Final Project Review Meeting Financial situation of TensiNet 8.7.2004

Final Project Review Meeting Financial situation of TensiNet 8.7.2004

Embed Size (px)

DESCRIPTION

Final Project Review Meeting Budget Tensinet Not included in the remaining budget: –University of Nottingham –UPM-Madrid –Tensotech Consulting –ESI –Club de la structure

Citation preview

Page 1: Final Project Review Meeting Financial situation of TensiNet 8.7.2004

Final Project Review Meeting

Financial situation of TensiNet

8.7.2004

Page 2: Final Project Review Meeting Financial situation of TensiNet 8.7.2004

Final Project Review Meeting

Budget Tensinet81.28%

18.72%Total Spent

Remaining budget

Page 3: Final Project Review Meeting Financial situation of TensiNet 8.7.2004

Final Project Review Meeting

Budget Tensinet• Not included in the remaining budget:

– University of Nottingham– UPM-Madrid– Tensotech Consulting– ESI– Club de la structure

Page 4: Final Project Review Meeting Financial situation of TensiNet 8.7.2004

Final Project Review Meeting

What to do?

These partners have to add their costs of the third period as adjustments to the last Cost Statement.

Don’t forget to give a detail of those adjustments

Page 5: Final Project Review Meeting Financial situation of TensiNet 8.7.2004

Final Project Review Meeting

Budget / Costs Table included in the Progress Reportwithout LincolnUPM

Balz

Bath

Page 6: Final Project Review Meeting Financial situation of TensiNet 8.7.2004

Final Project Review Meeting

Budget / Costs Still have to be covered:• Printing of the Guide: 20000 Euro

– 10000 SL-Rasch– 10000 VUB

• Editing (Brian Forster): 12000 Euro– 6000 VUB– 6000 SL-Rasch

• Balz: 8368 Euro SL-Rasch• Arup: 11015 Euro

– 7000 IFTH– 4000 SL-Rasch