Upload
gunji-venkata-srinivasa-babu
View
217
Download
0
Embed Size (px)
Citation preview
8/11/2019 Final Documentation Drawings CS0928
1/91
8/11/2019 Final Documentation Drawings CS0928
2/91
CONTENTS
1.INSTRUCTION MANUAL.
2.DRAWING FOR: -
a) 220KV BUS BAR PROTECTION PANEL.
3.
OPERATING & INSTRUCTION MANUALS: -
a.
NUMERCIAL BUSBAR PROTECTION RELAY, MAKE SEL, TYPE SEL 487B
b.
AUXiliARY. RELAY, MAKE JVS, TYPE: JRV 151.
c.
HIGH SPEED TRIPPING RELAY, MAKE JVS, TYPE JRV 181.
d.
MICROPROCESSOR BASED ANNUNCIATOR, 8WINDOW, MAKE JVS,
8/11/2019 Final Documentation Drawings CS0928
3/91
INSTALLATION, OPERATIONS AND MAINTENANCE
INSTRUCTIONS
220KV BUS BAR PROTECTION PANEL.
CUSTOMER: TRANSMISSION CORPORATION OF A.P. LTD.
(APTRANSCO), HYDERABAD.
ORDER REFERENCE
P.O. No : OM-0498/CEC(400KV)/(P&MM)/22/e-EHVT-22/2009/LOT-I/
PANELS/D.No 2010-1, DATED: 15.01.2010
OUR JOB REFERENCE: CS0928
8/11/2019 Final Documentation Drawings CS0928
4/91
Page 1.
1. GENERAL SPECIFICATIONS:
The Control & Relay Panel is of cubicle construction, suitable for floor mounting,indoor installation. The protective relays, indicating instruments and control equipment,which are suitable for flush mounting, have been fixed on the front of the panel for easyoperation and control. The hinged rear door will provide access to all the internalcomponents as well as to the terminals of the relays mounted on the front. Thisfacilitates easy inspection and maintenance. The rear door has been provided with
locking arrangements. Necessary hooks to enable easy handling of the panel have beenprovided at the top. Provision is made for terminating the incoming cables at the bottom
of the panel by providing separate line of terminal blocks. These are arranged columnwise inside the panel. Panel is suitable for cable entry from the bottom. Necessarydetachable undrilled gland plate has been provided.
2. PACKING AND INSPECTION:
Care is to be taken to ensure that the equipment reaches the user in perfectworking order. It is suggested to take utmost care while unpacking, shifting and
installing the equipment since it contains delicate instruments, relays, switches etc.Immediately after the unpacking, physically examine all the components and assembliesby observation at the front as well as opening rear hinged door for possible transitdamages, loose contacts, if any. Ensure that all the connections are rigid and proper.
3. ERECTION:
Th l h b id d ith b f h i h l h
8/11/2019 Final Documentation Drawings CS0928
5/91
Page 2.
Before energizing the AC & DC auxiliary supplies, ensure proper connection ofthese to the designated terminals. Please refer the terminal drawing provided. Ensureproper polarities are maintained for DC supply, CT circuit for proper functioning.
Ensure proper setting of the Num. Busbar protection relay, for operating value andtime settings. Refer the descriptive literature and the setting instructions for the variousrelays enclosed to this manual.
5. DESCRIPTION:
Refer schematic diagram referred above. A set of Bill of materials furnishingtherein the description of the various components incorporated in the control panelalong with the drawing have been kept inside the panel for reference. Please make use
of the same for commissioning.
The control & relay panel accepts CT, PT, auxiliary 240V single-phase AC supplyand DC station battery connections at respective designated terminal points. DC supplyis used for control supply, auxiliary supply of the relays, closing & tripping circuits of
the breaker etc. 240VAC single-phase supply is used for internal illumination lamps ofthe panel, space heater and 5/15 amps socket. The PT Supply is used for measuringthe Voltage and connected to the voltmeter.
Protective Fuses have been provided inside the panel for the various circuits, detailsof which have been furnished in the drawing. Kindly ensure proper rating and type ofthe Fuses that are used for the various circuits. Breaker control switch is provided on
th l f t lli th b k ll
8/11/2019 Final Documentation Drawings CS0928
6/91
Page:38. MAINTENANCE:
Normally the panel does not call for frequent maintenance. However, it isnecessary to ensure that the equipment is kept clean at all times. It is also necessary toensure proper air-cooling. Check the connections at regular intervals and tighten in caseof any loose connections. Do not allow dust and dirt to get deposited on any component.It is advisable to clean the internal components by blowing dry air from a distance orvacuum cleaner at regular intervals.
9. SERVICING:
Field servicing and calibration of instruments, relays to be avoided. This can bedone only at a laboratory where necessary test and calibration facilities are available. Incase of any problem, this can be handled by persons who are completely aware of the
relays incorporated.
****************
8/11/2019 Final Documentation Drawings CS0928
7/91
8/11/2019 Final Documentation Drawings CS0928
8/91
8/11/2019 Final Documentation Drawings CS0928
9/91
8/11/2019 Final Documentation Drawings CS0928
10/91
8/11/2019 Final Documentation Drawings CS0928
11/91
8/11/2019 Final Documentation Drawings CS0928
12/91
8/11/2019 Final Documentation Drawings CS0928
13/91
8/11/2019 Final Documentation Drawings CS0928
14/91
8/11/2019 Final Documentation Drawings CS0928
15/91
8/11/2019 Final Documentation Drawings CS0928
16/91
8/11/2019 Final Documentation Drawings CS0928
17/91
8/11/2019 Final Documentation Drawings CS0928
18/91
8/11/2019 Final Documentation Drawings CS0928
19/91
8/11/2019 Final Documentation Drawings CS0928
20/91
8/11/2019 Final Documentation Drawings CS0928
21/91
8/11/2019 Final Documentation Drawings CS0928
22/91
8/11/2019 Final Documentation Drawings CS0928
23/91
8/11/2019 Final Documentation Drawings CS0928
24/91
8/11/2019 Final Documentation Drawings CS0928
25/91
8/11/2019 Final Documentation Drawings CS0928
26/91
8/11/2019 Final Documentation Drawings CS0928
27/91
8/11/2019 Final Documentation Drawings CS0928
28/91
8/11/2019 Final Documentation Drawings CS0928
29/91
8/11/2019 Final Documentation Drawings CS0928
30/91
8/11/2019 Final Documentation Drawings CS0928
31/91
8/11/2019 Final Documentation Drawings CS0928
32/91
8/11/2019 Final Documentation Drawings CS0928
33/91
8/11/2019 Final Documentation Drawings CS0928
34/91
8/11/2019 Final Documentation Drawings CS0928
35/91
8/11/2019 Final Documentation Drawings CS0928
36/91
8/11/2019 Final Documentation Drawings CS0928
37/91
8/11/2019 Final Documentation Drawings CS0928
38/91
8/11/2019 Final Documentation Drawings CS0928
39/91
8/11/2019 Final Documentation Drawings CS0928
40/91
8/11/2019 Final Documentation Drawings CS0928
41/91
8/11/2019 Final Documentation Drawings CS0928
42/91
8/11/2019 Final Documentation Drawings CS0928
43/91
8/11/2019 Final Documentation Drawings CS0928
44/91
8/11/2019 Final Documentation Drawings CS0928
45/91
8/11/2019 Final Documentation Drawings CS0928
46/91
8/11/2019 Final Documentation Drawings CS0928
47/91
8/11/2019 Final Documentation Drawings CS0928
48/91
8/11/2019 Final Documentation Drawings CS0928
49/91
8/11/2019 Final Documentation Drawings CS0928
50/91
8/11/2019 Final Documentation Drawings CS0928
51/91
8/11/2019 Final Documentation Drawings CS0928
52/91
8/11/2019 Final Documentation Drawings CS0928
53/91
8/11/2019 Final Documentation Drawings CS0928
54/91
8/11/2019 Final Documentation Drawings CS0928
55/91
8/11/2019 Final Documentation Drawings CS0928
56/91
8/11/2019 Final Documentation Drawings CS0928
57/91
8/11/2019 Final Documentation Drawings CS0928
58/91
8/11/2019 Final Documentation Drawings CS0928
59/91
8/11/2019 Final Documentation Drawings CS0928
60/91
8/11/2019 Final Documentation Drawings CS0928
61/91
8/11/2019 Final Documentation Drawings CS0928
62/91
8/11/2019 Final Documentation Drawings CS0928
63/91
8/11/2019 Final Documentation Drawings CS0928
64/91
8/11/2019 Final Documentation Drawings CS0928
65/91
8/11/2019 Final Documentation Drawings CS0928
66/91
8/11/2019 Final Documentation Drawings CS0928
67/91
8/11/2019 Final Documentation Drawings CS0928
68/91
8/11/2019 Final Documentation Drawings CS0928
69/91
8/11/2019 Final Documentation Drawings CS0928
70/91
8/11/2019 Final Documentation Drawings CS0928
71/91
8/11/2019 Final Documentation Drawings CS0928
72/91
8/11/2019 Final Documentation Drawings CS0928
73/91
8/11/2019 Final Documentation Drawings CS0928
74/91
8/11/2019 Final Documentation Drawings CS0928
75/91
8/11/2019 Final Documentation Drawings CS0928
76/91
8/11/2019 Final Documentation Drawings CS0928
77/91
8/11/2019 Final Documentation Drawings CS0928
78/91
8/11/2019 Final Documentation Drawings CS0928
79/91
8/11/2019 Final Documentation Drawings CS0928
80/91
8/11/2019 Final Documentation Drawings CS0928
81/91
8/11/2019 Final Documentation Drawings CS0928
82/91
8/11/2019 Final Documentation Drawings CS0928
83/91
8/11/2019 Final Documentation Drawings CS0928
84/91
8/11/2019 Final Documentation Drawings CS0928
85/91
8/11/2019 Final Documentation Drawings CS0928
86/91
8/11/2019 Final Documentation Drawings CS0928
87/91
8/11/2019 Final Documentation Drawings CS0928
88/91
8/11/2019 Final Documentation Drawings CS0928
89/91
8/11/2019 Final Documentation Drawings CS0928
90/91
8/11/2019 Final Documentation Drawings CS0928
91/91