2
What We’l l Cover …
• Accelerating period-end closing process: Overview
• Getting started with the Closing Cockpit – 10 key steps
• Wrap-up
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 3/49
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 4/49
4
Typical Period-End Closing Process (cont.)
• The person responsible for an error must be informed
Usually by telephone or by email Once the error is corrected, the person responsible is informed
so that he or she can restart the job
• Communication is very important for efficiency “ Are you finished? Then I can start.”
Such communication takes time and is prone to error
Run
transactions
Start
background
jobs
Inform other
employees
Ask other
employees
Analyze
errors
Sarbanes-
Oxley
compliance
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 5/49
5
Needed Functionality for Period-End Close
• Uniform tool with which to:
Process all SAP and non-SAP period-end transactions
Detect, troubleshoot, and resolve errors
Restart failed tasks
• Plus a central place for:
Communication between individual employees
Storing documentation such as reports and error messages
Definit ion of dependencies between jobs
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 6/49
6
Introducing the “ Closing Cockpit”
• The Closing Cockpit:
Provides a structured interface for executing transactions andprograms of complex processes, such as closing processes
Its structural layout supports processes within anorganizational structure (e.g., a company code), as well asscenarios affecting multiple organizational structures
• The Closing Cockpit is particularly useful when: Activities recur periodically
More than one responsible person is involved
The activities are performed within a process that has a fixedchronological sequence or is determined by dependencies
The activities need to be supported by a shared, uniforminterface
The status of all periodic activities needs to be documented and
made transparent and available for the business
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 7/497
Introducing the “ Closing Cockpit” (cont.)
• In the monitor, you can display detailed information about allactive or completed jobs and flows that were scheduled in the
Closing Cockpit
Task listselection
Other tasklists
Task listselection
details
Tasksscheduled in
monitor
Details andlinks per task
OrganizationalUnits
Dependenciesof tasks
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 8/498
Closing Cockpit – Benefits
• Enhances process definition
Corporate template for local task plans Reduces configuration effort: It’s easy to combine local
task plans with organizational unit plans
• Reduces cost – one solution for all closing activit ies
• Boosts user productivity One user interface from configuration to execution
Single point of entry for all closing activities
Perfect overview of closing status
• Enhances quality and speed
Acceleration of closing process
Compliance
Transparency
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 9/499
Closing Cockpit – Business Value
• Enhances process definition
Less configuration effort: Easy combination of local task planswith organizational units
• Accelerates the closing process Through automation and easy task flow functionality
• Ensures transparent and compliant process List of executed task plans
Monitor: Perfect overview of the closing status and drill -down
to all details
• Improves user productivity Easy collaboration – single source of entry for all participants
in closing process
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 10/4910
What We’l l Cover …
• Accelerating period-end closing process: Overview
• Getting started with the Closing Cockpit – 10 key steps
• Wrap-up
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 11/4911
Getting Started with the Closing Cockpit – 10 Key Steps
1. Create a template
2. Create a task list
3. Schedule tasks
4. Define end of processing – workflow
5. Detect, analyze, and resolve errors6. Set the object status
7. Repeat the processing
8. Monitor execution with the schedule manager cockpit9. Track and analyze tasks
10. Understand the Workl ist Monitor
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 12/4912
Step 1: Create a Template
• The template only contains the relevant closing tasks and is d istributed to the
local companies. There it can be adapted accord ing to local requirements. You
don’t schedule/execute any jobs f rom a template, but f rom the task plans that
are derived from the template.
• You can also import templates from other systems, using the Remote FunctionCall (RFC) connection.
• The closing hierarchy refers to SAP’s organizational units. You can add your
own organizational units.
• The procedure for creating the template is the same as in the Schedule
Manager.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 13/49
13
From Corporate Template to Local Template
• Configure the corporate template for a standardized, group-wide closing process and
steps: Template CORP_TEMPL (corporate level), copied to template LOC_TEMP_1
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 14/49
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 15/49
15
Step 2: Create a Task List (cont.)
• Derive a local task template and assign to
organizational units: Configuration of template LOC_TEMP_1 (local level), including
task details (e.g., name of responsible person, planned start
time, expected runt ime, critical path, etc.)
• In the task list, all tasks are scheduled Blue boxes: Jobs/reports, gray boxes: Transactions, rhombus
in cyan color: Milestone (type “ note” )
You can create, schedule, and execute tasks for all areas
of mySAP ERP!
Jobs (reports), transactions, milestones (type “ note” ),
task flows
Note
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 16/49
16
First, Define or Customize a Flow Definition
• SAP provides a variety of predefined flow definit ions for
R/3 components that you can use as the basis for your
own flow definit ion.
• Choose “ Extras Flow Definition Administration of
Flow Definit ions” to display an overview of the flow
definitions available in the system.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 17/49
17
Flow Definition Management: Header Data
• All the flow definitionsdefined in the systemare displayed on theFlow DefinitionManagement screen.
• The “ Appl.”(application) column
specifies theapplication for whichthe flow definition hasbeen created andwhich programs areincluded.
• The “ Worklist”column displayswhich flow definitionuses a workl ist.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 18/49
18
Flow Definition Management Screen
• Some of the processing steps listed in the new flow definition, such as“ Preliminary Settlement for Co-Products” might be redundant since these arenot to be executed. To customize the flow definition, you first need to switch toEdit mode. You can delete processing steps from the flow definition by c lickingthe processing step you want to delete and choosing “ Cut Block.”
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 19/49
19
Next, Customize the Processing Steps
• The first two processing steps arerequired by the system so that theprocess can be carried out correctly.These steps do not requi re editing andcannot be deleted.
• The job chain is started and contro lledby SAP Business Workflow –processing step “ Workflow Started”
• The next processing step is a system-internal task that the system requiresto process the job chain.
• You need the third processing step if you use worklists . When you create avariant, you specify which objects (in
this case, production orders) you wantto include in the worklist. Only theorders selected in the worklis t areprocessed in the subsequentprocessing steps.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 20/49
20
Next, Customize the Processing Steps (cont.)
•You use processing step “ Overhead”to actually begin processing theobjects; the overhead calculation will becarried out for the objects selected inthe worklist (production orders).
• You can also define a selection profileand a selection variable in the variant
you have created.
• The processing steps “ Work inProcess,” “ Variance Calculation,” and“ Settlement” are edited at the sametime.
• In each sub-step, you have to enter the
responsible user or user group that is tobe contacted via the workflow if anyproblems occur in this step (e.g.,distribution list).
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 21/49
21
Next, Customize the Processing Steps (cont.)
• Once the objects have been
processed, a “workflow decision”email is sent. Double-click on thisprocessing step again to enter auser or user group that isresponsible for making this decision.
• If the user decides to renew theprocessing steps, the “Renew
Worklist Processing” step isactivated.
• In this case, processing starts againat the “ Overhead” step, and on lythe revised (incorrectly processed)objects are processed. The systemalso considers whether the object
only has to be reprocessed in thesettlement step or in the overheadcalculation step as well.
• If the user chooses “ Complete,” the“ Workflow Completed” step iscarried out.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 22/49
22
Processing Steps
• Authorization Check With WF-BATCH has been set as the default user. The WF-BATCH user has all the necessary
authorizations and should, therefore, be left as the entry in this field.
• If Errors, Mail To
In the event of an error occurring during background processing, for example, if the job
is canceled, the relevant user or group of users receives a mail containing information
on the error . You should, therefore, specify the relevant user.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 23/49
23
Finally, Include the Flow Definition in the Task List
• To carry out the flow definit ion in the Scheduler, you
have to create a task in the task list. Use the “Flow
Definit ion” task type for this purpose.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 24/49
24
Use Selection Variables in the Variants
• You can use selection variables to define variants for the Flow Definition that can be used to
specify predefined or default settings for specific fields. This means you do not have tocustomize the variants for each period-end clos ing step. This concerns the “ Period” and“ Fiscal Year” fields in particular. The above example illustrates how a variant is selected inthe worklist.
• To use a selection variable, you first have to create it using transaction STVARV. When youexecute the transaction, you first go to d isplay mode. To create or change a variable, switchto change mode where additional icons are displayed (e.g., “Create” and “ Change” ).
• The transaction accesses table TVARV, which is cross-client.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 25/49
25
Use Selection Variables in the Variants (cont.)
• You first have to assign anew name to the variant.
To make the selectionscreen ready for input,choose “ Create.”
• You can define whichfields will use theselection variables bychoosing “ Attributes.”
• You have to make theappropriate settings onthe selection screen. Thedefined selectionvariables are to be usedfor the “Period” and“ Fiscal Year” parameters.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 26/49
26
Use Selection Variables in the Variants (cont.)
• You first have to assign anew name to the variant.
To make the selectionscreen ready for input,choose “ Create.”
• You can define whichfields will use theselection variables bychoosing “ Attributes” .
• You have to make theappropriate settings onthe selection screen. Thedefined selectionvariables are to be usedfor the “Period” and“ Fiscal Year” parameters.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 27/49
27
Use Selection Variables in the Variants (cont.)
In this case, selectionvariables are used forthe “Period” and“Fiscal Year” fields.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 28/49
28
Use Selection Variables in the Variants (cont.)
1
2
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 29/49
29
Use Selection Variables in the Variants (cont.)
Choose a selectionvariable to set it as the
selection variable in
the variant
Result:
The parameter on the selection screen is locked and
can now only be maintained in transaction STVARV
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 30/49
30
Step 3: Schedule Tasks
The period-end
closing is
scheduled in
the Scheduler.
You can drag a
task to the
Daily Overview
for scheduling
using the leftmouse button.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 31/49
31
Step 4: Define End of Processing – Workflow
• After the background jobs of a flow definit ion have
ended, the workflow sends an express mail to the users
in line with the definit ion in the processing step “ Check
the Objects in the Workl ist.” A workflow email is also
sent to the Office inbox.
To call up the processor’s
Business Workplace,choose the “ Inbox”pushbutton.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 32/49
32
Step 4: Define End of Processing – Workflow (cont.)
The mail provides a
list of alternatives foryou to decide how
processing is to
continue.
You can call up the worklist monitor by
clicking the link. The system starts a new
session for this purpose. In the worklist
monitor, a list of all the objects with errors is
generated for the task (flow definition).
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 33/49
33
Step 5: Detect, Analyze, and Resolve Errors
• The object list in the workl ist monitor displays all objects with
errors. Double-click on the object to call up the short texts for the
generated error/warning/information messages.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 34/49
34
Step 5: Detect, Analyze, and Resolve Errors (cont.)
• If you double-click on the short text, the system displays the long
text. Links from long texts to other transactions (such as
Customizing) are also active.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 35/49
35
Step 6: Set the Object Status
Set Status for the object
Repeat
Processing
Skip
Processing
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 36/49
36
Step 7: Repeat the Processing
• Each new processing runis displayed in the monitor.
The number of objects witherrors is also updated.
S S C
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 37/49
37
Step 8: Monitor with the Schedule Manager Cockpit
• The left-hand part of the screen contains the actual task lis t, which contains thetasks for period-end closing, for example.
• The right-hand part of the screen contains the calendar, which comprises amonthly overview (top right) and a daily overview (bottom right). The dailyoverview provides an overview for today’s date of the planned/running tasks or
the tasks that have already been carried out. The task types “ background job”and “ flow definition” can also be scheduled in the daily overview.
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 38/49
St 10 Th “W kli t M it ”
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 39/49
39
Step 10: The “Workl ist Monitor”
The status column displays theprocessing status of each
processing step
St 10 Th “ W kli t M it ” ( t )
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 40/49
40
Step 10: The “ Workl ist Monitor” (cont.)
If you double-click
the task, the system
creates an object listfor the task
The system
automatically
displays this object
list from the
workflow mail
You can show the
messages for an
object, as well as
short texts, by
double-clicking the
relevant object
W kli t M it Di l i M
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 41/49
41
Worklist Monitor – Displaying Messages
The objects that are listed in the object lis t aredetermined by means of a filter, enabling you to
call up the objects according to processing status
Wh t W ’l l C
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 42/49
42
What We’l l Cover …
• Accelerating period-end closing process: Overview
• Getting started with the Closing Cockpit – 10 key steps
• Wrap-up
L L d
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 43/49
43
Lessons Learned
• Use the Closing Cockpit for all closing activit ies
• Schedule SAP programs to run in the background• Work with selection variables to default predefined
settings for the specific selection fields
• Use of SAP Workflow to send notifications to thebusiness
T h i l I f ti K A th i ti
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 44/49
44
Technical Information – Key Authorizations
Task List: Create and Change
Authorization Object Authorization Fields Settings/Values
B_SMAN_WPL WORKPLAN Name of task list
ACTVT 02 Change03 Display16 Execute
S_BDS_DS CLASSNAME SCHEDMANTASKCLASSTYPE OTACTVT 01 Add or Generate03 Display30 Determine
S_GUI ACTVT 61 Export
S_ALV_LAYO ACTVT 23 Maintain
Execute Batch Job Authorization Object Authorization Fields Settings/Values
S_BTCH_ADM BTCADMIN YS_BTCH_JOB JOBGROUP space
JOBACTION RELES_ADMI_FCD S_ADMI_FCD STOR
Monitor Display Authorization Object Authorization Fields Settings/Values
B_SMAN_WPL WORKPLAN Name of task listACTVT 03 Display
S_GUI ACTVT 61 Export
Technical Information Ke A thori ations (cont )
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 45/49
45
Technical Information – Key Authorizations (cont.)
Monitor Display Autho rization Object Authorization Fields Settings/Values
B_SMAN_WPL WORKPLAN Name of task list
ACTVT 03 DisplayS_GUI ACTVT 61 Export
Message Display Autho rization Object Authorization Fields Settings/Values
S_TABU_DIS ACTVT 02 ChangeDISBERCLS KKK
Flow Definition
Autho rization Object Authorization Fields Settings/ValuesPLOG PPFCODE DISP
AENDINSE
PLVAR 01OTYPE WS
S_GUI ACTVT 61 Export
Worklist Autho rization Object Authorization Fields Settings/Values
PLOG PPFCODE DISPAEND
PLVAR 01OTYPE RY, T, AC, O, S, A, P, $$, CINFOTYPE 1000, 1240, 1001, 1218SUBTYP B240, A007, B003, A008, B208, A003ISTAT 1 Active
Resources
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 46/49
46
Resources
• http://help.sap.com
mySAP ERP > SAP ERP Central Component (choose versionand language) > SAP ERP Central Component > Financials >
Financial Accounting (FI) > General Ledger Accounting (FI-GL)
(New) > Periodic Processing > Closing Operations >
Configuring the Closing Cockpit
http://help.sap.com/saphelp_erp2005vp/helpdata/en/42/f890
415ae3a109e10000000a155106/frameset.htm
• SAP Service Marketplace
https://websmp207.sap-ag.de/okp * https://websmp207.sap-ag.de/FI * > Fast Close > Media Library
* Requires login credentials to the SAP Service Marketplace
7 Key Points to Take Home
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 47/49
47
7 Key Points to Take Home
• SAP Closing Cockpit accelerates the closing process
through automation and easy task flow functionality• Key benefit: Less configuration effort and easy
combination of local task plans with organizational units
• SAP Closing Cockpit supports process transparency and
compliance
• It provides easy access to a list of executed task plans
• You can view the closing status of all tasks, and dril l
down to view execution details
7 Key Points to Take Home (cont )
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 48/49
48
7 Key Points to Take Home (cont.)
• Key feature: The Calendar view to quickly track and
analyze tasks and activit ies at-a-glance• Improves user productivity with easy collaboration and
single source of entry for all participants in closing
process
Your Turn!
8/9/2019 FIN07 Prahkina Accelerate Time to Close
http://slidepdf.com/reader/full/fin07-prahkina-accelerate-time-to-close 49/49
Your Turn!
How to contact me:
Michael Prakhina