RAIL FY 2012 AS PASSED - TRANSPORTATION PROGRAM Earnark 8/1/2011 9:27 PROJECT NAME DESCRIPTION NUMBER OTHER PE ROW CONST TOTAL T FUND TIB FEDERAL ARRA LOCAL TOTAL Green Mountain Railroad: CAVENDISH BR 130 SUPERSTRUCTURE REHAB GMRC(12) 40,000 50,000 90,000 90,000 90,000 CHESTER GMRC BRIDGE #114 STP GMRC(4) 22,500 22,500 22,500 22,500 CHESTER GMRC BRIDGE #121 STP GMRC(5) 29,041 29,041 29,041 29,041 CLARENDON GMRC BRIDGE #153 BEARINGS GMRC(7) 25,735 25,735 25,735 25,735 ROCKINGHAM BRIDGE PROJECT BR#108 (PARKER HILL ROAD) STP GMRC(1) 1,125,000 1,125,000 225,000 900,000 1,125,000 ROCKINGHAM BRIDGE #107 BEARINGS STP GMRC(9) 906,000 906,000 906,000 906,000 WALLINGFORD GMRC BRIDGE #145 BEARINGS STP GMRC(8) 200,668 200,668 200,668 200,668 New England Central Railroad AMTRAK "VERMONTER" NECR UPGRADE RR-FY11-AR02 46,810,427 46,810,427 33,773,723 13,036,704 46,810,427 SWANTON NECR CROSSING STP 2038(15) 50,000 312,500 362,500 36,250 326,250 362,500 ROYALTON NECR CROSSING STP 2034(14) 10,000 528,000 538,000 53,800 484,200 538,000 ROYALTON NECR CROSSING STP 2034(15) 10,000 528,000 538,000 53,800 484,200 538,000 Vermont Railway: BURLINGTON-RUTLAND BRIDGE LOAD RATINGS STP WCRS(4) 400,000 400,000 80,000 320,000 400,000 ARLINGTON VTR CROSSING STP 0114(4) 100,000 100,000 10,000 90,000 100,000 CLARENDON VTR BRIDGE #95 WCRS(10) 25,000 25,000 5,000 20,000 25,000 DORSET VTR BRIDGE #79 WCRS(8) 280,000 280,000 56,000 224,000 280,000 LEICESTER BR 229 BEARINGS WCRS(11) 83,100 83,100 16,620 66,480 83,100 MIDDLEBURY BR 233 BEARINGS WCRS(12) 51,284 51,284 10,257 41,027 51,284 MIDDLEBURY BR 234 SUPERSTRUCTURE RECONSTRUCTION WCRS(16) 64,644 64,644 12,929 51,715 64,644 MIDDLEBURY MIDDLEBURY SPUR US7 BRIDGE WCRS(22) 250,000 150,000 400,000 80,000 320,000 400,000 NEW HAVEN BR 243 BEARINGS WCRS(13) 34,330 34,330 6,866 27,464 34,330 NEW HAVEN BR 242 SUPERSTRUCTURE RECONSTRUCTION WCRS(18) 15,000 450,000 465,000 93,000 372,000 465,000 PITTSFORD 1 VTR BRIDGE #219 REPLACEMENT HPP ABRB(9) 100,000 3,000,000 3,100,000 20,000 600,000 2,480,000 3,100,000 PITTSFORD VTR CROSSING STP 2033(21) 849,773 849,773 84,977 764,796 849,773 RUTLAND CITY REHAB CENTER RUTLAND CROSSING RAIL 5307(15) 465,000 465,000 93,000 372,000 465,000 SALISBURY BR 232 SUPERSTRUCTURE RECONSTRUCTION WCRS(15) 91,000 91,000 18,200 72,800 91,000 SHAFTSBURY BRIDGE 57.5 RAIL 5307(41) 150,000 150,000 30,000 120,000 150,000 SHELBURNE - BURLINGTON QUIET ZONE CROSSING MAINTENANCE 100,000 100,000 100,000 100,000 WALLINGFORD BR 91 SUPERSTRUCTURE RECONSTRUCTION RAIL 04-9044 C/9 500,000 500,000 100,000 400,000 500,000 Washington County RR-Barre-Mtplr: BARRE-BERLIN-MONTPELIER LEASE, SUBSIDY & INFRASTRUCTURE REPAIR 04-9038 260,000 260,000 260,000 260,000 BARRE-BERLIN-MONTPELIER BRIDGE MAINTENANCE 100,000 600,000 700,000 700,000 700,000 COLOR KEY

FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

Embed Size (px)

Citation preview

Page 1: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

RAIL FY 2012 AS PASSED - TRANSPORTATION PROGRAM

Earnark

8/1/2011 9:27

PROJECT NAME DESCRIPTION NUMBER OTHER PE ROW CONST TOTAL T FUND TIB FEDERAL ARRA LOCAL TOTAL

Green Mountain Railroad:

CAVENDISH BR 130 SUPERSTRUCTURE REHAB GMRC(12) 40,000 50,000 90,000 90,000 90,000

CHESTER GMRC BRIDGE #114 STP GMRC(4) 22,500 22,500 22,500 22,500

CHESTER GMRC BRIDGE #121 STP GMRC(5) 29,041 29,041 29,041 29,041

CLARENDON GMRC BRIDGE #153 BEARINGS GMRC(7) 25,735 25,735 25,735 25,735

ROCKINGHAM BRIDGE PROJECT BR#108 (PARKER HILL ROAD) STP GMRC(1) 1,125,000 1,125,000 225,000 900,000 1,125,000

ROCKINGHAM BRIDGE #107 BEARINGS STP GMRC(9) 906,000 906,000 906,000 906,000

WALLINGFORD GMRC BRIDGE #145 BEARINGS STP GMRC(8) 200,668 200,668 200,668 200,668

New England Central Railroad

AMTRAK "VERMONTER" NECR UPGRADE RR-FY11-AR02 46,810,427 46,810,427 33,773,723 13,036,704 46,810,427

SWANTON NECR CROSSING STP 2038(15) 50,000 312,500 362,500 36,250 326,250 362,500

ROYALTON NECR CROSSING STP 2034(14) 10,000 528,000 538,000 53,800 484,200 538,000

ROYALTON NECR CROSSING STP 2034(15) 10,000 528,000 538,000 53,800 484,200 538,000

Vermont Railway:

BURLINGTON-RUTLAND BRIDGE LOAD RATINGS STP WCRS(4) 400,000 400,000 80,000 320,000 400,000

ARLINGTON VTR CROSSING STP 0114(4) 100,000 100,000 10,000 90,000 100,000

CLARENDON VTR BRIDGE #95 WCRS(10) 25,000 25,000 5,000 20,000 25,000

DORSET VTR BRIDGE #79 WCRS(8) 280,000 280,000 56,000 224,000 280,000

LEICESTER BR 229 BEARINGS WCRS(11) 83,100 83,100 16,620 66,480 83,100

MIDDLEBURY BR 233 BEARINGS WCRS(12) 51,284 51,284 10,257 41,027 51,284

MIDDLEBURY BR 234 SUPERSTRUCTURE RECONSTRUCTION WCRS(16) 64,644 64,644 12,929 51,715 64,644

MIDDLEBURY MIDDLEBURY SPUR US7 BRIDGE WCRS(22) 250,000 150,000 400,000 80,000 320,000 400,000

NEW HAVEN BR 243 BEARINGS WCRS(13) 34,330 34,330 6,866 27,464 34,330

NEW HAVEN BR 242 SUPERSTRUCTURE RECONSTRUCTION WCRS(18) 15,000 450,000 465,000 93,000 372,000 465,000

PITTSFORD 1 VTR BRIDGE #219 REPLACEMENT HPP ABRB(9) 100,000 3,000,000 3,100,000 20,000 600,000 2,480,000 3,100,000

PITTSFORD VTR CROSSING STP 2033(21) 849,773 849,773 84,977 764,796 849,773

RUTLAND CITY REHAB CENTER RUTLAND CROSSING RAIL 5307(15) 465,000 465,000 93,000 372,000 465,000

SALISBURY BR 232 SUPERSTRUCTURE RECONSTRUCTION WCRS(15) 91,000 91,000 18,200 72,800 91,000

SHAFTSBURY BRIDGE 57.5 RAIL 5307(41) 150,000 150,000 30,000 120,000 150,000

SHELBURNE - BURLINGTON QUIET ZONE CROSSING MAINTENANCE 100,000 100,000 100,000 100,000

WALLINGFORD BR 91 SUPERSTRUCTURE RECONSTRUCTION RAIL 04-9044 C/9 500,000 500,000 100,000 400,000 500,000

Washington County RR-Barre-Mtplr:

BARRE-BERLIN-MONTPELIER LEASE, SUBSIDY & INFRASTRUCTURE REPAIR 04-9038 260,000 260,000 260,000 260,000

BARRE-BERLIN-MONTPELIER BRIDGE MAINTENANCE 100,000 600,000 700,000 700,000 700,000

COLOR KEY

Page 2: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

RAIL FY 2012 AS PASSED - TRANSPORTATION PROGRAM

Earnark

8/1/2011 9:27

PROJECT NAME DESCRIPTION NUMBER OTHER PE ROW CONST TOTAL T FUND TIB FEDERAL ARRA LOCAL TOTAL

COLOR KEY

Washington County RR-Conn River:

BARNET WACR CRL BRIDGE 535 STRB(36) 60,000 60,000 60,000 60,000

COVENTRY BR 564 REHABILITATION WCRL(9) 25,000 50,000 75,000 75,000 75,000

COVENTRY NEW STEEL TRESTLE STRB(47) 50,000 50,000 50,000 50,000

COVENTRY REPLACE BR 562 STRB(42) 100,000 100,000 100,000 100,000

NEWBURY BR 519 SUPERSTRUCTURE REHABILITATION WCRL(15) 45,000 45,000 45,000 45,000

NEWPORT-RICHFORD CROSSING STP 2030(7) 10,000 734,063 744,063 74,406 669,657 744,063

ST. JOHNSBURY CROSSING STP 2037(11) 20,000 250,000 270,000 27,000 243,000 270,000

ST. JOHNSBURY CROSSING STP 7000(16) 25,000 600,000 625,000 62,500 562,500 625,000

WHITE RIVER JCT. - NEWPORT RAILROAD BRIDGE PROJECTS ALONG THE CT RIVER LINE 350,000 350,000 350,000 350,000

Statewide Projects

STATEWIDE RAIL HIGHWAY SURFACE AND SUBSTRUCTURE 200,000 200,000 200,000 200,000

STATEWIDE ADMINISTRATIVE SUPPORT - RAIL 850,000 850,000 850,000 850,000

STATEWIDE BRIDGE INVENTORY, INSPECTION & CLASSIFICATION 200,000 200,000 200,000 200,000

STATEWIDE LEASE & ENCROACHMENT MGMT OF STATE-OWNED RR ROW 300,000 300,000 300,000 300,000

STATEWIDE MAINTENANCE OF STATE-OWNED RAILROAD BUILDINGS 100,000 100,000 100,000 100,000

STATEWIDE OPERATION LIFESAVER 30,000 30,000 3,000 27,000 30,000

STATEWIDE 3-WAY PARTNERSHIPS-ECONOMIC DEVELOPMENT 555,000 555,000 185,000 370,000 555,000

STATEWIDE RAIL/HIGHWAY CROSSING MANAGEMENT STP 2030(8) 22,000 22,000 2,200 19,800 22,000

STATEWIDE RAILROAD PROJECT D&E 1,373,000 130,000 1,503,000 882,300 620,700 1,503,000

Passenger Rail

STATEWIDE 2 RAIL PASSENGER SERVICE (AMTRAK CONTRACT) 4,500,000 4,500,000 4,500,000 4,500,000

STATEWIDE RAIL PASSENGER MARKETING 50,000 50,000 50,000 50,000

TOTAL RAIL PROGRAM 7,015,000 2,655,000 280,000 59,446,065 69,396,065 10,104,381 2,031,668 10,079,589 33,773,723 13,406,704 69,396,065

TOTAL RAIL APPROPRIATION * 9,354,381 1,431,668 10,079,589 33,773,723 54,639,361

1. Assumes $600,000 TIB funds available from FY2011 carryforward for Pittsford BR219 construction.

2. Assumes $750,000 TF available from FY2011 carryforward from Amtrak cost savings in FY2011

FRA funding - 751,486

FHWA funding - 3,671,402

Earmark GMCR - FHWA 900,000

Earmark W. Corridor - FHWA 4,756,700

Page 3: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

RAIL

PE ROWCONSTOTHER

2,725,000280,000

59,446,065

1,441,2740

12,066,750

1,102,0000

10,020,000

69,396,065 20,998,024 18,612,000TOTAL6,945,000 7,490,000 7,490,000

Projected ProjectedBudget YearEstimated

FY 2012 FY 2013 FY 2014

1,102,0000

200,000

9,342,0008,040,000

ProjectedFY 2015

6/1/2011

Page 4: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: BI-STATE INTERCITY RAIL CORRIDOR TRACK 3 PLANNING.

ALBANY-BENNINGTON-RUTLAND

Comments: FULLY FUNDED IN FY2011 BUDGET.

PE ROWCONST

000

RAIL

Project Manager:JOE FLYNN

OTHER

000

000

000

0 0 0TOTAL 00

000

1,000,0001,000,000 0 0 0

000

1,000,0001,000,000

802-828-1331

00000Route:

000

00

Description: HIGH SPEED IMPROVEMENTS TO TRACK, ROADBED AND BRIDGES ON AMTRAK'S "VERMONTER" ROUTE, ALONG THE NEW ENGLAND CENTRAL RR FROM ST. ALBANS TO VERNON.

NEW ENGLAND CENTRAL

AMTRAK "VERMONTER"RR-FY11-AR02

Comments: ARRA PROJECT.

PE ROWCONST

000

RAIL

Project Manager:JOE FLYNN

OTHER

00

46,810,427

000

000

46,810,427 0 0TOTAL 00

00

26,231,846

26,231,8460 0 0 0

00

73,042,2730

73,042,273

802-828-1331

00000Route:

000

00

Description: SAFETY IMPROVEMENTS AT THE TH1/VERMONT RAILWAY GRADE CROSSING IN ARLINGTON, INCLUDING NEW SIGNALS, SIGNAL BOX, DRIVEWAY RELOCATION AND MUTCD UPGRADES.

TH 1 851-184B

ARLINGTONSTP 0114(4)

Comments:

PE ROWCONST

16,00900

RAIL

Project Manager:J. B. MCCARTHY

OTHER

00

100,000

000

000

100,000 0 0TOTAL 16,0090

158,9910

200,000

358,9910 0 0 0

175,0000

300,0000

475,000

802-828-3876

00000Route:

000

00

Page 16/1/2011

Page 5: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: REPLACEMENT OF TRUSS BR535 ON THE WASHINGTON COUNTY RAILROAD - CONNECTICUT RIVER LINE IN BARNET.CONN RIVER MAIN LINE

BARNETSTRB(36)

Comments:

PE ROWCONST

240,00300

RAIL

Project Manager:DOUG ZORZI

OTHER

00

60,000

000

000

60,000 0 0TOTAL 240,0030

34,9970

180,000

214,9970 0 0 0

275,0000

240,0000

515,000

802-828-5764

00000Route:

000

00

Description: EVALUATION, MAINTENANCE AND REHABILITATION OF BRIDGES ALONG THE WASHINGTON COUNTY RR IN BARRE, BERLIN AND MONTPELIER.

WASHINGTON CO. RR

BARRE-BERLIN-MONTPELIER

Comments:

PE ROWCONST

000

RAIL

Project Manager:J. B. MCCARTHY

OTHER

100,0000

600,000

000

000

700,000 0 0TOTAL 00

100,0000

100,000

200,0000 0 0 0

200,0000

700,0000

900,000

802-828-3876

00000Route:

000

00

Description: LEASE SUBSIDY, AND INFRASTRUCTURE REPAIR.WASHINGTON CO. RR

BARRE-BERLIN-MONTPELIER04-9038

Comments:

PE ROWCONST

000

RAIL

Project Manager:KEVIN CLAIRMONT

OTHER

000

000

000

260,000 260,000 260,000TOTAL 1,079,9091,079,909

000

260,000260,000 260,000 260,000 260,000

000

2,379,9092,379,909

802-828-2710

00000Route:

000

260,000260,000

Page 26/1/2011

Page 6: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: SCOPING FOR IMPROVEMENTS TO BR130 ON THE GREEN MOUNTAIN RR IN CAVENDISH.GREEN MTN RR CORP

CAVENDISHGMRC(12)

Comments:

PE ROWCONST

000

RAIL

Project Manager:J. B. MCCARTHY

OTHER

40,0000

50,000

00

331,250

000

90,000 331,250 0TOTAL 00

40,00000

40,0000 0 0 0

80,0000

381,2500

461,250

802-828-3876

00000Route:

000

00

Description: REPLACEMENT OF BEARINGS AND REHABILITATION OF BEARING SEATS, FOR BRIDGE NO. 114 ON THE GREEN MOUNTAIN RR IN CHESTER.

GREEN MTN RR CORP

CHESTERSTP GMRC(4)

Comments:

PE ROWCONST

13600

RAIL

Project Manager:J. B. MCCARTHY

OTHER

00

22,500

000

000

22,500 0 0TOTAL 1360

10,0000

153,077

163,0770 0 0 0

10,1360

175,5770

185,713

802-828-3876

00000Route:

000

00

Description: REPLACEMENT OF BEARINGS AND REHABILITATION OF BEARING SEATS, FOR BRIDGE NO. 121 ON THE GREEN MOUNTAIN RR IN CHESTER.

GREEN MTN RR CORP

CHESTERSTP GMRC(5)

Comments:

PE ROWCONST

1,21100

RAIL

Project Manager:J. B. MCCARTHY

OTHER

00

29,041

000

000

29,041 0 0TOTAL 1,2110

10,0000

194,369

204,3690 0 0 0

11,2110

223,4100

234,621

802-828-3876

00000Route:

000

00

Page 36/1/2011

Page 7: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: REHABILITATION OF BR153 ON THE GREEN MOUNTAIN RAILROAD IN CLARENDON, INCLUDING REPLACEMENT OF BEARINGS, REHABILITATION OF BRIDGE BEARING SEATS, AND RELATED CONCRETE AND MASONRY REPAIRS.

GREEN MTN RR CORP

CLARENDONGMRC(7)

Comments:

PE ROWCONST

000

RAIL

Project Manager:J. B. MCCARTHY

OTHER

00

25,735

000

000

25,735 0 0TOTAL 00

20,0000

239,381

259,3810 0 0 0

20,0000

265,1160

285,116

802-828-3876

00000Route:

000

00

Description: SCOPING FOR IMPROVEMENTS TO BR95 ON THE VERMONT RAILWAY IN CLARENDON.VT RAILWAY, INC.

CLARENDONWCRS(10)

Comments:

PE ROWCONST

50,95700

RAIL

Project Manager:J. B. MCCARTHY

OTHER

25,00000

000

000

25,000 0 0TOTAL 50,9570

50,00020,000

0

70,0000 0 0 0

125,95720,000

00

145,957

802-828-3876

00000Route:

000

00

Description: DESIGN AND CONSTRUCTION FOR REPLACEMENT OF BR562.CONN RIVER MAIN LINE

COVENTRYSTRB(42)

Comments:

PE ROWCONST

286,53400

RAIL

Project Manager:J. B. MCCARTHY

OTHER

100,00000

00

540,000

00

1,620,000

100,000 540,000 1,620,000TOTAL 286,5340

350,00000

350,0000 0 0 0

736,5340

2,160,0000

2,896,534

802-828-3876

00000Route:

000

00

Page 46/1/2011

Page 8: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: REMOVE FIVE LARGE-DIAMETER CULVERTS, AND CONSTRUCT NEW STEEL TRESTLE ON THE WASHINGTON COUNTY RAILROAD - CONNECTICUT RIVER LINE IN COVENTRY, TO PROVIDE FLOW EQUIVOCATION CHANNEL. BRIDGE NO. 561.

CONN RIVER MAIN LINE

COVENTRYSTRB(47)

Comments:

PE ROWCONST

000

RAIL

Project Manager:DOUG ZORZI

OTHER

00

50,000

000

000

50,000 0 0TOTAL 00

50,0000

728,000

778,0000 0 0 0

50,0000

778,0000

828,000

802-828-5764

00000Route:

000

00

Description: REHABILITATION OF BR564 ON THE WASHINGTON COUNTY RR - CONNECTICUT RIVER LINE IN COVENTRY.CONN RIVER MAIN LINE

COVENTRYWCRL(9)

Comments:

PE ROWCONST

000

RAIL

Project Manager:DOUG ZORZI

OTHER

25,0000

50,000

00

300,000

00

2,450,000

75,000 300,000 2,450,000TOTAL 00

20,00000

20,0000 0 0 0

45,0000

2,800,0000

2,845,000

802-828-5764

00000Route:

000

00

Description: SCOPING FOR STRUCTURAL MODIFICATIONS TO INCREASE LOAD CAPACITY OF BRIDGE NO. 79 ON THE VERMONT RAILWAY IN DORSET.VT RAILWAY, INC.

DORSETWCRS(8)

Comments:

PE ROWCONST

57,64100

RAIL

Project Manager:DOUG ZORZI

OTHER

00

280,000

000

000

280,000 0 0TOTAL 57,6410

50,0000

370,000

420,0000 0 0 0

107,6410

650,0000

757,641

802-828-5764

00000Route:

000

00

Page 56/1/2011

Page 9: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: REHABILITATION OF AN EXISTING TIMBER RAILROAD BRIDGE ON THE WASHINGTON COUNTY RAILROAD'S CONNECTICUT RIVER LINE IN FAIRLEE.

CONN RIVER MAIN LINE

FAIRLEE

Comments:

PE ROWCONST

000

RAIL

Project Manager:

OTHER

000

000

000

0 0 0TOTAL 00

00

150,000

150,0000 0 0 0

00

150,0000

150,000

00000Route:

000

00

Description: RECONSTRUCTION OF THE VERMONT RWY/LITTLE CHICAGO ROAD (TH5) GRADE CROSSING IN FERRISBURGH.VT RAILWAY, INC

FERRISBURGHRAIL 5306(1)

Comments: FEDERAL RAILWAY ADMINISTRATION (FRA) PROJECT. PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

35,05200

RAIL

Project Manager:KEVIN CLAIRMONT

OTHER

000

000

000

0 0 0TOTAL 35,0520

19,9480

270,738

290,6860 0 0 0

55,0000

270,7380

325,738

802-828-2710

00000Route:

000

00

Description: REHABILITATION OF BR229 ON THE VERMONT RAILWAY IN LEICESTER, INCLUDING REPLACEMENT OF BEARINGS AND TIMBER DECK, REHABILITATION OF BRIDGE BEARING SEATS, AND SCOUR PROTECTION.

VT RAILWAY, INC

LEICESTERWCRS(11)

Comments:

PE ROWCONST

2,70300

RAIL

Project Manager:DOUG ZORZI

OTHER

00

83,100

000

000

83,100 0 0TOTAL 2,7030

10,0000

200,000

210,0000 0 0 0

12,7030

283,1000

295,803

802-828-5764

00000Route:

000

00

Page 66/1/2011

Page 10: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: INITIATION OF FINAL DESIGN AND PERMITTING FOR A RAIL SPUR TO TRANSPORT LARGE LARGE AMOUNTS OF INDUSTRIAL MATERIALS BETWEEN MIDDLEBURY AND THE HAMLET OF FLORENCE IN PITTSFORD.

MIDDLEBURY SPUR

MIDDLEBURYST SPUR(2)

Comments: SEE MIDDLEBURY WCRS(22).

PE ROWCONST

1,348,31100

RAIL

Project Manager:

OTHER

000

000

000

0 0 0TOTAL 1,348,3110

000

00 0 0 0

1,348,311000

1,348,311

00000Route:

000

00

Description: REHABILITATION OF BR236 ON THE VERMONT RAILWAY IN MIDDLEBURY, INCLUDING REPAIR OF SUPERSTRUCTURE AND SUBSTRUCTURE.

VT RAILWAY, INC

MIDDLEBURYWCRS( )

Comments:

PE ROWCONST

000

RAIL

Project Manager:DOUG ZORZI

OTHER

000

000

000

0 0 0TOTAL 00

00

30,000

30,0000 0 0 0

00

30,0000

30,000

802-828-5764

00000Route:

000

00

Description: REHABILITATION OF BR233 ON THE VERMONT RAILWAY IN MIDDLEBURY, INCLUDING REPLACEMENT OF BEARINGS AND REHABILITATION OF BRIDGE BEARING SEATS.

VT RAILWAY, INC

MIDDLEBURYWCRS(12)

Comments:

PE ROWCONST

3,26300

RAIL

Project Manager:DOUG ZORZI

OTHER

00

51,284

000

000

51,284 0 0TOTAL 3,2630

16,7370

150,000

166,7370 0 0 0

20,0000

201,2840

221,284

802-828-5764

00000Route:

000

00

Page 76/1/2011

Page 11: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: REHABILITATION OF BR234 ON THE VERMONT RAILWAY IN MIDDLEBURY, INCLUDING REMOVAL OF EXISTING SUPERSTRUCTURE, INSTALLATION OF NEW CONCRETE SLABS, AND SUBSTRUCTURE REPAIRS.

VT RAILWAY, INC

MIDDLEBURYWCRS(16)

Comments:

PE ROWCONST

3,03100

RAIL

Project Manager:J. B. MCCARTHY

OTHER

00

64,644

000

000

64,644 0 0TOTAL 3,0310

6,9690

175,000

181,9690 0 0 0

10,0000

239,6440

249,644

802-828-3876

00000Route:

000

00

Description: CONSTRUCTION OF NEW BRIDGE FOR US7 OVER THE NEW RAILROAD SPUR IN MIDDLEBURY.VT RAILWAY, INC.

MIDDLEBURYWCRS(22)

Comments:

PE ROWCONST

9,73100

RAIL

Project Manager:J. B. MCCARTHY

OTHER

250,000150,000

0

190,2690

1,500,000

00

4,500,000

400,000 1,690,269 4,500,000TOTAL 9,7310

200,00000

200,0000 0 0 0

650,000150,000

6,000,0000

6,800,000

802-828-3876

00000Route:

000

00

Description: EVALUATION AND LOAD CAPACITY ANALYSIS OF EXISTING PIN TRUSS BRIDGE NOS. 304 AND 306, ON THE WASHINGTON COUNTY RAILROAD IN MONTPELIER.

WASHINGTON COUNTY RR

MONTPELIERWACR(3)

Comments:

PE ROWCONST

70,59100

RAIL

Project Manager:DOUG ZORZI

OTHER

000

000

000

0 0 0TOTAL 70,5910

104,40900

104,4090 0 0 0

175,000000

175,000

802-828-5764

00000Route:

000

00

Page 86/1/2011

Page 12: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: RECONSTRUCTION OF THE VERMONT RAILWAY GRADE CROSSING ON US7 IN NEW HAVEN JCT.US 7 851-367U

NEW HAVENRAIL 5307(16)

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

118,88900

RAIL

Project Manager:J. B. MCCARTHY

OTHER

000

000

000

0 0 0TOTAL 118,8890

16,1110

954,854

970,9650 0 0 0

135,0000

954,8540

1,089,854

802-828-3876

00000Route:

000

00

Description: REHABILITATION OF BR243 ON THE VERMONT RAILWAY IN NEW HAVEN, INCLUDING REPLACEMENT OF BEARINGS, REHABILITATION OF BRIDGE BEARING SEATS, RELATED CONCRETE AND MASONRY REPAIRS, AND SCOUR PROTECTION.

VT RAILWAY, INC

NEW HAVENWCRS(13)

Comments:

PE ROWCONST

2,70100

RAIL

Project Manager:DOUG ZORZI

OTHER

00

34,330

000

000

34,330 0 0TOTAL 2,7010

13,2990

125,000

138,2990 0 0 0

16,0000

159,3300

175,330

802-828-5764

00000Route:

000

00

Description: REHABILITATION OF BR242 ON THE VERMONT RAILWAY IN NEW HAVEN, INCLUDING REMOVAL OF EXISTING SUPERSTRUCTUE, INSTALLATION OF NEW BEARING SEAT AND BACKWALLS, AND INSTALLATION OF OPEN DECK STRINGER SUPERSTRUCTURE.

VT RAILWAY, INC

NEW HAVENWCRS(18)

Comments:

PE ROWCONST

000

RAIL

Project Manager:DOUG ZORZI

OTHER

15,0000

450,000

000

000

465,000 0 0TOTAL 00

25,00000

25,0000 0 0 0

40,0000

450,0000

490,000

802-828-5764

00000Route:

000

00

Page 96/1/2011

Page 13: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: REHABILITATION OF BR519 ON THE WASHINGTON COUNTY RR - CONNECTICUT RIVER LINE IN NEWBURY.CONN RIVER MAIN LINE

NEWBURYWCRL(15)

Comments:

PE ROWCONST

000

RAIL

Project Manager:DOUG ZORZI

OTHER

00

45,000

000

000

45,000 0 0TOTAL 00

23,00000

23,0000 0 0 0

23,0000

45,0000

68,000

802-828-5764

00000Route:

000

00

Description: IMPROVEMENTS TO FIVE RAIL/HIGHWAY CROSSINGS ALONG THE MONTREAL, MAINE & ATLANTIC RR: US5 IN NEWPORT CITY (DOT #847-921B); FARM ACCESS IN NEWPORT TOWN (847-908M); VT105 IN TROY (847-891L); DOMINION AVE. IN NORTH TROY (847-883U); AND VT105 IN RICHFORD (847-879E).

MM&A RAILROAD

NEWPORT-RICHFORDSTP 2030(7)

Comments:

PE ROWCONST

128,6930

749

RAIL

Project Manager:J. B. MCCARTHY

OTHER

10,0000

734,063

000

000

744,063 0 0TOTAL 129,4420

15,0000

499,251

514,2510 0 0 0

153,6930

1,234,0630

1,387,756

802-828-3876

00000Route:

000

00

Description: REPLACEMENT OF EXISTING TRUSS BRIDGE AND PLATE GIRDER APPROACH, BR219, ON THE VERMONT RAILWAY IN PITTSFORD.VT RAILWAY, INC.

PITTSFORDHPP ABRB(9)

Comments:

PE ROWCONST

817,3744,350

0

RAIL

Project Manager:DOUG ZORZI

OTHER

100,0000

3,000,000

00

8,695,500

000

3,100,000 8,695,500 0TOTAL 821,7240

350,000145,650

0

495,6500 0 0 0

1,267,374150,000

11,695,5000

13,112,874

802-828-5764

00000Route:

000

00

Page 106/1/2011

Page 14: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: DESIGN OF SAFETY IMPROVEMENTS FOR TWO RAIL/HIGHWAY CROSSINGS ON TH8 (WHIPPLE HOLLOW RD.) IN PITTSFORD: DOT CROSSING NUMBERS 837-138R AND 837-139X.

TH 8

PITTSFORDSTP 2033(21)

Comments:

PE ROWCONST

68,42400

RAIL

Project Manager:J. B. MCCARTHY

OTHER

00

849,773

000

000

849,773 0 0TOTAL 68,4240

81,57600

81,5760 0 0 0

150,0000

849,7730

999,773

802-828-3876

00000Route:

000

00

Description: INSTALL 12.5 MILES OF CONTINUOUS WELDED RAIL (CWR) ALONG THE VERMONT RAILWAY: MP 58.5-67.0 (PROCTOR-MIDDLEBURY); MP 83.0-87.0 (SALISBURY-MIDDLEBURY). INCLUDES SWITCH REBUILDS, DRAINAGE AND CROSSING RECONSTRUCTION.

VT RAILWAY, INC.

PROCTOR-MIDDLEBURYSTP WCRS(7)

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

208,39100

RAIL

Project Manager:KEVIN CLAIRMONT

OTHER

000

000

000

0 0 0TOTAL 208,3910

16,6090

3,500,000

3,516,6090 0 0 0

225,0000

3,500,0000

3,725,000

802-828-2710

00000Route:

000

00

Description: SCOPING TO EVALUATE ALTERNATIVES FOR NEW SUPERSTRUCTURE AND ABUTMENTS, ROW AND CONSTRUCTION, FOR BRIDGE NO. 108 ON THE GREEN MOUNTAIN RAILROAD, OVER TH6 (PARKER HILL RD.) IN ROCKINGHAM.

GREEN MTN RR CORP

ROCKINGHAMSTP GMRC(1)

Comments:

PE ROWCONST

310,19114,990

0

RAIL

Project Manager:DOUG ZORZI

OTHER

00

1,125,000

000

000

1,125,000 0 0TOTAL 325,1810

39,809110,110375,000

524,9190 0 0 0

350,000125,100

1,500,0000

1,975,100

802-828-5764

00000Route:

000

00

Page 116/1/2011

Page 15: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: DESIGN COUNTERMEASURES TO STABILIZE PIER FROM LONG-TERM EFFECTS OF RIVER SCOUR, AND SOUTH ABUTMENT WING WALL EMBANKMENT STABILIZATION OF THE RAIL BED.

GREEN MTN RR CORP

ROCKINGHAMSTP GMRC(16)

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

32,82000

RAIL

Project Manager:DOUG ZORZI

OTHER

000

000

000

0 0 0TOTAL 32,8200

27,1800

350,000

377,1800 0 0 0

60,0000

350,0000

410,000

802-828-5764

00000Route:

000

00

Description: ROCKINGHAM BRIDGE #107 @ MILE POST 5.023 BRIDGE BEARINGS SCOPING REPORT.GREEN MTN RR CORP

ROCKINGHAMSTP GMRC(9)

Comments:

PE ROWCONST

35,31200

RAIL

Project Manager:DOUG ZORZI

OTHER

00

906,000

000

000

906,000 0 0TOTAL 35,3120

114,6880

344,000

458,6880 0 0 0

150,0000

1,250,0000

1,400,000

802-828-5764

00000Route:

000

00

Description: IMPROVEMENTS TO THE TH5 (GEE HILL RD.)/NECR GRADE CROSSING IN ROYALTON.TH 5 247-550L

ROYALTONSTP 2034(14)

Comments:

PE ROWCONST

38,36500

RAIL

Project Manager:J. B. MCCARTHY

OTHER

10,0000

528,000

000

000

538,000 0 0TOTAL 38,3650

51,6350

100,000

151,6350 0 0 0

100,0000

628,0000

728,000

802-828-3876

00000Route:

000

00

Page 126/1/2011

Page 16: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: IMPROVEMENTS TO THE TH88 (LYONS RD.)/NECR GRADE CROSSING IN ROYALTON.TH 88 247-553G

ROYALTONSTP 2034(15)

Comments:

PE ROWCONST

22,47800

RAIL

Project Manager:J. B. MCCARTHY

OTHER

10,0000

528,000

000

000

538,000 0 0TOTAL 22,4780

117,5220

100,000

217,5220 0 0 0

150,0000

628,0000

778,000

802-828-3876

00000Route:

000

00

Description: RECONSTRUCTION OF THE VERMONT RAILWAY GRADE CROSSING ON WEST ST. IN RUTLAND CITY.WEST ST. 851-293E

RUTLAND CITYRAIL 5307(15)

Comments:

PE ROWCONST

88,67900

RAIL

Project Manager:J. B. MCCARTHY

OTHER

00

465,000

000

000

465,000 0 0TOTAL 88,6790

33,3210

310,000

343,3210 0 0 0

122,0000

775,0000

897,000

802-828-3876

00000Route:

000

00

Description: BRIDGE SCOPING AND PRELIMINARY ENGINEERING FOR THE VERMONT RAILWAY BETWEEN RUTLAND AND BURLINGTON.VT RAILWAY, INC.

RUTLAND-BURLINGTONWCRS(3)

Comments: BRIDGE LOAD CAPACITY ANALYSIS.

PE ROWCONST

000

RAIL

Project Manager:J. B. MCCARTHY

OTHER

400,00000

200,00000

80,00000

400,000 200,000 80,000TOTAL 00

000

00 0 0 0

760,000000

760,000

802-828-3876

00000Route:

80,00000

80,0000

Page 136/1/2011

Page 17: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: INSTALLATION OF APPROXIMATELY 2 MILES OF CONTINUOUS WELDED RAIL (CWR) ALONG THE CLARENDON & PITTSFORD RR BETWEEN FAIR HAVEN AND RUTLAND.

CLP RAILROAD

RUTLAND-FAIR HAVEN

Comments:

PE ROWCONST

000

RAIL

Project Manager:

OTHER

000

000

000

0 0 0TOTAL 00

120,0000

1,043,551

1,163,5510 0 0 0

120,0000

1,043,5510

1,163,551

00000Route:

000

00

Description: REHABILITATION OF BR232 ON THE VERMONT RAILWAY IN SALISBURY, INCLUDING REMOVAL OF EXISTING SUPERSTRUCTURE, INSTALLATION OF NEW CONCRETE SLABS, AND SUBSTRUCTURE REPAIRS.

VT RAILWAY, INC

SALISBURYWCRS(15)

Comments:

PE ROWCONST

2,14400

RAIL

Project Manager:J. B. MCCARTHY

OTHER

00

91,000

000

000

91,000 0 0TOTAL 2,1440

12,8560

234,000

246,8560 0 0 0

15,0000

325,0000

340,000

802-828-3876

00000Route:

000

00

Description: RESTORE HYDRAULIC CAPACITY TO EXISTING CONDITIONS AND STABILIZE THE INLET AND OUTLET EMBANKMENTS, FOR BRIDGE NO. 57.5 ON THE VERMONT RAILWAY IN SHAFTSBURY.

VT RAILWAY, INC.

SHAFTSBURYRAIL 5307(41)

Comments: FEDERAL SHARE IS FROM FEDERAL RAILROAD ADMINISTRATION (FRA).

PE ROWCONST

55,9950

75,503

RAIL

Project Manager:DOUG ZORZI

OTHER

150,00000

29,0050

500,000

00

1,250,000

150,000 529,005 1,250,000TOTAL 131,4980

100,000100,000

0

200,0000 0 0 0

335,000100,000

1,825,5030

2,260,503

802-828-5764

00000Route:

000

00

Page 146/1/2011

Page 18: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: PROJECT IS FOR QUIET ZONE CROSSING MAINTENANCE ALONG THE VERMONT RAILWAY, BETWEEN SHELBURNE AND BURLINGTON.VT RAILWAY, INC.

SHELBURNE-BURLINGTON

Comments: REQUIRED UNDER 1998 ACCESS AGREEMENT.

PE ROWCONST

000

RAIL

Project Manager:JOE FLYNN

OTHER

000

000

000

100,000 100,000 100,000TOTAL 00

000

175,000175,000 100,000 100,000 100,000

000

575,000575,000

802-828-1331

00000Route:

000

100,000100,000

Description: IMPROVEMENTS TO THE GRADE CROSSING OF CONCORD AVE. AND THE WASHINGTON COUNTY RR (CONNECTICUT RIVER DIV.) IN ST. JOHNSBURY, DOT #850-938H.

CONCORD AVE 850-938H

ST. JOHNSBURYSTP 2037(11)

Comments:

PE ROWCONST

3010

58,882

RAIL

Project Manager:JENNIFER ROYER

OTHER

20,0000

250,000

000

000

270,000 0 0TOTAL 59,1830

29,69900

29,6990 0 0 0

50,0000

308,8820

358,882

802-828-1118

00000Route:

000

00

Description: IMPROVEMENTS TO THE WASHINGTON COUNTY RR - CONN RIVER LINE/US5 (PASSUMPSIC ST.) GRADE CROSSING IN ST. JOHNSBURY.US 5 850-935M

ST. JOHNSBURYSTP 7000(16)

Comments:

PE ROWCONST

3,12700

RAIL

Project Manager:J. B. MCCARTHY

OTHER

25,0000

600,000

000

000

625,000 0 0TOTAL 3,1270

70,00000

70,0000 0 0 0

98,1270

600,0000

698,127

802-828-3876

00000Route:

000

00

Page 156/1/2011

Page 19: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: PROJECT IS FOR THE PURCHASE OF INTERSTATE RAIL PASSENGER SERVICE, AND RELATED EXPENSES.RAIL PASS. SERVICE

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOE FLYNN

OTHER

000

000

000

4,500,000 5,000,000 5,000,000TOTAL 3,133,5473,133,547

000

5,000,0005,000,000 4,500,000 5,000,000 5,000,000

000

28,133,54728,133,547

802-828-1331

00000Route:

000

5,500,0005,500,000

Description: PROJECT IS FOR THE ADMINISTRATIVE SUPPORT OF THE RAIL PROGRAM.RAILROAD ADMIN.

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOE FLYNN

OTHER

000

000

000

850,000 850,000 850,000TOTAL 8,796,8328,796,832

000

920,561920,561 850,000 850,000 850,000

000

13,117,39313,117,393

802-828-1331

00000Route:

000

850,000850,000

Description: INVENTORY, INSPECTION AND CLASSIFICATION OF STATE-OWNED RAILROAD BRIDGES.RAILROAD BRIDGES

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:

OTHER

000

000

000

200,000 200,000 200,000TOTAL 76,99176,991

000

100,000100,000 200,000 200,000 200,000

000

976,991976,991

00000Route:

000

200,000200,000

Page 166/1/2011

Page 20: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: PROJECT IS FOR THE AGENCY'S ESTIMATED EXPENDITURES ON TRANSPORTATION - RAILROAD BRIDGE PROJECTS THAT ARE CURRENTLY UNDER DEVELOPMENT, EVALUATION AND SCOPING.

RAILROAD BRIDGES

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:J. B. MCCARTHY

OTHER

1,373,000130,000

0

1,000,00000

1,000,00000

1,503,000 1,000,000 1,000,000TOTAL 00

1,048,00000

1,048,0000 0 0 0

5,421,000130,000

00

5,551,000

802-828-3876

00000Route:

1,000,00000

1,000,0000

Description: RAIL/HIGHWAY SURFACE AND SUBSTRUCTURE IMPROVEMENT.VARIOUS RAILROADS

STATEWIDE

Comments:

PE ROWCONST

398,73000

RAIL

Project Manager:J. B. MCCARTHY

OTHER

00

200,000

00

200,000

00

200,000

200,000 200,000 200,000TOTAL 398,7300

00

200,000

200,0000 0 0 0

398,7300

1,000,0000

1,398,730

802-828-3876

00000Route:

00

200,000

200,0000

Description: LEASE AND ENCROACHMENT MANAGEMENT OF STATE-OWNED RAILROAD RIGHT-OF-WAY.VARIOUS RAILROADS

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:

OTHER

000

000

000

300,000 300,000 300,000TOTAL 1,922,6781,922,678

000

250,000250,000 300,000 300,000 300,000

000

3,422,6783,422,678

00000Route:

000

350,000350,000

Page 176/1/2011

Page 21: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: OPERATION LIFESAVER.VARIOUS RAILROADS

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:

OTHER

000

000

000

30,000 30,000 30,000TOTAL 00

000

30,00030,000 30,000 30,000 30,000

000

150,000150,000

00000Route:

000

30,00030,000

Description: RAIL PASSENGER MARKETING.VARIOUS RAILROADS

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOE FLYNN

OTHER

000

000

000

50,000 50,000 50,000TOTAL 00

000

50,00050,000 50,000 50,000 50,000

000

250,000250,000

802-828-1331

00000Route:

000

50,00050,000

Description: PROJECT IS FOR THE PURPOSE OF PARTICIPATING IN THREE-WAY PARTNERSHIPS WITH RAILROADS AND RAIL SHIPPERS, TO DEVELOP NEEDED FACILITIES, INCLUDING SIDINGS, SPURS & SYSTEM DEVELOPMENT.

VARIOUS RAILROADS

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOE FLYNN

OTHER

000

000

000

555,000 600,000 600,000TOTAL 00

000

150,000150,000 555,000 600,000 600,000

000

2,505,0002,505,000

802-828-1331

00000Route:

000

600,000600,000

Page 186/1/2011

Page 22: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: MAINTENANCE OF STATE-OWNED RAILROAD PROPERTY AND BUILDINGS.VARIOUS RAILROADS

STATEWIDERR 1002

Comments:

PE ROWCONST

000

RAIL

Project Manager:

OTHER

000

000

000

100,000 100,000 100,000TOTAL 00

000

100,000100,000 100,000 100,000 100,000

000

500,000500,000

00000Route:

000

100,000100,000

Description: RAIL/HIGHWAY CROSSING IMPROVEMENTS.VARIOUS RAILROADS

STATEWIDESTP 2030( )

Comments: INDIVIDUAL PROJECTS SHOWN IN PROGRAM.

PE ROWCONST

000

RAIL

Project Manager:JENNIFER ROYER

OTHER

000

000

000

0 0 0TOTAL 00

498,1000

3,230,000

3,728,1000 0 0 0

498,1000

3,230,0000

3,728,100

802-828-1118

00000Route:

000

00

Description: COMPILATION, ANALYSIS AND MAINTENANCE FOR RAIL/HIGHWAY CROSSING IMPROVEMENTS (CRASH DATA, TRAFFIC VOLUMES, ETC.), AND EVALUATION OF DATABASE SYSTEMS.

VARIOUS ROUTES

STATEWIDESTP 2030(8)

Comments: SECTION 130.

PE ROWCONST

22,25800

RAIL

Project Manager:J. B. MCCARTHY

OTHER

22,00000

22,00000

22,00000

22,000 22,000 22,000TOTAL 22,2580

22,00000

22,0000 0 0 0

132,258000

132,258

802-828-3876

00000Route:

22,00000

22,0000

Page 196/1/2011

Page 23: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: RECONSTRUCTION OF BR63 ON THE VERMONT RAILWAY IN SUNDERLAND.VT RAILWAY, INC.

SUNDERLAND

Comments:

PE ROWCONST

000

RAIL

Project Manager:

OTHER

000

000

000

0 0 0TOTAL 00

80,0000

750,000

830,0000 0 0 0

80,0000

750,0000

830,000

00000Route:

000

00

Description: SCOPING FOR IMPROVEMENTS TO THE NEW ENGLAND CENTRAL RR/TH11 (LAKEWOOD RD.) GRADE CROSSING IN SWANTON.TH 11 247-636V

SWANTONSTP 2038(15)

Comments:

PE ROWCONST

3,17200

RAIL

Project Manager:J. B. MCCARTHY

OTHER

50,0000

312,500

000

000

362,500 0 0TOTAL 3,1720

72,82800

72,8280 0 0 0

126,0000

312,5000

438,500

802-828-3876

00000Route:

000

00

Description: REHABILITATION OF BR145 ON THE GREEN MOUNTAIN RAILROAD IN EAST WALLINGFORD, INCLUDING REPLACEMENT OF BEARINGS, REHABILITATIONOF BRIDGE BEARING SEATS, AND RELATED CONCRETE AND MASONRY REPAIRS.

GREEN MTN RR CORP

WALLINGFORDGMRC(8)

Comments:

PE ROWCONST

000

RAIL

Project Manager:J. B. MCCARTHY

OTHER

00

200,668

000

000

200,668 0 0TOTAL 00

20,0000

120,000

140,0000 0 0 0

20,0000

320,6680

340,668

802-828-3876

00000Route:

000

00

Page 206/1/2011

Page 24: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: PROJECT IS A NEW PRECAST CONCRETE SUPERSTRUCTURE FOR BR91.VT RAILWAY, INC.

WALLINGFORDRAIL 04-9044 C/9

Comments: INCLUDES ALLOWANCE FOR FORCE ACCOUNT WORK.

PE ROWCONST

62,61100

RAIL

Project Manager:J. B. MCCARTHY

OTHER

00

500,000

000

000

500,000 0 0TOTAL 62,6110

32,38900

32,3890 0 0 0

95,0000

500,0000

595,000

802-828-3876

00000Route:

000

00

Description: REHABILITATION OF THE DEMERITT PLACE GRADE CROSSING ON THE NEW ENGLAND CENTRAL RAILROAD IN WATERBURY (DOT #247-399G).

NEW ENGLAND CENTRAL

WATERBURY

Comments:

PE ROWCONST

000

RAIL

Project Manager:J. B. MCCARTHY

OTHER

000

000

000

0 0 0TOTAL 00

35,00015,000

350,000

400,0000 0 0 0

35,00015,000

350,0000

400,000

802-828-3876

00000Route:

000

00

Description: EVALUATION, MAINTENANCE AND REHABILITATION OF BRIDGES ALONG THE CONNECTICUT RIVER LINE.CONN. RIVER LINE

WHITE RIVER JCT.-NEWPORT

Comments:

PE ROWCONST

000

RAIL

Project Manager:J. B. MCCARTHY

OTHER

000

000

000

0 0 0TOTAL 00

75,0000

200,000

275,0000 0 0 0

75,0000

200,0000

275,000

802-828-3876

00000Route:

000

00

Page 216/1/2011

Page 25: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

PROJECTED

FY 2015

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2010

ESTIMATED CURRENT

YEAR FY 2011

ESTIMATED BUDGET YEAR

FY 2012

PROJECTED

FY 2013

PROJECTED

FY 2014

Description: UPDATE BRIDGE LOCATIONS ASSESSMENT OF SCOUR AND EROSION EFFECTS WITH SITE SURVEY AND RETROFIT EVALUATION AT ELEVEN WORST-RATED BRIDGES ALONG THE WASHINGTON COUNTY RR - CONNECTICUT RIVER LINE.

CONN. RIVER LINE

WHITE RIVER JCT.-NEWPORTSTRB43

Comments:

PE ROWCONST

000

RAIL

Project Manager:DOUG ZORZI

OTHER

00

350,000

000

000

350,000 0 0TOTAL 00

150,0000

300,000

450,0000 0 0 0

150,0000

650,0000

800,000

802-828-5764

00000Route:

000

00

Page 226/1/2011

Page 26: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

Project Name Manager

RAIL - CAPITAL PROGRAM

PE ROW Const Total Federal State Local

SFY 2012 D&E

Project Description

Bridge No. 557 RehabilitationBarton - Conn. River Line Doug Zorzi 45,000 0 0 45,000 0 45,000 0

Bridge No. 516 RehabilitationBradford - Conn. River Line Doug Zorzi 25,000 0 0 25,000 0 25,000 0

Bridge No. 544 RehabilitationBurke - Conn. River Line Doug Zorzi 25,000 0 0 25,000 0 25,000 0

Bridge No. 119 RehabilitationChester - Green Mtn RR Corp JB McCarthy 50,000 0 0 50,000 0 50,000 0

Bridge No. 152 RehabilitationClarendon - Green Mtn RR Corp JB McCarthy 40,000 0 0 40,000 0 40,000 0

Bridge No. 153 RehabilitationClarendon - Green Mtn RR Corp JB McCarthy 50,000 0 0 50,000 0 50,000 0

Bridge No. 566 RehabilitationCoventry - Conn. River Line Doug Zorzi 25,000 0 0 25,000 0 25,000 0

Bridge No. 563 RehabilitationCoventry - Conn. River Line Doug Zorzi 40,000 0 0 40,000 0 40,000 0

Bridge No. 565 RehabilitationCoventry - Conn. River Line Doug Zorzi 75,000 0 0 75,000 0 75,000 0

Bridge No. 249 RehabilitationFerrisburgh - VT Railway, Inc. 50,000 0 0 50,000 0 50,000 0

Bridge No. 541 RehabilitationLyndon - Conn. River Line Doug Zorzi 50,000 0 0 50,000 0 50,000 0

Bridge No. 72 Scour MitigationManchester - VT Railway, Inc Doug Zorzi 50,000 0 0 50,000 40,000 10,000 0

Middlebury Downtown TunnelMiddlebury - VT Railway, Inc JB McCarthy 500,000 100,000 0 600,000 480,000 120,000 0

Pioneer St. CrossingMontpelier - Washington Co RR JB McCarthy 18,000 5,000 0 23,000 20,700 2,300 0

Design for WACR BridgesMontpelier - Washington Co RR Doug Zorzi 75,000 0 0 75,000 0 75,000 0

Bridge No. 144 RehabilitationMt. Holly - Green Mtn RR 50,000 0 0 50,000 0 50,000 0

Bridge No. 500 RehabilitationNewbury - Conn. River Line Doug Zorzi 55,000 0 0 55,000 0 55,000 0

Bridge No. 111 RehabilitationRockingham - Green Mtn RR Corp Doug Zorzi 25,000 25,000 0 50,000 0 50,000 0

Bridge No. 112 RehabilitationRockingham - Green Mtn RR Corp JB McCarthy 25,000 0 0 25,000 0 25,000 0

Bridge No. 64 ReplacementSunderland - VT Railway, Inc JB McCarthy 100,000 0 0 100,000 80,000 20,000 0

1,373,000 130,000 0 1,503,000 620,700 882,300 0Totals:

6/1/2011 Page 1

Page 27: FY 2015 - Agency of Transportationvtrans.vermont.gov/sites/aot/files/portal/documents/aboutus/... · stp gmrc(4) comments: pe row const. 136 0 0 rail. project manager: j. b. mccarthy

Project Name Route Project Number Project Manager Phone No. Project Description

RAIL CANDIDATES

BARTON WCRL(11)CONN RIVER MAIN LINE REHAB BR558DOUG ZORZI 828-5764

BARTON WCRL(13)CONN RIVER MAIN LINE SCOPING FOR BR557DOUG ZORZI 828-5764

BENNINGTON-RUTLAND WCRS(4)VT RAILWAY, INC. IDENTIFY RAILROAD BRIDGESDOUG ZORZI 828-5764

BRADFORD WCRL(7)CONN RIVER MAIN LINE REHAB BR516DOUG ZORZI 828-5764

BURKE WCRL(14)CONN RIVER MAIN LINE SCOPING FOR BR544DOUG ZORZI 828-5764

CAVENDISH-LUDLOW STP GMRC(3)GREEN MTN RR CORP REPLACE RAIL ON GMRC

COVENTRY WCRL(10)CONN RIVER MAIN LINE REHAB BR566DOUG ZORZI 828-5764

MIDDLEBURY WCRS(9)VT RAILWAY, INC. BR239 LOAD CAPACITY SCOPINGJ. B. MCCARTHY 828-3876

NEWBURY WCRL(16)CONN RIVER MAIN LINE SCOPING FOR BR500DOUG ZORZI 828-5764

PROCTOR-NEW HAVEN STRB37VT RAILWAY, INC. REHAB RAILROAD BRIDGES

SALISBURY-MIDDLEBURY VT RAILWAY, INC. REPLACE RAIL AND TIES

SHAFTSBURY WCRS( )VT RAILWAY, INC REPLACE STONE ARCH BRIDGEDOUG ZORZI 828-5764

STATEWIDE WESTERN RAIL CORRI UPGRADE TO 286-K CAPACITYJ. B. MCCARTHY 828-3876

WATERFORD WCRL(5)CONN RIVER MAIN LINE BR537 SCOPINGDOUG ZORZI 828-5764