44
Lucia Ana VARGA – Secretary of State Anemarie CIURA – Deputy Director FLOOD MANAGEMENT IN ROMANIA FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE PRESENT AND FUTURE M I N I S T R Y OF E N V I R O N M E N T AND W A T E R M A N A G E M E N T R O M A N I A

FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

Lucia Ana VARGA – Secretary of State

Anemarie CIURA – Deputy Director

FLOOD MANAGEMENT IN ROMANIAFLOOD MANAGEMENT IN ROMANIA

PRESENT AND FUTUREPRESENT AND FUTURE

M I N I S T R Y OF E N V I R O N M E N T AND W A T E R M A N A G E M E N T

R O M A N I A

Page 2: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

ROMANIA IN EUROPE AND IN THE WORLD

Area: 237 500 km²Population 21 640 000 inh

Page 3: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

97.8 % of the Romanian surface are included in the Danube River Basin 30% of the Danube River Basin is in Romania

Page 4: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

D.A. OLT

D.A. SIRET

D.A. MURES

D.A. JIU

D.A. PRUT

D.A. BANAT

D.A. SOMES-TISA

D.A. CRISURI

D.A. BUZAU-IALOMITA

D.A. ARGES-VEDEA

D.A.DOBROGEA-LITORAL

ROMANIAN WATERS NATIONAL ADMINISTRATION – WATER DIRECTORATE’S

Page 5: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

WATER MANAGEMENT EVOLUTION

XVIII-th Centuries - The necessity of flood defence measures had the results : - hydrometric stations (first at Orsova in 1838)- Structural measures: dikes and non permanent reservoirs have been built- First mapping of flood defence structures

• 1924-1974 QUANTITATIVE WATER MANAGEMENT- have been built the reservoirs with complex role, including the flood mitigation-- 1924 First Water Law – elements of hydrologic measurement, situation and river

embankment- 1925 – River basin organisation- 1953 – First Government Decision for rational water use and for water quality

protection• 1974-2000 QUALITY AND QUANTITATIVE WATER MANAGEMENT

- Development of the hydraulic structures- 1976- first national program for arrangement of the river basins in Romania

- Preparation of the framework of hydraulic structures plans, for sustainable development and integrated of the water resources

- 1991 – Romanian Waters National Authority, with 11 river basin branches- 1996 – New water law

• STARTED OF THE YEAR 2000-WATER MANAGEMENT FOR SUSTAINABLEDEVELOPMENT BASED ON EUROPEAN LAWS

Page 6: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

WATER MANAGEMENT IN ROMANIA

PRINCIPLES:- water is a finite and vulnerable resource- water management organized in each river basin- integrate management for quality and quantity- river basin solidarity- polluter pays- water create a economic value

POLITICS:- administration: conservation; rational using of

water resources- rehability and development of Water Management

National System- financial: implement the new economic mechanism- institutional : implement the new structure of

Romanian Waters National Administration- implement of European Union Directives- participation: Basin Committee

Page 7: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

THE ACTUAL ORGANISATION OF THE WATER SECTOR IN ROMANIA

First level : : Ministry for Environment and Water Management – the central authority in water sector;

Second level : : National Administration “Apele Romane”– the implementing authority of water management policy;

Third level : : Local Authorities

Page 8: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

MINISTRY FOR ENVIRONMENT AND WATER MANAGEMENT

Page 9: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

(since 1956).

Page 10: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

1881 -1893

1918 -1930

1906 -1917

1982 -2003

1969 -1981

1954 -1968

1931 -1941

1942 -1953

1894 -1905

PERIODE

No. Years

1412 12 1213 11

15 13

21

1881 1893 1905 1917 1930 1941 1953 1968 1981

Rainy regimeNormal regimeDroughty regime

THE HIGH FLOODS CAUSES THE HIGH FLOODS CAUSES Very severe rains (100-200 l/sqm) which have fallen in a very short time on small areas;

Island effect (concrete and glass) generated by urban areas, which transmit to the climate specific characteristics

Civil indiscipline - various constructions in the river bed areas: houses, households, fences, saw-mills, waste deposits and materials deposits

The reduction of the river bed capacity by embankments without reservoirs and wet zones realization

Non-rational deforestation of a large fields, especially in the leakage forming zone

Page 11: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

COUNTY WITH HIGHEST VULNERABILITY DEGREE

COUNTY WITH MEAN VULNERABILITY DEGREE

FLOODS VURNERABILITY IN ROMANIA1992-2004

BUCHAREST

SATU-MARE MARAMURES

SUCEAVA

BIHORIASI

BISTRITA-NASAUDSALAJ

CLUJ

NEAMT

HARGHITAMURES

VASLUIBACAU

ARAD

ALBA

HUNEDOARA

COVASNASIBIUTIMIS VRANCEA GALATIBRASOV

BUZAUCARAS

-SEVERINARGES

VALCEA TULCEAPRAHOVABRAILA

DAMBOVITAGORJ

MEHEDINTIOLT

IALOMITA

CONSTANTA

ILFOV

DOLJCALARASI

GIURGIUTELEORMAN

BOTOSANI

COUNTY WITH HIGH VULNERABILITY DEGREE

COUNTY WITH LOW VULNERABILITY DEGREE

10 %Dm=50-70

Dtot=455-750

33 %Dm>70

Dtot>750

29 %Dm<30

Dtot<250

28 %Dm=30-50

Dtot=250-450

Dm – MEAN DAMAGES (mld. ROL);Dtot- TOTAL DAMAGES (mld. ROLi)

Page 12: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

FLOOD DEFENCE INFRASTRUCTURE

78905 KM WATERCOURSES

122 NATURAL LAKES

1420 WATER STORAGES WITH 14.2 BIL. CU.M. VOLUME

9365 KM DIKES FOR CITIES, VILLAGES, LANDS PROTECTION

6600 KM RIVER BAND STABILISATION WORKS

1100 KM CANALS

59 PUMPS STATIONS

Page 13: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

W.D. OLT

W.D. SIRET

W.D. MURES

W.D. JIU

W.D. PRUT

W.D. BANAT

W.D. SOMES-TISA

W.D. CRISURI

W.D. IALOMITA-BUZAU

W.D. ARGES-VEDEA

W.D. DOBROGEA-LITORAL

1335

217 314

2882

121309

479

191 108 89 63 28

1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003

DAMAGES PRODUCED BY FLOODS IN THE PERIOD 1992-2003

LEGEND

Damages value 1992-2003 mil USD

6137 mil USD

TOTAL DAMAGES1992-2003

Page 14: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

W.D. PRUT

W.D. SOMES-

TISAW.D. SIRET

W.D. OLT

W.D. MURES

W.D. JIU

W.D. CRISURI

W.D. BANAT

W.D. ARGES-VEDEA

W.D. IALOMITA-BUZAU

W.D. DOBROGEA

LITORALFlooded localities in natural conditions (no.)Protected localities (no.)

Left flooded localities in natural conditions (no)

TOTAL20502050

12981298752752

Affected localities by floods

Page 15: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

23

DEVELOPING WATER MANAGEMENT SYSTEM

INVESTMENTS PROGRAM for 2004: 56,5 Mil. EuroObjectives under development : 170

142 – objectives for flood defense22 - objectives for water sources supply6 - objectives for environmental protection

Page 16: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

23

FLOODS IN ROMANIA IN 2005

DEATH – 4 peoples DISTROYED3300 km pipelines830 houses

AFFECTED:393 localities from 28 counties5467 houses affected26 schools16 kindergarten10 hospitals159 187 hectars1330 km roads

0

200

400

600

800

1000

1200

1400

1600

0 50 100 150 200 250 300 350Timp (ore)

Qm

c/s

1912 1966 2000 2005

Page 17: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

1.1. MORE SPACE FOR WATER MORE SPACE FOR WATER

2.2. FLOOD MITIGATION USING:FLOOD MITIGATION USING:--RESERVOIRSRESERVOIRS--POLDERSPOLDERS--FLOODED ENCLOSUREFLOODED ENCLOSURE

3. LOCAL FLOOD DEFENCE WORKS FOR LOCALITIES 3. LOCAL FLOOD DEFENCE WORKS FOR LOCALITIES AND AGRICULTURAL AREASAND AGRICULTURAL AREAS

4. REDUCING OF RIVER 4. REDUCING OF RIVER ““KEEP ENCLOSUREKEEP ENCLOSURE”” WORKSWORKS

5. BIODIVERSITY PRESERVATION USING WETLANDS5. BIODIVERSITY PRESERVATION USING WETLANDS

Page 18: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

maximum level

normal level

ECONOMIC OBJECTIVES

LOCALITIES

DIKES

POLDER

FLOODED ENCLOSURE

WETLAND

RESERVOIR

LOCALITIES

ECONOMIC OBJECTIVES

Page 19: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

RUNCU RESERVOIR RUNCU RESERVOIRRUNCU

RUNCU RESERVOIR

RUNCU RESERVOIR

Page 20: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

TAIA RESERVOIR

Page 21: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

WATER SUPPLY OF THE AZUGA BREAZA ZONE AZUGA RESERVOIR

Page 22: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

MONITORING, SURVEY

Forward Survey & Early Warning Regional Logistic Support

LOGISTIC SUPPORT INFRASTRUCTURE

National Crisis Management System

RegionalNeeds

Reaction SystemsLevel

(feed-back)

InterministerialLEVEL

Planned

On-going

ROMANIAN STRATEGY FOR DESASTERS MANAGEMENT

RomanianStrategy

IntegrationIntegration

+

Launched

National Meteorological System(SIMIN) - $55M

National Disaster Management System(WATMAN) – aprox. $ 45M

Polution Monitoring System$TBD

Water Disaster Monitoring System(DESWAT) – aprox. $40M

Page 23: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

NATIONAL PROJECTS

IN IMPLEMENTATION AND PERSPECTIVE

1. SIMIN PROJECT (Meteorological Integrated National System)Stage: FINALIZED 2001÷2004

2. DESWAT PROJECT (Hydrological System for warning and forecasting)Stage: - Feasibility Study 2002

- Implementation 2004÷2007

3. WATMAN PROJECT (Water Management Integrated System )Stage: - Feasibility Study 2004

- Implementation 2005 ÷2008

Page 24: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

National Integrated Meteorological System Integrated Meteorological System --SIMINSIMIN

v

v

MeteorologicalMeteorological Radar Doppler CRadar Doppler C--band band

INMHCentrul de Prognoza

National

SPV

SPV

SPV

SPV

SPV

SPV

Meteorological Radar Doppler SMeteorological Radar Doppler S--bandband

v

Weather Forecast CenterWeather Forecast CenterAutomated surface Automated surface obcervationobcervation stations stations –– air, water quality measurements, rainfall, fog, etc.air, water quality measurements, rainfall, fog, etc.

HydroHydro--meteorological river and sea buoysmeteorological river and sea buoysLightning detectorsLightning detectors

SPV

Page 25: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

National Institute of

Meteorology

SIMIN

Central Operations Facility

INMH- Integration of radar and other

meteorological sensor information- Latest in software tools for short and

long term forecasting- Modeling software for NOWcasting- Automatic storage of the recorded data- Tools for statistics- Expansion of commercial market

INMH- Integration of radar and other

meteorological sensor information- Latest in software tools for short and

long term forecasting- Modeling software for forecasting- Automatic storage of the recorded data- Tools for statistics- Expansion of commercial market

ROMATSA- Wind Profile- Turbulence, wind-shear- Icing Conditions- Forecast of Fog set & rise- Short-term forecast- Storm areas

ROMATSA- Wind Profile- Turbulence, wind-shear- Icing Conditions- Forecast of Fog set & rise- Short-term forecast- Storm areas

Civil Defense-- Rainfall flooding forecast- Forest fire detection- Lightning detection- Hail forecast & early warning- Terrain slip forecast (landslides)- Pollution spreading- Insects and bird detection

Civil Defense

- Emergency Management information- Rainfall flooding forecast- Forest fire detection- Lightning detection- Hail forecast & early warning- Terrain slip forecast (landslides)- Pollution spreading- Insects and bird detection

Regia Apelor- Flooding forecast & warning- River flow forecast- Automatic storage- Precipitation quantity forecast

APELE ROMANE

- Flooding forecast & warning- River flow forecast- Automatic storage- Precipitation quantity forecast

Min of Transportation- Severe storm forecast- Precipitation quantity forecast- Slippery road conditions- Fog set & rise conditions

MIN OF TRANSPORTATION

- Severe storm forecast- Precipitation quantity forecast- Slippery road conditions- Fog set & rise conditions

Other Subscribers- Hydro-Power plants- Local Phone service- Agriculture companies and farmers- Insurance companies- Television Stations- Private Transportation companies

Other Subscribers- Hydro-Power plants- Local Phone service- Agriculture companies and farmers- Insurance companies- Television Stations- Private Transportation companies

Min of Defense- NATO interoperable data- Timely operational data

MIN OF DEFENSE- NATO interoperable data- Timely operational data

IntegratedSystem

Radar SensorsRadar Sensors

AutomatedMeteorological

Stations

AutomatedMeteorological

Stations

ASOC

Anti-Hail System

END-USERS

Page 26: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

SYSTEM CAPABILITYSYSTEM CAPABILITY

PRECISELY INDICATES / ANTICIPATES TIME & PRECISELY INDICATES / ANTICIPATES TIME &

PLACE:PLACE:1.1. FLOODING AND RAINFALL ACCUMULATION FLOODING AND RAINFALL ACCUMULATION 2.2. DAMAGING WINDSDAMAGING WINDS3.3. HAIL, ICING, SLIPPERY, FOG, LIGHTNINGHAIL, ICING, SLIPPERY, FOG, LIGHTNING4.4. AIR TURBULENCE (GUST FRONTS, SEA AIR TURBULENCE (GUST FRONTS, SEA

BREEZES/FRONTS)BREEZES/FRONTS)5.5. TROPOSPHERIC WIND PROFILINGTROPOSPHERIC WIND PROFILING6.6. FORESTRY AND TECHNOLOGIC FIRES FORESTRY AND TECHNOLOGIC FIRES

/EXPLOSIONS/EXPLOSIONS7.7. BIRDS & INSECTS BEVIESBIRDS & INSECTS BEVIES8.8. AIR POLLUTION SPREADINGAIR POLLUTION SPREADING

Page 27: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

AUTOMATICAL MEASURE POINTS

WEATHER AUTOMATICAL STATIONS (60)

LIGHTNING DETECTORSNETWORK (8 Sensors)

Hydro-meteorological river and sea buoys (8 River, 3 Sea)

Page 28: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

DESWAT PROJECT OBJECTIVES DESWAT PROJECT OBJECTIVES

•• MODERNIZATION OF HYDROLOGICAL MODERNIZATION OF HYDROLOGICAL PHENOMENA FORECAST SYSTEM.PHENOMENA FORECAST SYSTEM.

•• MODERNIZATION OF HYDROLOGICAL AND MODERNIZATION OF HYDROLOGICAL AND QUALITY MONITORING STATIONSQUALITY MONITORING STATIONS

•• INTEGRATION OF RECEPTION DATA FROM INTEGRATION OF RECEPTION DATA FROM EXISTING SYSTEMS (STATIONS AND INTERNET) EXISTING SYSTEMS (STATIONS AND INTERNET) WITH NEW AUTOMATIC CONFIGURATIONWITH NEW AUTOMATIC CONFIGURATION

•• REALISATION COMMUNICATION NETWORK IN REALISATION COMMUNICATION NETWORK IN REAL TIME BETWEEN MEASURE POINTS, REAL TIME BETWEEN MEASURE POINTS, COLLECTING AND PROCESSING CENTERS AND COLLECTING AND PROCESSING CENTERS AND USERSUSERS

•• SUPPORTING DECISIONAL MAKERS WITH DATA SUPPORTING DECISIONAL MAKERS WITH DATA AND INFORMATION IN REAL TIMEAND INFORMATION IN REAL TIME

•• FACILITING EXCHANGE OF HYDROLOGICAL DATA FACILITING EXCHANGE OF HYDROLOGICAL DATA AT REGIONAL AND EUROPEAN LEVEL AT REGIONAL AND EUROPEAN LEVEL

Page 29: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE
Page 30: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

UPGRADE OR REPLACE EXISTING STRUCTURES581 HYDROLOGICAL STATIONS

70 QAULITITY STATIONS250 RAINGAGE STATIONS

DESWAT UPGRADE HYDROLOGICAL MONITORING STATIONS

Page 31: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

Replace manual sensors with Automatic Hydrometric StationsLevel sensors (float, pressure, radar, soil moisture)Water temperature sensorsPrecipitation sensorsEnvironmental quality sensors (dissolved oxygen,

conductivity, pH, redox, turbidity)Heavy metal ion (nitrates, phosphates, etc.)

DESWAT Upgrade Hydrometric sensors and data collection

Page 32: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

DESWAT DEVELOPMENT HYDROLOGICAL DATA INTEGRATION SOFTWARE

Enhance analysis and product generation capabilities. Passing from paper to digital format

Page 33: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

STAGE I- Pilot Project in Arges -Vedea Basin - 18 months STAGE II - 6 BASINS- 36 MONTHSSTAGE III- 5 BASINS - 24 MONTHS

IMPLEMENTATION STAGES

GIS baza de date pentru modele hidrologice(forecasting si hidraulic)

Imaginea Landsat a bazinului Dâmboviþa Harta topograficã suprapusã imaginii

Statii hidrologice automate sireteaua de comunicatii

Apele RomaneDESWAT012345678

1930

1940

1950

2000

2010

2020

2030

2040

2050

2100

ABR RateABRHistorical

Modele Hidrologice

SIMIN hydrological products

Page 34: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

SAF-T-NET server

COF Communications

Gateway

SIMIN – DESWAT Integration

SIM

INca

st

OMNI-Hydro-Trac

SIMIN Forecaster workstation

National Hydrological Service Center

Apele Romane

Communications Gateway

VIPW server

MWEPNational Management

Center

012345678

1930

1940

1950

2000

2010

2020

2030

2040

2050

2100

A BR R at eA BRHist or ical

with

hyd

rolo

gica

l pro

duct

sAPELE ROMANE

National Water Resource Management Center

Basin Dispatch Centers (Level 2)Hydrological Service Centers

DataGIS maps

InfrastructureSensors

Page 35: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

WATMAN PROJECT END WATMAN PROJECT END -- USERS USERS

MINISTRY OF WATER AND ENVIROMENTALPROTECTION;

MINISTRY OF PUBLIC ADMINISTRATION

“APELE ROMÂNE” NATIONAL ADMINISTRATION

COUNTIES AND LOCAL ADMINISTRATION

CIVIL PROTECTION

Page 36: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

PROJECT PURPOSE :PROJECT PURPOSE :

1. INCREASING REACTION CAPACITY OF CENTRAL PUBLIC ADMINISTRATION IN CASE OF FLOODS , ACCIDENTAL POLLUTION, ACCIDENTS AT HYDROTECHNICAL WORKS

2. REALIZATION OF NEW MODERN INSTRUMENT FOR WATER MANAGEMENT IN TIME OF DRAUGHTS, FLOODS, ACCIDENTAL POLLUTION

3. REALIZATION OF NEW MODERN INSTRUMENT FOR DEMAGES EVALUATION DONE BY FLOODS , ACCIDENTAL POLLUTION, ACCIDENTS AT HYDROTECHNICAL WORKS

4. INTEGRATION HYDRO-METEOROLOGICAL DATA AND FORECASTS BY SIMIN AND DESWAT PROJECTS

Page 37: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

OBJECTIVES (1):OBJECTIVES (1):•• BUILDING OF 11 BASIN CENTERS (ONE IN EACH RIVER BASIN) BUILDING OF 11 BASIN CENTERS (ONE IN EACH RIVER BASIN)

ENDOWED WITH SPECIAL EQUIPMENT FOR INTERVENTION IN CASE ENDOWED WITH SPECIAL EQUIPMENT FOR INTERVENTION IN CASE

OF FLOODS AND ACCIDENTAL POLLUTION, ETCOF FLOODS AND ACCIDENTAL POLLUTION, ETC

•• MODERNISATION OF ACTUAL INFORMATIONAL SYSTEM FROM MODERNISATION OF ACTUAL INFORMATIONAL SYSTEM FROM

WATER FIELD AND INTERCONNECTION WITH INFORMATIONAL WATER FIELD AND INTERCONNECTION WITH INFORMATIONAL

SYSTEM OF CENTRAL AND LOCAL ADMINISTRATIONSYSTEM OF CENTRAL AND LOCAL ADMINISTRATION

•• REALIZATION OF FIXED INTERVENTION SECTIONS IN CASE OF REALIZATION OF FIXED INTERVENTION SECTIONS IN CASE OF

ACCIDENTAL POLLUTION FOR MAIN RIVERS AND ACCIDENTAL POLLUTION FOR MAIN RIVERS AND

TRANSBOUNDARIES RIVERSTRANSBOUNDARIES RIVERS

•• REALIZATION OF INTERVENTION PLANS TO OPTIMIZE ACTIONS OF REALIZATION OF INTERVENTION PLANS TO OPTIMIZE ACTIONS OF

ALL ACTORS INVOLVED IN CASE OF FLOODS, DRAUGHTS, ALL ACTORS INVOLVED IN CASE OF FLOODS, DRAUGHTS,

ACCIDENTAL POLLUTION, ETCACCIDENTAL POLLUTION, ETC

Page 38: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

OBJECTIVES (2):OBJECTIVES (2):

•• ENDOWMENT WITH SOFTWARE FOR SETTING UP OF ENDOWMENT WITH SOFTWARE FOR SETTING UP OF

POTENTIAL AREAS TO BE AFFECTED BY FLOODS, POTENTIAL AREAS TO BE AFFECTED BY FLOODS,

ACCIDENTAL POLLUTIONS, ETCACCIDENTAL POLLUTIONS, ETC

•• ENDOWMENT WITH SOFTWARE FOR ESTABLISHING ENDOWMENT WITH SOFTWARE FOR ESTABLISHING

AND ASSESSING OF DAMAGES PRODUCED BY AND ASSESSING OF DAMAGES PRODUCED BY

FLOODS, ACCIDENTAL POLLUTIONS, ETC.FLOODS, ACCIDENTAL POLLUTIONS, ETC.

•• ENDOWMENT WITH SOFTWARE FOR SETTINGENDOWMENT WITH SOFTWARE FOR SETTING--UP OF UP OF

ACTIONS PLANS IN CASE OF SPECIAL PHENOMENAACTIONS PLANS IN CASE OF SPECIAL PHENOMENA

Page 39: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

FLOOD RISK MAP

Page 40: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

CAMPULUNG

STALPENI

RADESTI

VALEA POPII

COLIBASI

LOTURI

GROSANI

VOINESTI

VALEA MARE-PRAVAT

LIVEZENI

CISMEA

OPRESTI

PISCANI

MIHAIESTI

LERESTI

DARMANESTI

OGREZEA

VALEA BRADULUI

RUDENI

LAZARESTI

COSTITA

BUCSENESTI (LOTASI)

FURNICOSI

VALEA PENCHII

BURNESTI

POJORATA

DEALUL FRUMOS

Golesti

Budeasa

le

Maracineni

Pitesti

Riusor

Bascov

CampulungCampulung

PitestiPitesti

-- IMPLEMENTING OF DECISIONAL SUPPORT SYSTEMS IMPLEMENTING OF DECISIONAL SUPPORT SYSTEMS --

WATMANWATMANPilot Project Pilot Project TarguluiTargului river river –– Water Directorate Water Directorate ArgesArges VedeaVedea

Page 41: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

Automatic levels monitoring Automatic levels monitoring

ComunicationComunication systems and database systems and database with technical parameters (internal with technical parameters (internal pressionpression, seismic parameters, 3D , seismic parameters, 3D

movements, etc)movements, etc)

SCADA system for automatic operation SCADA system for automatic operation of hydraulic of hydraulic equipementequipement

WATMANWATMANPilot Project Pilot Project TarguluiTargului river river –– Water Directorate Water Directorate ArgesArges VedeaVedea

Implementation of SCADA systems for dam monitoring, Implementation of SCADA systems for dam monitoring, comunicationcomunicationsystems and remote sensing of hydraulic systems and remote sensing of hydraulic equipementsequipements

Page 42: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

33--D MODELSD MODELS

FLOODED AREAS FLOODED AREAS -- DETAILEDDETAILEDVULNERABILITYVULNERABILITY HAZARDHAZARD

FLO

OD

RIS

K A

SS

ESM

ENT

FLO

OD

RIS

K A

SS

ESM

ENT-- FLOOD RISK ASSESMENT FLOOD RISK ASSESMENT --

WATMANWATMANPilot Project Pilot Project TarguluiTargului river river –– Water Directorate Water Directorate ArgesArges VedeaVedea

Page 43: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

C.C.D.D.C.C.D.D.

BASINBASINDISPATCH + DISPATCH +

C. H. F.C. H. F.

ACTION SHEMA AT RIVER BASIN LEVELACTION SHEMA AT RIVER BASIN LEVEL

SIMINSIMIN DESWATDESWATExistent stationsExistent stations

I.E.R.I.E.R.

L.C.C.D.D.L.C.C.D.D.

Direct interventionDirect intervention

FeedFeed--back (back (smssms, net, fax), net, fax)

Data,warning,alertData,warning,alert

C.C.D.D.C.C.D.D.-- County Committee for Disasters County Committee for Disasters DefenseDefense

C.H.F C.H.F --Center for Hydrological ForecastCenter for Hydrological Forecast

I.E.R. I.E.R. --Intervention Emergency CenterIntervention Emergency Center

DESWAT DESWAT --Automatic stationsAutomatic stations

SIMIN SIMIN --RadarRadar

LEGENDLEGEND

Page 44: FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

Th k f tt tiThank you for attention