FOGA ApS FISHERMENS INFORMATION OF OILAND GAS ACTIVITIES Trafikhavnskaj 19 DK6700 Esbjerg Tel.: +45 75 45 11 44 EMail: [email protected] Web page: www.foga.dk NORTH SEA ACTIVITIES Week 4 January 21, 2020 FOGA ApS has on basis of information received from offshoreoperators at the North Sea prepared the following newsletter describing present activities: Side 1 Info 2.1 Info 4.0 Info 2.0 Info 14.0 Info 9.0 Info 1.0 Info 3.0 Info 5.0 Info 6.0 Info 7.0 Signatures: Warning Safety zone Pipeline with 200 meter protective zone Buoy Existing installation Mobile rig 1 MAERSK RESOLUTE: Port of Esbjerg. 2 NOBLE SAM TURNER is expected to come into position at DAN FB later today (21/1). 4 CROSSWAY EAGLE in position at TYRA W Info 10.0 Info 14.0 Info 15.0 © Crown Copyright and/or database rights. Reproduced by permission of the Controller of Her Majesty’s Stationery Office and the UK Hydrographic Office (www.GOV.uk/UKHO). "Unter Verwendung von Datenmaterial des Bundesamtes für Seeschifffahrt und Hydrographie (BSH) hergestellt (Lizenznr. 201706)". Do not copy without permission from FOGA ApS 2 NOBLE SAM TURNER is expected to come into position at DAN FB later today (21/1). 4 CROSSWAY EAGLE in position at TYRA W. 5 MAERSK GUARDIAN in position at TYRA E. 12 COLGA: Port of ESBJERG. A lost anchor and 6 schakles of chain is located on pos. 56°00.28N 007°57.7E Vessels: The vessel VESTLAND CYGNUS is expected at the TYRA Fields from 23/1. The vessel DEFENDER is working at the TYRA Fields. The vessel EURUS EXPRESS is expected at the DUC Fields from this week and 7 days ahead. The vessel MAERSK TRACKER conducting maintenance at the DUC Fields. The vessel SIDDIS MARINER is working at the TYRA E Field. The vessels CECILIE & ANETTE CHRISTINA are acting as guard vessels at the Havfrue cable. The vessel Ile de Batz is laying the havhingsten subsea cable. The vessel GEO OCEAN IV is conducting an UXO survey at the site for the Thor windfarm. The tugboat Rimfaxe and the dregder Njord R are working at the Horns Rev 3. After the rigmove the vessel BUGSIER 10 will act as standby vessel at the SKJOLD Field. The vessel ESVAGT CAROLINE is expected at the SKJOLD Field by Thursday or Friday as replacement for the BUGSIER 10. ESVAGT CAROLINE is expected to be the SKJOLD Field for approx. 14 days. Side 1

FOGA ApS NORTH SEAE‐Mail: [email protected] Webpage: ... (via subsea Y‐connection with a split from HARALD) ... C/S Ile de Batzis currently (week 4) laying a branching unit and

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FOGA ApS NORTH SEAE‐Mail: fish.info@foga.dk Webpage: ... (via subsea Y‐connection with a split from HARALD) ... C/S Ile de Batzis currently (week 4) laying a branching unit and

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Week 4January 21, 2020

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

Side 1

Info 2.1

Info 4.0

Info 2.0

Info 14.0Info 9.0

Info 1.0

Info 3.0

Info 5.0

Info 6.0

Info 7.0Signatures:Warning

Safety zone

Pipeline with 200 meter protective zone

Buoy

Existing installation

Mobile rig

1 MAERSK RESOLUTE: Port of Esbjerg. 2 NOBLE SAM TURNER is expected to come into position at DAN FB later today (21/1).4 CROSSWAY EAGLE in position at TYRA W

Info 10.0

Info 14.0

Info 15.0

© Crown Copyright and/or database rights. Reproduced by permission of the Controller of Her Majesty’s Stationery Office and the UK Hydrographic Office (www.GOV.uk/UKHO). "Unter Verwendung von Datenmaterial des Bundesamtes für Seeschifffahrt und Hydrographie (BSH) hergestellt (Lizenznr. 2017‐06)". Do not copy without permission from  FOGA ApS

2 NOBLE SAM TURNER is expected to come into position at DAN FB later today (21/1).4 CROSSWAY EAGLE in position at TYRA W.5 MAERSK GUARDIAN in position at TYRA E. 12 COLGA: Port of ESBJERG. A lost anchor and 6 schakles of chain is located on pos. 56°00.28N 007°57.7EVessels:The vessel VESTLAND CYGNUS is expected at the TYRA Fields from 23/1. The vessel DEFENDER is working at the TYRA Fields.The vessel EURUS EXPRESS is expected at the DUC Fields from this week and 7 days ahead.The vessel MAERSK TRACKER conducting maintenance at the DUC Fields.The vessel SIDDIS MARINER is working at the TYRA E Field. The vessels CECILIE & ANETTE CHRISTINA are acting as guard vessels at the Havfrue cable. The vessel Ile de Batz is laying the havhingsten subsea cable.The vessel GEO OCEAN IV is conducting an UXO survey at the site for the Thor windfarm. The tugboat Rimfaxe and the dregder Njord R are working at the Horns Rev 3. After the rigmove the vessel BUGSIER 10 will act as standby vessel at the SKJOLD Field. The vessel ESVAGT CAROLINE is expected at the SKJOLD Field by Thursday or Friday as replacement for the BUGSIER 10. ESVAGT CAROLINE is expected to be the SKJOLD Field for approx. 14 days.

Side 1

Page 2: FOGA ApS NORTH SEAE‐Mail: fish.info@foga.dk Webpage: ... (via subsea Y‐connection with a split from HARALD) ... C/S Ile de Batzis currently (week 4) laying a branching unit and

Rigs in the Port of Esbjerg

Info 1.0

Rigs: COLGA

Vessels:The vessel VESTLAND CYGNUS is expected at the TYRA Fields from 23/1 for close down of satellite platforms and cleaning

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

Update of informationWeek 4January 21 ‐ 27, 2020Next FOGA Info to be distributed January 28, 2020

COLGA

Total E&P Danmark A/S

SIDDIS MARINER

MAERSK TRACKER

MAERSK RESOLUTE

VESTLAND CYGNUS

Vessels:The vessel VESTLAND CYGNUS is expected at the TYRA Fields from 23/1 for close down of satellite platforms and cleaning of pipelines. The vessel DEFENDER is working at the TYRA Fields.The vessel EURUS EXPRESS is expected at the DUC Fields from this week and 7 days ahead. The vessel MAERSK TRACKER conducting maintenance at the DUC Fields.The vessel SIDDIS MARINER (Walk to work) is working at the TYRA E Field for close down of satellite platforms and cleaning of pipelines. The vessels ASSISTER, BUGSIER 10 & FAIRPLAY 27 are taking care of the rig move of NOBLE SAM TURNERwhich is expected to come into position 21/1. After the rigmove the vessel BUGSIER 10 will act as standby vessel at the SKJOLD Field. The vessel ESVAGT CAROLINE is expected at the SKJOLD Field by Thursday or Friday as replacement for the BUGSIER 10. ESVAGT CAROLINE is expected to be the SKJOLD Field for approx. 14 days. 

TYRA FUTURE:Both new pipelines between TYRA W & TYRA E has been deployed and trenched into the seabed. More information on this project can be found on page 4.

Rigmoves: NOBLE SAM TURNER is expected to come into position at DAN FB later today (21/1). The accommodation rig CROSSWAY EAGLE in position at TYRA W.The accommodation rig MAERSK GUARDIAN in position at TYRA E. 

NOBLE SAM TURNER

CROSSWAY EAGLEMAERSKGUARDIAN

SIDDIS MARINER

DEFENDEREURUS EXPRESSFAIRPLAY 27

BUGSIER 10 ASSISTER

Info 2.0

Info 2.1

The accommodation rig MAERSK GUARDIAN in position at TYRA E. 

SIRI‐field:  56o 28.96' N  004o 54.67' E

CECILIE‐A field: 56o 24.13' N  004o 45.58' E

NINI A‐field:  56o 38.45' N  005o 19.27' E

NINI B‐field: 56o 40.49' N  005o 24.74' E

STINE field ‐ Subsea installations:STINE SCB‐1:  56o 30.96' N  005o 02.46' E

STINE SCB‐2:  56o 30.95' N  005o 03.56' E

The safety zones are 500 mfrom the positions.

Vessels: 

Hejre Project: 

In connection to the establishment of the HEJRE Platform a safety zone of 500 m has been established around the position: 56°14,809' N ‐ 003°57,534' E. 

Illustration of hose when idle.

SIRI tanker loading facility.

NOBLE SAM TURNER

CROSSWAY EAGLEMAERSKGUARDIAN

DEFENDEREURUS EXPRESSFAIRPLAY 27

Info 3.0

56 14,809  N  003 57,534  E. 

FINO 3 ‐ Research PlatformThe research platform FINO 3 was established in 2007/2008 approx. 45 nautical miles west of the island Sylt at the position: 55° 11,7' N 007° 09,5' E. A 500 meter safety zone has been established around the platform. 

Please see the web page from the "Forschungs‐ und Entwicklungs zentrum, Fachhochschule Kiel Gmbh" www.fino3.de for more information.

DAN TYSK windfarmThe DAN TYSK  windfarm has been etablised at the shown site.  

SANDBANK windfarm The SANDBANK windfarm has been etablised.  

HEJRE Field

FINO 3

Side 2

Page 3: FOGA ApS NORTH SEAE‐Mail: fish.info@foga.dk Webpage: ... (via subsea Y‐connection with a split from HARALD) ... C/S Ile de Batzis currently (week 4) laying a branching unit and

Info 4.0

SYD ARNE field

The storage tank and top site of  SOUTH ARNE field is installed at position 56o 04,72' N  004o 13,82' E, connected with a new bridge to the platform South Arne WHP E (Well Head Panel) at position 56o 04,693' N  004o 13,85' E.

The satellitplatform Syd Arne WHP N is installed at the position 56o 05,744' N  004o 13,154' E, where a safety zone of 500 meter is established acc. to Offshore safety order.  SOUTH ARNE's tanker loading  facility,  where tankers are  loaded at  8 ‐ 10 day  intervals  is located at WGS‐84 pos. 56o 05,55' N  004o 15,37' E. 

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Update of informationWeek 4 January 21 ‐ 27, 2020Next FOGA Info to be distributed January 28, 2020

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

Info 6.0

Crew Transfer Vessels (CTV) KEM 1, and BOLDER, the tugboat Rimfaxe and the dregder Njord R will be doing works in the area. 

All 49 WTG's are installed.

Horns Rev 3 Marine Coordination Centre has been established by Vattenfall and is in operation 24/7. HR3 MCC can be contacted by VHF can 16 and 10 or by duty‐phone no.: +45 27 87 50 50. HR3 MCC is monitoring traffic in the area and at the construction site.

SYD ARNE Field

SYD ARNE tanker loading facility

Syd ArneSAL system56 05,549 N04 15,368 E

o

o

Syd ArneWHPN platform56 05,744 N04 13,154 E

o

o

Syd ArneWHPE platform56 04,694 N04 13,852 E

o

o

Syd ArneGBS platform56 04,702 N04 13,731 E

o

o

Info 7.0

Info 8.0

Info 9.0

Danish navigational warning no. DK‐214‐16

At the below mentioned position a wreck of a submarine has been discovered containing dangerous ammunition.Due to safety reasons, Danish Maritime Authority prohibit all unauthorized fishing, anchoring and diving on and within 100 m radius of the wreck in pos. 55 30,62 N ‐ 007 56,84 E. Please note that the size of the prohibited area has been changed. Violation of the prohibition is punishable by fine or prison.

Orsted operates 3 pipelines in the Danish North Sea sector:

20” Oil pipeline from GORM to Filsø24” Gas pipeline from SYD ARNE to Blåbjerg. (via subsea Y‐connection with a split from HARALD)30” Gas pipeline from TYRA E‐E to Kærgård

From the vessel GEO OCEAN IV an UXO survey are carried out on behalf of Energinet, at the site for the coming Thor wind farm. Oth l t d t t f d d di t Fi hi l t d t di t th i fi hiFrom the vessel GEO OCEAN IV an UXO survey are carried out on behalf of Energinet, at the site for the coming Thor wind farm. Other vessels are requested to pass at a safe speed and distance. Fishing vessels are requested to coordinate their fishing activities with the FOGA FLO Tony Buhl Nielsenwho is stationed onboard the GEO OCEAN IV, listening on VHF ch. 16. On behalfof Energinet, 4 x 4  yellow buoys have been deployed at the Thor site in order to monitor the wildlife. All in all 16 buoys to be deployed within the Thor site. Every position consists of 4 yellow buoys with a distance of 250 m between each others. The yellow buoys are special marks with yellow light and a yellow X as topsign.

No. Name LAT N LONG E

1 Thor_T1 56 16.999 7 45.116

2 Thor_T2 56 17.049 7 33.317

3 Thor_T3 56 20.343 7 40.898

4 Thor_T4 56 24.734 7 44.734

GEO OCEAN IV 

Side 3

Page 4: FOGA ApS NORTH SEAE‐Mail: fish.info@foga.dk Webpage: ... (via subsea Y‐connection with a split from HARALD) ... C/S Ile de Batzis currently (week 4) laying a branching unit and

Info 10.0

TYRA FUTURE:

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Update of informationWeek 4January 21 ‐ 27, 2020Next FOGA Info to be distributed January 28, 2020

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

The charts below shows the new pipelines between the TYRA Fields.

Total E&P Danmark A/S

Info 14.0

Info 15.0

The works along the Havfrue cable in Danish waters are carried out by the vessel CS RESPONDERwhich is working along the cable route in a North Western direction at the Westcoast of Jutland off Nymindegab. As of now the cable works are temporary suspended and they are expected to be resumed on/around January 27 ‐ 28, 2020. The vessels CECILIE & ANETTE CHRISTINA are acting as guard vessels. CECILIE on station at Asset 44,43,42 EUROPIPE, NORDNED E & W and ANETTE CHRISTINA on station at PLIB # 4 position 56°31,8 N – 005° 58,6E.

CS RESPONDER

From the vessel C/S Ile de Batz the company Alcatel Submarine Networks are laying a subsea cable between Denmark and UK, from Nov 2019 ‐ Feb 2020 (Havhingsten subsea telecom system). The vessel C/S Ile d'Aix has joined the project (Dec 2019 – Mar 2020) for cable burial at pipeline crossing locations. Mariners are requested to keep clear of the cable laying vessels.  C/S Ile de Batz is currently (week 4) laying a branching unit and will carry on cable installation and ploughing until the end of the week where the weather is planned to deteriorate. End of week 4, post lay burial might be performed if weather allows until the 25th of January. The vessel will then leave DK waters for cable loading in Calais, France, then be back in DK waters week 6 for continuation of lay and ploughing of the cable towards UK waters. Leaving DK waters is planned early March.

C/S Ile d'Aix is currently out of DK waters for other assignments, planned to be back for cable post lay burial at crossings location 

This newsletter and infochart has been prepared on request from the operators in the North Sea and is distributed via E‐mail to all fishing vessels and interested parties around the North Sea. Please also visit FOGA's website www.foga.dk. E‐mail [email protected] to subscribe or unsubscribe. Please also notice that the size of the newsletter as a pdf file is approx. 1 mb.

C/S Ile d'Aix is currently out of DK waters for other assignments, planned to be back for cable post lay burial at crossings location 9th of February approximately for about 3 weeks.

The cable route is shown on the chart. 

C/S Ile de Batz 

C/S Ile d'Aix

Side 4