19
FY09 Redesign Who has heard of it? What is it? What does it mean to you next year? 1

FY09 Redesign Who has heard of it? What is it? What does it mean to you next year? 1

Embed Size (px)

Citation preview

FY09 Redesign

Who has heard of it? What is it? What does it mean to you next year?

1

FY09 EMIS Redesign (EMIS-R)

2

ODE has decided that E.M.I.S – Education Management Information System

Should be redesigned to be…

FY09 EMIS Redesign (EMIS-R)

3

ODE has decided that E.M.I.S – Education Management Information System

Should be redesigned to… E.M.I.S. – Every Morning I Scream

4

EMIS

EMIS

What is the redesign?

Multi-year project to completely redesign EMIS for Ohio schools

Modified vertical reporting structureChanges in how data gets from

NWOCA to ODECurrent: Flat files submitted to ODEFuture: XML-based structure built

upon SIF

5

What is SIF?

More information at http://www.sifinfo.org/

SIF = Schools Interoperability Framework

SIF enables diverse applications to interact and share data related to entities in the pK-12 instructional and administrative environment.

6

SIF consists of…

Software Application (i.e. eSIS): Software program implemented within a school or district

SIF Data Object: Sets of information shared by software applications using

the rules of the SIF Specification SIF Agent:

A software program (written by a vendor) that serves as the intermediary between the software application and the SIF Zone

ZIS (Zone Integration Server): A software program that serves as the central

communications point in a SIF Zone

7

Copyright © SIF Association

Components of SIF

Zone Integration Server• Software• Routing• Access Control

SIF Agents• Communicate with ZIS• Assemble and process

messages

Data Objects• Sets of information• XML

Network Account

H.R. &Finance

Data Analysis

& Reporting Instructional

Services

Library Automation

GradeBook

FoodServices

Student Information

Services

Copyright © SIF Association

District Zone

State Zone

SIF Zones

Logical grouping of applications, agents, and ZIS

Highly flexible and scalable

Library Automation

FoodServices

Student Information System

Network Account

Transportation

Student Information System

• No predefined size or structure… specific to your implementation

Copyright © SIF Association

Components Working TogetherVertical Interoperability

DistrictDistrictDistrict

State

What does this mean to you? NWOCA is a pilot for the EMIS Redesign

Pilot testing to begin December 2008 What does this mean next year?

Districts will likely see very little direct interaction with the SIF pilot.

Aggregations and submissions will still be processed in the same manner next year

Districts WILL start to see changes in the EMIS files and data structures.

11

What will be changing?

See FY09 EMIS Manual – Appendix Y for more details

Three new record typesStudent Standing (FS)Student Attributes- Effective Date (FD)Student Attributes- No Date (FN)

Smaller Student Demographic (GI) No more Student Attendance (GK)

12

Effective Dates

Present on FS and FD records Provide continuous values for elements

where needed by ODE New record when values change Open versus Closed record Report first day of school to end of

reporting period- cumulative for year Example improvements: OE funding,

yearend attendance

13

Student Standing (FS)

Relationship of student to district Attending and Assigned Building How Received (Student Status) Sent Reason (A/H Indicator) x 2 Received and Sent IRNs

14

Student Standing (FS)

Tuition Type Attendance Counts x 3 Effective Dates Multiple SSIDs (rare) Percent of Time split Admission/Withdrawal date/reason

15

More Changes….

The addition of the FS, FD, and FN records will be the biggest changes (along with the adjustments to the existing GI record).

More information to come as it becomes available.

16

Questions on FY09 Redesign?

17

eSIS Update Visit website - http://home.nwoca.org/students/esis/ Phase I

Ayersville, Tinora, Edon, Maumee, and Lake Fully live

Phase II Doing well; currently working through scheduling and

conversions Fully live start of 2008/2009 school year

Phase III Commences next fall and includes ALL remaining districts

currently using McSIS/POISE Communication coming early next week

18

Questions on…

19