G+7 Storeyed+3Basements

Plinth area:32,000 sq.m

Solar PV System 930KWp Capacity

PROJECT TEAM

User organisation MoEF

Execution Agency CPWD

Architectural and

Structural Planning CPWD

Consultants

Green Building M/s DPAP

MEP Services M/s Spectral Services

Interior Design M/s Kothari

Construction agencies

1.Main Composite Contract M/s Swadeshi Civil Infra structure

2. Solar Power M/s Swadeshi Civil Infra structure

3.Automated Parking M/s Simplex Projects

4

INDIRA PARYAVARAN BHAWAN

Area details

Plot area 9565 sqm

Plinth Area 31400 sqm

Project Completion Cost Rs 195 Cr

(Tentative)

Basements

1. Fully automated Robotic parking for 330 cars

2. All bulk MEP Services i/c

a)AC plant room 500 TR

b) Electrical Substation and Transformers

c)Fire fighting pump house

d) Sewage treatment plant (30KL/day)

e) DG set 500KVA and UPS

BUILDING UTILITY DETAILS

BUILDING UTILITY DETAILS

Superstructure

1. Office space for 600 employees i/c 3 Ministers

2. Auditorium 125 seating capacity

3. Committee rooms and conference rooms(7 Nos)

4. Roof garden ,Gymnasium and Yoga room for

recreation

5. Cafeteria, Kitchen and executive dining hall

7

• Roof Top Solar Power plant 930 KW Capacity

6000 sqm

• Fully Automated Robotic

Car Parking 330 cars

Additional Scope beyond conventional

8

UNIQUE FEATURES

•FIRST

•FIRST

in GOVERNMENT SECTOR

targeted for both ratings

of Green building

“NET – ZERO ENERGY”

Multistoreyed Building

with 100% ON-SITE Power Generation

5STAR GRIHA

LEED India PLATINUM

LARGEST Roof top

Solar Power system

in any multistoreyed Building

(930KWp)

9

ACHIEVEMENTS

a)40% Savings in ENERGY

b)ZERO Electricity Billing

a)55% Savings in Water

b)Zero Net Disharge

Overall Environmental

Protection

GREEN

BUILDING

COMPOSITE CONTRACT

Services Included (All inclusive)

1.Main structure and finishing works

2.Central Air Conditioning

3.Sub station

4.Lifts

5.Fire Fighting & Fire Alarm

6.IBMS

7.DG Sets

8.UPS

9.CCTV system

10.Internal EI

CHRONOLOGY OF EVENTS

Foundation stone laying 19.11.2009

Sanction of PE(A/A& ES) 23.06.2010

Conceptual Approval by DUAC 06.01.2011

Total Planning time < 1 Y 2M

Start of the Project 28.01.2011

Completion of the Project 31.10.2013

Completion Certificate by NDMC 31.12.2013

Total Construction time 2Y 11M

12

Sl No Approval Concept

stage

Completion

Stage

1 Forest (Tree cutting ) 04.01.2011 ----------

2 Environmental Impact

Assessment

05.01.2011 ----------

3 Delhi Fire Services 21.12.2010 28.10.2013

4 AAI 24.05.2010 ----------

5 Land Use Change ----------

6 DUAC 06.01.2011 11.12.2013

7 ASI 19.04.2010 ----------

8 NDMC 13.01.2011 31.01.2014

(expected)

STATUTORY APPROVALS

Completion of Project : 31.10.2013 Ready for Occupation: 31.12.2013

Sl No Approval Concept

stage

Completion

Stage

9 Electric Load

Sanction

------------ Oct 2013

10 Energisation of HT

panels

----------- Nov2013

11 Substation by CEA ----------- Oct 2013

12 Labour safety (Delhi

Govt)

----------- Nov 2013

13 Electric Power

Supply

----------- 31.12.2013

14 Water Supply &

Sewerage Connection

----------- 24.01.2014

STATUTORY APPROVALS

Completion of Project : 31.10.2013 Ready for Occupation: 31.12.2013

ARCHITECTURAL PLANNING AND LANDSCAPING

• Effective Ventilation by orientating the building E-W and by

optimum integration with nature by separating out different blocks

with connecting corridors and a huge central court yard.

E W

N

ARCHITECTURAL PLANNING AND LANDSCAPING

•The Building Envelope has been designed

i) to receive 75% of natural daylight to reduce energy

consumption.

ii) Access Friendly to differently-abled persons.

•Out of total 79 trees

existing on the site ,

only 19 were cut, and

11 transplanted

ARCHITECTURAL PLANNING AND LANDSCAPING

•More than 50% area outside

the building is soft

with plantation and grassing.

•circulation roads and pathways

soft with grass paver blocks

to enable ground water recharge

E&M Services REGULAR

1.Central Air Conditioning(HVAC)

2.Lifts

3.Fire Fighting & Fire Alarm

4.IBMS

5.DG Sets

6.UPS

7.CCTV system

8.Audio Visual System

9.Internal EI

SPECIAL

1.Fully Automated robotic Parking for 330 cars

22

ENERGY SCENARIO (Average Annual)

Power Requirement (Base

Case) 22.0 lakh KWh

Power Requirement(Design

Case) 13.6 lakh KWh

Percentage savings 40% (approx)

Targeted Solar Power

Generation 14.3 lakh KWh

Net Power generation 0.7 lakh KWh

(Surplus)

23

ENERGY EFFICIENCY

ECBC 2007 ACTUAL

Lighting Power

Density (LPD)

11.8 W/sqm

5 W/sqm

HVAC load 20 sqm/Tr 40 sqm/Tr

Total 100W/sqm

40 W/sqm

CENTRAL PUBLIC WORKS DEPARTMENT

OPTIMIZED BUILDING

ENVELOPE

OPTIMIZED DAY

LIGHTING

1)PROPER ORIENTATION

2)INSULATED WALLS AND

ROOF

3)GLASS TRANMITTING

LIGHT BUT NOT HEAT

2)SENSORS

1)ENERGY EFFICIENT

LED LIGHTS

CENTRAL PUBLIC WORKS DEPARTMENT

OPTIMIZED ENERGY

SYSTEMS I/C HVAC

1)CHILLED BEAM SYSTEM

OF AIR CONDITIONING

WITH <50%

CONVENTIONAL

ENERGY CONSUMPTION

3)REGENRATIVE LIFTS

2)GEOTHERMAL HEAT

EXCHANGE SYSTEM

4)ENERGY EFFICIENT

EQUIPMENT

In the IPB project Chilled Beams are being installed in

second floor to sixth floor.

Chilled Beam Water in Temperature is 16° C and

water out temperature is 20° C.

Room temperature maintained is 26 ±1 ° C.

Chilled Beams with Drain pan are used to drain out

water droplets due to condensation during monsoon.

160 TR of air conditioning load of the Building is met

through Chilled Beam system.

CHILLED BEAM WORK AT SITE

Total room mixing

is achieved

through

Convection

currents

within the space

Chilled Water

Hot Water

Primary air ventilation

from Dedicated Outdoor

Air Source

CHILLED BEAMS INDUCTION UNITS OVERVIEW

28

Flexible Duct (6 Inch dia.)

Chilled Beam

Drain Pipe (¾” dia.)

Chilled Water Supply Pipe (½” dia.)

Chilled Water Return Pipe (½” dia.)

Suppl

y Air

Induc

ed Air

A CHILLED BEAM INSTALLED AT SITE

There are 180 vertical bores at the Depth of 80 meter all along the Building Premises. Minimum 3 meter distance is maintained between any two bores.

Each bore is lowered with HDPE pipe U-loop (32mm outer Dia.) and grouted with Bentonite Slurry.

Each U-Loop is connected to MS Header Pipe(100mm Dia.)which finally joins the Condenser Water Line in Plant Room.

Condenser hot water is sent at 100°F (37.8° C) & back at 900 F (32.2° C).

One U-Loop has 0.9 TR Heat Rejection capacity, so all together 160 TR of Heat rejection is obtained without using a cooling tower.

A GEOTHERMAL HEAT EXCHANGE WORK AT SITE

GEO THERMAL HEAT EXCHANGE

VERTICAL CLOSED LOOPS

Renewable Energy to be Generated : 14 lakh KWh

Per Year

Area required for locating Solar panels :

Area available over terraces :

Creation of this additional space(6000 minus 2200 m2)

in a multistoreyed building with restricted plot & roof areas

where no structure including surface parking is provided around

the building, was a big Constraint

,32

NET ZERO ENERGY A MAJOR CHALLENGE

2200 m2

6000 m2

33

ACTUAL SOLAR POWER

GENERATION (as on 25.01.2014)

•Power Evacuation to grid started on 19.11.2013

•Power generation achieved 3000 KWh(per day)

•Total generation so far 2.0 lakh KWh

34

SOLAR PV SYSTEM 930KWp CAPACITY

TOTAL AREA 6000 M2

TOTAL AREA OF PANELS 4650 M2

ANNUAL ENERGY Generation 14.3 lakh units

Highest efficiency (20%) Solar PV panels

Grid Interactive System

36

37

Flyash (Reuse) :

Cement used is PPC (Portland Pozzolona

Cement)(29% Fly Ash)

In all RCC, PCC, Plaster, Masonry Work.

FALG Bricks and AAC blocks used instead of

clay bricks.

UTILISATION OF FLY ASH

AAC BLOCKS

INDIRA PARYAVARAN BHAWAN,NEW DELHI

FALG BRICKS

FLYASH LIME GYPSUM BRICKS

FLYASH 40%

Use of material available within a radius of 800 km .

Dholpur stone, Kota stone, North Indian Granites, AAC Blocks, FaLG

bricks etc.

LOW ENERGY MATERIALS

Granite

(Lakha Red) Dholpur Stone

REGIONALLY AVAILABLE

Use of material available having Recycled content

FaLG Bricks, Terrazo Tiles, Vitrified Tiles, Calcium Silicate Tiles, crazy marble etc.

LOW ENERGY MATERIALS

RECYCLED / RECYCLABLE

Terrazo Tiles Calcium Silicate

Tiles

Crazy Marble

Polymer Thermosetti

ng Resin (Phenol Formal

Dehyde)

BAMBOO MAT

Woven sheet using

Bam0.boo slivers 0.6 to 0.8mm thick & 5mm wide

JUTE / COIR MAT

Jute / Coir Thread

woven into coarse cloth

BAMBOO – JUTE COMPOSITE DOORS

Satisfies all the quality parameters

that a normal flush door does

LOW ENERGY MATERIALS

RAPIDLY RENEWABLE

45

• Fly Ash Brick

• Aerated Autoclaved Cement (AAC) Block

• Portland Puzzolona Cement

• Terrazzo tile flooring with salvaged stone pieces

• Grass Paver Blocks Pavements

• Local Stone with Marble Strips

• Calcium Silicate Tiles

• Bamboo Jute Composite for Frames & Doors

• Low Volatile Organic Compound Paints

Use of Eco friendly Materials

55% Reduction in overall use of water

Low discharge water fixtures

Low demand plants in landscaping

Use of Geothermal Cooling

Recycling of waste water for ZERO Discharge

Rain water harvesting

Recharge wells, supply to NDMC Tankers

All the three(3) basements will be used for Automatic Car Parking system. Total Capacity : 330 nos. of cars. The following type of system is adopted in this project:- 1. Shuttle Dolly System( 2nd & 3rd Basement). 2. Puzzle Parking System(1st Basement).

AUTOMATIC CAR PARKING SYSTEM

INTRODUCTION

The followings are the stringent targets of the

project:-

1. Maximum waiting time : 180 sec(i.e. 3minutes)

2. Total evacuation time : 40 minutes.

(Emergency)

SALIENT FEATURE

LIFT ENTRY LOBBY

LIFT WELL

SHUTTLE BAY

SHUTTLE BAY

55