FAST OPERATIONS MANAGEMENT COMMITTEE AGENDA – FEBRUARY 6, 2020 Page 1 of 3 NOTICE AND AGENDA OF PUBLIC MEETING FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION OPERATIONS MANAGEMENT COMMITTEE 9:30 A.M. FEBRUARY 6, 2020 TRAFFIC MANAGEMENT CENTER 4615 WEST SUNSET ROAD, ROOM A105 LAS VEGAS, NV 89118 (702) 432-5300 This agenda with full backup is available at the Regional Transportation Commission Administration Building, 600 S. Grand Central Pkwy., Las Vegas, Nevada; the Regional Transportation Commission’s website, http://www.rtcsnv.com; or by contacting Tammy McMahan at (702) 676-1538. THIS MEETING HAS BEEN PROPERLY NOTICED AND POSTED IN THE FOLLOWING LOCATIONS: Clark County Government Center 500 S. Grand Central Pkwy. Las Vegas, NV 89155 City of Henderson Office of the City Clerk 240 Water Street Henderson, NV 89015 CC Regional Justice Center 200 Lewis Ave. Las Vegas, NV 89155 RTC 600 S. Grand Central Pkwy. Las Vegas, NV 89106 RTC website www.rtcsnv.com Nevada Public Notice website https://notice.nv.gov BY: ________________________________________________________ DocuSign Envelope ID: 0DE15B8D-F693-4026-8D3C-DF7ED9D2F102

FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

FAST OPERATIONS MANAGEMENT COMMITTEE AGENDA – FEBRUARY 6, 2020 Page 1 of 3

NOTICE AND AGENDA OF

PUBLIC MEETING

FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION

OPERATIONS MANAGEMENT COMMITTEE

9:30 A.M. FEBRUARY 6, 2020

TRAFFIC MANAGEMENT CENTER 4615 WEST SUNSET ROAD, ROOM A105

LAS VEGAS, NV 89118 (702) 432-5300

This agenda with full backup is available at the Regional Transportation Commission Administration Building, 600 S. Grand Central Pkwy.,

Las Vegas, Nevada; the Regional Transportation Commission’s website, http://www.rtcsnv.com; or by contacting Tammy McMahan at

(702) 676-1538.

THIS MEETING HAS BEEN PROPERLY NOTICED AND POSTED IN THE FOLLOWING LOCATIONS:

Clark County Government Center 500 S. Grand Central Pkwy. Las Vegas, NV 89155

City of Henderson Office of the City Clerk 240 Water Street Henderson, NV 89015

CC Regional Justice Center 200 Lewis Ave. Las Vegas, NV 89155

RTC 600 S. Grand Central Pkwy. Las Vegas, NV 89106

RTC website www.rtcsnv.com Nevada Public Notice website https://notice.nv.gov

BY: ________________________________________________________

DocuSign Envelope ID: 0DE15B8D-F693-4026-8D3C-DF7ED9D2F102

mcmahant
Typewritten Text
mcmahant
Typewritten Text
os
mcmahant
Typewritten Text
Page 2: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

FAST OPERATIONS MANAGEMENT COMMITTEE AGENDA – FEBRUARY 6, 2020 Page 2 of 3

Items 2 through 5 are items for possible action. Items 1 and 6 through 8 are discussion items and no action can be taken. Please be advised that the Freeway and Arterial System of Transportation Operations Management Committee (Committee) has the discretion to take items on the agenda out of order, combine two or more agenda items for consideration, remove an item from the agenda, or delay discussion relating to an item on the agenda any time. 1. CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION: No action can be taken on

any matter discussed under this item, although the Committee can direct that it be placed on a future agenda.

2. APPROVAL OF THE MINUTES: Meeting of December 5, 2019 (FOR POSSIBLE ACTION) 3. RECEIVE THE FAST STATUS, ACTIVITY, AND CALL STATUS/COMPLAINT REPORTS (FOR

POSSIBLE ACTION)

4. RECEIVE THE NEVADA DEPARTMENT OF TRANSPORTATION (NDOT)-FAST INTELLIGENT TRANSPORTATION SYSTEM OPERATIONS REPORT PERFORMED AS PART OF NDOT’S CONTRACTS (FOR POSSIBLE ACTION)

5. DISCUSS CURRENT AND FUTURE FUNDING OPTIONS FOR THE OPERATION OF THE

FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION ARTERIAL MANAGEMENT SYSTEM (FOR POSSIBLE ACTION)

6. DISCUSS NEW TRANSPORTATION TECHNOLOGIES AND THEIR USE IN MEASURING,

MONITORING, AND ENHANCING PERFORMANCE ON SOUTHERN NEVADA ROADWAYS 7. DISCUSS TOPICS OF INTEREST

8. CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION: No action can be taken on

any matter discussed under this item, although the Committee can direct that it be placed on a future agenda

During Citizens Participation, any citizen in the audience may address the Committee on any matter. No vote can be taken on a matter not listed on the posted agenda; however, the Committee can direct that the matter be placed on a future agenda. Each citizen must be recognized by the Chairman. The citizen is then asked to state his or her name, and to spell the last name for the record. The Chairman may limit remarks to three minutes’ duration, if such remarks are disruptive to the meeting or not within the Committee’s jurisdiction. The Regional Transportation Commission keeps the official record of all proceedings of the meeting. In order to maintain a complete and accurate record, copies of documents used during presentations should be submitted to the Recording Secretary. The Regional Transportation Commission appreciates the time citizens devote to be involved in this important process.

DocuSign Envelope ID: 0DE15B8D-F693-4026-8D3C-DF7ED9D2F102

mcmahant
Typewritten Text
mcmahant
Typewritten Text
os
mcmahant
Typewritten Text
Page 3: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

FAST OPERATIONS MANAGEMENT COMMITTEE AGENDA – FEBRUARY 6, 2020 Page 3 of 3

In compliance with Nevada Revised Statute 241.035(4), the Regional Transportation Commission of Southern Nevada shall create an audio and/or video recording of the meeting and retain such recording(s) for the required period of time.

The Regional Transportation Commission Meeting Room and Conference Room are accessible to the disabled. Assistive listening devices are available for the hearing impaired. A sign language interpreter for the deaf will be made available with a forty-eight hour advance request to the Regional Transportation Commission offices. Phone: (702) 676-1500 TDD (702) 676-1834

Any action taken on these items is advisory to the Regional Transportation Commission.

DocuSign Envelope ID: 0DE15B8D-F693-4026-8D3C-DF7ED9D2F102

mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
os
mcmahant
Typewritten Text
Page 4: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
vasm
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Slip Sheet
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Page 5: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Respectfully submitted, BRIAN HOEFT, P.E. Director of FAST cp

REGIONAL TRANSPORTATION COMMISSION OF

SOUTHERN NEVADA

AGENDA ITEM

Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: INITIAL CITIZENS PARTICIPATION PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION OPERATIONS MANAGEMENT COMMITTEE CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION GOAL: ENHANCE PUBLIC AWARENESS AND SUPPORT OF THE REGIONAL

TRANSPORTATION SYSTEM FISCAL IMPACT: None BACKGROUND: In accordance with State of Nevada Open Meeting Law, the Regional Transportation Commission of Southern Nevada Freeway and Arterial System of Transportation (FAST) Operations Management Committee (OMC) shall invite interested persons to make comments. For the initial Citizens Participation, the public should address items on the current agenda. For the final Citizens Participation, interested persons may make comments on matters within the FAST OMC’s jurisdiction, but not necessarily on the current agenda.

No action can be taken on any matter discussed under this item, although the FAST OMC can direct that it be placed on a future agenda.

DocuSign Envelope ID: DDA70D4D-32FD-4288-BCCB-930CAD3AEF0E

mcmahant
Typewritten Text
mcmahant
Typewritten Text
os
mcmahant
Typewritten Text
colemanz
Text Box
FAST OMC Item #1 February 6, 2020
mcmahant
Typewritten Text
Page 6: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
vasm
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Slip Sheet
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Page 7: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

MINUTES FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION

OPERATIONS MANAGEMENT COMMITTEE REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

DECEMBER 5, 2019 These minutes were prepared in compliance with NRS 241.035. Text is in summarized rather than verbatim format. For complete contents, please refer to

meeting recordings on file at the Regional Transportation Commission.

THIS MEETING WAS PROPERLY NOTICED AND POSTED IN THE FOLLOWING LOCATIONS ON NOVEMBER 26, 2019

Clark County Government Center 500 S. Grand Central Pkwy. Las Vegas, NV 89155

City of Henderson Office of the City Clerk 240 Water Street Henderson, NV 89015

CC Regional Justice Center 200 Lewis Ave. Las Vegas, NV 89155

RTC 600 S. Grand Central Pkwy. Las Vegas, NV 89106

RTC website www.rtcsnv.com Nevada Public Notice website https://notice.nv.gov

CALL TO ORDER Mr. Michael Hudgeons, Chair, called the meeting to order at 9:32 a.m. in Meeting Room A105 of the Traffic Management Center. MEMBERS PRESENT: Michael Hudgeons, City of North Las Vegas, Chair Joe Damiani, Regional Transportation Commission of Southern Nevada (Alternate), Vice-Chair Michelle Castro, Nevada Department of Transportation (Alternate) Kevin Futch, City of Henderson (Alternate) Massoud Javid, Clark County Public Works Joseph Norby, City of Las Vegas MEMBERS ABSENT: None RTC/FAST STAFF: Brian Hoeft, Director of Freeway and Arterial System of Transportation (FAST) Lonnie Brown, FAST Manager of Traffic Systems Maintenance Theresa Gaisser, FAST Manager of Engineering Raymund Berlo, FAST Traffic Systems Maintenance Supervisor David Crisler, FAST Traffic Operations Supervisor Walter Vodrazka, Jr., FAST Principal Project Engineer Carmen Perkins, FAST Administrative Specialist INTERESTED PARTIES: Ron Riddels, Jr., Las Vegas Electric Ati Abad, Atkins John Penuelas, Regional Transportation Commission of Southern Nevada Catherine Lu, Regional Transportation Commission of Southern Nevada

DocuSign Envelope ID: D87375FE-A0C7-41D3-972D-D93FC7B7DC85

mcmahant
Typewritten Text
colemanz
Text Box
FAST OMC Item #2 February 6, 2020
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Page 8: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Minutes – FAST-Operations Management Committee Meeting of December 5, 2019 Page 2 of 10

Item: 1. CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION Comments: No comments were made. Motion: No motion was necessary. Vote/Summary: No vote was taken.

Item: 2. APPROVAL OF THE MINUTES: Meeting of October 3, 2019 (FOR POSSIBLE ACTION) Comments: No comments were made. Motion: Mr. Joseph Norby, City of Las Vegas, made a motion to approve the minutes. Vote/Summary: 6 Ayes. 0 Nays. The motion carried. Ayes: Chair Michael Hudgeons, Vice-Chair Joe Damiani, Michelle Castro, Kevin Futch, Massoud Javid, and Joseph Norby. Nays: None Absent: None

Item: 3. RECEIVE THE FAST STATUS, ACTIVITY, AND CALL STATUS/COMPLAINT

REPORTS (FOR POSSIBLE ACTION) Comments: OPERATIONS REPORT Ms. Theresa Gaisser, FAST Manager of Engineering, addressed certain FAST operations projects. Ms. Gaisser shared that FAST staff continued coordinating with Nevada Department of Transportation (NDOT) on the Dynamic Message Sign (DMS) public safety announcements throughout the region. She added that FAST had received a lot of interest in this both media and press regarding the messages. The FAST manager stated that FAST personnel would continue to follow the guidelines laid out in the NDOT DMS manual. Ms. Gaisser also shared that FAST staff had been closely coordinating with Nevada Highway Patrol (NHP) to ensure that messages were also enforcement related, such as messages related to High Occupancy Vehicle (i.e., CROSS THE DOUBLE LINE PAY THE FINE). These messages were presented before the DMS committee before they were posted on the DMS signs. The posted messages typically aligned with national campaigns or special events nationally or regionally. The FAST Manager reported FAST staff had been closely coordinating with NDOT personnel on the completion of Project Neon in regards to the configuration and implementation of the additional gantries, ramp metering and fiber optics connections. Ms. Gaisser then related that FAST staff had continued to share traffic signal monitoring issues with local entities regarding the overnight max outs at different signalized intersections as well as sharing split facing and construction timing reports on a weekly basis.

DocuSign Envelope ID: D87375FE-A0C7-41D3-972D-D93FC7B7DC85

Page 9: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Minutes – FAST-Operations Management Committee Meeting of December 5, 2019 Page 3 of 10

Mr. Walter Vodrazka, FAST Principal Project Engineer, reported on additional operations activities. Mr. Vodrazka reported there were approximately 20 remaining controllers on i2 software system. He communicated that there were less than 10 controllers to program into ATMS 980 Controllers. Mr. Vodrazka mentioned that FAST personnel had handled several special events and activities at the Las Vegas Convention Center, Black Friday at the shopping malls, and sporting events at the T-Mobile arena. The FAST Principal Project Engineer also noted that FAST personnel had assisted with various construction projects around the Valley. Additionally, FAST staff members had supported Clark County School District and other agencies at several community events promoting pedestrian safety. Mr. Vodrazka added that FAST staff would work on traffic plans for the 2020 Consumer Electronics Show and the Winter 2020 exposition at the World Market Center in January 2020. Mr. Vodrazka concluded his report by saying that FAST staff and a consultant had handled various timing projects at different sites including Charleston Boulevard, Sahara Avenue, Losee Road, Craig Road, St. Rose Parkway, Horizon Drive, Rainbow Boulevard, and Blue Diamond Road. MAINTENANCE ACTIVITIES Mr. Lonnie Brown, Manager of Traffic Systems Maintenance for the Freeway and Arterial System of Transportation (FAST), reported on maintenance activities. Arterial Management System Efforts Mr. Brown reported that FAST staff placed switches and Closed-circuit televisions (CCTVs) along Martin Luther King Boulevard for the Project Neon. These intersections would be turned over to the City of Las Vegas. The Manager of Traffic Systems Maintenance shared that FAST staff placed layer 2 switches and CCTVs on the Charleston Intelligent Transportation System (ITS) project between Decatur Boulevard and Shadow Lane. Mr. Brown then shared that FAST staff had removed, in an urgent manner, equipment at four bus shelters along east Fremont Street as part of a City of Las Vegas project. Next, the FAST Manager communicated that FAST staff placed wireless radios along Jones Boulevard at Hacienda Avenue, Reno Avenue and Tropicana Avenue temporarily until fiber optic cable would be installed. Mr. Brown then reported that FAST staff had completed fiber optic cable placement along Lake Mead Boulevard. The Manager of Traffic Systems Maintenance then discussed the damaged fiber cable located on Sahara Avenue. He shared that FAST staff had spliced the fiber cable at Commercial Center Drive but the personnel had not completed the repair on the Maryland Parkway side. Mr. Brown went on to share that FAST personnel had several discussions with the City of Las Vegas regarding fiber cable placement within the Medical District along Alta Drive to the Las Vegas City Hall. The FAST Manager mentioned that FAST staff had completed a partial punch list for Hollywood Boulevard, he clarified that no fiber cable had been placed but the infrastructure was installed.

DocuSign Envelope ID: D87375FE-A0C7-41D3-972D-D93FC7B7DC85

Page 10: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Minutes – FAST-Operations Management Committee Meeting of December 5, 2019 Page 4 of 10

The Manager of Traffic Systems Maintenance reported that FAST staff had restored communication to Las Vegas Speedway Jurisdictional Center (JMC). Freeway Management System Efforts Mr. Brown mentioned that FAST staff had completed the sub-system test for Project Neon. He noted that a 60-day standalone test of the nearly 130 devices was underway. The Manager of Traffic Systems Maintenance manager noted that FAST personnel continued to migrate from an existing NDOT system to a new system from Interstate 15 (I-15) at St. Rose Parkway to Primm Boulevard and from the 215 North Beltway at U.S. 95 north to 8th Street at Interstate 515. Mr. Brown reported that FAST staff had reestablished communications between Interstate 11 at U.S. 95 and Dynamic Message Sign (DMS) 41 for the Boulder DMS. The FAST manager mentioned that FAST personnel had started preparation for the project at U.S. 95 and Kyle Canyon Road to Durango Drive. The Manager of Traffic Systems Maintenance then discussed working with NDOT’s District 2 personnel to attain a connection between the northern Nevada facility and the facility in Las Vegas on Washington Avenue. The connection is being navigated through NV Energy. Mr. Brown noted that FAST staff installed and configured 3 switches and 5 CCTVs for the Starr overpass between I-15 and Las Vegas Boulevard. The FAST Manager concluded his report by sharing that FAST staff was preparing for the I-15/215 Beltway project where larger fiber optics cable would be installed. He related that project contractor personnel had cut through three major fiber optics cables that brought down a major portion of not just the FAST network but all the local jurisdictions’ and first responders’ networks. Mr. Brown indicated that the entire FAST maintenance staff had gone into action to reroute circuits and worked with the contractor to get the major circuits back up. He noted that the communications were restored in less than 12 hours. Motion: No motion was necessary. Vote/Summary: No vote was taken.

Item:

4. RECEIVE THE NEVADA DEPARTMENT OF TRANSPORTATION (NDOT)-FAST INTELLIGENT TRANSPORTATION SYSTEM OPERATIONS REPORT PERFORMED AS PART OF NDOT’S CONTRACTS (FOR POSSIBLE ACTION) Comments: Following a detailed handout [attached], Ms. Michelle Castro, Nevada Department of Transportation (NDOT or Transportation Department), read entries on the report, noting that the handout provided more in-depth information about the relevant projects. Projects Under Construction Project Neon

NDOT’s Traffic Operations staff were conducting fiber optics testing and results analysis would continue. The final system acceptance test would follow after fiber optics testing is completed.

DocuSign Envelope ID: D87375FE-A0C7-41D3-972D-D93FC7B7DC85

Page 11: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Minutes – FAST-Operations Management Committee Meeting of December 5, 2019 Page 5 of 10

U.S. 95 Package 2B/5, Durango Drive to Kyle Canyon Road

Next, the NDOT representative informed the Freeway and Arterial System of Transportation Operations Management Committee (FAST OMC or Committee) that construction was completed for the U.S. 95 Package 2B/5, Durango Drive to Kyle Canyon Road project. She added there may be punch list items and close out tasks.

FAST Project K1, U.S. 95 from California/Nevada Stateline to Boulder City Bypass

Ms. Castro stated that the power distribution sites were adjusted and finalized. This contract was about 40 percent complete and anticipated to be completed in January 2020.

FAST Project H3, Interstate 15 (I-15) from Logandale-Overton Interchange to the Arizona state

Line

The NDOT representative reported that construction was about 70 percent complete. Projects Under Design Fast Project K2, State Route (SR) 163 from U.S. 95 to Arizona State Line

Ms. Castro reminded the Committee that FAST Project K2 continued to be delayed due to a permitting issue. The project is currently scheduled to document in May 2020. ITS Programs & Projects Wrong Way Driver Update

Next, the NDOT representative related the progress on the Wrong Way Driver projects. Reno - TM4, US 395 north of Interstate 80 (I-80) Ms. Castro indicated that testing of the VIION and TAPCO systems had concluded. Early results of the TAPCO tests were positive. A Relief of Maintenance would be issued in the near future. NDOT’s Traffic Operations staff were also planning to test systems from FLIR, GRIDSMART, and MH Corbin. Reno – I-80 from Stateline to Keystone Ave The NDOT representative reported that testing of the VIION systems had begun. She added that NDOT’s Traffic Operations staff estimated all devices would be online for the first quarter of 2020. Reno – Reno Spaghetti Bowl Express Ms. Castro informed the committee that technical provisions specify complete Wrong Way Driver systems for infrastructure only. Carson – Interstate 580 Fairview to N. Carson The NDOT representative reported that technical provisions specify complete Wrong Way Driver systems for infrastructure only. Las Vegas – U.S. 93 Garnet Interchange Ms. Castro related that technical provisions specify complete Wrong Way Driver systems for infrastructure only. Las Vegas –U.S. 95 2B/5 The NDOT representative reported that technical provisions specify complete Wrong Way Driver systems for infrastructure only with the exception of the northbound U.S. 95 Durango Drive Off-Ramp. She added that the Wrong Way Driver system would be installed with integration and testing to be done.

DocuSign Envelope ID: D87375FE-A0C7-41D3-972D-D93FC7B7DC85

Page 12: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Minutes – FAST-Operations Management Committee Meeting of December 5, 2019 Page 6 of 10

Las Vegas – I-15 Starr Avenue Interchange Ms. Castro related that technical provisions specify complete Wrong Way Driver systems for infrastructure only. The NDOT representative reminded the Committee that Federal Highway Administration was no longer granting approval for experimentation for additional red rectangular flashing beacons at Wrong Way Driver locations. She added that NDOT would be evaluating the initial installations and developing a plan of action, which may include finalizing these installation at approved locations as well as system expansion with Manual on Uniform Traffic Control Devices (MUTCD) compliant Wrong Way Driver signs (e.g., LED border) and devices (e.g., 1W1C signal heads). On November 25, 2019, NDOT issued an amendment to the original request for experimentation to include the sites along I-80 and updated the amended list of locations dated December 18, 2015. This request will add 17 locations to the 20 locations where the red rectangular flashing beacons were previously approved.

Dynamic Message Signs (DMS) Policy

Ms. Castro shared that the annual DMS meeting was scheduled for December 19, 2019. In the meeting, representatives would discuss any questions and/or comments on the policy, request for changes to committee members, messages approved in 2019, message schedule for 2020, and ideas for the public DMS competition. The following messages were scheduled for November 2019: National Response Awareness Week MOVE OVER OR SLOW DOWN FOR STOPPED EMERGENCY VEHICLES Duration: November 17-23, 2019 (Statewide) Thanksgiving Holiday/Occupant Protection Month: KEEP YOUR STUFFING ON THE INSIDE BUCKLE UP The following messages were scheduled throughout December 2019 and on January 1, 2020: Impaired Driving Month DON’T ADD TO THIS NUMBER ### FATALITIES Duration: December 6-27, 2019 (Statewide) Christmas Holiday ONLY REINDEER CAN FLY WATCH YOUR SPEED Duration: December 23-25, 2019 (Statewide) New Year Holiday DRIVE SOBER OR GET PULLED OVER Duration: December 31, 2019 – January 1, 2020 (Statewide)

DocuSign Envelope ID: D87375FE-A0C7-41D3-972D-D93FC7B7DC85

Page 13: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Minutes – FAST-Operations Management Committee Meeting of December 5, 2019 Page 7 of 10

The following message was requested by RTC FAST and approved through the DMS Committee for use for the Road to Zero grant project: TRAFFIC MONITORING AHEAD SPEED LIMIT 65 MPH 511 Traveler Information

The NDOT representative advised the committee that winter weather would bring increased traffic to the 511 site and those statistics would be provided at an upcoming FAST OMC meeting. NDOT’s Public Information Office has been encouraging people to check the site and sign up for MY511 alerts. She added that NDOT personnel were working on repairing a compatibility issue with video streaming and android.

Traffic Incident Management (TIM) Coalition

Ms. Castro shared that the TIM Coalition meeting would take place on December 5, 2019 in Las Vegas. The progress over the last year will be reviewed and awards would be distributed. The planning meeting for 2020 would take place in January 2020. She added that Strategic Highway Research Program (SHRP) 2 training would no longer be scheduled for every other month and instead would be offered as it is requested.

Freeway Service Patrol(FSP)/Hazmat/Waycare

FSP The NDOT representative reported that the dashcams had been installed in all Las Vegas vehicles. Live feeds via Geotab would be made available to the ROC operators once the cameras were activated in December 2019. Hazmat Ms. Castro indicated that the coordination meeting in November 2019 addressed some issues NDOT staff had encountered with activation over the last few months. NDOT personnel were researching methods to have responsible parties comply with payment. Waycare The NDOT representative stated there were no updates. She added that regular coordination meetings were taking place biweekly as the platform system was fine-tuned to accommodate the needs of the district. NDOT FAST Operations Agreement

Ms. Castro shared that FAST and NDOT personnel had been holding meetings to discuss several elements of the Fiscal Year 2020/2021 agreement. Items under discussion include migrating NDOT Intelligent Transportation System (ITS) to the NDOT fiber network, incident management planning and enhanced documentation of expenses.

ITS Strategic Deployment Plan

The NDOT representative indicated that the final draft of NDOT’s ITS Strategic Deployment plan should be received by December 2019, which will include the summary document and GIS layer. The final presentation was also scheduled for December 2019. The project would be completed pending a few small adjustments from the final round of comments.

DocuSign Envelope ID: D87375FE-A0C7-41D3-972D-D93FC7B7DC85

Page 14: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Minutes – FAST-Operations Management Committee Meeting of December 5, 2019 Page 8 of 10

Advanced Signal Warning Systems (ASWS) Guidance

Ms. Castro informed attendees that NDOT received the final version of the Advanced Signal Warning Systems (ASWS) Guidelines in November 2019 and were awaiting formal approval/adoption. She added that with the new guidelines completed, the next stage would be to prepare the public for the expected changes in the ASWS through dissemination of information. NDOT’s public information staff members would take the lead in developing a webpage. The webpage is expected to be online by January 2020. Negotiations were also underway to bring on board a consultant to assist NDOT’s traffic information and public information personnel with information dissemination and organizing public meetings in affected counties/jurisdictions prior to the actual work. Comments Mr. Brian Hoeft, Director of FAST, added to Ms. Castro’s statement regarding the DMS policy. He commented that at the meeting in the December 2019, representatives would discuss a public DMS message competition. He shared the Chief Executive Officer of the Regional Transportation Commission of Southern Nevada and the Director of the Nevada Department of Transportation had asked him about public input on DMS messages. Mr. Hoeft noted the entities wanted to ensure progress on this project and successful outcomes. Motion: No motion was necessary. Vote/Summary: No vote was taken.

Item: 5. DISCUSS NEW TRANSPORTATION TECHNOLOGIES AND THEIR USE IN MEASURING, MONITORING, AND ENHANCING PERFORMANCE ON SOUTHERN NEVADA ROADWAYS Comments:

Mr. Brian Hoeft, Director of the Freeway and Arterial System of Transportation (FAST), shared that in November 2019, FAST personnel participated in events. He shared that during the Specialty Equipment Market Association (SEMA) APEX show, FAST personnel had worked directly with the Auto Care Association to assist with a demonstration on various connected vehicle activities. FAST staff also collaborated with City of Las Vegas personnel on this effort. The FAST Director noted that Auto Care Association representatives filmed activities both on east Fremont Street and a closed course near Cashman field. He added that the filmed events were shared in a video that was showcased at the podium area at the Las Vegas Convention Center and received a lot of positive feedback. Mr. Hoeft indicated this was the second year that FAST personnel had collaborated directly with the Auto Care Association and looked forward to future occasions. The FAST Director informed the Committee that FAST staff had partaken in the International Road Federation Conference. FAST and other Regional Transportation Commission of Southern Nevada (RTC) staff participated on panel discussions, made presentations and hosted tours at the FAST Traffic Management Center. Mr. Hoeft shared that FAST personnel had conducted a general tour that had delegates from most of the continents in the world represented. FAST staff members had conducted a tour for representatives from Dubai and received noteworthy follow up questions. Mr. Hoeft stated that in his opinion, The interaction demonstrated that FAST’s technology efforts was garnering favorable exposure and interest from people from all over the world. Mr. Hoeft commented that the Consumer Electronics Shows (CES) had become a centerpiece event related to transportation and technology and was scheduled for January 2020. The FAST Director shared

DocuSign Envelope ID: D87375FE-A0C7-41D3-972D-D93FC7B7DC85

Page 15: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Minutes – FAST-Operations Management Committee Meeting of December 5, 2019 Page 9 of 10

that at the beginning the CES week, the RTC would host an event called GoNV, a summit that would involve many technology-related presentations and discussions. The event was scheduled to take place at the Thomas & Mack Center meeting facilities in Las Vegas, Nevada. He stated that FAST staff members were preparing for the CES/Waycare event as well. The FAST Director noted that the Traffic Incident Management (TIM) December 5, 2019 meeting had included a recap of happenings during the year. Mr. Hoeft expressed that one of the projects that had trickled out of the TIM coalition efforts was the Road to Zero 2019 Grant awarded to Nevada Highway Patrol (NHP). He reminded the committee that this effort was a partnership between FAST/NHP/Waycare personnel. Building on the success of the pilot deployment, staff had incorporated additional traffic incident management sites into the Southern Nevada freeway system. Mr. Hoeft reported that preliminary results in October and November of 2019 suggest that there were quantifiable benefits to the traffic incident management sites. He added that FAST would share additional data collection, evaluation, and conclusive results in the future. The FAST Director expressed that it would be nice if these efforts would enhance major infrastructure investments. He noted that as public entities spend millions of dollars in transportation systems but to get the most benefits out of the safety perspective and the efficiency perspective, entities were starting to understand the benefits of the technology and collaboration. Ms. Theresa Gaisser, FAST Manager of Engineering, noted that in addition to the events Mr. Hoeft mentioned, FAST personnel also participated in six peer exchanges with six different agencies. The FAST Manager noted that the events were held at the Traffic Management Center (TMC), typically for a one-day event. Those agencies included Columbia ITS, Colorado Department of Transportation (CDOT), the East Japan Roadway Federation, the West African National Roadways, and Jacksonville Transit Authority. The FAST Manager went on to update the committee on the Waycare platform efforts. Ms. Gaisser noted that FAST had entered into year two of utilizing the Waycare platform at the TMC and had collectively logged 75,000 incidents into the system. The incidents ranged from disabled vehicles, motorists assists, crashes, freeway incidents, construction events, and other major special events throughout the valley. Next, the FAST Manager of Engineering reported on the status of the efforts on the INRIX AV (Autonomous Vehicles) Road Rules platform. She noted that FAST staff had worked on the platform last year on version one of the platform and were working on completing enhancement to areas that had been previously coded into the platform in preparation of CES 2020. This effort would allow the RTC to expand their understanding the information associated with connected and autonomous vehicles needed to operate and navigate on the public roadways. Ms. Gaisser concluded her remarks reporting that FAST personnel continued their engagement with the United States Department of Transportation (USDOT) Work Zone Data Exchange Program. She indicated that staff was involved in the monthly working group meetings and assisting to write technical specifications. This effort attempts to determine what information would be beneficial to the public when navigating through construction zones and how to relay that information to public fleets and autonomous vehicles and connected users through social media sites and crowdsourcing like WAZE. Motion: No motion was necessary. Vote/Summary: No vote was taken.

DocuSign Envelope ID: D87375FE-A0C7-41D3-972D-D93FC7B7DC85

Page 16: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Minutes – FAST-Operations Management Committee Meeting of December 5, 2019 Page 10 of 10

Item:

6. DISCUSS COMMITTEE TOPICS OF INTEREST Comments: No comments were made. Motion: No motion was necessary. Vote/Summary: No vote was taken.

Item: 7. CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION Comments: No comments were made. Motion: No motion was necessary. Vote/Summary: No vote was taken.

ADJOURNMENT The meeting adjourned at 9:57 a.m. Respectfully submitted, Carmen Perkins, Recording & Transcription Secretary

DocuSign Envelope ID: D87375FE-A0C7-41D3-972D-D93FC7B7DC85

Page 17: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

NDOT–FAST ITS OPERATIONS REPORT December 5, 2019 OMC Meeting Submitted by Seth Daniels

Projects Under Construction Project Neon (Contract 3624) Fiber testing and results analysis continue. The final system acceptance test will follow. US95 Package 2B/5, Durango Drive to Kyle Canyon Road (Contract 3692) The construction should be finished. There may be punch list items and close out tasks. FAST Project K1, US95 from CA/NV Stateline to Boulder City Bypass (Contract 3736) Power distribution sites were adjusted and finalized. This contract is about 40% complete and is anticipated to be done in January of 2020. FAST Project H3, I-15 from Logandale-Overton interchange to the AZ state Line (Contract 3740) Construction is about 70% complete. Projects Under Design Fast Project K2, SR163 from US95 to AZ State Line Status same as previous update. The NV Energy permitting process with BLM has been delaying this project. The project is currently scheduled to Doc in May 2020. ITS Programs & Projects Wrong Way Driver Update Reno - Contract 3653 (TM4, US 395 north of I 80) Testing of the VIION and TAPCO systems are concluded. Early results of the TAPCO tests are positive. Relief of Maintenance to be issued soon. We are also planning to test systems from FLIR, GRIDSMART, and MH Corbin. Reno – Contract 3711 (I 80 from Stateline to Keystone Ave) Testing of the VIION systems has begun. Estimated first quarter of 2020 to have all devices online. Reno – Reno Spaghetti Bowl Express Technical Provisions specify complete WWD systems for infrastructure only. Carson – Contract 3763 (I 580 Fairview to N. Carson) Installing infrastructure only. Las Vegas - Contracts 3697 (US93 Garnet Interchange.), 3724 (US95 3C, & 3D/E) Installing infrastructure only. Las Vegas – Contract 3692 (US95 2B/5) Installing infrastructure only with the exception of the NB US 95 Durango Dr. Off-Ramp WWD system is installed with integration and testing to be done. Las Vegas – Contract 3683 (I-15 Starr Ave. Interchange) Installing infrastructure only. FHWA is no longer granting approval for experimentation for additional red RRFB WWD locations, and NDOT will be evaluating the initial installations and developing a plan of action, which may include finalizing RRFB WWD installation at approved locations as well as system expansion with MUTCD-compliant WWD signs (e.g. LED border) and devices (e.g. 1W1C signal heads). On November 25, 2019 NDOT issued an amendment to the original request for experimentation to include the sites along I-80 and updated the amended list of locations dated December 18, 2015. This request will add 17 locations to the 20 locations where the red RRFB was previously approved.

colemanz
Text Box
FAST OMC Item #4 Handout December 5, 2019
Page 18: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

DMS Policy: The annual DMS meeting is scheduled for December 19th from 2pm – 4pm. In the meeting we will discuss any questions/comments on the policy, request for changes to committee members, messages approved in 2019, message schedule for 2020, and ideas for the public DMS competition. The following messages were scheduled for November: National Response Awareness Week:

MOVE OVER OR SLOW DOWN FOR STOPPED

EMERGENCY VEHICLES Duration: November 17th – 23rd (Statewide) Thanksgiving Holiday/Occupant Protection Month:

KEEP YOUR STUFFING

ON THE INSIDE BUCKLE UP

The following messages are scheduled through December: Impaired Driving Month:

DON’T ADD

TO THIS NUMBER ### FATALITIES

Duration: December 6th and 27th (Statewide)

DRIVE SOBER OR GET PULLED OVER

Duration: December 31st – January 1st (Statewide) Christmas Holiday:

ONLY REINDEER CAN FLY

WATCH YOUR SPEED Duration: December 23rd – 25th (Statewide) The following message was requested by RTC FAST and approved through the committee for use for the Road to Zero grant project:

TRAFFIC MONITORING AHEAD

SPEED LIMIT 65 MPH

Page 19: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

511 Traveler Information Winter weather will bring increased traffic to the site and those statistics will be provided on the next update. PIO have been encouraging people to check the site and sign up for MY511 for alerts. Working on fixing a compatibility issue with video streaming and android. Traffic Incident Management (TIM) Coalition TIM Coalition in Las Vegas will take place on December 5th. The progress over the last year will be reviewed and awards given. Planning meeting for 2020 will take place the week of January 20th. SHRP2 training will no longer be scheduled for every other month and instead will be offered as it is requested. Freeway Service Patrol/Hazmat/Waycare FSP dashcams have been installed in all Las Vegas vehicles. Live feeds via Geotab will be made available to the ROC operators once the cameras are activated sometime in December. Hazmat Coordination meeting in early November addressed some issues we have seen with activation over the last few months. Researching methods to have responsible parties comply with payment. Waycare No new updates, regular coordination meetings are taking place biweekly as the platform system is fine-tuned to accommodate the needs of the district. NDOT FAST Operations Agreement FAST and NDOT have ongoing meetings scheduled to discuss several elements of the FY20/21 agreement. Items under discussion include migrating NDOT ITS to the NDOT fiber network, incident management planning and enhanced documentation of expenses. ITS Strategic Deployment Plan Draft final of the plan should be received by the week of December 3rd which will include the summary document and GIS layer. Final Presentation is scheduled for December 12th. The project will be completed pending a few small adjustments from the final round of comments. Advanced Signal Warning Systems (ASWS) Guidance NDOT received the final version of the ASWS Guidelines in mid-November and we are awaiting formal approval/adoption. With the new guidelines completed, the next stage is to prepare the public for the expected changes in the ASWS through dissemination of information. NDOT Public Information is taking the lead in developing a webpage as a start and this should be online by January 2020. Negotiations are also underway to bring on-board a consultant to assist NDOT Traffic Information/Public Information with information dissemination and organizing public meetings in affected counties/jurisdictions prior to the actual work.

Page 20: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
vasm
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Red Slip Sheet
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Page 21: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

REGIONAL TRANSPORTATION COMMISSION

OF SOUTHERN NEVADA

AGENDA ITEM

Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: FAST STATUS, ACTIVITY, AND CALL STATUS/COMPLAINT REPORTS PETITIONER: M. J. MAYNARD, CHIEF EXECUTIVE OFFICER

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION (FAST) OPERATIONS MANAGEMENT COMMITTEE RECEIVE THE FAST STATUS, ACTIVITY, AND CALL STATUS/COMPLAINT REPORTS (FOR POSSIBLE ACTION) GOAL: MAINTAIN AND IMPROVE TRANSPORTATION SYSTEM INFRASTRUCTURE

FISCAL IMPACT: None by this action BACKGROUND: The monthly Activity Reports (Freeway Management System (FMS) and Arterial Management System (AMS), AMS Operations by Agency, and Complaints/Controllers Reports) are included in the backup. Respectfully submitted, ____________________________ BRIAN HOEFT, P.E. Director of FAST cp

DocuSign Envelope ID: DDA70D4D-32FD-4288-BCCB-930CAD3AEF0E

mcmahant
Typewritten Text
mcmahant
Typewritten Text
os
mcmahant
Typewritten Text
colemanz
Text Box
FAST OMC Item #3 February 6, 2020
mcmahant
Typewritten Text
Page 22: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

1 | P a g e

M E M O R A N D U M

To: Freeway and Arterial System of Transportation Operations Management Committee (FAST OMC)

From: FAST Maintenance and Operations

Date: February 6, 2020

Subject: FAST Activity Report from November 21, 2019 through January 20, 2020

AMS Maintenance Issues

Date Entered Location Issue Agency

Date to agency

Resolution Status

01/08/20 09:49:51

cc 2462 no feed from camera Clark County

No video signal coming from camera. Camera needs to be replaced.

Open

12/31/19 07:08:19

Flamingo / I-15 NB Flamingo/I-15 NB is down.

Clark County

Fiber has been damaged, used 25 pair copper line and two DSL switches to connect the two intersections temporarily.

Open

09/26/19 10:56:06

Russell Would like to start working on East Russell traffic. Would like comm on Mountain Vista, Annie Oakley and Sandhill.

Clark County

Open

09/26/19 10:55:06

Russell Would like to start working on East Russell traffic. Would like comm on Mountain Vista, Annie Oakley and Sandhill.

Clark County

Open

09/26/19 10:49:33

Russell Requesting an intersection old camera be replaced at Russell/ Nellis interchange to better views of Russell corridor.

Clark County

Open

Page 23: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

2 | P a g e

09/26/19 10:32:21

Russell Would like to start working on East Russell traffic. Would like comm on Mountain Vista, Annie Oakley and Sandhill.

Clark County

Open

08/13/19 05:45:07

Sahara / Maryland Pkwy No communication. Fiber has been damaged during a paving project. Seven intersections affected on Sahara from Maryland East to Mojave.

Clark County

A temporary fiber splice was accomplished at Boulder/Sahara allowing the 7 intersections on Hub 7 to be placed on Hub 5. A temporary switch was installed at Boulder/Sunset to accomplish this. All intersections are now communicating. This is temporary.

Open

01/09/20 13:08:19

cc 3161 No PTZ, restarted camera and KITS

Las Vegas Connected to COHU cable, could not get it to work, camera needs to be changed.

Open

12/09/19 06:38:50

Sahara/ I-15 SB No Communications Performed one shot and laser light fiber may be damaged could not locate damage point at this time.

Las Vegas Found fiber vandalized will need repair

Open

11/21/19 15:14:17

Wyoming / Western New intersection - Project NEON

Las Vegas Configure switch and encoder. Connect switch to network and add to RNMS. Camera has no PTZ. Referred to Jamar.

Open

11/21/19 15:12:33

MLK / Oakey New intersection - Project NEON

Las Vegas Configure switch and encoder. Connect to network and add to KITS, RNMS and Canvas. The camera is glitchy and bad Tx. Referred to Jamar.

Open

09/26/19 06:47:30

Russell Requesting an intersection old camera be replaced at Russell/515 SB interchange to better views of Russell corridor.

Henderson Open

Page 24: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

3 | P a g e

03/07/19 10:40:00

Major/Boulder HWY No video, camera 5007 is missing.

Henderson New Sidewinder camera install, waiting on City of Henderson to run CAT5 cable from camera to cabinet.

Open

06/06/19 10:46:44

Paradise/Convention SB bus stop

This bus stop is being removed for construction.

RTC Remove all FAST equipment from SB bus stop and camera that looks at NB bus stop. Splice fiber through to maintain connection to switch at paradise/Convention Center NB bus stop.

Open

01/06/20 06:37:55

camera 21021 Paradise/Convention SW

the camera is dark FAST TDR shows open at about 240 feet.

Open

01/18/20 09:27:33

CC 2360 no camera feed even after restart

NDOT Checked working at this time

Closed

12/13/19 15:02:06

I 15 SB and NB Cameras on I-15 need cleaning.

NDOT Cleaned cameras on I-15 NB and SB from Sahara to St. Rose.

Closed

01/22/20 14:49:55

Buffalo/Sunset Fiber infrastructure to this cabinet

Clark County

Configure and install new switch at Buffalo/Sunset, as well as replacing RS900G with a RSG920P at Sunset/215WB.

Closed

01/18/20 11:51:55

CC 2171 No pan or tilt when using medium control speed. PTZ works on fast speed

Clark County

Check working at this time

Closed

01/14/20 18:44:53

Durango & 215 WB CCTV 2036 is dead Clark County

Reset Power Closed

01/14/20 15:10:23

Decatur & Sunset Camera is dirty Clark County

Cleaned camera. Closed

01/14/20 08:50:06

LV Blvd Line locate on Las Vegas Boulevard between Spring Mountain and Desert Inn (specifically BRT-TVM fiber and associated CDCAs).

Clark County

CC located fiber. We located CDCA

Closed

01/13/20 06:06:28

Sammy Davis/Frank Sinatra

No communication to Sammy Davis/Frank Sinatra. Car accident took out the cabinet.

Clark County

County replaced cabinet, reconnected original RS900 and Teleste encoder, everything came back up fine.

Closed

Page 25: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

4 | P a g e

01/10/20 10:33:53

Desert Inn/Polaris DMS on Polaris has no Comm. going to it.

Clark County

Reset circuit Breaker on South side of Desert Inn 500 feet West of Polaris.

Closed

01/10/20 07:33:38

I-215 WB & S Durango No video. Clark County

Replaced encoder. Closed

01/09/20 05:20:21

LV Blvd/Convention Center

No Comm. with cabinet.

Clark County

Found the switch power cord disconnected from the receptacle. Plugged in power cord back, all comm. came back.

Closed

01/08/20 14:37:26

Lone Mountain/Fort Apache

No video image. Clark County

Replaced switch and set camera to auto-negotiate. Video now working.

Closed

01/08/20 10:04:21

Las Vegas & SLS Could you rename this CCTV, SLS has been renamed to Liset.

Clark County

Changed the name to 2327 LVBLVD/Liset.

Closed

01/08/20 09:00:30

cc 21021 No feed from camera Clark County

Duplicate. Closed

01/08/20 06:14:08

Fort Apache/Lone Mountain

New intersection already has LC gator patch in cabinet.

Clark County

Connected RS900 switch and encoder for new camera in cabinet, and connected RS900 in HUB 9.

Closed

01/07/20 09:18:54

Paradise/Convention Ctr CCTV 21022

CCTV 21022 has no PTZ

Clark County

Replaced encoder. Closed

01/03/20 14:12:59

I-215 WB & S Durango No video. Clark County

Cycled power to the camera.

Closed

12/31/19 09:06:09

Jones & Reno Encom at Jones/Reno intermittently dropping out. Transmit CCQ low.

Clark County

Reduced radio power to low. Transmit CCQ normal again and the radio is operational.

Closed

12/31/19 07:00:14

Lake Mead (circuit 6-27) Encoms on Lake Mead from Nellis to Hollywood now working (circuit 6-27). Lake Mead/Nellis, Lake Mead/Christy, Lake Mead/Sloan, Lake Mead/Mt Hood, and Lake Mead/Hollywood.

Clark County

Reset encom radio manually

Closed

12/27/19 10:14:40

Twain & Dean Martin No comm. Clark County

Low DSL SNR. Switched connection to another copper pair.

Closed

Page 26: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

5 | P a g e

12/19/19 11:59:10

Harmon/Cosmopolitan Camera cleaning. Clark County

Cleaned camera. Closed

12/19/19 11:58:24

Flamingo/Augustus-Via Del Nord

Camera cleaning. Clark County

Cleaned camera. Closed

12/19/19 11:57:17

Sands/Wynn South Gate Camera cleaning. Clark County

Cleaned camera. Closed

12/19/19 11:56:16

Sands/Koval Camera cleaning. Clark County

Cleaned camera. Closed

12/19/19 11:53:33

Las Vegas BLVD/CC215 WB

Camera cleaning. Clark County

Cleaned camera. Closed

12/19/19 11:52:29

Las Vegas BLVD/Welcome Sign

Camera cleaning. Clark County

Cleaned camera. Closed

12/18/19 14:47:34

Karen/Paradise No com. Clark County

Contractor working in area hit interconnect approximate 20ft from cabinet, referred to County. Contractor has repaired the interconnect. Back online.

Closed

12/18/19 09:14:51

LVBLVD/SLS New year’s camera cleaning.

Clark County

Cleaned cameras from LVBLVD/Convention Center to LVBLVD/Russel.

Closed

12/17/19 09:22:14

Silverado Ranch/I-15SB Wrong IP address in the traffic controller.

Clark County

Programmed correct IP address into traffic controller, changed label, and tested with fishbowl. Comm is good

Closed

12/17/19 09:18:39

Silverado Ranch/I-15NB Camera has dual titles. Also discovered IP addresses were incorrect in the traffic controllers.

Clark County

Cleared duplicate camera title, changed the address in traffic controller, labeled switch, video encoder. Confirmed with fishbowl comm is good.

Closed

12/16/19 18:05:22

Blue Diamond & Jones Cannot focus CCTV 2408

Clark County

Replacement scheduled for 12/19/19 Replaced camera 12/23/2019

Closed

12/16/19 15:37:44

Pebble & Durango No Communications Clark County

Restore power to encom radio

Closed

12/11/19 07:49:10

Russell/Polaris Camera out of focus. Tried clearing NVRAM. This camera will need to be cleaned and/or replaced.

Clark County

R&R camera Closed

11/27/19 Tropicana/Wilbur No picture. Clark Reboot camera. Closed

Page 27: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

6 | P a g e

11:06:22 County 11/25/19 09:13:32

Bermuda/Serene #2511 CCTV 2511 bad picture.

Clark County

Installed video isolator, made video worse. Reset video encoder and Cohu camera. Video is much better. Camera needs cleaned.

Closed

11/25/19 08:30:52

Sammy Davis/Mel Torme DSL circuit is out affecting Sammy Davis/Mel Torme and Industrial/Desert Inn.

Clark County

Found switch would not power up. Replaced and reconfigured new switch: tested connection and working.

Closed

11/19/19 05:33:10

Silverado Ranch/Gillespie

No Comm to intersection.

Clark County

Replaced the rugged 900 switch. Comm restored.

Closed

01/08/20 14:42:52

Bonanza/Veterans No communication with switch, 12 nodes down.

Las Vegas Interconnect conductors damaged/shorted in pull box. Re-spliced and regained connection.

Closed

01/08/20 06:20:42

Bonanza/Veterans Circuit on Bonanza west of LV Blvd is offline.

Las Vegas duplicate entry Closed

01/08/20 06:19:11

Charleston/Pecos DSL circuit at Charleston/Pecos is offline.

Las Vegas Plugged power cable going to switch to a different receptacle.

Closed

01/03/20 14:14:59

Rainbow & Gowan Interconnect available, but no communications equipment installed.

Las Vegas Installed DSL switch. Closed

01/02/20 10:32:45

Charleston/4Th No Comm. Las Vegas Car accident took out the cabinet, CLV working on replacing cabinet. Reconnected DSL switch, Comm. is back.

Closed

12/31/19 07:19:16

Buffalo/John Herbert No link from Buffalo/Skypointe to Buffalo/John Herbert.

Las Vegas No power to switch due to a bad circuit breaker. Installed a power strip to use another outlet and restored power to the switch.

Closed

12/31/19 07:03:37

4th Street (circuit 5-18) Encoms on 4th Street down from Library to Stewart (circuit 5-18). 4th/Stewart and 4th/Library.

Las Vegas Reset Encom radios at 4th/Stewart and 4th/Library.

Closed

Page 28: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

7 | P a g e

12/31/19 07:02:12

Ogden (circuit 5-17) Encoms on Ogden down (circuit 5-17). Ogden/3rd and Ogden/Casino Center.

Las Vegas Reset Encom radios at Ogden/3rd and Ogden/Casino Center.

Closed

12/23/19 18:52:25

Lake Mead & Buffalo No focus when zooming CCTV 3314

Las Vegas Replaced Camera Closed

12/20/19 11:47:59

Centennial cntr/Centennial Gateway

Intersection cabinet has fiber, but is not online.

Las Vegas LC Gator in cabinet going South to Centennial cnt. and Ann. connected both sides. Configured and installed RS900 Rugged com switch with IP address (10.9.4.120)

Closed

12/19/19 11:55:18

Imperial/Main Camera cleaning Las Vegas Cleaned camera. Closed

12/19/19 11:54:24

Clark/Main Camera cleaning. Las Vegas Cleaned camera. Closed

12/18/19 12:58:29

Tenaya/Gowan No Comm. Las Vegas Replaced switch. Closed

12/18/19 06:49:07

LVBLVD/Circus Clean Camera for New Year’s Eve.

Las Vegas Cleaned Camera Closed

12/18/19 06:48:18

LVBLVD/Cathedral Clean Camera for New Year’s Eve.

Las Vegas Cleaned Camera Closed

12/18/19 06:47:31

LVBLVD/Wynn Clean Camera for New Year’s Eve.

Las Vegas Cleaned Camera Closed

12/18/19 06:46:33

LVBLVD/Paris Clean Camera for New Year’s Eve.

Las Vegas Cleaned Camera Closed

12/18/19 06:44:44

LVBLVD/Planet Hollywood

Clean Camera for New Year’s Eve.

Las Vegas Cleaned Camera Closed

12/18/19 06:43:00

LVBLVD/Reno Clean Camera for New Year’s Eve.

Las Vegas Cleaned Camera Closed

12/18/19 06:41:54

LVBLVD/215EB Clean Camera for New Year’s Eve.

Las Vegas Cleaned Camera Closed

12/16/19 05:33:01

Sahara / Rainbow Circuit on Sahara from Rainbow to Cimarron and south to Twain is offline.

Las Vegas Traffic cabinet was replaced and jumpers where not reconnected correctly. Swapped jumpers and operating normal.

Closed

12/12/19 10:54:18

Charleston & I-15 SB camera dirty Las Vegas clean camera

Closed

Page 29: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

8 | P a g e

12/11/19 14:45:33

Alta/Rancho Fiber team spliced Alta/Tonopah CDCA to port 9,10,11,12 of the CDCA in cabinet.

Las Vegas Replaced RS900G with an RSG920P to connect three intersections to one switch.

Closed

12/10/19 08:07:08

Camera 3533 Camera 3533 is not displaying anything, even after turning it off and on again.

Las Vegas Reboot camera. Closed

12/09/19 06:37:42

Bonanza / Lamb No Communications Las Vegas Reset tripped circuit breaker

Closed

12/05/19 08:59:11

Bonneville/LV Premium Outlet

New camera installed.

Las Vegas Configured trans-coder and camera, put camera into KITS, Canvas, and cleaning list.

Closed

12/05/19 06:11:17

Grand Central / Iron Horse

New camera Las Vegas Configure camera and encoder. Add to Canvas and KITS. Add to Camera Cleaning list.

Closed

12/05/19 05:24:22

western/neon gateway new intersection Las Vegas Setup ruggedcom switch and encoder, put camera in KITS and canvas.

Closed

12/03/19 14:50:21

MLK/US 95 SB New camera still has the protective lens on it.

Las Vegas Contractor removed Closed

12/03/19 13:08:32

Charleston & Campbell New camera Las Vegas Program and set up in kits and canvas

Closed

12/03/19 13:06:58

Charleston & Arville New Camera Las Vegas Program set up in kits and canvas

Closed

12/03/19 13:05:39

Charleston & Essex New camera Las Vegas Program set up in kits and canvas

Closed

12/03/19 11:14:05

Charleston/Shadow Configure new cameras and add to KITS, Canvas, and cleaning list.

Las Vegas Configure new cameras and add to KITS, Canvas, and cleaning list.

Closed

12/03/19 11:13:15

Charleston/Hinson Configure new cameras and add to KITS, Canvas, and cleaning list.

Las Vegas Configure new cameras and add to KITS, Canvas, and cleaning list.

Closed

12/03/19 09:25:52

Sahara/Boulder HWY BRT camera (10.31.3.74) on the NB bus station not working.

Las Vegas Reboot camera. Closed

Page 30: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

9 | P a g e

12/02/19 14:20:33

3369 No com to switch at Las Vegas Blvd/95S. Found port working intermittently.

Las Vegas Replaced switch, com restored.

Closed

12/02/19 14:19:23

3193 No com to switch at Las Vegas Blvd/95S. Found port working intermittently.

Las Vegas Replaced switch, com restored.

Closed

12/02/19 13:03:13

Rock Springs & US-95 Off Ramp

Unable to upload plan changes during US-95 SB Closure due to a fatal crash. There is no comm here yet.

Las Vegas Fiber team spliced the gator to the fiber going to Lake Mead/ Rock Springs. Configured and installed RS900 to the gator and connected the controller to it.

Closed

11/22/19 13:50:42

MLK/US 95 SB New camera. Las Vegas Configured and installed new camera in KITS and canvas.

Closed

11/22/19 13:49:56

MLK/ US 95 NB New camera. Las Vegas Configured and installed new camera in KITS and canvas.

Closed

11/22/19 10:10:20

Alta/Rancho DSL switch not being used.

Las Vegas Removed switch and all cabling.

Closed

11/22/19 07:22:50

3510 Ptz not working Las Vegas All functions of PTZ working. May have been a network issue earlier.

Closed

11/21/19 15:11:11

Charleston / I-15 SB New intersection - Project NEON

Las Vegas Configure switch and encoder. Connect to network and add to KITS, RNMS and Canvas.

Closed

11/21/19 15:10:11

MLK / Ellis New intersection - Project NEON

Las Vegas Configure switch and encoder. Connect to network and add to KITS, RNMS and Canvas.

Closed

11/21/19 15:09:30

MLK / Wellness New intersection - Project NEON.

Las Vegas Configure switch and encoder. Connect to network and add to KITS, RNMS and Canvas.

Closed

11/21/19 15:07:08

MLK / Charleston New intersection Project NEON

Las Vegas Configure new switch and encoder. Connect to network and add to KITS, RNMS and Canvas.

Closed

Page 31: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

10 | P a g e

11/21/19 15:05:55

MLK/Pinto New intersection project NEON

Las Vegas Configure switch and encoder. Connect to network RNMS. The camera has no analog output. Referred to Jamar. Camera cable was repaired. Test OK

Closed

11/20/19 08:33:38

Bonanza/D Street Circuit from Bonanza/D Street to Washington/J Street is offline

Las Vegas Signal is dark. NV Energy issue. Power has been restored.

Closed

11/20/19 07:19:51

Jones & Edna Power Outage Las Vegas Power restored. Closed

11/19/19 14:23:53

BRT Sahara/Boulder HWY

Brt bus station on Sahara / Boulder HWY going SB is not communicating.

Las Vegas RTC doing maintenance on the bus station on Boulder HWY just south of Sahara, station was shut down by RTC and turned back on.

Closed

01/22/20 16:26:48

Aliante & 215 EB Lost Title North Las Vegas

Re-send title to camera. Closed

12/19/19 10:03:02

Craig/Losee CCTV 4013 Dirty Camera North Las Vegas

Cleaned camera. Closed

11/25/19 08:26:07

Detector@215EB/Aliante Circuit is down from 215EB/Aliante to Aliante/Elkhorn.

North Las Vegas

Found switch with a bad port. Replaced switch and reconfigured; tested connection and working.

Closed

01/17/20 11:41:00

Horizon/515 SB Ramp No comm. to cabinet.

Henderson Replaced switch. Closed

12/31/19 08:53:20

Russell (circuit 5-19) Encoms on Russell from Stephanie to I-15 SB are not working. Russell/Stephanie, Russell/I-15 NB and Russell/I-15 SB.

Henderson Reboot POE on all three intersections.

Closed

12/31/19 06:58:42

Russell (circuit 5-24) Encoms on Russell from Whitney Ranch to Nellis not working (circuit 5-24). Russell/Whitney Ranch, Russell/Galleria and Russell/Nellis.

Henderson Reboot POE on all three intersections.

Closed

12/26/19 05:29:56

St. Rose/Maryland Intermittent com to Encom.

Henderson Power cycle encom. Normal operation returned.

Closed

Page 32: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

11 | P a g e

12/20/19 14:36:52

Racetrack/Boulder HWY Camera #1 not working.

Henderson Reboot POE. Closed

12/16/19 05:35:09

Gibson / 215 The circuit on Gibson from 215 NB to Las Entradas is offline.

Henderson Strip plug was plugged into a GFCI outlet and it was tripped. Installed new strip plug to non GFCI outlet. Moved all FAST gear to new outlet. All Comm and cameras are restored.

Closed

12/04/19 13:10:50

Eastern/Grand Hills No Comm. Henderson Reboot ruggedcom switch.

Closed

11/23/19 12:04:41

cc 5069 Camera has no PTZ Henderson Reboot encoder and change protocol from FAST to Cohu and back to FAST.

Closed

11/20/19 08:54:51

Stephanie/Patrick No Comm. from Stephanie/Patrick going North.

Henderson Replaced the switch on Stephanie/Galleria.

Closed

01/02/20 12:51:16

BRT 6211 No video. RTC Configured layer 3 switch for VLAN 31.

Closed

01/02/20 07:09:11

BRT 6210 Edward with traffic planning advises no comm to this camera

RTC Configured layer 3 switch for VLAN 31.

Closed

01/02/20 07:08:17

BRT 6209 Edward with traffic planning adv no comm to this camera

RTC Configured layer 3 switch for VLAN 31.

Closed

12/17/19 10:33:09

Las Vegas Blvd/Caesars No comm to TVM ticketing machine. No power to machine from the marquee sign. Trapeze is on sight.

RTC Power restored to location. Ping switch, comm good.

Closed

11/19/19 06:16:32

Falcon Ridge/Pioneer No comm to Falcon Ridge/Pioneer and the Traffic Shop switch.

Mesquite Mesquite is rerouting fiber for a construction project. They should have the fiber respliced in a few days. Splicing is complete and back online.

Closed

12/24/19 07:52:42

camera 5132 the camera has no PTZ

Boulder City

PTZ is working now. Closed

12/12/19 13:30:58

cameras 2555, 2556 These cameras are not in canvas.

FAST Give FAST Operators and FAST Viewers permission to "View" CCTV 2555, 2556 and 2557.

Closed

Page 33: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

12 | P a g e

12/12/19 06:42:01

camera 2155 The camera will not focus properly.

FAST Closed

FMS Maintenance Issues

Date Entered Location Issue Agenc

y Date to agency Resolution Status

12/06/19 10:10:17

CC 118 Camera image is very dark/faded

NDOT Was ok all morning but got dark in the afternoon. Resetting camera worked for now. Went dark in the afternoon the next day, likely needs a new camera.

Open

12/04/19 06:20:15

DS 4 removed due to construction, will be replaced at a later date in the project

NDOT Open

11/19/19 13:58:40

ds 197 no data NDOT Replaced surge card in the cabinet and at the pole. Replaced (2) 174 click cards. Pin 6 still showing 0 speed in Kits though. Need to resolve that before closing.

Open

10/10/19 14:31:46

LV Blvd to Charleston SB 515

EAM NDOT Gathering device information Open

10/02/19 07:46:13

CC 203 No PTZ NDOT contractor notified this is a repeat problem Open

06/24/19 12:37:20

DS 2 Has 24V leaving cabinet, 0V at pole

NDOT Open

05/10/19 07:52:46

I-515 NB Boulder On ramp

Meter on luminair pole knocked down

NDOT Recovered knocked down pole. Waiting for contractor repair. Base damaged

Open

04/16/19 06:17:02

DS 233 pins 7-10

Detector pole knocked down.

NDOT Waiting for contractor to replace pole. Open

04/15/19 06:56:22

ds 212 no detection NDOT Pole knocked down, awaiting replacement Open

04/04/19 05:43:56

ds 566 no data NDOT Can't talk to radar head, LVE to replace under warranty

Open

01/28/19 07:25:58

ds 406 pole knocked down

NDOT Rich, Dave, and Michael picked up pole. Contractor to replace pole. Ray located boxes for contractor.

Open

Page 34: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

13 | P a g e

03/21/18 05:35:08

DS 499 City pole knocked down and base broke power wire to DS 499. Waiting on city to replace pole.

NDOT Open

06/19/17 12:57:41

Detector 450 Pole knocked down.

NDOT Rich, Michael, and Dave picked up the poles and brought them back to the TMC. Awaiting contractor to replace pole and radar head.

Open

06/09/18 06:59:27

CCTV #709, CC-215 EB Aviary

No video. Clark County

known cabling issue, no immediate timeframe for replacement

Open

08/20/19 16:19:46

Apex Inspection Site

Cameras 321, 322, & 323 are having issues maintaining a lock on the video feed.

FAST 08/20/19

Don't seem to be talking to the cell modems, still investigating

Open

11/25/18 19:46:33

I-515 Paradise Hills

Camera 426, power issues

FAST 11/25/18

Known cabling issue, no immediate time frame for replacement

Open

01/11/20 15:49:51

DMS 13 Multiple DMS boards at multiple locations not displaying travel times.

NDOT The end date was 1/10/2010 in Kits for many of the travel times. Changed them to 2029, restarted services on the server, checked OK.

Closed

12/26/19 13:53:10

US95 SB/Main St. to Eastern

Line Locates NDOT Located fiber by CCTV 401, between 16th and Bruce, and off Marlin between 19th and 21st.

Closed

12/19/19 13:32:44

CC 301 No PTZ NDOT reboot encoder Closed

12/12/19 13:34:23

Cameras Clean cameras NDOT Cleaned cameras 401,403,405,406,407,408,417,608,607,606,605

Closed

12/11/19 15:29:06

CCTV 605 215/Airport Connector

Video goes in and out

NDOT Replaced camera. Closed

Page 35: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

14 | P a g e

12/05/19 13:27:44

Project Neon Cameras

Go with contractor to verify lowering devices and clean cameras for project neon

NDOT Verified lowering devices and cleaned cameras for project neon

Closed

12/05/19 12:44:35

TT24, 53, 96 TT signs not working with new comm boards

NDOT Got in contact with Ray from Skyline and was able to reprogram board network addressing

Closed

12/05/19 12:41:55

US95 SB Rancho

NDOT putting in guard rail near fiber

NDOT Helped locate fiber Closed

12/03/19 07:22:53

ds 584 no data NDOT Reset Moxa terminal server, data returned. Closed

12/03/19 07:22:26

ds 565 no data NDOT Reset Moxa terminal server, data returned. Closed

12/03/19 07:22:01

ds 564 no data NDOT Reset Moxa terminal server, data returned. Closed

12/03/19 07:21:32

ds 563 no data NDOT Reset Moxa terminal server, data returned. Closed

12/03/19 07:21:03

ds 560 no data NDOT Reset Moxa terminal server, data returned. Closed

12/03/19 07:20:31

ds 561 no data NDOT Reset Moxa terminal server, data returned. Closed

12/03/19 07:19:51

ds 562 no data NDOT Reset Moxa terminal server, data returned. Closed

11/28/19 14:37:49

515/Flamingo CCTV 411, no PTZ

NDOT Replaced Teleste encoder. Ptz test ok. Closed

11/27/19 12:23:21

shop NDOT needs help installing switches and locating fiber

NDOT 11/27/19

Helped install switches and locate fiber Closed

11/21/19 14:25:09

DS 284 (RM51) 515NB/ Flamingo

No data NDOT Reset click cards for lanes 1-4. Verified functions at the cabinet and data on Kits.

Closed

11/21/19 14:18:14

DMS 34 US95 NB/Jones

Travel times not posting

NDOT Reset sign. Verified that travel time is posting on sign and in Kits.

Closed

11/21/19 05:47:41

CCTV 708 No video NDOT Configured encoder. Moved video cable from bad video port on 2 channel encoder to new encoder. All functions are back.

Closed

Page 36: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

15 | P a g e

11/20/19 05:51:59

CCTV 710 No video NDOT Configured encoder and switched from bad video port on 2 channel encoder over to new encoder.

Closed

11/19/19 13:59:34

ds 70 invalid data NDOT Reset click cards, test OK Closed

11/19/19 05:14:15

CCTV 713 No video NDOT Cycled power to camera at the cabinet. Video is back.

Closed

01/15/20 15:07:00

Hub 6 Construction Boring Project near Hub 6 - Stewart and Pecos, Charleston off & on ramp locations

FAST 01/15/20

Fiber Optic cable locating and marking - Photos taken and placed in appropriate folders (See: Site Pics Folder)

Closed

01/14/20 06:47:46

camera 122 The camera has no zoom in or out

FAST Reboot power to the camera at the cabinet. Verified zoom in and out.

Closed

01/10/20 15:14:30

93 Northwest Boulder City

Line Locate due to N-Dot Project

FAST 01/21/20

Fiber Optic Line Locating on 93 Northwest Bound from Temple Rock Rd to Hoover Dam Lodge

Closed

01/06/20 08:22:42

DMS 109 Unable to post message

FAST 01/06/20

I was able to post a message. There is one pixel board stuck on that needs attention though. Can still post in the meantime. Update: reconfigured Skyline Pixel settings - uploaded new data - verified functionality via Skyline Envoy, Hyper Terminal and KITS

Closed

01/03/20 12:43:01

US-95 SB & NB I-215

Detector #508, #517, #518, #521 - no data transmitting - able to Ping and interface

FAST 01/03/20

Restart Server 'Mustang' Services - verify communication and data transmission via KITS

Closed

12/27/19 14:42:48

6799 West I-215 Beltway

No Power to Pedestal Address 6799 W. I-215 Beltway between Tenaya WY and Jones Blvd North side of town - causing In-op DMS 97, 98, 103 and multiple Freeway street lights

FAST 12/27/19

Contact NV Energy Tkt# 1760444 - verified damage to Transformer (Rainbow & Sleepy Pine) by unknown source - NV Energy evaluating time to repair/replace damage Transformer - Update 1453 hours: DMS 98, 100 operative - DMS 97 still IN-Op will investigate at next opportunity. Reset GFI to DMS 97.

Closed

Page 37: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

16 | P a g e

12/24/19 09:03:37

Summerlin Pkwy EB W of Buffalo

DMS 5 - Displaying only partial letters

FAST 12/24/19

Reconnected DMS Display board connections - visually verified all lettering & LEDs functioning

Closed

12/20/19 12:34:20

I-15 NB to Apex

CCTV Cameras 312, 315-316,317 & 319 - Preventative Maintenance - cleaned and serviced CCTV Cameras

FAST 12/20/19

Preventative Maintenance - cleaned and serviced various CCTV cameras - verified functionality via KITS

Closed

12/19/19 13:35:01

I-15 SB from Apex

CCTV Cameras 310, 311, 313, 317 & 322 - Preventative Maintenance - cleaned and serviced CCTV Cameras

FAST 12/19/19

Preventative Maintenance - cleaned and serviced various CCTV cameras - verified functionality via KITS

Closed

12/19/19 05:53:10

I-15 NB & SB, US95 NB

CCTV Cameras 218,220,222 & 301-303, 711-714 - Preventative Maintenance - cleaned and serviced CCTV Cameras

FAST 12/18/19

Preventative Maintenance - cleaned and serviced various CCTV cameras - verified functionality via KITS

Closed

12/17/19 15:49:18

I-15 Northbound & 215

CCTV Cameras 123-125 & 500,600, 601, 610, 613 - Preventative Maintenance - cleaned and serviced CCTV Cameras

FAST 12/17/19

Preventative Maintenance - cleaned and serviced various CCTV cameras - verified functionality via KITS

Closed

Page 38: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

17 | P a g e

12/17/19 15:34:43

NB Valley View RM21

Switch 10.11.68.40 - Inoperative port on Switch causing communication failure to other Switches on network

FAST 12/17/19

Replaced RS900 Switch - configured Network Ports, LAN and communications to TMC and Network - verified Ping and Ruggedcom functionality

Closed

12/13/19 14:56:32

I-15 South to Sloan

CCTV Cameras 112-115 & 117-118, 122 & 126-130 - Preventative Maintenance - cleaned and serviced CCTV Cameras

FAST 12/13/19

Preventative Maintenance - cleaned and serviced various CCTV cameras - verified functionality via KITS

Closed

12/10/19 06:40:02

I-15 NB Washington

Camera 301 has no PTZ

FAST 12/10/19

Remote Connect to CCTV - Reset Encoder - test functionality via KITS

Closed

12/06/19 15:44:09

I-15 SB DMS 4

Detector #242 In-op - Controller lost power and Modem Card no communication

FAST 12/06/19

Relocated Power connector for Controller and replaced and reprogrammed new Modem Card - verified functionality via KITS

Closed

11/22/19 10:50:32

53284 So. US-95

NDOT Project 3736 - Pedestal Service Inspection

FAST 12/11/19

Las Vegas Electric Contractor not completed with needed wiring and connections - advised contractor of the issue Contractor will contact FAST representatives when ready for completion of inspection. Pedestal Inspection completed 12-11-19

Closed

11/22/19 10:44:48

54884 So. US-95

NDOT Project 3736 - Pedestal Service Inspection

FAST 11/22/19

Inspect newly installed 200A Service Pedestal prior to activation - all components verified

Closed

11/22/19 10:40:20

29996 So. US-95

NDOT Project 3736 - Pedestal Service Inspection

FAST 11/22/19

Inspect newly installed 200A Service Pedestal prior to activation - all components verified

Closed

Page 39: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

18 | P a g e

11/22/19 06:05:49

System Wide No Travel Times posting

FAST 11/22/19

Restart Services on Maserati, Cayenne and Mustang Servers - verified functionality via KITS

Closed

11/21/19 15:00:18

I-515 SB Flamingo WB (RM50)

Detector #283 - Inoperative Vehicle Detector Unit - Possible due to bad weather conditions

FAST 11/21/19

Reset Detector Click Cards - verified counts and functionality via KITS

Closed

11/21/19 14:57:36

I-515 NB Sunset (RM59)

Detector #298 - Inoperative Vehicle Detector Unit - Possible due to bad weather conditions

FAST 11/21/19

Reset Detector Click Cards - verified counts and functionality via KITS

Closed

11/21/19 14:53:24

US-95 SB Decatur (RM30)

Detector #211 - Inoperative Vehicle Detector Unit - Possible due to bad weather conditions

FAST 11/21/19

Reset Detector Click Cards - verified count and functionality via KITS

Closed

Operations Projects Issues

Date Entered Location Issue Agency Date to

agency Resolution Status

01/02/20 14:40:50

Clark County Spring Mountain from Las Vegas Blvd to Mel Torme was observed to require adjustments to signal timing. Pattern 18

Clark County

Adjusted offset at Fashion Show. Adjusted offset and sequence to Mel Torme. Traffic has been observed to progress efficiently after signal timing adjustments. Pattern 18

Open

12/06/19 15:04:38

T-Mobile Hockey Special Event 7pm game

Clark County

12/17/19 Hockey Special Event Edit: Provided assistance with Arena ingress and egress traffic.

Open

01/13/20 14:42:00

MLK Coordinate Bonneville from MLK to Grand Central in the Am and Midday per CLV request.

Las Vegas AM pattern works OK for EB traffic. Enabled a midday pattern 15 with 160's and 80's. Performed before and after travel runs for report.

Open

Page 40: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

19 | P a g e

10/30/19 11:07:16

Rampart/Durango Build 120 pattern for consultant on Rampart north of Charleston

Las Vegas Open

12/17/19 10:59:07

FAST Controllers loaded with Apogee version 76.15U have to be upgraded to version 76.15W due to the dsrc issue in Version U.

NDOT Upgrade 10 980 controllers with Version W. Request DSRC license for controllers that do not originally have the license.

Closed

12/02/19 15:01:38

NEON Ramp Meters

Check 170 controller programming & status of NEON Ramp Meter Operability.

NDOT 11/26/19 Check 170 controller programming & detection status. Observed Operational test of the five NEON Ramp Meters.

Closed

12/02/19 14:45:54

NEON Ramp Meters

Inspect & provide punch list for 5 Ramp Meters installed or affected by Project NEON. Charleston NB & SB Sahara NB MLK & US95 NB 15 SB & Pinto

NDOT 11/18/19 Inspected & provided punch list to FAST FMS Division.

Closed

01/08/20 14:30:17

LVBLVD Re-time LVBLVD from Tropicana to Flamingo in the midday 160 pattern.

Clark County

Adjusted sequences/offsets along LVBLVD from Flamingo to Tropicana in midday 160 pattern 18. Collected before and after runs.

Closed

12/04/19 14:45:56

Clv Signals appear not to be in coordination due to early returns despite having coordinated patterns.

Las Vegas Create Peer to Peer schematics and drawing @ Industrial/Southbridge-Northbridge intersections. Attached drawing to database and downloaded configuration to field at both intersections. Early returns and/or force offs are now semi-synchronous. Intersections back to normal operation 12/9/19.

Closed

12/04/19 10:02:18

CLV Charleston ITS Project Updated Detector Diagrams need to be attached to the ATMS database and saved to depot. Upload/ archive intersections 25 Intersections

Las Vegas Save 25 detector diagrams to depot and attach to their respective databases. Upload and archive databases.

Closed

Page 41: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

20 | P a g e

11/25/19 06:39:32

Charleston Long wait for side street service in the early mornings. Need to build 70 second patterns.

Las Vegas Built a 70 second pattern to run early mornings at Charleston I-15 NB and SB signals.

Closed

11/19/19 13:31:29

CLV Gentlemen, Please attach these and as we progress, EB on Charleston, I will provide diagrams for the entire project. 11 Detector Diagrams

Las Vegas Save Files to correct Format for FAST. Attach Documents to ATMS database after Upload/Download detection changes. Edit- task complete

Closed

12/24/19 09:22:18

Henderson Galleria Drive from Gibson to Marks street has been observed to have more traffic during the early and late hours of the day.

Henderson Created pattern 3 to implement during the early AM hours and the late PM hours in the schedule. @ Galleria and the 95 (both ramps, the 60 sec cycle has been extended in the schedule to match pattern 3 schedule at the adjacent intersections. Will observe the new patterns and adjust as necessary before closing. Edit: observed, functions as intended.

Closed

01/15/20 07:45:03

Regional Many databases are on "Test Op Mode" 1 either because of scheduled free all day or because of construction timing/signal modifications. Must verify which is which to help distinguish construction timing vs scheduled free.

FAST Upload and compare Databases. Verify which controllers are indeed placed on "test Op Mode" for construction timing/signal modifications. Controllers that can be scheduled free have been removed from "test OP Mode" and are now running TBC Edit Completed

Closed

01/08/20 07:32:36

CLV Jose, Can you please change the Purdue logger interval to 15 minutes for these signals? 3506 3507 3508 3553 3560 3274 3038 Thanks. Gang

FAST Upload and archive field changes to controllers. Implemented the Purdue logger and adjusted time interval for logs. Download to field.

Closed

Page 42: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

21 | P a g e

12/19/19 08:23:09

Fast 10 controllers need to upgrade to version W from 15 G or U. Controllers without DSRC need to be licensed. Edit- 26 Controllers

FAST Upgraded 10 controllers to version W and requested DSRC license for 3 of them. Edit Upgrade 26 Controllers, request DSRC license for 10 Edit Upgrade 34 controllers

Closed

12/19/19 05:56:09

Multiple The following controller requires Purdue logging to be enabled. 3064,3075,3344,7005

FAST Enable Purdue logger for listed intersections, 3075 appears to have Purdue already enabled. I turned off and re-enabled the logger to see if that helps. 7005 has major field changes that must be reviewed before enabling the logger. Edit- Sandhill was reviewed over and fixed, Purdue has been enabled in all the requested intersections

Closed

12/11/19 05:59:17

FAST Upgrade 3 ATC 980 controllers from Version 15G to Version 15U. Request License to Version U controllers with no DSRC

FAST Upgrade 3 ATC 980 controllers from Version 15G to Version 15U. Request License to Version U controllers with no DSRC Edit- Task Completed

Closed

11/20/19 10:14:06

FAST Upgrade 12 ATC 980 controllers from Version 15G to Version 15U.

FAST Upgrade 12 ATC 980 controllers from Version 15G to Version 15U. Request License to Version U controllers with no DSRC -Edit Task completed

Closed

Operations Special Events Issues

Date Entered Location Issue Agency Date to

agency Resolution Status

12/24/19 11:47:17

Boulevard Mall

Safe Santa UNLV Safety Event RTC/FAST Kindergarten Crosswalk

Clark County

12/14/19 Attended Safety Event from 0900 to 1300

Closed

12/24/19 11:37:48

Woolley ES CCSD Bike Rodeo @ Woolley ES. RTC/FAST Kid Crosswalk.

Clark County

12/12/19 Attended Bike Rodeo from 1430 to 1700

Closed

12/06/19 15:08:36

T-Mobile Hockey Special Event 12pm game

Clark County

12/31/19 Hockey Special Event Edit: Provided assistance with Arena ingress and egress traffic.

Closed

Page 43: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

22 | P a g e

12/06/19 15:07:19

T-Mobile Hockey Special Event 7pm game

Clark County

12/28/19 Hockey Special Event Edit: Provided assistance with Arena ingress and egress traffic.

Closed

12/06/19 15:06:03

T-Mobile Hockey Special Event 7pm game

Clark County

12/23/19 Hockey Special Event Edit: Provided assistance with Arena ingress and egress traffic.

Closed

12/06/19 15:03:32

T-Mobile Hockey Special Event 5pm game

Clark County

12/15/19 Hockey Special Event Edit: Provided assistance with Arena ingress and egress traffic.

Closed

12/06/19 15:02:18

T-Mobile Hockey Special Event 7pm game

Clark County

12/10/19 Hockey Special Event Edit: Provided assistance with Arena ingress and egress traffic.

Closed

12/06/19 15:01:09

T-Mobile Hockey Special Event 4pm game

Clark County

12/08/19 Hockey Special Event Edit: Provided assistance with Arena ingress and egress traffic.

Closed

12/02/19 13:44:17

Valley wide Monitor holiday shopping traffic around various shopping malls and high traffic areas.

Clark County

Monitored, adjusted many signals for holiday shopping traffic around various shopping malls and high traffic areas.

Closed

12/24/19 11:27:35

Pearson Community Ctr.

Bicycle Bonanza & Safety Event

North Las Vegas

11/16/19 Attended Safety Event from 0800 to 1200

Closed

Operations Construction Issues

Date Entered Location Issue Agency Date to

agency Resolution Status

12/17/19 09:42:27

Flamingo NB ramp down to 1 lane for construction

Clark County

Adjusted patterns for NB. Raised passage from 2 to 4 seconds.

Open

09/04/19 06:26:20

Durango lanes reduced, need timing adjusted and recalls programmed

Clark County

adjusted max times, added min recalls for phases 1 and 5 for construction

Open

12/18/19 10:42:07

Craig Construction along Craig From MLK - Berg. Lanes taken.

North Las Vegas

Enabled 160 pattern to run all day along Craig from MLK to Berg for construction.

Open

Page 44: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

23 | P a g e

01/14/20 15:14:17

COH Lake Mead Pkwy from Fiesta - Warm Springs is under construction for manhole covers. One lane EB. Per COH

Henderson Per COH implemented construction TOD plans on corridor. Running pattern 19 (160) from 6:30am-6:30pm Mon-Thurs until project is complete.

Open

12/19/19 06:18:22

Eastern Repaving project, signals need retimed along Eastern from Horizon to Silverado.

Henderson Revised schedule for AM travel. Enabled 180 pattern to run earlier than normal. Project completed, schedules back to normal.

Closed

Operations Incidents Issues

Date Entered Location Issue Agency Date to

agency Resolution Status

12/17/19 05:52:48

CC 12/16/19 The following intersection is reporting back as flashing according to ATMS and verified by video: 2182 Rainbow & Russell

Clark County

12/16/19 Contacted Clark County regarding the intersection on flash, awaiting response edit-Problem has been resolved, no response from county.

Closed

11/21/19 06:05:25

Clark County

The following intersections are reporting back as flashing according to ATMS: 2180 Decatur & University, verified by camera 2244 Tropicana & Sandhill, verified by camera

Clark County

11/21/19 Notified CC about intersections on flash. Awaiting response. Edit- County responded via email, issues resolved

Closed

11/20/19 07:24:27

CC The following Intersections are reporting back as flashing and have been verified by video: 2204 Casino / Golden Nugget 2339 Nellis / Carey 2307 Flamingo / Perry- Sam’s Town 2404 Las Vegas Blvd / Reno Intersection Dark: 2304 Windmill / Spencer is “DARK” Verified by camera 2024

Clark County

11/20/19 Notified CC about intersections on flash/DARK. Awaiting response. Edit- Issues were resolved. No follow up email from Clark County.

Closed

Page 45: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

24 | P a g e

11/19/19 05:51:41

CC 2149 Paradise and Edison is verified Flashing Via ATMS and Video.

Clark County

11/19/19 Sent Clark County an email regarding intersection on flash. Edit- County Fixed the issue on field. No response from County whether they were dispatched or fixed the issue however. The intersection was verified to be in normal operation after video verification and ATMS reporting.

Closed

01/06/20 08:52:04

CLV Intersection just received com. Pattern 13 reports back as pattern fail.

Las Vegas

Uploaded, no changes. Performed a diagnostics and discovered no cord phase assigned to pattern 13. Assigned cord phase. Issue resolved

Closed

12/17/19 05:54:33

CLV The following intersection is reporting as flashing via ATMS, verified by video: 3072 Charleston & Lamb

Las Vegas

12/17/19 Contacted CLV regarding the issue, awaiting response. Edit- Issue has been resolved by clv, did not receive response/update.

Closed

11/21/19 06:24:36

CLV ATMS reports that 3450 Durango & Deer Springs Is on Flash/SDLC Fault. Upon further investigation it appears that the intersection is not in flash mode via camera, but indeed has an SDLC fault. The SDLC fault can be verified by this morning’s SPM report

Las Vegas

11/21/19 Contacted CLV about the issue, awaiting response. Edit- no response; Issue appears to be cleared.

Closed

12/13/19 07:08:23

shop Fatal North Las Vegas

12/13/19 Help with traffic movement Closed

FAST OMC Citizen Complaints Report

Agency Location Date Entered Date To Agency Status Clark County Tropicana & Eastern 01/14/20 13:52:15 01/14/20 Open

Detailed Description Action Taken By Staff/Resolution SB not serving after plan change at 5:15am today per phone call to Bob from County. Went back to Jan 1st in ATMS history. Started happening today.

NO power to detection unit, max recalls in place until repaired.

Agency Location Date Entered Date To Agency Status Clark County Rainbow 12/19/19 15:42:25 12/19/19 Open

Detailed Description Action Taken By Staff/Resolution West to South Detection malfunctioning (will sent to in the works). Placed max recall on phase 7.

Sent to county to check detection.

Page 46: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

25 | P a g e

Agency Location Date Entered Date To Agency Status Clark County Flamingo & Palos Verdes 12/11/19 21:12:17 N/A Open

Detailed Description Action Taken By Staff/Resolution Palos Verdes turns green even when there are no cars present. Also, the walk sign comes up with no pedestrians present

This complaint was turned in to county 10/31/2019.

Agency Location Date Entered Date To Agency Status Clark County CC 12/05/19 06:35:30 N/A Open

Detailed Description Action Taken By Staff/Resolution Citizen Complaint- 8:33 pm 12/4/19 Citizen describes the N-W left turn is stuck green when no cars are present, causing SB to stop unnecessarily. Citizen notes the S-E left turn does not behave that way and operates normally. Claims to have observed the issue at 8pm-8:30pm but believes it is an all-day problem. Citizen did not want to leave a name or number for contact.

Sent to county to check detection.

Agency Location Date Entered Date To Agency Status Clark County George Crockett @

Gillespie 01/18/20 11:03:41 N/A Closed

Detailed Description Action Taken By Staff/Resolution Caller advised red light over right lane out EB George Crockett @ Gillespie. Verified on camera 601

send email to in the works with screen shot of missing red light, per camera 601 both red heads illuminated

Agency Location Date Entered Date To Agency Status Clark County Tropicana & Eastern 01/17/20 11:52:03 01/17/20 Closed

Detailed Description Action Taken By Staff/Resolution WBL not long enough at 3pm 1/16/20. Was getting the allotted 25 seconds

around that time. No preempts. Delays on all directions. No more time for the turn, without affecting other traffic.

Agency Location Date Entered Date To Agency Status Clark County Lone Mtn & Fort Apache 01/08/20 10:57:06 01/04/20 Closed

Detailed Description Action Taken By Staff/Resolution Detection issue NB & SB serving with no one there.

Added to in the works

Agency Location Date Entered Date To Agency Status Clark County Jones/Desert Inn 01/02/20 15:19:34 N/A Closed

Detailed Description Action Taken By Staff/Resolution Caller advises NB is not serving and traffic is backed up to spring mtn. added phase call

Added phase call for 60 mins, Raul will investigate further

Agency Location Date Entered Date To Agency Status Clark County Flamingo & Eastern 12/31/19 13:25:44 N/A Closed

Detailed Description Action Taken By Staff/Resolution The West-to-South left turn needs more time. Traffic backs way up. Weekdays, Noon time

Adjusted W/S split in midday pattern 18. Observed, cleared most cycles but many cars not utilizing lane #1.

Page 47: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

26 | P a g e

Agency Location Date Entered Date To Agency Status Clark County Nellis/Hacienda 12/11/19 12:42:36 12/12/19 Closed

Detailed Description Action Taken By Staff/Resolution Caller advises there is not enough time given to traffic on Nellis. ATMS shows no comm to this signal

Detection for Hacienda "maxing" out. Min recalls on Nellis per timing sheet. Forwarded detection issues to In The Works. Clark County has repaired detection. Working correctly.

Agency Location Date Entered Date To Agency Status Clark County LVB/Elvis Presley 12/11/19 07:01:36 N/A Closed

Detailed Description Action Taken By Staff/Resolution Scott with LVCC advises S/E LT not serving. ATMS shows no activity on split 5, CCTV showing no service when vehicle is present

Monitored via CCTV, S/E turned served with P2 multiple times

Agency Location Date Entered Date To Agency Status Clark County South 215 ramp 12/06/19 14:37:08 N/A Closed

Detailed Description Action Taken By Staff/Resolution NB is backed up passed the EB ramp. It happed a little after 2 pm. 12-06-2019

Split history said it took almost 10 mins to drop in to sinc. Put is on fixed and changed the schedule time to 1359.

Agency Location Date Entered Date To Agency Status Clark County Paradise/Karen 12/06/19 10:12:04 N/A Closed

Detailed Description Action Taken By Staff/Resolution Caller advises that SB thru was not serving long enough. Unable to check splits; running free pattern and no camera in the area.

This is running split phase operation by county for construction.

Agency Location Date Entered Date To Agency Status Clark County Blue Diamond & Rainbow 12/02/19 18:15:47 12/02/19 Closed

Detailed Description Action Taken By Staff/Resolution EBL too short all day, especially around 3pm during the week.

Looked like a backup at 3pm today. Moved 5 seconds more to the EBL turn. Cleared the turn most of the afternoon. Heavy traffic at intersection causes delays for most directions.

Agency Location Date Entered Date To Agency Status Clark County Spencer/Pyle 11/22/19 15:13:47 N/A Closed

Detailed Description Action Taken By Staff/Resolution Caller states Spencer NB to Pyle WB left did not serve, caller advised went from red to yellow to red. Caller advised this occurred at approximately 14:55. Caller advised left turn served during next cycle. No comm to signal or camera

Complaint was not observed. Detection was operating correctly. Watched Intersection for 90 minutes and NBL never skipped.

Agency Location Date Entered Date To Agency Status Clark County Jones 11/20/19 10:37:50 11/19/19 Closed

Detailed Description Action Taken By Staff/Resolution Received a complaint that NB & SB ped button is not working. The ped was crossing NB but could see SB peds running across the street. Could one of the county guys check it out?

Put in InTheWorks

Page 48: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

27 | P a g e

Agency Location Date Entered Date To Agency Status Las Vegas Bonneville/Main 01/10/20 08:25:02 N/A Closed

Detailed Description Action Taken By Staff/Resolution Caller advises this signal is out of coordination eastbound thru to las Vegas Blvd. ATMS is showing Test phase 47. she advises this occurs daily at 3:30pm

Running split phase, will contact CLV to find out details. Removed today.

Agency Location Date Entered Date To Agency Status Las Vegas Sahara & I-15 01/08/20 11:48:28 01/04/20 Closed

Detailed Description Action Taken By Staff/Resolution Intersection is out of step.

Set clock, clock was ahead +50 sec

Agency Location Date Entered Date To Agency Status Las Vegas Sahara & 15 01/08/20 11:44:27 01/04/20 Closed

Detailed Description Action Taken By Staff/Resolution out of step, We lost comm. Set clock, clock was ahead +50 sec

Agency Location Date Entered Date To Agency Status Las Vegas Imperial & Commerce 12/27/19 09:46:41 N/A Closed

Detailed Description Action Taken By Staff/Resolution RTC driver on SDX route advises that Imperial WB at Main is supposed to be synced with Imperial WB at Commerce, he advises that not enough time on the green for bus to get through. Driver also advises that the bus is not being recognized Imperial WB at Main for between 4-5 mins. Caller advises this happens all the time (no specific day or time). Caller believes that ped call may be one of the causes of the delay. Caller advises this delays his route approximately 10 minutes each day.

Made adjustments to pattern 10, did not have experience the wait times as described.

Agency Location Date Entered Date To Agency Status Las Vegas Imperial & Main 12/27/19 09:46:21 N/A Closed

Detailed Description Action Taken By Staff/Resolution RTC driver on SDX route advises that Imperial WB at Main is supposed to be synced with Imperial WB at Commerce, he advises that not enough time on the green for bus to get through. Driver also advises that the bus is not being recognized Imperial WB at Main for between 4-5 mins. Caller advises this happens all the time (no specific day or time). Caller believes that ped call may be one of the causes of the delay. Caller advises this delays his route approximately 10 minutes each day.

Made adjustments to pattern 10, did not see wait times as described.

Page 49: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

28 | P a g e

Agency Location Date Entered Date To Agency Status Las Vegas Buffalo & Alta 12/24/19 09:44:50 12/24/19 Closed

Detailed Description Action Taken By Staff/Resolution Alta backs up in both directions in the afternoon during the week.

12/30/19 could not verify complaint, will observe traffic when school is back in session. 01/06/20 observed traffic through school egress and didn't see an issue.

Agency Location Date Entered Date To Agency Status Las Vegas Jones/Oakey 11/22/19 09:32:41 N/A Closed

Detailed Description Action Taken By Staff/Resolution Citizen complaint, before 7Am both NB & SB left turns from Jones serve at least 10 secs or more even if there's no traffic there.

Split history does not show any issues. Programmed pattern 13 to float mode, will monitor.

Agency Location Date Entered Date To Agency Status Henderson Lake Mead Pkwy/Water 01/04/20 08:23:13 N/A Open

Detailed Description Action Taken By Staff/Resolution RTC Dispatch advises no service on NB thru, bus waited multiple cycles for thru to serve. Split history shows no service on Phase 6 08:00 to 08:07. Day plan shows plan change at 08:00 from plan 2 to plan 29. no camera at intersection

Added min recall 2, 6 and a max recall 4, 8 until detection checked out.

Agency Location Date Entered Date To Agency Status Henderson Horizon Dr/Pacific 11/27/19 09:55:08 N/A Closed

Detailed Description Action Taken By Staff/Resolution Caller advises not enough time for WB, it takes two cycles to get through signal. Caller advises this happens daily after the AM rush hour. Per ATMS, day plan changes at 07:45 from 17 to 8.

Implemented a 120 cycle to give more time for WB traffic. Will continue to monitor its implementation and iron out any quirks. Edit- N-W LT backs up, changed the sequence to lag this movement and alleviate the problem. Edit- after a few days of monitoring, the 120 appears safe to keep implemented

Page 50: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
vasm
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Slip Sheet
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Page 51: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

REGIONAL TRANSPORTATION COMMISSION

OF SOUTHERN NEVADA

AGENDA ITEM

Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: NDOT-FAST ITS OPERATIONS REPORT PETITIONER: M. J. MAYNARD, CHIEF EXECUTIVE OFFICER

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION OPERATIONS MANAGEMENT COMMITTEE RECEIVE THE NEVADA DEPARTMENT OF TRANSPORTATION (NDOT)-FAST INTELLIGENT TRANSPORTATION SYSTEM OPERATIONS REPORT PERFORMED AS PART OF NDOT’S CONTRACTS (FOR POSSIBLE ACTION) GOAL: IMPROVE THE EFFICIENCY AND EFFECTIVENESS OF THE TRANSPORTATION

SYSTEM AND AIR QUALITY BY MANAGING CONGESTION; MAINTAIN AND IMPROVE TRANSPORTATION SYSTEM INFRASTRUCTURE

FISCAL IMPACT: None by this action BACKGROUND: A representative from the Nevada Department of Transportation will discuss the status of the Freeway and Arterial Integration Project of Freeway and Arterial System of Transportation (FAST) Packages, Interstate 15, U.S. 95, and other project-related issues concerning FAST expansion and integration. Respectfully submitted, ____________________________ BRIAN HOEFT, P.E. Director of FAST cp

DocuSign Envelope ID: DDA70D4D-32FD-4288-BCCB-930CAD3AEF0E

mcmahant
Typewritten Text
mcmahant
Typewritten Text
os
mcmahant
Typewritten Text
colemanz
Text Box
FAST OMC Item #4 February 6, 2020
mcmahant
Typewritten Text
Page 52: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
vasm
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Slip Sheet
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Page 53: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Respectfully submitted, BRIAN HOEFT, P.E. Director of FAST cp

REGIONAL TRANSPORTATION COMMISSION OF

SOUTHERN NEVADA

AGENDA ITEM

Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: CURRENT AND FUTURE FUNDING OPTIONS PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION OPERATIONS MANAGEMENT COMMITTEE DISCUSS CURRENT AND FUTURE FUNDING OPTIONS FOR THE OPERATION OF THE FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION ARTERIAL MANAGEMENT SYSTEM (FOR POSSIBLE ACTION) GOAL: IMPROVE THE EFFICIENCY AND EFFECTIVENESS OF THE TRANSPORTATION SYSTEM AND AIR QUALITY BY MANAGING CONGESTION

FISCAL IMPACT: None BACKGROUND: The current Freeway and Arterial System of Transportation (FAST) agreement, approved on July 14, 2016, specifies that the operation of the FAST Arterial Management System (AMS) be funded with revenue collected from Question 10 (sales tax). Although the FAST agreement specifies sales tax be used for FAST AMS operations, other funding sources may also be eligible, including fuel tax. This item affords the FAST Operations Management Committee the opportunity to discuss the merits of modifying the current FAST agreement and directing staff accordingly.

DocuSign Envelope ID: DDA70D4D-32FD-4288-BCCB-930CAD3AEF0E

mcmahant
Typewritten Text
mcmahant
Typewritten Text
os
mcmahant
Typewritten Text
colemanz
Text Box
FAST OMC Item #5 February 6, 2020
mcmahant
Typewritten Text
Page 54: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 55: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 56: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 57: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 58: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 59: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 60: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 61: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 62: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 63: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 64: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 65: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 66: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 67: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 68: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 69: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 70: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 71: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 72: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 73: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
Page 74: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
vasm
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Slip Sheet
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Page 75: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

REGIONAL TRANSPORTATION COMMISSION

OF SOUTHERN NEVADA

AGENDA ITEM

Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: TRANSPORTATION TECHNOLOGIES PETITIONER: M. J. MAYNARD, CHIEF EXECUTIVE OFFICER

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION OPERATIONS MANAGEMENT COMMITTEE DISCUSS NEW TRANSPORTATION TECHNOLOGIES AND THEIR USE IN MEASURING, MONITORING, AND ENHANCING PERFORMANCE ON SOUTHERN NEVADA ROADWAYS GOAL: ENHANCE PUBLIC AWARENESS AND SUPPORT OF THE REGIONAL

TRANSPORTATION SYSTEM FISCAL IMPACT: None by this action BACKGROUND: The Freeway and Arterial System of Transportation Operations Management Committee (FAST OMC) and FAST personnel can share information about rapidly deploying transportation technologies and, in particular, the opportunity to quantify and enhance system performance. While no action may be taken on the subjects discussed, this item provides an opportunity for the exchange of information and may serve as the forum to recommend future FAST OMC agenda items. Respectfully submitted, ____________________________ BRIAN HOEFT, P.E. Director of FAST cp

DocuSign Envelope ID: DDA70D4D-32FD-4288-BCCB-930CAD3AEF0E

mcmahant
Typewritten Text
mcmahant
Typewritten Text
os
mcmahant
Typewritten Text
colemanz
Text Box
FAST OMC Item #6 February 6, 2020
mcmahant
Typewritten Text
Page 76: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
vasm
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Slip Sheet
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Page 77: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

REGIONAL TRANSPORTATION COMMISSION

OF SOUTHERN NEVADA

AGENDA ITEM

Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: TOPICS OF INTEREST PETITIONER: M. J. MAYNARD, CHIEF EXECUTIVE OFFICER

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION OPERATIONS MANAGEMENT COMMITTEE DISCUSS TOPICS OF INTERESTGOAL: ENHANCE PUBLIC AWARENESS AND SUPPORT OF THE REGIONAL

TRANSPORTATION SYSTEM FISCAL IMPACT: None by this action BACKGROUND: The Freeway and Arterial System of Transportation Operations Management Committee (FAST OMC or Committee) and Committee facilitators can share information about activities, meetings, news, and other topics of interest in an informal manner. While no action may be taken on the subjects discussed, this item provides an opportunity for the exchange of information and may serve as the forum to recommend future FAST OMC agenda items. Respectfully submitted, ____________________________ BRIAN HOEFT, P.E. Director of FAST cp

DocuSign Envelope ID: DDA70D4D-32FD-4288-BCCB-930CAD3AEF0E

mcmahant
Typewritten Text
mcmahant
Typewritten Text
os
mcmahant
Typewritten Text
colemanz
Text Box
FAST OMC Item #7 February 6, 2020
Page 78: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
vasm
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Slip Sheet
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Page 79: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial

Respectfully submitted, BRIAN HOEFT, P.E. Director of FAST cp

REGIONAL TRANSPORTATION COMMISSION OF

SOUTHERN NEVADA

AGENDA ITEM

Metropolitan Planning Organization [X] Transit [ ] Administration and Finance [ ] SUBJECT: FINAL CITIZENS PARTICIPATION PETITIONER: M.J. MAYNARD, CHIEF EXECUTIVE OFFICER

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA RECOMMENDATION BY PETITIONER: THAT THE FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION OPERATIONS MANAGEMENT COMMITTEE CONDUCT A COMMENT PERIOD FOR CITIZENS PARTICIPATION GOAL: ENHANCE PUBLIC AWARENESS AND SUPPORT OF THE REGIONAL

TRANSPORTATION SYSTEM FISCAL IMPACT: None BACKGROUND: In accordance with State of Nevada Open Meeting Law, the Regional Transportation Commission of Southern Nevada Freeway and Arterial System of Transportation (FAST) Operations Management Committee (OMC) shall invite interested persons to make comments. For the initial Citizens Participation, the public should address items on the current agenda. For the final Citizens Participation, interested persons may make comments on matters within the FAST OMC’s jurisdiction, but not necessarily on the current agenda.

No action can be taken on any matter discussed under this item, although the FAST OMC can direct that it be placed on a future agenda.

DocuSign Envelope ID: DDA70D4D-32FD-4288-BCCB-930CAD3AEF0E

mcmahant
Typewritten Text
mcmahant
Typewritten Text
os
mcmahant
Typewritten Text
colemanz
Text Box
FAST OMC Item #8 February 6, 2020
Page 80: FREEWAY AND ARTERIAL SYSTEM OF TRANSPORTATION … · 5. discuss current and future funding options for the operation of the freeway and arterial system of transportation arterial
vasm
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
Slip Sheet
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text
mcmahant
Typewritten Text