59
Gorham East West Corridor Feasibility Study Public Informational Meeting October 8, 2009

Gorham East West Corridor Feasibility Study

  • Upload
    audi

  • View
    55

  • Download
    0

Embed Size (px)

DESCRIPTION

Gorham East West Corridor Feasibility Study. Public Informational Meeting October 8, 2009. Public Meeting Agenda. Welcome and Introductions Study Background, Purpose, and Overview Economic Outlook Linking Land Use and Transportation Planning - PowerPoint PPT Presentation

Citation preview

Page 1: Gorham East West Corridor Feasibility Study

Gorham East West Corridor Feasibility Study

Public Informational MeetingOctober 8, 2009

Page 2: Gorham East West Corridor Feasibility Study

Public Meeting Agenda• Welcome and Introductions

• Study Background, Purpose, and Overview

• Economic Outlook

• Linking Land Use and Transportation Planning

• Input Session: Benefits, opportunities and drawbacks of projected growth

• Study Findings To-Date

• What’s Next

Page 3: Gorham East West Corridor Feasibility Study

Gorham East West Feasibility Study

• Why are we here– Discuss what this Study needs to achieve– Provide important information that affects you

• Why conduct this Study?– Serious congestion and safety issues– Regional growth– Four communities looking ahead: worked with

Legislature to request Study

Page 4: Gorham East West Corridor Feasibility Study

Gorham East West Feasibility Study

• Why are you here– Want public input on information presented– Have we overlooked or missed anything

Page 5: Gorham East West Corridor Feasibility Study

Background• Congestion likely to increase/safety issues

• Over last 10 years - fastest growing region in Maine

• Gorham Bypass one piece of the solution

• A range of additional solutions likely

• This is not JUST a transportation study - looking at land use/land development patterns is key to finding the right solutions

Page 6: Gorham East West Corridor Feasibility Study

6

Study Purpose

• Evaluate feasible transportation strategies and corresponding land use actions

• Consistent with federal and state requirements: NEPA and STPA

• Include all affected communities and relevant stakeholders

• Open and unbiased process• No predetermined outcome• Purpose and Need Statement developed by

stakeholders outlines goals and values

Page 7: Gorham East West Corridor Feasibility Study
Page 8: Gorham East West Corridor Feasibility Study

Study Overview

• Started in Spring of 2009• 15-month Study (to June 2010)• First 6 months

• Collecting and summarizing data• Working with Steering and Advisory Committees• Developed Purpose and Need Statement

• Rest of 2009:• Work with communities and committees to develop

growth scenarios and measures of effectiveness

Page 9: Gorham East West Corridor Feasibility Study

Study Overview (cont.)

• January/February 2010• Brainstorm all possible transportation and land

use strategies (solutions)

• March-June 2010• Analyze transportation and land use strategies• Identify recommended strategy(s)

Page 10: Gorham East West Corridor Feasibility Study

Employment-Population Changes in the South Portland-

Scarborough-Gorham-Westbrook Region

A Preliminary Outlook

Page 11: Gorham East West Corridor Feasibility Study

Cumberland County Population

Page 12: Gorham East West Corridor Feasibility Study

York County Population

Page 13: Gorham East West Corridor Feasibility Study

Total Population Growth

14% 38% 24% 31%

Page 14: Gorham East West Corridor Feasibility Study

Employment

Page 15: Gorham East West Corridor Feasibility Study

Total Employment Growth

30% 22% 25% 11%

Page 16: Gorham East West Corridor Feasibility Study

Major Economic Development Issues

• The Most Jobs: Retail and Services– The Retail Hangover– Professional and technical services– Health:

• Ambulatory Health Services• Social Assistance

• Fastest Growing – Amusement and recreation services– Social assistance – Museums– Nursing/Ambulatory Health

Page 17: Gorham East West Corridor Feasibility Study

Three Keys to Transportation-Economic Growth Link

• Access – ease of moving goods and people

• Agglomeration - benefits that occur when locating near each other

• Avoided Costs – these include:– Cost of utilities– Cost of transportation/moving goods – Local costs

Page 18: Gorham East West Corridor Feasibility Study

Gorham

Scarborough

Westbrook

South Portland

Where Jobs are Located

Page 19: Gorham East West Corridor Feasibility Study

Gorham

Scarborough

Westbrook

South Portland

Trade, Health, Professional-Tech Services

Professional-Technical Services

Trade

Health-Social Assistance

Where Key Jobs are Located

Page 20: Gorham East West Corridor Feasibility Study
Page 21: Gorham East West Corridor Feasibility Study

Planning for Land Use and Transportation

Page 22: Gorham East West Corridor Feasibility Study

Why Plan for Land Use and Transportation?

• First, it makes sense: managing land use can reduce demand on highways

• Second, Maine’s laws require careful consideration of how development will affect and be affected by “significant” transportation projects

Page 23: Gorham East West Corridor Feasibility Study

Does Managing Land Use Make a Difference?

• Transportation is simply a way of connecting one land use to another: home to work, business to warehouse, skier to ski resort, worker to lunchtime restaurant

• Over last 40 years, trend has been to separate one type of land use from another and put more distance between them

• This pattern has contributed to:• highway demand and congestion, • reduced choices in feasible ways of getting from one

place to another, and,• the conversion of thousands of extra acres of rural land

into development

Page 24: Gorham East West Corridor Feasibility Study

Land Use Decisions Do Matter

Certain arrangements of land use can: • Reduce traffic volumes by 20% - 30% compared with a

spread-out pattern of development• Improve safety and traffic flow by managing access onto

and off the roads• Increase choice in how to move about – walking,

bicycling, ride-sharing, transit as well as single-occupancy auto

• Help preserve rural and scenic character of highways (by avoiding excessive commercial strips)

Page 25: Gorham East West Corridor Feasibility Study

An Example – Reduced need for Autos

Page 26: Gorham East West Corridor Feasibility Study

Why Plan for Land Use and Transportation…together?

• The State’s major metropolitan economy will continue to put pressure on the land market, rural character, and the transportation system

• While land use is regulated locally, the market operates regionally

• Each community has something to gain and lose –

fiscally, character of community – from the decisions of neighbors

• This region has begun to think about the transportation – land use connection– PACTS “Destination Tomorrow”– Revised zoning approaches– Leadership in transit TIF legislation

Page 27: Gorham East West Corridor Feasibility Study

The approach to measuring effect of land use

• Where will next 50,000 jobs & 50,000 homes go, and how will this affect the transportation system?

• Study Approach to include two land use scenarios:

• Low Density Scenario: An extension of the last 25 years.• Land Use/Transportation Scenario: Evaluate the results of

adopting land use policies and infrastructure investments that follow best practices with respect to the 4 Ds (density, distance, design, diversity)

• Evaluated by “measures of effectiveness”

Page 28: Gorham East West Corridor Feasibility Study

How decide on an “alternative” land use scenario?

• Technical workshops with community planners and leaders and Steering Committee

• Review by Advisory Committee• Review by Public

Page 29: Gorham East West Corridor Feasibility Study

Audience Feedback

• Question for You:– In your opinion, is growth in your

community a problem or a benefit?• Is the problem the amount of growth or the

location of growth?• Specific examples are welcome

Page 30: Gorham East West Corridor Feasibility Study

Suggested Protocol

–NO SOLUTIONS!–Please state your name, town,

organization if applicable–Please speak into the

microphone

Page 31: Gorham East West Corridor Feasibility Study

Study Findings to Date

What did we collect and why??

32

Page 32: Gorham East West Corridor Feasibility Study

33 33

Study Findings Categories

• Natural and Physical Resources• Land Use• Transportation• Other

Page 33: Gorham East West Corridor Feasibility Study

Natural and Physical Resources

Page 34: Gorham East West Corridor Feasibility Study

1

1

2

Rare Species1.New England Cottontail2.Upland Sandpiper

Page 35: Gorham East West Corridor Feasibility Study

Rare Species1.New England Cottontail2.Wood Turtle3.Spotted Turtle

3

1

2

Page 36: Gorham East West Corridor Feasibility Study

Rare Species1.New England Cottontail2.Upland Sandpiper

1

13

5

4

1 6

1

1

7

1

1

3. Blanding’s Turtle4. Eastern Box Turtle5. Least Bittern

6. Saltmarsh Sharp-tailed sparrow7. Harlequin Duck

Page 37: Gorham East West Corridor Feasibility Study

Rare Species1.New England Cottontail

1

Page 38: Gorham East West Corridor Feasibility Study
Page 39: Gorham East West Corridor Feasibility Study
Page 40: Gorham East West Corridor Feasibility Study
Page 41: Gorham East West Corridor Feasibility Study

Land Use

Page 42: Gorham East West Corridor Feasibility Study
Page 43: Gorham East West Corridor Feasibility Study
Page 44: Gorham East West Corridor Feasibility Study
Page 45: Gorham East West Corridor Feasibility Study
Page 46: Gorham East West Corridor Feasibility Study
Page 47: Gorham East West Corridor Feasibility Study
Page 48: Gorham East West Corridor Feasibility Study

Transportation

Page 49: Gorham East West Corridor Feasibility Study
Page 50: Gorham East West Corridor Feasibility Study
Page 51: Gorham East West Corridor Feasibility Study
Page 52: Gorham East West Corridor Feasibility Study
Page 53: Gorham East West Corridor Feasibility Study
Page 54: Gorham East West Corridor Feasibility Study
Page 55: Gorham East West Corridor Feasibility Study
Page 56: Gorham East West Corridor Feasibility Study
Page 57: Gorham East West Corridor Feasibility Study
Page 58: Gorham East West Corridor Feasibility Study

Other DataData Status

PACTS Regional Bicycle and Pedestrian Plan To be completed Fall 09

Regional Bus Routes Study Begin Fall 09

Regional Transit Map and Timetables COMPLETED!!

Regional Transportation Plan (Destination Tomorrow) 2006 Study being updated, complete by June 2010

Portland Peninsula Transit Study COMPLETED !!

Maine State Rail Plan Ongoing – to be completed Fall 09/Early 10

Mountain Division Branch – Stimulus Application COMPLETED !!

Page 59: Gorham East West Corridor Feasibility Study

What’s Next?• Land Use workshops this Fall to prepare for next

Public Meeting

• Public Meeting in early 2010 to review scenarios and how we measure them (MOEs)

• Public Meeting in Spring 2010 to review initial findings and recommendations

• Review data and COMMENT via:

www.gorhamcorridor.org