Final Project Review Meeting
Financial situation of TensiNet
8.7.2004
Final Project Review Meeting
Budget Tensinet81.28%
18.72%Total Spent
Remaining budget
Final Project Review Meeting
Budget Tensinet• Not included in the remaining budget:
– University of Nottingham– UPM-Madrid– Tensotech Consulting– ESI– Club de la structure
Final Project Review Meeting
What to do?
These partners have to add their costs of the third period as adjustments to the last Cost Statement.
Don’t forget to give a detail of those adjustments
Final Project Review Meeting
Budget / Costs Table included in the Progress Reportwithout LincolnUPM
Balz
Bath
Final Project Review Meeting
Budget / Costs Still have to be covered:• Printing of the Guide: 20000 Euro
– 10000 SL-Rasch– 10000 VUB
• Editing (Brian Forster): 12000 Euro– 6000 VUB– 6000 SL-Rasch
• Balz: 8368 Euro SL-Rasch• Arup: 11015 Euro
– 7000 IFTH– 4000 SL-Rasch