18
GLOBAL STATUS OF CCS 2015-2016: A WATERSHED YEAR FOR CCS? Andrew Purvis, GM EMEA 11 th May 2015

GLOBAL STATUS OF CCS

Embed Size (px)

Citation preview

Page 1: GLOBAL STATUS OF CCS

GLOBAL STATUS OF CCS 2015-2016: A WATERSHED YEAR FOR CCS?

Andrew Purvis, GM EMEA 11th May 2015

Page 2: GLOBAL STATUS OF CCS

The Global CCS Institute

!  We are an international membership organisation.

!  Offices in Washington DC, Brussels, Beijing and Tokyo. Headquarters in Melbourne.

!  Our diverse international membership consists of:

o  governments,

o  global corporations,

o  small companies,

o  research bodies, and

o  non-government organisations.

!  Specialist expertise covers the CCS/CCUS chain.

OUR MISSION To accelerate the

development, demonstration and deployment of CCS

globally.

1 Authoritative knowledge

sharing 2 Fact-based, influential

advice and advocacy

3 Create

favourable conditions to implement

CCS

Page 3: GLOBAL STATUS OF CCS

Agenda

•  CCS is necessary •  CCS is real •  An EU perspective

Page 4: GLOBAL STATUS OF CCS

Fossil fuel demand growing and reserves robust

Source: BP Statistical Review of World Energy 2014

Fossil fuel proved reserves:

6 trillion barrels of oil equivalent

Reserves to production ratio:

~75 years

Source: IEA World Energy Outlook, 2014 (New policies scenario)

Page 5: GLOBAL STATUS OF CCS

CCS is a vital element of a low-carbon energy future

Source: IEA Energy Technology Perspectives (2015)

A transformation in how we generate and use energy is needed

Gt C

O2 e

mis

sion

s

6DS

2DS

Page 6: GLOBAL STATUS OF CCS

Mitigation cost increases in scenarios with limited availability of technologies

Source: IPCC Fifth Assessment Synthesis Report, November 2014.

Percentage increase in total discounted mitigation costs (2015-2100) relative to default technology assumptions – median estimate

450$ $$$$$138%$ $$$$$$$7%$ $$$$$$$$6% $$$$$$$$64%

2100$concentra3ons$(ppm$CO2eq)$

no$CCS$ nuclear$$phase$out$

limited$$solar/wind$

limited$$bioenergy$

4/11$ 8/11$ 8/11$ 8/11$

$$Symbol$legend$–$frac3on$of$models$successful$in$producing$scenarios$(numbers$indicate$number$of$successful$models)$

All$models$successful$

Between$80$and$100%$of$models$successful$

Between$50$and$80%$of$models$successful$

Less$than$50%$of$models$successful$

Page 7: GLOBAL STATUS OF CCS

CCS is real

Current operational projects have around 27

Mtpa of CO2 capture capacity

Page 8: GLOBAL STATUS OF CCS

Large-scale CCS projects by region or country

North America, China and UK (with 6) have the most projects

Americas$ 5 6 6 10 27

Early planning$

Advanced planning$ Construction $ Operation$ Total $

China $ 7 4 - - 11

Europe$ 3 4 - 2 9

Gulf Cooperation Council$ - - 2 - 2

Rest of World$ 4 - 1 1 6

Total$ 19 14 9 13 55

Page 9: GLOBAL STATUS OF CCS

2015

EOR

Dedicated Geological

Power Generation

Actual and expected operation dates for projects in operation, construction or advanced planning

2014-2015 is a watershed period for CCS – it is a reality in the power sector and additional project approvals are anticipated

Operating 2017 2016

Hydrogen production

Natural gas processing

Chemical production

Iron and steel production

Synthetic natural gas

Fertiliser production

Oil refining

2018 2019 2020

= 1Mtpa of CO2 (areas of circle are proportional to capacity)

Coal-to-liquids

* Injection currently suspended

Boundary Dam

Medicine Bow

Kemper Petra Nova

ROAD

Sargas Texas

Sinopec Shengli

TCEP Peterhead

White Rose

HECA

Don Valley

Illinois Industrial Yanchang

Sinopec Qilu

Abu Dhabi

ACTL Agrium Coffeyville

Century Plant

Enid Fertilizer

Val Verde

Air Products

Lost Cabin

Lula

Snøhvit Sleipner

Shute Creek

In Salah*

Uthmaniyah

Quest

Gorgon Spectra

ACTL Sturgeon

Petro China Jilin

Great Plains

FutureGen 2.0

Page 10: GLOBAL STATUS OF CCS

2015 -2016: A year of action

ROAD

Quest ACTL Agrium Decatur Uthmaniyah

US China Projects Peterhead White Rose

Abu Dhabi CCS Kemper County

Operational 2016

FID 2015

Operational 2015

•  COP 21 •  IEA Ministerial •  CSLF Ministerial •  CEM Ministerial

Page 11: GLOBAL STATUS OF CCS

New horizons Realising the portfolio

Widespread deployment

2010 – 2015 2016 – 2020 2020 →

A pathway to CCS deployment

Decisions made at start of decade are now

bearing fruit

2014 and 2015 are watershed years for CCS

Ensure conditions are supportive for projects in advanced planning

Decisions and actions required now to lay policy,

legal and infrastructure foundations for post-2020

project portfolio

Page 12: GLOBAL STATUS OF CCS

Strong policy drives investment

Data source: Bloomberg New Energy Finance as shown in IEA presentation “Carbon Capture and Storage: Perspectives from the International Energy Agency”, presented at National CCS week in Australia, September 2014.

20

1929

0

400

800

1200

1600

2000

CCS All clean energy

Clean energy investment between 2004-2013 USD billion

•  Scale of renewables investment is instructive

•  CCS has not enjoyed commensurate policy support

•  EOR has provided impetus in North America

•  Policy parity is essential

•  How do we get CCS onto a similar curve?

Page 13: GLOBAL STATUS OF CCS

ADVANCED CCS PROJECTS - EUROPE Snøhvit

Peterhead CO2 cc: 1 Mpta Power sector

Sleipner

ROAD CO2 cc: 1 Mtpa Power sector

Don Valley CO2 cc: 1 Mtpa Power sector

White Rose CO2 cc: 2 Mtpa Power sector

Operate

Advanced

12 in total 14 in total

Early 19 in total

Page 14: GLOBAL STATUS OF CCS

•  Progress in Europe on CCS demonstration projects has been slow.

•  In contrast with Europe, in other parts of the world projects in operation or construction phase and the pipeline has increased – led by North America (Boundary Dam, Kemper County, Petra Nova) 11 projects in China

Are there grounds for optimism?

ADVANCED CCS PROJECTS – EUROPE

Page 15: GLOBAL STATUS OF CCS

EU CCS POLICY DEVELOPMENTS - AN OPPORTUNITY

•  2030 Framework •  Energy Union •  CCS Directive Review •  Innovation Fund (NER400) •  Initiatives in the EP •  UK CCS support and projects •  COP 21 Paris

•  New Commission •  New Parliament •  UK support

Page 16: GLOBAL STATUS OF CCS

WHAT NEEDS TO BE DONE

•  The EC should •  Engage with Member States on CCS through 2050

decarbonisation plans •  Deliver ETS Reform, including creating a

modernisation/innovation fund to fund CCS projects •  Support the development of hubs, clusters, and

Common User Infrastructure •  Recognise Industrial and Part Chain CCS project in

NER400 •  Ensure key European projects cross the finish line

Page 17: GLOBAL STATUS OF CCS

IN SUMMARY….

•  CCS is an essential mitigation technology •  2015 is year of action globally, and represents a

significant opportunity for CCS •  While EU progress has been slow, there is cause for

optimism –  We have supporters in the EC, EP and in the UK –  The EU CCS Community is aligned –  There are policy opportunities to promote delivery of CCS

projects

Page 18: GLOBAL STATUS OF CCS

GLOBALCCSINSTITUTE.COM