17
Fraud Awareness Co FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Embed Size (px)

Citation preview

Page 1: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Corey Walker

Office of Program Management

Sound Transit Steel Casing Product Substitution Review

Page 2: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Seattle Light Rail Project

15.6 Miles from Downtown to Airport13 stations35 Light Rail VehiclesTotal Cost $2.7 BillionFTA Share $500 MillionFFGA awarded 2003Opened to S. 154th St July 2009Airport Station Opened December 2009

2

Page 3: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Project Map

3

Page 4: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Tukwila Freeway Route

Approximately 4.9 miles of guideway87% elevated187 columns support the elevated guidewayColumns up to 80 feet highThree types of footings used depending on

height and soil type

4

Page 5: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Elevated Guideway

5

Page 6: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Construction of Guideway

6

Page 7: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Steel Casings on Site

7

Page 8: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Casing Installation

8

Page 9: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Foundation Ready for Concrete

9

Page 10: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Foundation Casings

Prevent shaft from collapsing during construction

Provide additional shear strength to resist earthquake forces

Have little effect on ability of column to support the weight of trains and guideway (not counted on in design)

10

Page 11: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Product Substitution

Sound Transit (ST) specified 50,000 psi (50 ksi) steel

Subcontractor provided 36,000 psi (36 ksi) steelST issued a Non-Conformance reportSubcontractor provided letter indicating that it

was 50 ksi steelLetter was found to be falsified

11

Page 12: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

ST Response

Designers calculated strength of columns with 36 ksi steel

Columns still provided necessary strength with a reduced factor of safety

Concluded that no additional measures were required to ensure safety

12

Page 13: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

FTA Oversight

FTA Project Management Oversight Consultant (PMOC) was on project since it began

Two on-site staff, task order manager and technical expert

Reviewed ST Construction Management and Quality Assurance procedures

Visited construction sites weekly

13

Page 14: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

PMOC Actions

PMOC Confirmed ST construction managers had issued a Non-Conformance report

Checked ST engineers calculations and verified conclusions

Performed independent analysis to ensure structure was safe

14

Page 15: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

PMOC Analysis

Brought in structural engineering specialist to perform analysis

Made computer model of columns, shafts, casings and foundations with the 36 ksi steel

Ran computer simulation of how the structure would fail when stressed to the point of failure

15

Page 16: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

Model Results

Columns fail outside of the areas surrounded by the casings

The casings are not the part of the structure that would fail during an earthquake

Therefore, the use of weaker steel in the casings does not impact the ability of the structure to resist the design earthquake

In other words, the safety of the structure is not compromised

16

Page 17: Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review

Fraud Awareness ConferenceFEDERAL TRANSIT ADMINISTRATION

FTA Costs

Expert was not part of PMOC team assigned to monitor project

Charged 202 hours to FTA Flew from New York to Seattle to review

documents, visit siteTotal cost was $30,523Appleby reimbursed FTA for costs of review

17