-Downtime Total Parts / # of Identical Parts * CC / 60 - Minutes Worked = Downtime -Hourly (If you forget to check your hourly product count, you can calculate it with this formula) (60 - Downtime) * 60 / Cycle time = The number of shots produced for that hour -Total parts is the total number of GOOD pieces and SCRAP pieces. -Cycle time is the ACTUAL time, not the book time. -Minutes worked is the entirety of the time you were working on those pieces. Re gardless of down time.

formula for doing paperwork for the ungrateful.txt

Embed Size (px)

Citation preview

-DowntimeTotal Parts / # of Identical Parts * CC / 60 - Minutes Worked = Downtime

-Hourly (If you forget to check your hourly product count, you can calculate it with this formula)(60 - Downtime) * 60 / Cycle time = The number of shots produced for that hour

-Total parts is the total number of GOOD pieces and SCRAP pieces.

-Cycle time is the ACTUAL time, not the book time.

-Minutes worked is the entirety of the time you were working on those pieces. Regardless of down time.