18
Goldsborough Goldsborough Dam Dam Removal Removal Near Shelton, Washington Near Shelton, Washington Compiled by Compiled by Ken Ken Kozmo Kozmo Bates Bates Doug Lantz, Tetra Doug Lantz, Tetra- Tech Tech Jim Fraser, WDFW Jim Fraser, WDFW Constructed Constructed 1921 1921

Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

Embed Size (px)

Citation preview

Page 1: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

1

GoldsboroughGoldsborough DamDam RemovalRemovalNear Shelton, Washington Near Shelton, Washington

Compiled byCompiled byKen Ken KozmoKozmo BatesBatesDoug Lantz, TetraDoug Lantz, Tetra--TechTechJim Fraser, WDFWJim Fraser, WDFW

ConstructedConstructed 19211921

Page 2: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

2

caca 19291929

AprilApril, 20012001

Page 3: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

3

MayMay, 20012001

Page 4: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

4

Page 5: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

5

SeptemberSeptember, 20012001

GoldsboroughGoldsborough CreekCreek

•• Upstream of damUpstream of dam–– 60 sq miles of watershed60 sq miles of watershed–– 24 miles excellent low 24 miles excellent low

gradient rearing habitatgradient rearing habitat•• Expected anadromous species Expected anadromous species

adult passageadult passage–– Coho Coho -- 2,0002,000–– Chum Chum -- 10,00010,000–– Chinook Chinook –– (threatened)(threatened)–– Steelhead, seaSteelhead, sea--run cutsrun cuts

Page 6: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

6

GoldsboroughGoldsborough DamDam

• Initially built in 1921 for power, RM 2.3• 1 mile upstream of City of Shelton• Initially 8 – 14 feet high• Built on Kitsap clay – channel incision accelerated by

bed material depletion• Damage, not useful after 1996 flood damage• 35 feet high, 100 feet wide when removed in 2001

DamDam RemovalRemoval PartnersPartners

Corps of Engineers• Design• Section 206 - 65%

cost $2.8M• Final design by Tetra-

Tech

Washington Department of Fish and Wildlife

• Sponsor• $1.4M - Legislative

appropriation

Simpson Timber Company• Owner-operator by MOU with state• $148k dam removal and real estate• Conservation District

Page 7: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

7

DesignDesign / Construct/ Construct IssuesIssues

• Passage for all species, life stages• Rigid channel chosen

– Minimize flood hazard risk in City of Shelton – Manage headcut potential

• Kitsap formation clay• Wetlands• Railroad trestle• Cost

Railroad Trestle

Existing Dam

Wetland

Wetland

Weir Structure

Begin Project

End Project

Steep Banks

Kitsap Layer

Natural Gas line Crossing

Page 8: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

8

Project slope = 0.021

Cut: 27,000 cy

Fill: 40,000 cy

Profile of Goldsborough Creek

Construction bypassConstruction bypass2000 feet300 cfs capacity

summer flood of recordDownstream juvenile passage

Page 9: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

9

SoldierSoldier PilesPiles35 weirs35 weirs527 piles 527 piles -- Drive / drillDrive / drill

PrecastPrecast concreteconcrete panelspanels

Page 10: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

10

FishFish passagepassage weirweir crestcrest– cast in place, streambed

shape

DebrisDebris

Page 11: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

11

BankBank protectionprotection –cut and fill slopescut and fill slopes

Page 12: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

12

UpstreamUpstream headcut headcut ––At top of projectAt top of project

88.0

89.0

90.0

91.0

92.0

93.0

94.0

95.0

96.0

0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0

2001 Pre-project

2002(Weir)

330’ above project330’ above project

90

91

92

93

94

95

96

97

0.0 10.0 20.0 30.0 40.0 50.0 60.0

2001 Pre-project

2002

Page 13: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

13

1360’ 1360’ above above projectproject

102

103

104

105

106

107

108

109

110

111

0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0

2001 Pre-project

2002

Project slope = 0.021

Profile of Goldsborough Creek

Page 14: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

14

PassagePassage conditionsconditionsnear fish passage near fish passage

design flowdesign flow

TenTen--Year Monitoring PlanYear Monitoring Plan

• Pre and post smolt monitoring

• Downstream passage through the project

• Fish passage snorkeling observations, radio tracking if necessary

• No juvenile passage monitoring

• Construction compliance -survey, veg plats, photos

Page 15: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

15

Habitat MonitoringHabitat Monitoring

• Pre-project and post (?) habitat evaluation – upstream, downstream

• TFW ambient monitoring protocol – 5 km

• Benthic Index of Biotic Integrity • Spawner surveys

O&M AgreementO&M Agreement

• Duration: for life of project – 100 years• Annual and post-flood inspections and surveys

– fish passage– Habitat features

• Repair as necessary• $7500 / year funded by Simpson Timber Company

Page 16: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

16

MonitoringMonitoringcamerascameras

Project dedication dayProject dedication day

Page 17: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

17

Page 18: Goldsborough Dam Removal Near Shelton, …rrnw.org/wp-content/uploads/Bates_Ken.pdfGoldsborough Dam Removal Near Shelton, Washington Compiled by Ken Kozmo Bates Doug Lantz, ... –

18

4 days later4 days later

1010--yr flood eventyr flood event