Final Documentation Drawings CS0928

Embed Size (px)

Citation preview

  • 8/11/2019 Final Documentation Drawings CS0928

    1/91

  • 8/11/2019 Final Documentation Drawings CS0928

    2/91

    CONTENTS

    1.INSTRUCTION MANUAL.

    2.DRAWING FOR: -

    a) 220KV BUS BAR PROTECTION PANEL.

    3.

    OPERATING & INSTRUCTION MANUALS: -

    a.

    NUMERCIAL BUSBAR PROTECTION RELAY, MAKE SEL, TYPE SEL 487B

    b.

    AUXiliARY. RELAY, MAKE JVS, TYPE: JRV 151.

    c.

    HIGH SPEED TRIPPING RELAY, MAKE JVS, TYPE JRV 181.

    d.

    MICROPROCESSOR BASED ANNUNCIATOR, 8WINDOW, MAKE JVS,

  • 8/11/2019 Final Documentation Drawings CS0928

    3/91

    INSTALLATION, OPERATIONS AND MAINTENANCE

    INSTRUCTIONS

    220KV BUS BAR PROTECTION PANEL.

    CUSTOMER: TRANSMISSION CORPORATION OF A.P. LTD.

    (APTRANSCO), HYDERABAD.

    ORDER REFERENCE

    P.O. No : OM-0498/CEC(400KV)/(P&MM)/22/e-EHVT-22/2009/LOT-I/

    PANELS/D.No 2010-1, DATED: 15.01.2010

    OUR JOB REFERENCE: CS0928

  • 8/11/2019 Final Documentation Drawings CS0928

    4/91

    Page 1.

    1. GENERAL SPECIFICATIONS:

    The Control & Relay Panel is of cubicle construction, suitable for floor mounting,indoor installation. The protective relays, indicating instruments and control equipment,which are suitable for flush mounting, have been fixed on the front of the panel for easyoperation and control. The hinged rear door will provide access to all the internalcomponents as well as to the terminals of the relays mounted on the front. Thisfacilitates easy inspection and maintenance. The rear door has been provided with

    locking arrangements. Necessary hooks to enable easy handling of the panel have beenprovided at the top. Provision is made for terminating the incoming cables at the bottom

    of the panel by providing separate line of terminal blocks. These are arranged columnwise inside the panel. Panel is suitable for cable entry from the bottom. Necessarydetachable undrilled gland plate has been provided.

    2. PACKING AND INSPECTION:

    Care is to be taken to ensure that the equipment reaches the user in perfectworking order. It is suggested to take utmost care while unpacking, shifting and

    installing the equipment since it contains delicate instruments, relays, switches etc.Immediately after the unpacking, physically examine all the components and assembliesby observation at the front as well as opening rear hinged door for possible transitdamages, loose contacts, if any. Ensure that all the connections are rigid and proper.

    3. ERECTION:

    Th l h b id d ith b f h i h l h

  • 8/11/2019 Final Documentation Drawings CS0928

    5/91

    Page 2.

    Before energizing the AC & DC auxiliary supplies, ensure proper connection ofthese to the designated terminals. Please refer the terminal drawing provided. Ensureproper polarities are maintained for DC supply, CT circuit for proper functioning.

    Ensure proper setting of the Num. Busbar protection relay, for operating value andtime settings. Refer the descriptive literature and the setting instructions for the variousrelays enclosed to this manual.

    5. DESCRIPTION:

    Refer schematic diagram referred above. A set of Bill of materials furnishingtherein the description of the various components incorporated in the control panelalong with the drawing have been kept inside the panel for reference. Please make use

    of the same for commissioning.

    The control & relay panel accepts CT, PT, auxiliary 240V single-phase AC supplyand DC station battery connections at respective designated terminal points. DC supplyis used for control supply, auxiliary supply of the relays, closing & tripping circuits of

    the breaker etc. 240VAC single-phase supply is used for internal illumination lamps ofthe panel, space heater and 5/15 amps socket. The PT Supply is used for measuringthe Voltage and connected to the voltmeter.

    Protective Fuses have been provided inside the panel for the various circuits, detailsof which have been furnished in the drawing. Kindly ensure proper rating and type ofthe Fuses that are used for the various circuits. Breaker control switch is provided on

    th l f t lli th b k ll

  • 8/11/2019 Final Documentation Drawings CS0928

    6/91

    Page:38. MAINTENANCE:

    Normally the panel does not call for frequent maintenance. However, it isnecessary to ensure that the equipment is kept clean at all times. It is also necessary toensure proper air-cooling. Check the connections at regular intervals and tighten in caseof any loose connections. Do not allow dust and dirt to get deposited on any component.It is advisable to clean the internal components by blowing dry air from a distance orvacuum cleaner at regular intervals.

    9. SERVICING:

    Field servicing and calibration of instruments, relays to be avoided. This can bedone only at a laboratory where necessary test and calibration facilities are available. Incase of any problem, this can be handled by persons who are completely aware of the

    relays incorporated.

    ****************

  • 8/11/2019 Final Documentation Drawings CS0928

    7/91

  • 8/11/2019 Final Documentation Drawings CS0928

    8/91

  • 8/11/2019 Final Documentation Drawings CS0928

    9/91

  • 8/11/2019 Final Documentation Drawings CS0928

    10/91

  • 8/11/2019 Final Documentation Drawings CS0928

    11/91

  • 8/11/2019 Final Documentation Drawings CS0928

    12/91

  • 8/11/2019 Final Documentation Drawings CS0928

    13/91

  • 8/11/2019 Final Documentation Drawings CS0928

    14/91

  • 8/11/2019 Final Documentation Drawings CS0928

    15/91

  • 8/11/2019 Final Documentation Drawings CS0928

    16/91

  • 8/11/2019 Final Documentation Drawings CS0928

    17/91

  • 8/11/2019 Final Documentation Drawings CS0928

    18/91

  • 8/11/2019 Final Documentation Drawings CS0928

    19/91

  • 8/11/2019 Final Documentation Drawings CS0928

    20/91

  • 8/11/2019 Final Documentation Drawings CS0928

    21/91

  • 8/11/2019 Final Documentation Drawings CS0928

    22/91

  • 8/11/2019 Final Documentation Drawings CS0928

    23/91

  • 8/11/2019 Final Documentation Drawings CS0928

    24/91

  • 8/11/2019 Final Documentation Drawings CS0928

    25/91

  • 8/11/2019 Final Documentation Drawings CS0928

    26/91

  • 8/11/2019 Final Documentation Drawings CS0928

    27/91

  • 8/11/2019 Final Documentation Drawings CS0928

    28/91

  • 8/11/2019 Final Documentation Drawings CS0928

    29/91

  • 8/11/2019 Final Documentation Drawings CS0928

    30/91

  • 8/11/2019 Final Documentation Drawings CS0928

    31/91

  • 8/11/2019 Final Documentation Drawings CS0928

    32/91

  • 8/11/2019 Final Documentation Drawings CS0928

    33/91

  • 8/11/2019 Final Documentation Drawings CS0928

    34/91

  • 8/11/2019 Final Documentation Drawings CS0928

    35/91

  • 8/11/2019 Final Documentation Drawings CS0928

    36/91

  • 8/11/2019 Final Documentation Drawings CS0928

    37/91

  • 8/11/2019 Final Documentation Drawings CS0928

    38/91

  • 8/11/2019 Final Documentation Drawings CS0928

    39/91

  • 8/11/2019 Final Documentation Drawings CS0928

    40/91

  • 8/11/2019 Final Documentation Drawings CS0928

    41/91

  • 8/11/2019 Final Documentation Drawings CS0928

    42/91

  • 8/11/2019 Final Documentation Drawings CS0928

    43/91

  • 8/11/2019 Final Documentation Drawings CS0928

    44/91

  • 8/11/2019 Final Documentation Drawings CS0928

    45/91

  • 8/11/2019 Final Documentation Drawings CS0928

    46/91

  • 8/11/2019 Final Documentation Drawings CS0928

    47/91

  • 8/11/2019 Final Documentation Drawings CS0928

    48/91

  • 8/11/2019 Final Documentation Drawings CS0928

    49/91

  • 8/11/2019 Final Documentation Drawings CS0928

    50/91

  • 8/11/2019 Final Documentation Drawings CS0928

    51/91

  • 8/11/2019 Final Documentation Drawings CS0928

    52/91

  • 8/11/2019 Final Documentation Drawings CS0928

    53/91

  • 8/11/2019 Final Documentation Drawings CS0928

    54/91

  • 8/11/2019 Final Documentation Drawings CS0928

    55/91

  • 8/11/2019 Final Documentation Drawings CS0928

    56/91

  • 8/11/2019 Final Documentation Drawings CS0928

    57/91

  • 8/11/2019 Final Documentation Drawings CS0928

    58/91

  • 8/11/2019 Final Documentation Drawings CS0928

    59/91

  • 8/11/2019 Final Documentation Drawings CS0928

    60/91

  • 8/11/2019 Final Documentation Drawings CS0928

    61/91

  • 8/11/2019 Final Documentation Drawings CS0928

    62/91

  • 8/11/2019 Final Documentation Drawings CS0928

    63/91

  • 8/11/2019 Final Documentation Drawings CS0928

    64/91

  • 8/11/2019 Final Documentation Drawings CS0928

    65/91

  • 8/11/2019 Final Documentation Drawings CS0928

    66/91

  • 8/11/2019 Final Documentation Drawings CS0928

    67/91

  • 8/11/2019 Final Documentation Drawings CS0928

    68/91

  • 8/11/2019 Final Documentation Drawings CS0928

    69/91

  • 8/11/2019 Final Documentation Drawings CS0928

    70/91

  • 8/11/2019 Final Documentation Drawings CS0928

    71/91

  • 8/11/2019 Final Documentation Drawings CS0928

    72/91

  • 8/11/2019 Final Documentation Drawings CS0928

    73/91

  • 8/11/2019 Final Documentation Drawings CS0928

    74/91

  • 8/11/2019 Final Documentation Drawings CS0928

    75/91

  • 8/11/2019 Final Documentation Drawings CS0928

    76/91

  • 8/11/2019 Final Documentation Drawings CS0928

    77/91

  • 8/11/2019 Final Documentation Drawings CS0928

    78/91

  • 8/11/2019 Final Documentation Drawings CS0928

    79/91

  • 8/11/2019 Final Documentation Drawings CS0928

    80/91

  • 8/11/2019 Final Documentation Drawings CS0928

    81/91

  • 8/11/2019 Final Documentation Drawings CS0928

    82/91

  • 8/11/2019 Final Documentation Drawings CS0928

    83/91

  • 8/11/2019 Final Documentation Drawings CS0928

    84/91

  • 8/11/2019 Final Documentation Drawings CS0928

    85/91

  • 8/11/2019 Final Documentation Drawings CS0928

    86/91

  • 8/11/2019 Final Documentation Drawings CS0928

    87/91

  • 8/11/2019 Final Documentation Drawings CS0928

    88/91

  • 8/11/2019 Final Documentation Drawings CS0928

    89/91

  • 8/11/2019 Final Documentation Drawings CS0928

    90/91

  • 8/11/2019 Final Documentation Drawings CS0928

    91/91