GABES STEG POWER PLANT Crane Liebherr LTM 1600-8 (600 T) Crawler crane CC2600 DEMAG (500 T) SETTING UP OF 10 MODULES OF BOILER (240T/ PIECE) Crane DEMAG (500T) (SERGAZ EL HAOURIA) VERTICAL SETTING OF EXCHANGER Crane CC2600 DEMAG (500T) Crane Liebherr LTM 1120 (120T) TURBINE AND COMPRESSER REPLACEMENT Crane CC2600 DEMAG (500T) SETTING UP OF EXCHANGER (78 TONS) COMPRESSION STATION OF EL HAOUAIRIA (CAP BON) Crane DEMAG CC 2600 (500T) CEMENT PLANT CIOK-TAJEROUINE Replacement of two oven’s ferrules with bending (220T) CEMENT PLANT OF ENNFIDHA Setting of separator (110t) Crane DEMAG CC 2600 (500T) BRITISH GAZ GABES Unloading and burying of five gas reservoirs (240T) SAFETY FIRST

GABES STEG POWER PLANT SETTING UP OF 10 … · alcatel carre autostable 30m 40m 50m 60m 25 - 20 15 - 2 ... socles mÉtalliques pour les bts outdoor et shelter systÈme de balisage

  • Upload
    lyhanh

  • View
    222

  • Download
    1

Embed Size (px)

Citation preview

GABES STEG POWER PLANT

Crane Liebherr LTM 1600-8 (600 T)

Crawler crane CC2600 DEMAG (500 T)

SETTING UP OF 10 MODULES OF BOILER (240T/ PIECE)

Crane DEMAG (500T)

(SERGAZ – EL HAOURIA) VERTICAL SETTING OF EXCHANGER

Crane CC2600 DEMAG (500T)

Crane Liebherr LTM 1120 (120T)

TURBINE AND COMPRESSER REPLACEMENT

Crane CC2600 DEMAG (500T)

SETTING UP OF EXCHANGER (78 TONS) COMPRESSION STATION

OF EL HAOUAIRIA (CAP BON)

Crane DEMAG CC 2600 (500T)

CEMENT PLANT CIOK-TAJEROUINE

Replacement of two oven’s ferrules with bending (220T)

CEMENT PLANT OF ENNFIDHA

Setting of separator (110t)

Crane DEMAG CC 2600 (500T)

BRITISH GAZ GABES

Unloading and burying of five gas reservoirs (240T)

SAFETY FIRST

MAIN ACTIVITES

1. STRUCTURES FABRICATION AND ERECTION

2. MECHANICAL EQUIPMENTS ERECTION

3. PREFABRICATION AND ERECTION OF ALL KINDS OF PIPES (CS, AS, AND SS)

4. ELECTRICAL INSTALLATION

5. INSTRUMENTATION

6. PIPELINES SETTING

PRINCIPALES ACTIVITES:

1. FABRICATION & MONTAGE STRUCTURES

2. MONTAGE DES EQUIPEMENTS MECANIQUES

3. PREFABRICATIONS ET MONTAGE TOUS TYPES DE TUYAUTERIE(CS,AS ET SS)

4. INSTALLATIONS ELECTRIQUES

5. INSTRUMENTATIONS

6. POSE DE PIPE-LINE

SAFETY FIRST

CPF OUM CHIAH MATMATA TUNISIE

SAFETY FIRST

PROJET ANNEE MAITRE

D’OUVRAGE

MAITRE

D’OEUVRE

CPF-WAHA PRODUCTION

FACILITIES

Travaux d’extension-PIPING

2008/200

9

PIONEER/

ETAP PIONEER

CPF OUM CHEIH

Travaux d’extension & Revamping

2007/200

8

PERENCO/

ETAP PERENCO

STATION COMPRESSION GAS

HAOUARIA

Gestion de matériel et levage

Fourniture et Montage de deux

filtres à manches Type FLS

2007 SCOGAT SAMPROGETTI

Unit GPL Gabes

Augmentation de capacité station

gaz (GPL Gabes)

2006 STEG TECHNOFRIG

O

Pipe-line GAZOUDUC TRANSTUNISIE

Gazoduc (déchargement, triage et

alimentation de l’unité de montage

tranche I & tranche II

1992

/

1993

SNAM

PROGETTI SIF ISOPIPE

Unit GPL Gabès

Station de récupération GPL. 1986 STEG LUMUS

CREST(France)

Gazoduc –NORTH TUNIS 1986 STEG STEG

Pipe line SITEP

Pose de pipe-line 1985 SITEP SITEP

CPF OUM CHEIH Maitre de l’ouvrage : PERENCO/ETAP Durée de projet : 5 mois Travaux réalisés : Equipements mécaniques montés : 700 T Structure et supports métalliques montés : 300 T

Préfabrication et montage tuyauterie : 350 T Installation électrique - Instrumentation Traitement de surface - isolation thermique

CPF-WAHA PRODUCTION FACILITIES Maitre de l’ouvrage : PIONNER/ETAP Durée de projet : 8 mois Travaux réalisés : Équipements mécaniques montés : 600 T Structure et supports métalliques montés : 300 T Préfabrication et montage tuyauterie : 550 T Installation électrique - Instrumentation Traitement de surface - Isolation thermique

STATION COMPRESSION GAS HAOUARIA Maitre de l’ouvrage : SNAMPROGETTI Travaux réalisés : Équipements mécaniques montés : 500 T Structure métallique montée : 250T Préfabrication et montage Tuyauterie : 800 tonnes Installation électrique - Instrumentation Traitement de surface- Isolation thermique

UNITE GPL GHANOUCHE Maitre de l’ouvrage : STEG

Durée de projet : 12 mois Travaux réalisés : Équipements mécaniques montés : 828 T

Structure et supports métalliques montés : 350T

Préfabrication et montage tuyauterie : 583T

Installation électrique - Instrumentation

Traitement de surface - Isolation thermique

SAFETY FIRST

PROJECT YEAR CLIENT CONTRACTOR

CPF-WAHA Production facilities

Extension works - piping 2008/2009 PIONEER/

ETAP PIONEER

CPF Oum Chiah

Extension works and revamping 2007/2008 PERENCO

/ETAP PERENCO

GAS COMPRESSION STATION HAOUARIA

Material management , lifting, supply

and erection of two handle filters type

FLS

2007 SCOGAT SAMPROGETTI

LPG UNIT GABES

Increase of capacity of the gas station

(LPG Gabes) 2006 STEG TECHNOFRIGO

Gas pipeline Transtunisie

Gas pipeline (unloading, sorting and

power supply of the erection unit part I

and part II)

1992

/

1993

SNAM

PROGETTI SIF ISOPIPE

LPG unit Gabes

LPG recovery station factory 1986 STEG

LUMUS

CREST(France)

Gas pipeline North Tunis 1986 STEG STEG

SITEP pipeline

Pipeline setting 1985 SITEP SITEP

Project: CPF-WAHA Production facilities Client: PIONEER/ETAP

Project duration: 8 months Executed works: Erection of mechanical equipments: 600T

Erection of steel structure and supports: 300T

Pipes prefabrication and erection: 550T

Electrical installation Instrumentation

Surface treatment Thermal isolation

Project: Revamping and construction works Client: PERENCO/ETAP

Project duration: 5 months Executed works: Erection of mechanical equipments: 700T

Erection of steel structure and supports: 300T

Pipes prefabrication and erection: 350T

Electrical installation Instrumentation

Surface treatment Thermal isolation

Project: Gas compression station Haouaria

Client: SNAMPROGETTI Executed works: Erection of mechanical equipments: 500T

Erection of steel structure: 250T

Pipes prefabrication and erection: 800T

Electrical installation Instrumentation

Surface treatment Thermal isolation

Project: LPG Gabes GHANNOUCH

Client: STEG

Project duration: 12 months Executed works: Erection of mechanical equipments: 828T

Erection of steel structure and supports: 350T

Pipes prefabrication and erection: 583T

Electrical installation Instrumentation

Surface treatment Thermal isolation

SAFETY FIRST

MAIN ACTIVITIES

1. FABRICATION, ERECTION OF ALL TYPES OF PYLONS

2. ERECTION OF EQUIPMENTS ON ANTENNAS (BTS, BATTERIES …)

PRINCIPALES ACTIVITES:

1. FABRICATION, MONTAGE DE TOUS TYPES DES PYLONES

2. MONTAGES DES EQUIPEMENTS SUR LES ANTENNES (BTS BATTERIE,….)

SAFETY FIRST

ANNEE CLIENT TYPE DE PYLONE HAUT NBRE FOURNISSEUR

PYLONE PROJET

1997 SOTETEL

ALCATEL

Carre autostable 30m 40m

50m 60m

25 - 20

15 - 2

ELFOULADH T.TELECOM GSM PHASE I

1997 ELFOULADH Carre auto stable

45m 60m

75m 100m

2 - 1

1 - 1

ELFOULADH MINISTERE DE LA DEFENCE

2000 SITE carre autostable 70m 90m 1 - 2 MITAS RESEAU M. DE L’INTERIEUR

2001 ERICSSON

WIBE

carre autoporté tubulaire 30m 42m

50m

120 - 20

20

WIBE T. TELECOM RESEAU GSM PHASE II

2001 NEC carre autoporté 30m 50m

70m

2 - 4

1

MITAS TUNISIE TELECOM

2002 ERICSSON Monopole, Pylône et BTS 30 m 13 TUNISIE TELECOM

POUR CE CHAPITRE CERI PEUT OFFRIR LES SERVICES SUIVANTS: Recherche des sites : VUE NOTRE CONNAISSANCE DU TERRAIN EN TUNISIE ET NOTRE SAVOIR FAIRE EN RÉALISATION

DES SITES GSM ET EN SE BASANT SUR NOS COMPÉTENCES LOCAUX, CERI PEUT CONTRIBUER À LA RECHERCHE, NÉGOCIATION DES SITES GSM

RÉALISATION CLÉ EN MAIN DES SITES ROOFTOP FOURNITURE & INSTALLATION DES SHELTERS (CONFORMÉMENT À LA RECOMMANDATION DU

CLIENT) FOURNITURE ET INSTALLATION DES GROUPES ÉLECTROGÈNES. FOURNITURE ET INSTALLATION DES MÂTS ROOFTOP Y COMPRIS LES SUPPORTS ANTENNES. FOURNITURE ET INSTALLATION DES COFFRETS ÉLECTRIQUES. FOURNITURE ET INSTALLATION DES SYSTÈMES PARATONNERRE ET MISE À LA TERRE. SOCLES MÉTALLIQUES POUR LES BTS OUTDOOR ET SHELTER SYSTÈME DE BALISAGE NOCTURNE. RÉALISATION CLÉ EN MAIN DES SITES GREEN FIELD. CONSTRUCTION EN DURE DES ABRIS

INFRASTRUCTURE EXTERNES DES SITES DE TÉLÉCOMMUNICATIONS

SAFETY FIRST

FOR THIS CHAPTER CERI MAY OFFER THE FOLLOWING SERVICES: Searching for sites: Due to our knowledge of the fields in Tunisia and our knowhow in the realisation

of GSM sites and based on our local competences, CERI may contribute to the searching and negociation of GSM sites

Realisation on turnkey basis of rooftop sites Supply and installation of shelters (according to client recommendations) Supply and installation of generators groups Supply and installation of rooftop masts including antenna supports Supply and installation of electrical boxes Supply and installation of lighting conductor earthling systems. Steel stands for outdoor BTS and shelter Night marking system REALIZATION on turnkey basis of green field sites Supply and installation of shelters (according to client recommendations) Construction in hard of shelters Supply and installation of generators groups

YEAR CLIENT TYPE OF PYLON HEIGHT NBRE PYLON SUPPLIER PROJECT

1997 SOTETEL

ALCATEL

Square self stable 30m 40m

50m 60m

25 - 20

15 - 2

ELFOULADH T.TELECOM GSM

PHASE I

1997 ELFOULADH Square self stable 45m 60m

75m 100m

2 - 1

1 - 1

ELFOULADH MINISTRY OF DEFENCE

2000 SITE Square self stable 70m 90m 1 - 2 MITAS NETWORK OF THE

INTERIOR

2001 ERICSSON

WIBE

Square tubular Self

supporting

30m 42m

50m

120 - 20

20

WIBE T. TELECOM GSM

NETWORK PHASE II

2001 NEC Square self

supporting

30m 50m

70m

2 - 4

1

MITAS TUNISIE TELECOM

2002 ERICSSON Pylon and BTS

monopoly

30 m 13 TUNISIE TELECOM

EXTERNAL INFRASTRUCTURE OF TELECOMMUNICATION SITES

SAFETY FIRST

MAIN ACTIVITIES

1. FABRICATION AND ERECTION OF STEEL STRUCTURES AND SUPPORTS

2. ERECTION OF MECHANICAL EQUIPMENTS

3. PREFABRICATION AND ERECTION OF ALL KINDS OF PIPES (CS, AS, AND SS)

4. ELECTRICAL INSTALLATION

5. INSTRUMENTATION

PRINCIPALES ACTIVITES:

1. FABRICATION & MONTAGE DE STRUCTURES ET SUPPORT METALIQUE

2. MONTAGE DES EQUIPEMENTS MECANIQUES

3. PREFABRICATION ET MONTAGE TOUS TYPE DE TUYAUTERIE (CS,AS, ET SS)

4. INSTALLATIONS ELECTRIQUES

5. INSTRUMENTATIONS

SAFETY FIRST

CENTRALE EOLIENNE KCHABTA-METLINE 120 MW

STEG-TUNISIE

SAFETY FIRST SAFETY FIRST

SAFETY FIRST

PROJET ANNEE MAITRE

D’OUVRAGE

MAITRE

D’OEUVRE

KCHABTA METLINE PHASE II

CENTRALE EOLIENNE 70MW

CONSTRUCTION DE 52 TOURS EOLIENNES DE 1,32

MW

2012/2013 STEG GAMESA

GHANOUCHE GABES

Construction de la centrale électrique cycle combiné

500 MW

2009/

2010 STEG ALSTOM

KCHABTA METLINE PHASE 1

Centrale éolienne 120 MW

Construction de 91 tours éoliennes de 1.32 MW

2009/

2010 STEG GAMESA

SIDI DAOUD PHASE III

MONTAGE DE 26 TOURS EOLIENNES DE 1.32 MW

2006/

2007 STEG

MADE

TUNISIE

SIDI DAOUD PHASE II

Montage de tours éoliennes

2002 /

2003 STEG

MADE

TUNISIE

Centrale cycle combine RADES II

Montage deux chaudières

Montage deux cheminées by Bass

Montage deux cheminées de finition

2001 SITE (USA) ALSTHOM

CENTRALE THERMIQUE DE RADES

Montage chaudière

Montage des équipement mécaniques

Montage de deux condenseurs

Montage de deux stations de pompage

1996

/

1998

STEG ANSALDO

ENERGIA

CENTRALE À CYCLE COMBINÉ (SOUSSE)

Montage de deux chaudières . 1994 STEG

GEC

ALSTHOM

GHANOUCHE GABES

Construction de la Centrale électrique cycle combiné

500 MW

2009

/

2010

STEG ALSTOM

KCHABTA METLINE

Station Eoliennes

Montage des Eoliennes

2009

/

2010

GAMESA MMI

SAFETY FIRST

PROJECT YEAR CONTRACTOR CLIENT

KCHABTA METLINE PHASE II

Wind turbine plant 70MW construction of 52

wind turbine towers of 1,32MW

2012/2013 STEG GAMESA

GHANOUCHE GABES

construction of the combined cycle electrical

plant 500MW

2009/

2010 STEG ALSTOM

KCHABTA METLINE PHASE 1

Wind turbine plant 120MW construction of 91

wind turbine towers of 1,32MW

2009

/

2010

STEG GAMESA

SIDI DAOUD PHASE III

Erection of 26 wind turbine towers of 1.32MW

2006

/

2007

STEG MADE TUNISIA

SIDI DAOUD PHASE II

Erection of wind turbine towers

2002 /

2003 STEG MADE TUNISIA

COMBINED CYCLE PLANT OF RADES II

Erection of two furnaces

Erection of two by pass smokestacks

Erection of two finishing stage smokestacks

2001 SITE (USA) ALSTHOM

THERMAL PLANT OF RADES

Erection of two furnaces

Erection of mechanical equipments

Erection of two condensing unit

Erection of two pumping stations

1996

/

1998

STEG ANSALDO

ENERGIA

COMBINED CYCLE PLANT (SOUSSE)

Erection of two furnaces 1994 STEG GEC ALSTHOM

GHANOUCHE GABES

Construction of the combined cycle electrical

plant 500 MW

2009/

2010 STEG ALSTOM

KCHABTA METLINE

Wind turbine station

Wind turbine station

2009

/

2010

GAMESA MMI

CENTRAL GHANOUCHE STEG –TUNISIE 420 MW

SAFETY FIRST

KCHABTA METLINE PHASE II Maitre de l’ouvrage : STEG/ GAMESA

Durée de projet : 18 mois Travaux réalisés : Montage de 91 tours éoliennes de 1.32 MW Equipements Mécaniques : 7280 T

Structure et support Métalliques : 9646 T

travaux de terrassement, excavation génie civil.

SIDI DAOUED STATION EOLIENNES Maitre de l’ouvrage : STEG/MADE Durée de projet : 8 mois Travaux réalisés : Montage de 26 tours éoliennes de 1,32 MW Equipements Mécaniques : 2000 T

Structure et support Métalliques :4000 T

Project: CONSTRUCTION DE CENTRALE ELECTRIQUE DE GANOUCHE GABES ALSTOM

Maitre de l’ouvrage : STEG Durée de projet : 12 Mois Travaux réalisés : mécaniques 4500 T

Structure métalliques : 400 T

Préfabrication et montage tuyauterie : 600 T

Installation électrique

Instrumentation

Traitement de surface

Isolation thermique

Project: CONSTRUCTION DE CENTRALE ELECTRIQUE DE SOUSSE Maitre de l’ouvrage : GEC ALSTOM

Travaux réalisés : Equipements Mécaniques : 3500 T

Structure Métallique : 2800 T Préfabrication et montage tuyauterie :500 T

SAFETY FIRST

Project: KCHABTA and METLINE (Towers erection) Client: STEG/GAMESA

Project duration: 18 months Executed works: Erection of 91 wind turbine towers of 1.32MW Erection of mechanical equipments: 7280T

Erection of steel structure and supports: 9646T

Leveling works, excavation and civil works of 91 towers

Project: SIDI DAOUED wind turbine station Client: STEG/MADE

Project duration: 8 months Executed works: Erection of 26 wind turbine towers of 1.32MW

Erection of mechanical equipments: 2000T

Erection of steel structure and supports: 4000T

Project: CONSTRUCTION OF ELECTRICAL POWER PLANT AT GANOUCHE GABES ALSTOM Client: STEG

Project duration: 12 months Executed works: Erection of mechanical equipments: 4500T

Erection of steel structure and supports: 400T

Pipes prefabrication and erection: 600T

Electrical installation

Instrumentation

Surface treatment Thermal isolation

Project: Construction of combined cycle electrical power plant at Sousse

Client: GEC ALSTOM

Executed works: Erection of mechanical equipments: 3500T

Erection of steel structure and supports: 2800T

Pipes prefabrication and erection: 500T

SAFETY FIRST

MATERIEL DE LEVAGE Notre parc d’engins est constamment renouvelé : Plus de 50 grues , de capacités allant jusqu’à 600 tonnes, nous permet d’assurer une grande variété d’opérations de montage, de levage et de transport. Des moyens de transport (semi-remorques, portes chars télescopique, camions, moyens de transport du personnels, Chariots éleveurs de capacité allant jusqu’à 30 Tonnes La formation continue de notre personnels et les outils informatiques mise en place permettent à notre société d’apporter un service satisfaisant à nos clients en développant des solutions techniques innovantes : La simulation et la cinématique pour chaque opération de

manutention, La Conception de dispositifs particuliers, La Création d’outillages spécifiques.

NACELLES TÉLESCOPIQUES La mise à disposition des nacelles de hauteur de plus de 40 m en remplacement des échafaudages, dans certains cas, permet à nos équipes de montage de travailler en sécurité et leurs faciliter les travaux en hauteur, d’économiser et maitriser le temps.

SAFETY FIRST

Lifting materials

Our engine fleet is constantly renewed:

More than 50 cranes of a capacity up to 600 Tons, allow us to insure a wide variety of erection, lifting and transport operations

Transportation means (tractor trailers, telescopic floats, trucks, personal transportation means)Forklifts of a capacity going to 30 tons

The continuous training of our personnel and the IT equipments put in place allow our company to provide satisfying services to our clients by developing innovative technical solutions.

The simulation and the kinematic for each operation of handling,

The Conception of special measures

The Creation of specific tools

Telescopic cherry picker

Making available of cherry pickers of a height of more than 40m in replacement of scaffolding in some cases allow to our erection teams to work safely and make easier the work at height which leads to save and control time

SAFETY FIRST

OUTILLAGE SPÉCIAL

Soudure

Pour couvrir tous les domaines, CERI développe des solutions concrètes grâce à la mise en place de moyens matériels et humains adéquats.

CERI dispose de soudeurs hautement qualifiés, conformément aux normes américaine ASME et

Européenne dans les principaux procédés suivants:

GTAW - GAS TUNGSTEN ARC WELDING

SMAW - SHIELDED METAL ARC WELDING

GMAW - GAS METAL ARC WELDING

SAW - SUBMERGED ARC WELDING

TRAITEMENT THERMIQUE ET PRÉCHAUFFAGE Nos machines de traitement thermiques à six canaux, équipées d’automates qui gèrent quatre thermo-contrôles par canal, nous donnent plus de flexibilités pour respecter les besoins les plus difficiles de nos clients.

MACHINE DE COUPE ET CHAUFREIN Découpage et chanfreinage des tuyauteries à froid: Pour la mise en œuvre des différentes nuances des aciers (acier à carbone, acier inox et surtout les aciers alliées) nous nous sommes équipés des moyens de coupe et de chanfreinage mécanique tube pour tous les diamètres : de 4¨ jusqu’à 24¨

MACHINE DE SOUDURE AUTOMATIQUE DC 1000)

SERRAGE Clé Hydraulique (couple de

serrage de 2000 NM à 40.000 NM)

Clé dynamométrique (couple de serrage de 100 NM à 2500.000 NM)

GRUES A TOUR Grues à tour de hauteur allant de

20 m jusqu’à 120 M longueur de flèche max 60 M

SAFETY FIRST

Special tools Welding In order to cover all the fields, CERI develops clear solutions by mean of the availability of material and human means CERI disposes of welders highly qualified, according to European and American (ASME) standard in the following main methods: GTAW - GAS TUNGSTEN ARC WELDING SMAW - SHIELDED METAL ARC WELDING GMAW - GAS METAL ARC WELDING SAW - SUBMERGED ARC WELDING

Thermal treatment and preheating

Our machines of thermal treatment of six canals, equipped by automatons which manage four thermal-controls by each canal, give us more flexibility to respect the hardest needs of our clients.

Machine of cutting and weld groove Cold cutting and weld groove of pipes For the implementation of the different steel grades (carbon steel, stainless steel, and specially the alloyed steels) we have been equipped by the means of tube mechanical chamfer cutting for all the diameters : from 4¨ until 24¨

Machine of automatic welding DC 1000

Hydraulic chucking Hydraulic wrench (Torque from 2000

NM to 40.000 NM)

Torque Wrench (Torque from 100 NM to 2500.000 NM)

Tower crane Tower crane of a height from 20 up to 120 M

Maximum crane beam length 60 M

SAFETY FIRST

Une pluridisciplinarité de compétences compose les services Montage, Ingénierie, Management de projet, Commercial, Administratif, Financier et Qualité. Notre effectif permet d'intervenir à tous les niveaux. Ainsi notre force est de pouvoir adapter les différents intervenants pour chacun des projets réalisés. Nos effectifs ont évolué pendant la dernière décennie de 400 personnes en 2002 à 800 personnes en 2012 avec des pics de plus de 2000 personnes en 2010. BUREAU TECHNIQUE : Notre bureau technique permet la conception, le développement et le suivi de projets grâce, entre autres, à l’utilisation des logiciels pour la planification, le design (MS PROJECT, PREMAVERA, AUTOCAD, CADWORKS PLAN, TEKLASTRUCTURE …). SERVICE MONTAGE : Plus que la mise en place de ressources matérielles, notre société tient à mettre les moyens humains nécessaires en qualification et en nombre pour apporter un service satisfaisant à nos clients. Un noyau de Personnel clé permanent de 240 personnes permet le pilotage des chantiers et la coordination entre la direction et les divers chantiers et de veiller à la réalisation des projets dans les délais.

An underdesciplinarity of competences make up our erection, engineering, project management, commercial, administrative, financial and quality departments. Our staff allows intervening in all the levels. Thus our force is to be able to adapt the different stakeholders for each realized project. Our staff improved during the last ten years from 400 persons in 2002 to 800 persons in 2012 with a peak of more than 2000 persons in 2010. TECHNICAL OFFICE: Our technical office allow the conception, the development and the following up of the projects thanks to ,among others, the use of software for planning, design (MS-project, PREMAVERA, AUTOCAD, CADWORKS PLAN, TEKLASTRUCTURE …). ERECTION DEPARTMENT: In addition to the putting in place of the material resources, our company cares for putting the necessary human means in sufficient qualification and number to bring a satisfying service to our clients. A permanent kernel of key staff of 240 persons allows the following up of sites and the coordination between the management department and the different sites and insures the realization of the projects within the deadlines.

SAFETY FIRST

CERI GROUP SAFETY FIRST

CERI S.A 1983

SIEGE SOCIAL: RUE 8600 N°82 Z.I. CHARGUIA I

BP 58 TUNIS CEDEX 1080

Tél : + 216 71 894 107 -

+216 71 807 729

Fax : + 216 7 1 806 441

Email: [email protected]

Site Web:

www.ceritunisie.com

CERI ALGERIE SARL 2006

SIEGE: HYDRA IMMB: ISSAFA WA MARWA

BLOC C-ALGER

Mail: [email protected]

****************************

CERI MAURITANI 2005 SIEGE : 15 SOCOGIM PLAGE-

NOUAKCHOT MAURITANIE

Mail: [email protected]

***************************

CERI CONGO 2008 SIEGE :

ENCEINTE HOTEL LEDGER PLAZA MAYA- MAYA

Avenue Auxence ICKONGA BRAZZAVILLE, REPUBLIQUE DU CONGO

Mail: [email protected] ********************************

CERI LYBIE SIEGE :

21325 JANZOUR TRIPOLI

LYBIE Mail: [email protected] **********************