50
Bryon Ringley, PE Travis White, PE, SI April 2013 5 th Avenue Dam Removal & Lower Olentangy River Ecosystem Restoration Project

5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Bryon Ringley, PE

Travis White, PE, SI

April 2013

5th Avenue Dam Removal & Lower Olentangy River

Ecosystem Restoration Project

Page 2: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Presentation Overview

Project Background History Project Partners Project Phases

Design Report Preliminary Design Permitting Final Design Construction

Mussel Rescue Photos

Questions & Discussion

West Milton Dam, Pre-Construction

West Milton, Ohio

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Page 3: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

History of 5th Avenue Dam

1935: Dam constructed

2002 – 2004: EPA issues consent decrees

2004 – 2006: City and EPA agree to remove dam

2006 – 2007: USACE feasibility study

2008 – 2011: Stantec completes engineering

2011: City receives OEPA WRRSP funding

2012: Environmental covenants signed & construction begins

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Page 4: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Project Partners - $6.9M

City of Columbus

The Ohio State University

Ohio Environmental Protection

Agency

Friends of the Lower Olentangy

Watershed (FLOW)

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Page 5: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Project Phases

Phase 1 – Design Report (2009-10)

Phase 2 – Design & Permitting (2010-11)

Phase 3 – Construction (2012-14)

Phase 4 – Monitoring (2014-19)

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Page 6: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Phase 1 – Design Report

Ecological Surveys

H&H Modeling

Sediment Management

Hydrogeological Conditions

Structural / Geotechnical Evaluations

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Page 7: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Phase 1 – Ecological Surveys

Qualitative Habitat Evaluation Index (QHEI)

Average Score Free Flowing Portions of River = 68.5 (Warm Water Habitat)

Average Score Area Impounded by Dam = 30.8 (Impaired)

Freshwater Mussels

11 species in Project Area

3 Ohio Species of Concern

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Page 8: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 1 – H&H Modeling

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

HEC-RAS (v 4.0.0) Model

Predicted Decrease in WSEs for all recurrence intervals

No CLOMR Required

Page 9: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 1 – Sediment Management

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Channel bed predominantly sand with clean gravel and cobble

Sediment deposition near left and right banks

Recommended 2-stage

lowering of dam

Page 10: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 1 – Hydrogeological Conditions

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Sand and gravel aquifer beneath project area

Dynamic relationship

between groundwater and

river stage

Image by Koreny (1996) “Hydrology of a

Constructed Riparian Wetland System

Characterization and Predictive Modeling”

Page 11: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 1 – Structural / Geotechnical Evaluations

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

12 geotechnical borings

Structural evaluation of 9 bridges, 20 buildings, and multiple sewer

outfalls

Findings: Dam removal and

lowering of normal water

elevations will have no

significant impact to structures

Sewer outfalls to be

incorporated into final design

Page 12: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Phase 1 – Future Conditions Renderings

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Immediately after restoration Five years after restoration

Twenty five years after restoration

Page 13: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 2 - Design

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Goals

Remove 5th Avenue Dam & Restore Olentangy River

Improve water quality & aquatic habitat

Must be aesthetically pleasing

No negative impacts to existing bridges, utilities, bikepath,

sewer outfalls

No rise in base flood elevations

Page 14: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Phase 2 - Design

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

DA mi2

Ab

kf ft

2

Page 15: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Phase 2 - Design

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Page 16: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 2 - Design

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

US of Dam 2345Ground Points Bankfull Indicators Water Surface Points

Ele

vation (

ft)

Horizontal Distance (ft)

700

710

720

730

740

750

0 500 1000 1500 2000

W b k f = 4 0 1 . 8 D b k f = 2 . 1 2 A b k f = 8 5 0 . 9

Typ RifTyp Rif Bankfull Indicators Water Surface Points Typ Rif w/o IB

Ele

vation (

ft)

Horizontal Distance (ft)

710

720

730

740

-100 0 100 200 300 400 500 600

W b k f = 1 7 8 D b k f = 4 . 6 6 A b k f = 8 2 9 . 7

w/d = 22

w/d = 38

w/d = 200

Page 17: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 2 - Design

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Page 18: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 2 - Design

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Page 19: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 2 - Design

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Page 20: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Phase 2 – Permitting

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

• Floodplain Permit – City of Columbus

• LOMR – FEMA (after construction)

• 404/401 – US Army Corps of Engineers / OEPA

• NWP 27 • US Fish & Wildlife • ODNR • OHPO

• ODOT ROW Permit

• ODNR Dam Safety

• Environmental Covenants (tied to funding through OEPA)

Page 21: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Phase 3 – Construction

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

• Dam Removal

• Mussel Rescue

• Construction of NCD Structures

• Constructed Riffle

• Toe Wood

• Live Branch Layering

• Landscaping

Page 22: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Phase 3 – Dam Removal

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

August 29, 2012

Page 23: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Presentation

Overview

Phase 3 – Dam Removal

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

August 29, 2012

Page 24: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Dam Removal

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

August 30, 2012

Page 25: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Dam Removal

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

August 31, 2012

Page 26: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Dam Removal

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

September 4, 2012

Page 27: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Dam Removal

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

September 5, 2012

Page 28: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Dam Removal

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

September 6, 2012

Page 29: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Mussel Rescue

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Page 30: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Mussel Rescue

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Species Common Name

North

Project

Limit to

Lane

Bridge

Lane

Bridge to

Woody

Hayes

Bridge

Woody

Hayes

Bridge to

Pedestrian

Bridge

Pedestrian

Bridge to

Herrick

Bridge

South

King Ave

Bridge to

Dam

Directly

Below Dam

Under 315

Bridge Total

Elktoe 2 3 21 26

Threeridge 113 317 143 1 2 56 337 969

Cylindrical papershell 1 1

Wabash pigtoe 5 26 22 53

Plain pocketbook 32 56 10 2 12 63 175

Wavy-rayed lampmussel 12 15 4 1 32

Fat mucket 569 614 322 8 48 7 31 1599

White heelsplitter 617 509 732 41 261 30 204 2394

Fluted shell 31 40 2 1 1 5 19 99

Round pigtoe 1 2 3

Kidneyshell 3 6 1 10

Giant floater 167 196 306 21 73 19 37 819

Mapleleaf 84 181 220 2 5 9 64 565

Creeper 5 5 2 4 5 21

Lilliput 8 8

Paper pondshell 142 108 401 68 17 1 2 739

Unionid Total 1783 2074 2175 142 409 146 784 7513

Species Richness 14 13 14 7 8 10 11 16

Page 31: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Constructed Riffle

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

December 17, 2012

Page 32: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Constructed Riffle

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

December 17, 2012

Page 33: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Constructed Riffle

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

December 17, 2012

Page 34: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Constructed Riffle

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

December 17, 2012

Page 35: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Constructed Riffle

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

January 2, 2013

Page 36: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Toe Wood

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

December 17, 2012

Page 37: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Toe Wood

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

December 17, 2012

Page 38: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Toe Wood

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

December 31, 2012

Page 39: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Toe Wood

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

January 2, 2013

Page 40: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Toe Wood

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

January 2, 2013

Page 41: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Live Branch Layering

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

January 7, 2013

Page 42: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Live Branch Layering

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

January 7, 2013

Page 43: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Live Branch Layering

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

January 7, 2013

Page 44: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Live Branch Layering

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

January 10, 2013

Page 45: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Live Branch Layering

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

January 10, 2013

Page 46: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Live Branch Layering

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

January 10, 2013

Page 47: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Live Branch Layering

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

January 29, 2013

Page 48: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 3 – Live Branch Layering

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

February 22, 2013

Page 49: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Phase 4 - Monitoring

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

5 years of post-construction monitoring required by USACE

• QHEI – Years 1, 3, 5

• IBI & ICI – Years 3, 5

• ORAM – Years 1, 3, 5

• Geomorphology Survey – Years 1, 5

• Floodplain & Wetland Plantings ≥ 80% Native Ohio,

≤ 5% Invasive Species at end of Year 5

Page 50: 5th Avenue Dam Removal & Lower Olentangy River Ecosystem ... · 5th Avenue Dam Removal & Olentangy River Ecosystem Restoration Project 2013 OWEA WATERSHED WORKSHOP US of Dam 2345

Questions & Discussion

5th Avenue Dam Removal & Olentangy River Ecosystem Restoration

Project

2013 OWEA WATERSHED WORKSHOP

Bryon Ringley, PE

Senior Principal

[email protected]

Travis White, PE, SI

Senior Project Engineer

[email protected]

March 28, 2013