Octobre 17 2006 MPI Munich FCAL Workshop in Munich W. Lohmann, DESY The 14 mrad X-angle, two IPs The push-pull option The next calendar dates Where we are with FCAL

FCAL Workshop in Munich

  • Upload
    shakti

  • View
    44

  • Download
    0

Embed Size (px)

DESCRIPTION

FCAL Workshop in Munich. W. Lohmann, DESY. The 14 mrad X-angle, two IPs The push-pull option The next calendar dates Where we are with FCAL. The new IR scheme. Detector hall. Beam Delivery for two IPs. The push-pull option. - PowerPoint PPT Presentation

Citation preview

Page 1: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

FCAL Workshop in Munich

W. Lohmann, DESY

The 14 mrad X-angle, two IPs

The push-pull option

The next calendar dates

Where we are with FCAL

Page 2: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

The new IR scheme

Page 3: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

Detector hall

Beam Delivery for

two IPs

Page 4: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

accessible during run (rad worker)

accessible during run (GERT)

not accessible during run

The push-pull option

fence

Platform for electronic and services (~10*8*8m). Shielded (~0.5m of concrete) from five sides. Moves with detector. Also provide vibration isolation.

Page 5: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

The next calendar dates

EUDET annual meeting Oct. 18-20

ECFA workshop, November 6-10

ACFA WS, Beijing, February 2007

We have to report about our results after the first year, and to write a report

Draft (final) of the DCR (will be published end of 2006 together with the machine RDR)

prepare ourselfs, FCAL meeting before?

LCWS,Hamburg, June 2007

Page 6: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

Where are we with FCAL

-We worked out an advanced design for several crossing

angles, 2, 20, 14 mrad; -this design is part of the LDC, (partly also for SiD,

GLD) concepts-we got an encouraging statement by the PRC-we have new members and extended our scope – GamCal to analyse photons (welcome Bill Morse)-we founded a Collaboration-we are part of EUDET, EUROTEV

However: many questions still not answered

Page 7: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

Current design (Example LDC, 14 mrad):

Luminometer

BeamCal

TPC

ECA

L

HCAL

-Background on LumiCal ?- Background in the inner Detector?

Technology: Tungsten/Si (C)

sandwich

Page 8: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

A few topics to be thought

Selection of Bhabha events:

Energy selection cut

At which energy this cut has to be put?-Theoretical uncertainty -Energy scale uncertainty

Page 9: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

A few topics to be thought

The Bhabha cross section depends on the polarisation

How well is this understood?-higher order corrections - considered in the Monte Carlo

Page 10: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

A few topics to be thought

Electron detection efficiency:

Algorithm relies on constant bunch charge

Look on Dumping Rings

How stable is this mechanism?-Bunch-to-bunch fluctuations (Contact to machine people )

Page 11: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

Simulations

Progress:-GEANT4 simulation of LumiCal, new geometry-4f background in LumiCal-Beam-diagnostics with GamCal, BeamCal

Topics:- GamCal design- Reconstruction of Bhabha events from clusters- How influence radiative effects for a given detector the uncertainty of the measurement- Optimised segmentation/structure for LumiCal- Realistic readout scheme, - More realistic BeamCal simulation- Backscatterd background

Page 12: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

Sensors and Readout

Progress:-testbeam studies: performance as a function of the absobed dose, for the first time done up to a few MGy - Laser alignment - first experience with the Phy3 chip- First experience with GaAs, very soon large prototypes

Topics:-continue studies of diamond sensors, GaAs-Si sensor studies (to learn to work with them).-Assembly of full sensor planes prototype test.-Readout electronics design for the prototype O(1000) channels.-Concept for the readout electronics -very critical issue !

Page 13: FCAL Workshop in Munich

Octobre 17 2006 MPI Munich

This meeting at MPI

-Reports on many topics mentioned

-Discussions on ‘critical’ issues -More responsibilities to subgroups (simulation, electronics, sensors)-periodic reviews of milestones (PRC, EUDET) -conferences, LC notes, publications…