

Page 15: Green Transport and the Carbon Market. Making the connection. September 2011

© 2011 Deloitte Touche Tohmatsu Limited

15