Gas European Network Code Implementation. May 2013 Lisa Martin. What has happened so far?. Ofgem open letter on Congestion Management Procedures (CMP) implementation. Included question on impact of change in the Gas Day. Individual TSO process on CMP implementation: - PowerPoint PPT Presentation
Citation preview
Gas European Network Code Implementation
May 2013
Lisa Martin
2
• Ofgem open letter on Congestion Management Procedures (CMP) implementation. – Included question on impact of change in the Gas Day.
• Individual TSO process on CMP implementation:– NGG consults on Bacton/Moffatt - Ofgem approval– IUK consulting (published 30 April) on its I/C – Ofgem/CREG
approval– BBL consults on its I/C- Ofgem/ACM approval– Ireland still under discussion
What has happened so far?
3
Summary of responses on change to Gas Day
• Very consistent tone of responses (non-confidential will be made available on Ofgem website).
• Avoid underestimating the scale of the task.• Preference for early consultation on how it will be implemented
and coordinated approach.• Preference for early decision on a fixed implementation date.• Recognition that change will be felt from offshore to customer
meter, with not all parties under Ofgem jurisdiction.
4
CAM Requirements
• Implementation 1 November 2015• Capacity to be auctioned as bundled, standard products• Applies to interconnector points (Bacton & Moffat) – may also apply to
entry and exit points to and from third countries (subject to relevant NRA decision)
• Applies to capacity that is available to be sold & contracted capacity once it becomes available, e.g. – BBL – capacity that is currently unsold & any that becomes available
through Oversubscription or Surrender (CMP), further capacity from 2016
– IUK – Oversubscription or Surrender, all capacity from 2018– & to relevant capacity at Bacton & in Belgium & Netherlands– So stepwise approach to implementation
• Implementation needs to meet obligations of CAM• There are options for implementation
5
Key Issues to be considered
GB issues Shared issues
Capacity identification e.g. how to calculate capacity at Bacton?
How to bundle capacity?
Should changes apply to all entry/exit points in GB or just interconnection points?
What booking platform to use (PRISMA ) & how this should be governed?
How do we go about changing the gas day?
Interaction between capacity/ allocation & nominations (within-day)?
Ensuring standardised capacity products are sold
TSO cooperation
Package approach at cross-border points - look at CAM, nominations in balancing, charging etc
6
Process
Ofgem NGGCREG Fluxys
IUK
Working groups (GB/ Bel/ NL) ?
Ofgem NGGACM GTS
BBL
Shared issues Shared issues
GB issues
Need to consider with Irish NRAs- Moffat
7