5
Gerry Murphy, TIE, Level 2 Rope Access 8 Blair Athol Wynd, Carfin, Motherwell, Scotland ML1 4FT | Mobile 07825711261 Home 01698 269926 / Email: [email protected] Professional Profile: I am a very safety conscious, flexible, reliable and motivated individual who has over 29 years of experience in the application of all types of Thermal Insulation systems to various Plant and Equipment, be it Cryogenic, Acoustic or High temperature work Insulation Systems. I am also skilled in the development and fabrication of sheet Metal having worked in many on site fabrication workshops up and down the country from the BP Sullom voe terminal in Shetland to the Fawley refinery in Southampton. I am a practical person with good leadership qualities who uses his initiative to achieve deadlines and is able to work safely under pressure, I am a good Team player, but also enjoy working on my own comfortably when required, with excellent communication skills and inter-personnel skills, friendly and approachable. Present Certificates / Qualifications Held Time Served Thermal Insulation Engineer | Cardonald Collage Glasgow Rope Access level 2 Level 2 Iccor Certified Insulation Inspector Qualified Level I Nace coating Inspector Qualified Offshore Survival, Offshore Medical, Mist Vantage card Number: WAH Unit 2

Gerry Murphy Updated CV

Embed Size (px)

Citation preview

Page 1: Gerry Murphy Updated CV

Gerry Murphy, TIE, Level 2 Rope Access8 Blair Athol Wynd, Carfin, Motherwell, Scotland ML1 4FT | Mobile 07825711261 

Home 01698 269926 / Email:  [email protected]

Professional Profile:I am a very safety conscious, flexible, reliable and motivated individual who has over 29 years of experience in the application of all types of Thermal Insulation systems to various Plant and Equipment, be it Cryogenic, Acoustic or High temperature work Insulation Systems.

I am also skilled in the development and fabrication of sheet Metal having worked in many on site fabrication workshops up and down the country from the BP Sullom voe terminal in Shetland to the Fawley refinery in Southampton.

I am a practical person with good leadership qualities who uses his initiative to achieve deadlines and is able to work safely under pressure, I am a good Team player, but also enjoy working on my own comfortably when required, with excellent communication skills and inter-personnel skills, friendly and approachable.

Present Certificates / Qualifications HeldTime Served Thermal Insulation Engineer | Cardonald Collage Glasgow

Rope Access level 2

Level 2 Iccor Certified Insulation Inspector Qualified

Level I Nace coating Inspector Qualified

Offshore Survival, Offshore Medical, Mist

Vantage card Number:

WAH Unit 2

Experienced in the following Application of various Insulations:Terostat, FoamGlas, Pyrogel, Cryogel, Armaflex, Rockwool, Ceramic Wool, Calcium silicate, Ulva Shield, Fiba Roll, Fiba Clad, All types of Metal Cladding, Various refractory Cement Coatings, etc.

CUI TEAM LEAD/ROPE ACCESS | BILFINGER SALAMIS |BRITANNIA PLATFORM: 2008 - PRESANTResponsible for all Platform CUI Work scopes from line surveys, material take offs and execution of all Insulation Removal and Application. All Insulation QAQC reporting.

Platform Shutdown Insulation works.

Insulation Surveys.

General Platform Insulation Requirements.

Page 2: Gerry Murphy Updated CV

ROPE ACCESS T.I.E. | RBG | BUZZARD HOOK UP & VARIOUS PLATFORMS:2006 - 2008All types of Insulation work on a variety of Oil and Gas Platforms.

CUI campaigns and General Platform Insulation work using Rope access.

T.I.E. | HERTEL INSULATION |GRANGEMOUTH REFINERY: 2003 - 2006Involved in Large CUI campaign on KG Plant which involved removal and replacement of Insulation to various Cryogenic Plant and Equipment.

Various Refinery shutdown campaigns.

Sheet metal fabrication to CUI specifications and application of Insulation and Cladding to Pipework, Frac Columns, Vessels and Tanks.

Hertel special project team member which undertook the execution of all new On Site Insulation contract work.

T.I.E. | HERTEL INSULATION | CONOCO REFINERY, CLEETHORPS: 2003Involved in Large Refinery Shutdown Programme which involved removing and replacing Insulation on various Plant and Equipment Including Cryogenic applications.

Also the fabrication of sheet Metal to CUI specifications.

T.I.E. | CAPE INDUSTRIAL SERVICES | FAWLEY REFINERY, SOUTHHAMPTON:2002 - 2003Involved in Large Refinery Shutdown Programmes which involved removing and replacing Insulation on various Plant and Equipment Including Cryogenic applications.

Also the fabrication of sheet Metal to CUI specifications.

T.I.E. | CAPE INDUSTRIAL SERVICES | SULLOM VOE OIL TERMINAL, SHETLAND:2001 - 2002Involved in Gas Plant Over Hall Shutdown Programme which involved removing and replacing Insulation on various Plant and Equipment Including Cryogenic applications

Also the fabrication of sheet Metal to CUI specifications.

T.I.E. | CAPE INDUSTRIAL SERVICES | GRANGEMOUTH REFINERY: 2001Involved in COD 1,2 & 3 Plant Shutdown, Removal and replacement of Various Insulation Systems on a range of Cryogenic and high temp Plant and equipment.

T.I.E. | HERTEL INSULATION | GRANGEMOUTH REFINERY: 1999 - 2001Involved in PEX–PP3 Plant Constructions, application of Insulation to various Plant and Equipment Including Cryogenic Applications Also the fabrication of sheet Metal to CUI specifications.

Page 2

Page 3: Gerry Murphy Updated CV

T.I.E. | CAPE INDUSTRIAL SERVICES | SULLOM VOE OIL TERMINAL, SHETLAND: 1997 - 1999Involved in the Application of Insulation to the Schehallion pipeline system, and the Fabrication of sheet metal to BP CUI specifications.

T.I.E. | C&D INSULATION | LONGANNET, COCKENZIE & IRONBRIDGE POWER STATIONS: 1996 -1997Involved in Large Power Station Shutdowns, removal and replacement of various Insulations to Boiler walls, Pipework, Burner fronts and dead spaces.

T.I.E. | CHEIFTAIN INSULATION | BAE SYSTEMS SHIPYARD, GLASGOW: 1995 - 1996 Involved in the Application of various Insulation systems to Underdecks, Pipework and HVAC Vent work ducting during the construction of HMS Ocean and the Sea Launch Commander Ships.

T.I.E. | BPS OFFSHORE | EAST BRAE OIL PLATFORM HOOK UP: 1994 - 1995All types of Insulation work on a variety of Oil and Gas Platforms.

CUI campaigns and General Platform Insulation work using Rope access.

T.I.E. | BPS OFFSHORE| FLOTTA OIL TERMINAL, SHETLAND: ORKNEY ISLANDS 1990 - 1994Gas Plant 1 & 2 Over Hall which involved removing and replacing Insulation on various Plant and Equipment Including Cryogenic applications and high temp work.

Also the fabrication of sheet Metal to CUI specifications.

APPRENTICE T.I.E. | HAT CONTRACTING SERVICES| MOSSMORRAN GAS PLANT, VARIOUS CONSTRUCTION SITES IN CENTRAL SCOTLAND, CARDONALD COLLAGE: 1997 -1990Involved in the Application of Insulation to Pipework, Columns and Vessels in the Shell Mossmorran Industrial Gas Plant. Also the application of various Insulation systems to Pipework and Vent work on a large number of locations in central Scotland such as the Construction of Hospitals, schools and hotels etc.

INTERESTS: Snowboarding, Gym, Fly-fishing and Football.

REFERENCES AND ALL CERTIFICATION:On request

Page 3

Page 4: Gerry Murphy Updated CV

Page 4