Page 1: H 1 Freeway H-1 Freeway

H 1 FreewayH-1 FreewayDeck Repairs and PM Contraflow

Interstate H-1 FreewayF d l Aid P j t N BR H1 1 (263) dFederal Aid Project No. BR-H1-1 (263) and

Federal Aid Project No. NH-H1-1 (260)

PUBLIC INFORMATION MEETINGAugust 27, 2013g ,

Page 2: H 1 Freeway H-1 Freeway

Deck Repairs- Project Status

WaimaluViaduct

Pearl Cityea C tyViaduct

The Pearl City and Waimalu viaduct decks are being repaired by removing and replacing d t i t d t ti Thi ill tdeteriorated concrete sections. This will restore structural integrity and provide a smooth riding surface.

Page 3: H 1 Freeway H-1 Freeway

Deck Repairs- Project StatusOUTBOUND (Westbound)

• Priority 1 (two innermost lanes) completed

• Priority 2 (outer lanes) anticipated completion by January 2014

Page 4: H 1 Freeway H-1 Freeway

INBOUND (E tb d)

Deck Repairs- Project StatusINBOUND (Eastbound)

• Upon completion of outbound repair, shift to Priority 1 (two innermost lanes) and Priority 2 (outer lanes) anticipatedPriority 2 (outer lanes) anticipated completion by May 2014

Page 5: H 1 Freeway H-1 Freeway

Deck Repairs- Project Status

CONSTRUCTION WORKING HOURS

Traffic:Traffic:• Westbound - Night work Monday to

Thursday 7:30 pm to 4:30 am.• Eastbound – Night work Monday to• Eastbound – Night work Monday to

Thursday 6:00 pm to 4:30 am.

Sun SatMon Tue Wed Thur Fri

Page 6: H 1 Freeway H-1 Freeway

Deck Repairs- Project StatusCONSTRUCTION WORKING HOURS

• Adding select Sunday day and night work

12 1

210

11

between 9:00 am to 4:30 am Monday. Helps to expedite work with longer uninterrupted hours

3

4

57

8

9

6

Sun Mon

Page 7: H 1 Freeway H-1 Freeway

Deck Repairs- Project StatusCONSTRUCTION ISSUE - NOISE

Noise• Noisy activities are required by the• Noisy activities are required by the

Department of Health to end before Midnight

• When possible work areas will beWhen possible, work areas will be enclosed to reduce noise

Page 8: H 1 Freeway H-1 Freeway

PM Contra-FlowConstruction Activities

1. Widen Pearl City Viaduct (Westbound)(Westbound)• From Pearl City Interchange

(Waiau Interchange) to Waipahu Off-rampp

2. Restripe lanes at Halawa merge (Westbound)

3. Widen shoulders at Waiawa Interchange (Westbound)

Page 9: H 1 Freeway H-1 Freeway

Widen Pearl City Viaduct (Westbound)Westbound (mauka) side of Pearl CityWestbound (mauka) side of Pearl City Viaduct will be widened

Pearl City on-ramp Waipahu

off-ramp

Home DepotSears DistributionCenter

May June July Aug Sept Oct Nov Dec Jan Feb Mar April June July Aug Sept

Page 10: H 1 Freeway H-1 Freeway

Deck Extension Construction Sequence• At least 2 lanes of traffic

will be open at all times• Pour new

barrier and remove existingCONSTRUCTION SAFETY ZONE existing

• Pour new deck

Existing median and Zipper barrier

• Install pier

• Install girder

• Install collar

• Install pier cap extension

WESTBOUND

Page 11: H 1 Freeway H-1 Freeway

Proposed Pearl City Viaduct WideningH-1 Westbound to Waiawa

AUXILIARY LANE 6

5

4

3MEDIAN BARRIER

2

1

MEDIAN BARRIER

3

4

5

3

2

1

H-1 Eastbound to Honolulu

SHOULDER

Page 12: H 1 Freeway H-1 Freeway

Widen Pearl City Viaduct (Westbound)

L l ill bLane closures will be required due to overhead workAffected lanes areAffected lanes are

• Hugh Street• Lehua Avenue • Kamehameha

High a near theKamehamehaHighwayHighway near the

Sears distribution warehouse

Highway

Hugh St

LehuaAvenue

PEARL CITY VIADUCT

Page 13: H 1 Freeway H-1 Freeway

Widen Pearl City Viaduct (Westbound)

• During working hours from 7:00 am to 3:30 pm work crews will be constructing formwork under the viaducts between girdersconstructing formwork under the viaducts between girders.

• Areas under the viaducts need to be vacated for access and safety.

Page 14: H 1 Freeway H-1 Freeway

Restripe Lanes (Westbound)Restripe lanes at Halawa mergeRestripe lanes at Halawa merge(Westbound)

• Provides shoulder lane between Halawa Interchange and Pearl City

Aiea High School

Halawa Interchange and Pearl City Interchange off ramp during the PM Peak period

Aiea High School

Page 15: H 1 Freeway H-1 Freeway

Widen Waiawa Interchange Shoulders

Waikele

WaiawaI t hWiden shoulders Interchange

(Westbound) to Waikele to create a new 4th lane

Waipahu

Leeward Community College

Page 16: H 1 Freeway H-1 Freeway

Contact Information

For additional information, questions or comments, please visit our project website at: www.pmcontraflow.com

Or call:Th Hotline: 945 1144The Hotline: 945-1144

Page 17: H 1 Freeway H-1 Freeway

H 1 FreewayH-1 FreewayDeck Repairs and PM Contraflow

Mahalo!Questions and Comments?

Please KokuaPlease Kokua1. Please use the microphone to voice your

questions & comments2 Li it ti t 3 i t f i2. Limit your time to 3 minutes for maximum

participation3. Please be respectful of the process