FACILITIES COUNCIL
MEETING DATE: November 20, 2015
SUMMARY: Facilities Master Plan 2011-2030 – Annual update for 2015 is
submitted for the information of the Council.
COMMENTS: The Facilities Master Plan 2011-2030 (FMP) maps and
spreadsheets serve as primary reference materials for the FMP ad
hoc implementation subcommittees, the Facilities Council,
Facilities Advisory Committee, Architecture Landscape Review
Board, campus leadership, staff, project architectural/engineering
teams, public-private partnerships, and as general information
about University plans.
Annual updates, as part of the University’s Capital Budget
process, will ensure that the maps and spreadsheets are current.
This annual update for 2015 reflects UMD’s FY 2017-2026
Capital Improvement Program and FY 2016-2025 System Funded
Construction Program and includes the following changes:
o Projects Completed:
- Prince Frederick Hall (425, former S6)
- Main Administration (077) (Partial renovation)
- Chemistry (091) (Partial renovation)
- Severn Building (810) (Partial conversion) – Phase 3
Physical Distribution Center occupants relocation
- Centennial Garden, Frat Row (Partial installation)
Summer, 2014 (E-L3)
- School of Public Health Garden – Summer, 2014 (NE_L1)
o Projects Demolished:
- Police Substation (018)
- Shriver Hall (075)
o Projects Added
- Period 1 New Construction:
Ellicott Area Dining Hall Replacement (NW6)
- Period 1 Renovation:
Plant Operations & Maintenance Building (006)
Motor Transportation Building (011)
- Period 1 Landscape and Transportation
Relocation of Tennis Courts (from Cole SAB)
(NW_L6)
S:\Facilities Planning\FMP 2011-30_Updates\FMP_Update_2015\FMP-FC-cover_15n17.doc Page 2 of 4
o Projects Added (continued)
Period 1 Demolition:
Storage Facility (200) (expansion of Cole SAB)
Ellicott Area Dining Hall (257) (replaced by NW6)
Anacostia Building (332)
- Period 2 New Construction:
Engineering Annex (NE16 – replaces Building 093)
Renovate and Expand Annapolis Hall (008) (S10)
- Period 2 Renovation:
Centreville Hall (098)
Bel Air Hall (099)
Elkton Hall (254)
Denton Hall (297)
o Projects moved from Period 2 to Period 1 New Construction:
- Human Performance and Academic Research Facility to New
Cole Fieldhouse (W3)
o Projects moved from Period 2 to Period 1 Renovations:
- Hornbake (147) – Ground and Fourth Floor
o Projects moved from Period 1 to Period 2 New Construction:
- Administrative Office Building (CC3)
- Golf Course Maintenance Facilities (GC2)
- Electric Substation (N4)
- Bioscience Research Support Facility Phase 1 (NE2)
- Chemistry Building Wings 1 & 2 Replacement (NE13)
- SCUB IV Expansion (NE15)
- Public Protection and Security Research Building,
SCUB 2 Expansion and Site Development (S3)
- Worcester Hall Replacement (450 beds), SCUB 2
Expansion and Site Development (S8)
o Projects moved from Period 1 to Period 2 Renovations:
- Cecil Hall (017)
- Woods Hall (047)
- Francis Scott Key (048)
- Rossborough Inn (080)
- Chestertown Hall (121)
- Cumberland Hall (122)
- Architecture Building (145)
- Easton Hall (253)
- Hagerstown Hall (258)
- La Plata Hall (259)
S:\Facilities Planning\FMP 2011-30_Updates\FMP_Update_2015\FMP-FC-cover_15n17.doc Page 3 of 4
o Projects moved from Period 1 to Period 2 Demolition:
- Plant Operations & Maintenance Building (006)
o Project Name Changes:
- Comcast Center to Xfinity Center (360) (throughout)
- Building and Landscape Services Building to Wye Oak
Building (428, project N12) (New Construction
Completed)
- Bioengineering Building to A. James Clark Hall (NE6)
(Period 1)
- Computer Science Building to Brendan Iribe Center for
Computer Science and Innovation Building (NE8)
(Period 1)
- East District Mixed Use Development : Hotel & Garage (E1)
(Period 1)
- East District Mixed Use Development : Innovation
District : Phase 2 (E2) (Period 1)
- East District Mixed Use Development : Leonardtown-
Building 383 : Phase 3 (E4) (Period 2)
o Project Site Changes:
- Farm Master Plan Fields / Pastures (from NE_L4 to
NE_L8) (Period 1)
- Kehoe Track Relocation (388) (from N12 to N_L6)
(Period 2)
o Projects deleted or removed from FMP:
- South Campus Dining Hall (026) removed from
Renovation (Period 1)
- Cole Student Activities Building (162) removed from
Renovation (Period 2)
- Shipley Field (159) removed from Demolition
(Period 1)
- Motor Transportation Building (011) removed from
Demolition (Period 1)
- Heavy Equipment Building (426) removed from
Demolition (Period 2)
- Wye Oak Building (428) removed from Demolition
(Period 2)
The annual update for 2015 is available on the University website
https://www.facilities.umd.edu/sitepages/FPmasterplan.aspx
as well as in print version, by request.
S:\Facilities Planning\FMP 2011-30_Updates\FMP_Update_2015\FMP-FC-cover_15n17.doc Page 4 of 4
AREA AFFECTED: UMD Campus
ATTACHMENTS: Background Information
SUBMITTED BY: Daniel FC Hayes, Department of Facilities Planning
Projects Completed Since Last Update (from July 2014 to June 2015)
Number GSF
New Construction 1 186,849
Building Renovations 1 38,900
Building Demolitions 1 3853
Landscape and Transportation Improvements 1 N/A
Total 4
Projects Completed Since Plan Approved (from January 2011 to June 2015)
Number GSF
New Construction 8 655,290
Building Renovations 13 645,201
Building Demolitions 19 (126,088)
Landscape and Transportation Improvements 3 N/A
Total 43
Summary for All Planning Periods
Number GSF
New Construction 58 8,701,428
Building Renovations 66 3,620,172
Building Demolitions 48 (752,108)
Landscape and Transportation Improvements 66 N/A
Total 238
Planning Period 1 (July 2015‐ December 2020)
Number GSF
New Construction 15 3,112,828
Building Renovations 21 908,139
Building Demolitions 19 (360,508)
Landscape and Transportation Improvements 40 N/A
Total 95
Planning Period 2 (January 2021‐ December 2030)
Number GSF
New Construction 43 5,588,600
Building Renovations 45 2,712,033
Building Demolitions 28 (261,659)
Landscape and Transportation Improvements 26 N/A
Total 142
Building # Site # Project Building Type GSF
419 NW2 Oakland Hall Auxiliary 233,436
039 S4Van Munching Hall
Addition/RenovationAcademic 15,282
164 W1 University House Non‐Academic 15,133
424 N1 Shuttle Bus Facility Auxiliary 10,947
426 N3Heavy Equipment
BuildingNon‐Academic 7,136
415 NE4Physical Sciences
Complex ‐Phase 1Academic 172,986
428 N12 Wye Oak Building Non‐Academic 13,520
425 S6 Prince Frederick Hall Auxiliary 186,849
Total 655,290
Building # District GSFDate
CompletedComments
059 CC 22,647 2012
089 NE 5,800 2012 Partial
099 NE 20,090 2012To provide air
conditioning
115 NE 114,118 2012 Partial
171 E 10,445 2012
176 E 11,833 2012
810 OP 53,677 2012For Innovation
District relocations
007 E 30,346 2013For Department of
Public Safety
091 NE 40,500 2013 Partial
098 NW 139,888 2013To provide air
conditioning
254 NW 115,658 2013To provide air
conditioning
077 CC 41,299 2014 Partial
810 OP 38,900 2015
Partial ‐ For Physical
Distribution
Warehouse
relocation
Total 622,554
FMP 2015 Update ‐ Projects Completed Since Plan Approved
January 2011 ‐ June 2015
Renovation
New Construction
Date Completed
2011
2011
2012
2012
2012
2013
2013
2014
Elkton Hall
Project
Chincoteague Hall
Engineering Laboratory
Bel Air Hall
A.V. Williams Building
Phi Sigma Sigma Sorority
Alpha Phi Sorority
Severn Building ‐ Phase 1 And
1A
Pocomoke Building
Chemistry Building
Centreville Hall
Main Administration Building
Severn Building ‐ Phase 3
FMP 2015 Update ‐ Projects Completed Since Plan Approved
January 2011 ‐ June 2015
Building # District Building GSFDate
Completed
Reason for
Demolition
050 N 3,244 2012 Site for new facility
066 S 2,572 2012 Site for new facility
012 E 11,832 2014East District
Redevelopment
013 E 5,862 2014East District
Redevelopment
055 E 680 2014East District
Redevelopment
075 CC 22,315 2014 Site for new facility
100 E 1,829 2014East District
Redevelopment
101 E 1,840 2014East District
Redevelopment
112 E 603 2014East District
Redevelopment
208 E 666 2014East District
Redevelopment
212 E 1,874 2014East District
Redevelopment
215 E 3,342 2014East District
Redevelopment
216 E 3,267 2014East District
Redevelopment
217 E 682 2014East District
Redevelopment
343 E 4,225 2014East District
Redevelopment
385 E 610 2014East District
Redevelopment
410 E 546 2014East District
Redevelopment
018 E 3,853 2015 Site for new facility
238 E 3,853 2015 Site for new facility
002 E 56,246 2014East District
Redevelopment
Total 129,941
Plant Operations &
Maintenance Shop
Demolition
Project
Grounds Office Building
West Education Annex
Plant Operations &
Maintenance Shop
Shuttle Bus Facility
Plant Operations &
Maintenance Storage
Shriver Laboratory
Plant Operations &
Maintenance Shop
Harrison Laboratory
Shuttle Bus Trailer
Temporary Building
Plant Operations &
Maintenance Shop
Building Services Operations
Heavy Equipment Building
Solid Waste Storage
Campus Mail Facility
Pest Control Trailer
Shuttle Bus Trailer
Police Substation (7505 Yale
Avenue)
Police substation
FMP 2015 Update ‐ Projects Completed Since Plan Approved
January 2011 ‐ June 2015
Project_ID Project TypeDate
Completed
CC_T3 Transportation 2013
E_L3 Landscape 2014
W_L1 Auxiliary 2012Byrd Stadium Field Sports Field
Landscape and Transportation
Project Comments
Sharrows & Signage Signage
Centennial Garden (Fraternity Partial
Site Building GSF Floors Project Type
Campus Core
Planning Period 1 CC1Edward St. John Learning
and Teaching Center159,015 3 Academic
CC2
Benjamin
Building/Center for
Young Children
95,700 5 Academic
CC3Administrative Office
Building57,100 4 Academic
East
E1
East District Mixed‐use
Development: Hotel and
Garage
775,450 varies East District
E2
East District Mixed‐use
Development:
Innovation District:
Phase 2
279,400 varies East District
E3 Day Care Facility 13,500 2 Auxiliary
E4
East District Mixed‐use
Development:
Leonardtown‐Physical
Distribution Center:
Phase 3
2,080,800 varies East District
FMP 2015 Update New Construction
July 2015 ‐ December 2030
Planning Period 2
Planning Period 1
Planning Period 2
Site Building GSF Floors Project Type
FMP 2015 Update New Construction
July 2015 ‐ December 2030
Northeast
NE1
Campus Farm Master
Plan ‐ New Buildings and
Renovations
41,800 2 Academic
NE6 A. James Clark Hall 184,239 6 Academic
NE8
Brendan Iribe Center for
Computer Science and
Innovation
215,600 9 Academic
NE14Chemistry Renovation ‐
Phase 2A NMR3,750 1 Academic
NE2Bioscience Research
Support Facility ‐ Phase 1113,775 5 Academic
NE3Bioscience Research
Support Facility ‐ Phase 2102,000 5 Academic
NE5Physical Sciences ‐ Phase
2106,300 6 Academic
NE7Nutrition & Food
Sciences94,000 6 Academic
NE9Physical Sciences ‐ Phase
3102,400 7 Academic
NE10 IT Bldg 100,000 4 Academic Support
NE11A. James Clark Hall ‐
Phase 254,500 6 Academic
NE12 Aerospace Engineering 106,800 6 Academic
NE13Chemistry ‐ Wing 1
Replacement88,300 5 Academic
NE15 SCUB Expansion 8,540 2 Auxiliary
NE16 Engineering Annex 182,000 9 Academic
Planning Period 1
Planning Period 2
Site Building GSF Floors Project Type
FMP 2015 Update New Construction
July 2015 ‐ December 2030
North
Planning Period 1 N2
Paint Branch Parking
Garage ‐ Phase 1 (1,000
spaces)
300,0005 (4‐Story
"Read")Auxiliary
N4 Electric Substation 5,400 1 Utility
N2a
Paint Branch Parking
Garage ‐ Phase 2 (1,000
spaces)
300,0005 (4‐Story
"Read")Auxiliary
N2b
Paint Branch Parking
Garage ‐ Phase 3 (1,000
spaces)
300,0005 (4‐Story
"Read")Auxiliary
N5Environmental Service
Facility Expansion10,100 2 Academic Support
N6Xfinity Center Office
Expansion7,020 1 Auxiliary
N7
Field Hockey and
Lacrosse Complex
Expansion
5,800 1 Auxiliary
N8
Xfinity Center Addition
(Basketball Practice
Facility)
22,500 1 Auxiliary
N9
Xfinity Center Addition
(Gymnastics Practice
Facility)
15,000 1 Auxiliary
N10Robert E. Taylor Stadium
Expansion2,640 1 Auxiliary
N11 New Energy Plant 60,000 2 Utility
Planning Period 2
Site Building GSF Floors Project Type
FMP 2015 Update New Construction
July 2015 ‐ December 2030
Northwest
NW1
School of Public Health ‐
Addition/Conversion ‐
Phase 2
27,299 3 Academic
NW3Undergrad Housing 1
(515 Beds)169,950 9 Auxiliary
NW6Replace Ellicott Dining
Hall57,750 2 Auxiliary
NW4Undergrad Housing 2
(515 Beds)169,950 9 Auxiliary
NW5
Replacement Housing
(650 Beds) + Residential
Facilities Office
Relocation
240,300 8 Auxiliary
West
Planning Period 1 W3 New Cole Fieldhouse 281,400 2 Auxiliary/ Academic
W2
Ludwig Soccer Stadium
Upgrades (12,000 to
18,000 seats)
105,700 1 Auxiliary
W4 Shipley Field Upgrades 16,900 1 Auxiliary
W5Gossett Football Team
House Addition7,500 1 Auxiliary
W6Campus Drive Parking
Garage (2,200 spaces)660,000
6 (5‐story
"read")Auxiliary
Planning Period 1
Planning Period 2
Planning Period 2
Site Building GSF Floors Project Type
FMP 2015 Update New Construction
July 2015 ‐ December 2030
South
Planning Period 1 S7South Campus
Recreation Building70,000 3 Auxiliary
S1Architecture Building
Additions122,250 3 Academic
S2
School of Public Policy
Building and Site
Development
74,800 4 Academic
S3
Public Protection and
Security Research
Building, SCUB Expansion
and Site Development
134,000 5 Academic
S5Visual Arts and Cultures
Building112,300 4 Academic
S8
Worcester Hall
Replacement (450 beds),
SCUB Expansion and Site
Development
135,000 4 Auxiliary
S9
Behavioral and Social
Sciences Research
Building
120,000 5 Academic
S10Expand and Renovate
Annapolis Hall32,900 3 Auxiliary
Golf Course
Planning Period 1 GC1 Indoor Driving Range 1,000 1 Auxiliary
GC2Golf Course
Maintenance10,400 1 Auxiliary
GC3
B&LM Grounds
Maintenance
Replacement
20,000 1 Academic Support
Planning Period 2
Planning Period 2
Site Building GSF Floors Project Type
FMP 2015 Update New Construction
July 2015 ‐ December 2030
Off Campus
Planning Period 1 N/A
Central Maryland
Research and Education
Center Office Building
(near Ellicott City)
34,500 TBD Academic
N/A
MIFRI Western MD
Regional Training Center
Upgrade
13,100 TBD Academic Support
N/ANew Data Center
(Research Park)83,000 TBD Academic Support
Outlying Properties
Planning Period 2 OP1
Chesapeake Bay
Mesocosm (near Avrum
Gudelsky Veterinary
Center)
8,000 1 Academic
3,112,828
5,588,600
Total 8,531,428
GSF Planning Period 1 (July 2015 ‐December 2020)
GSF Planning Period 2 (January 2021 ‐ December 2030)
Planning Period 2
NOTES:
Worcester Hall (051) Replacement: Building is 77,600 GSF plus 7,000 GSF for half of existing SCUB II.
Public Protection and Security Research: Building is 120,000 GSF plus 7K GSF for half of existing SCUB II and 7K GSF for future SCUB expansion for future development.
Benjamin Building (143): Building is 85,000 GSF plus 10,700 GSF for CYC replacement.
New Electric Sub‐station: Footprint is 10% larger than footprint of Mowatt sub‐station.
New Energy Plant: 30K footprint plus 10K outside area for trucks/storage if this becomes bio‐mass.
A. James Clark Hall (429) Phase I: Building is 148,070 GSF plus 30,700 GSF for extra floor.
New SCUB Expansion is 8,540 GSF on site to be determined.
East District Mixed‐use Development Hotel and Garagage (site E1): GSF includes parking garage, GSF from Real
Estate Office. GSFs for sites E2 and E4 were calculated assuming same land use density as site E1.
Building # Building District GSF Comments
034 Jimenez Hall CC 63,200
064 Dorchester Hall CC 35,436
073 H.J. Patterson Hall CC 56,600 Wing 1 Renovation
074 Holzapfel CC 27,400 Renovated as part of St. John Center
001 Energy Plant E 39,655 Upgrade
006Plant Operations &
Maintenance BuildingE 20,165 East District Redevelopment
011Building 011 (Motor
Transportation Building)E 9,016 East District Redevelopment
082 John S. Toll Physics Building NE 163,093 North Wing renovation
091 Chemistry Building NE 36,300 Partial
096 Cambridge Hall NE 55,792
103Animal Science Service
BuildingNE 4,030 Per Farm Master Plan
108 Horse Barn NE 4,188 Per Farm Master Plan
109 Sheep Barn NE 6,152 Per Farm Master Plan
110 Cattle Barn NE 6,105 Per Farm Master Plan
115 A.V. Williams Building NE 108,500 Partial
147 Hornbake Library NE 7,500 Ground and Fourth Floor renovations
256 Ellicott Hall NW 123,247
141 Tawes Hall W 31,550 Convert theater to offices / classrooms
810 Severn Building OP 22,080 For Remote Library Storage
810 Severn Building ‐ Phase 2 OP 49,230 For Innovation District relocations
810 Severn Building ‐ Phase 3 OP 38,900 For Physical Distribution Warehouse relocation
Total 908,139
FMP 2015 Update Building Renovations
Planning Period 1 (July 2015 ‐ December 2020)
Building
NumberBuilding District GSF Comments
009 Memorial Chapel CC 25,776
040 Morrill Hall CC 16,277
042 Tydings Hall CC 101,945
043 Taliaferro Hall CC 47,870
046 Marie Mount Hall CC 114,757
047 Woods Hall CC 24,055
048 Francis Scott Key Hall CC 24,804 Ground and First Floors
052 Mitchell Building CC 19,840 Partial
071 Lee Building CC 20,662 Partial
073 H.J. Patterson Hall CC 62,372 Wing 2 Renovation
076 Symons Hall CC 54,753 Center and North wings
077Main Administration
BuildingCC 41,299 Partial
078 Reckord Armory CC 35,541 Ground Floor: convert lecture halls to other uses
079 Turner Hall CC 25,666
080 Rossborough Inn CC 8,963
143 Benjamin Building CC 112,505
309 Indoor Practice Facility GC 20,963 Convert to multi‐purpose sport practice
081 Wind Tunnel Building NE 31,567
082 John S. Toll Physics Building NE 163,093 North Wing renovation
082 John S. Toll Physics Building NE 74,733 South Wing renovation
084 Mathematics Building NE 25,981 Ground Floor: Classroom up‐grades
091 Chemistry Building NE 40,500 Partial
115 A.V. Williams Building NE 114,118 Partial
142Animal Sciences/Agriculture
Engineering BuildingNE 62,462 Wing 1 Renovation
144 Biology‐Psychology Building NE 250,240
231 Microbiology Building NE 88,285
237 Geology Building NE 24,390
098 Centreville Hall NW 139,888
099 Bel Air Hall NW 20,090
121 Chestertown Hall NW 29,090
122 Cumberland Hall NW 124,486
252 Denton Hall NW 117,468
253 Easton Hall NW 117,473
FMP 2015 Update Building Renovations
Planning Period 2 (January 2021 ‐ December 2030)
Building
NumberBuilding District GSF Comments
258 Hagerstown Hall NW 124,241
259 La Plata Hall NW 137,723
254 Elkton Hall NW 115,658
017 Cecil Hall S 20,096
039 Van Munching Hall S 34,900 Partial: School of Public Policy wing
145 Architecture Building S 67,163
362 Byrd Stadium Concessions 1 W 4,620
363 Byrd Stadium Concessions 2 W 2,663
364 Byrd Stadium Concessions 3 W 2,705
365 Byrd Stadium Concessions 4 W 11,193
367 Byrd Stadium Concessions 5 W 9,159
379Gossett Football Team
HouseW TBD
Total 2,712,033
3,620,172
FMP 2015 Update Building Renovations
Planning Period 2 (January 2021 ‐ December 2030)
Total Planning Periods 1 & 2
Building # Building District GSF Reason for Demolition
003 Service Building E 84,029 East District Redevelopment
020Motorcycle Storage
BuildingE 416 East District Redevelopment
210Plant Operations &
Maintenance StorageE 499 East District Redevelopment
332 Anacostia Building N 1,787 Site for new facility
085Institute For Physical
Sciences & TechnologyNE 28,534 Site for new facility
087Central Animal
Research FacilityNE 7,163 Site for new facility
093 Engineering Annex NE 10,888 Site for new facility
102 Agriculture Shed NE 2,322 Per Farm Master Plan
103Animal Science Service
BuildingNE 1,397 Per Farm Master Plan
119 Poultry Barn NE 1,026 Per Farm Master Plan
257 Ellicott Area Dining Hall NW 48,280 Site for new facility
803
Adelphi Road Office
Annex (8701 Adelphi
Rd)
OP 4,818 Site for new facility
051 Worcester Hall S 33,541 Site for new facility
054 Preinkert Field House S 28,237 Site for new facility
065 Carroll Hall S 26,470 Site for new facility
069 Wicomico Hall S 27,684 Site for new facility
070 Caroline Hall S 26,959 Site for new facility
811Knox Road Building
(4218‐20 Knox Road)S 3,332 Site for new facility
158Varsity Sports
TeamhouseW 22,857 Site for new facility
200 Storage Facility W 269 Site for new facility
Total 360,508
FMP 2015 Update Building Demolition
Planning Period 1 (July 2015 ‐ December 2020)
Building # Building District GSF Reason for Demolition
006Plant Operations & Maintenance
BuildingE 20,165 East District Redevelopment
116 Temporary Building (South Of 201) E 1,440 East District Redevelopment
201 Leonardtown Office Building E 10,018 East District Redevelopment
204 Temporary Building (West Of 201) E 869 East District Redevelopment
207 Temporary Building (West Of 201) E 733 East District Redevelopment
238 Leonardtown Apartment E 10,152 East District Redevelopment
239 Leonardtown Apartment E 12,582 East District Redevelopment
240 Leonardtown Apartment E 10,152 East District Redevelopment
241 Leonardtown Apartment E 6,291 East District Redevelopment
242 Leonardtown Apartment E 10,152 East District Redevelopment
243 Leonardtown Apartment E 5,076 East District Redevelopment
244 Leonardtown Apartment E 13,452 East District Redevelopment
245 Leonardtown Apartment E 13,452 East District Redevelopment
246 Leonardtown Apartment E 13,452 East District Redevelopment
247 Leonardtown Apartment E 13,452 East District Redevelopment
248 Leonardtown Apartment E 13,452 East District Redevelopment
249 Leonardtown Apartment E 13,452 East District Redevelopment
250 Leonardtown Community Center E 3,660 East District Redevelopment
124Grounds Material And Equipment
BuildingN 7,372 Site for new facility
327Grounds Herbicide/Pesticide
Storage BuildingN 235 Site for new facility
328Grounds Operations And
Maintenance BuildingN 3,157 Site for new facility
344 Environmental Service Facility N 7,752 Replaced by new facility
045 Instructional Television Building NE 3,082 Site development project
227 Jull Hall NE 17,574 Site for new facility
381 Center For Young Children NW 10,645 Site for new facility
067Satellite Central Utilities Building
(SCUB 2)S 13,664 Site for new facility
158 Varsity Sports Teamhouse W 22,857 Site for new facility
369Byrd Stadium Maintenance
BuildingW 3,319 Site for new facility
Total 261,659
Total Planning Periods 1 & 2 622,167
FMP 2015 Update Building Demolition
Planning Period 2 (January 2021 ‐ December 2030)
Campus Core Site Project Project Type
CC_L1Rossborough Inn Gardens
ImprovementsLandscape
CC_L2McKeldin Library Hardscape and
LandscapeLandscape
CC_L3McKeldin Mall Improvements
(phased)Landscape
CC_L4 South Chapel Lawn Enhancements Landscape
CC_L5 Chapel Fields Improvements Landscape
CC_L6South Gate Landscape
ImprovementsLandscape
CC_T1Campus Drive at Anne Arundel:
Create Pedestrian/Bike PathsTransportation
CC_T2Purple Line and Streetscape /
Landscape ImprovementsTransportation
CC_T4 Capital Bikeshare Transportation
CC_L7Garden of Reflection and
Remembrance ‐ Phase 2Landscape
CC_L8 Morrill Hall Quad Improvements Landscape
CC_L9 Anne Arundel Green Landscape
CC_L10Lot Y Conversion and Landscape
ImprovementsLandscape
CC_L12 Tawes Plaza Improvements Landscape
East
E_L1
Route 1 Pedestrian Median
Improvements (to be
implemented by Maryland State
Highway Administration)
Landscape
E_L2
Fraternity Row ‐ multi‐field layout,
artificial turf (4 fields, 270' x 660'
overall)
Sports Field
E_L3Centennial Garden (Fraternity
Row)Landscape
E_T1
Purple Line and
Streetscape/Landscape
Improvements
Transportation
Planning Period 2 E_L4 East Campus ‐ Phase 2 Park Landscape
2015 FMP Landscape and Transportation
Planning Period 1
July 2015 ‐December
2020
Planning Period 2
January 2021 ‐
December 2030
Planning Period 1
2015 FMP Landscape and Transportation
Golf Course Site Project Project Type
Planning Period 1 GC_L1 Holman Short Game Expansion Sports Field
GC_L2
Golf Course Ponds and Storm
Water Management
Improvements
Landscape
GC_L3
Perimeter Landscape
Improvements University
Boulevard and Adelphi Road
Landscape
North
N_L1Paint Branch Drive Gateway
EnhancementsLandscape & Transportation
N_T1Pedestrian/Bicycle Improvements
at Xfinity CenterTransportation
N_L2Recreation Fields on Paint Branch
Parking Garage RoofSports Field
N_L3Terrapin Trail Retention Pond
ImprovementsLandscape
N_L4Paint Branch Drive Wooded
Wetlands ImprovementsLandscape
N_L5
Wooded Hillock Conservation
Garden and Perimeter Landscape
Improvements University
Boulevard
Landscape
N_L6Relocate Kehoe Track and
Throwing AreaSports Field
N_L7 ICA/RecWell Field (Infield of Track) Sports Field
Northeast
NE_L1 Hornbake Plaza Improvements Landscape
NE_L2Bioretention Garden
Improvements (Technology Drive)Landscape
NE_L3Northgate Park (West) Landscape
ImprovementsLandscape
NE_L8 Farm Master Plan Fields/Pastures Landscape
NE_T1 Regents Drive Improvements Transportation
NE_T2Pedestrian/Bicycle Improvements
at Stadium Drive EastTransportation
Planning Period 1
Planning Period 2
Planning Period 2
Planning Period 1
2015 FMP Landscape and Transportation
NE_T3 Paint Branch Drive Improvements Transportation
NE_T4
Bicycle Connection and Pedestrian
Bridge at A.V. Williams Building,
North
Transportation
NE_L4Animal Sciences Building
Courtyard ImprovementsLandscape
NE_L5Kim Engineering Building Plaza
ImprovementsLandscape
NE_L6Mathematics Building Courtyard
ImprovementsLandscape
NE_L7
Outdoor Volleyball Courts (4 sand
or artificial turf, 50'x80' each,
including buffer space)
Sports Field
Northwest
NW_L1School of Public Health Building
GardenLandscape
NW_L2 Hagerstown Woods Improvements Landscape
NW_L6Relocation of Tennis Courts from
Cole Student Activities BuildingSports Field
NW_L3Campus Creek Trail and Ecosystem
EnhancementsLandscape
NW_L4Multi‐Sport Recreation Field (220'
x 150', artificial turf)Sports Field
NW_L5 Volleyball and/or Basketball Courts Sports Field
Outlying Properties
Planning Period 1 OP_L2 Campus Tree Nursery Landscape
OP_L1Greenmead Drive Entry
EnhancementsLandscape
OP_L3Avrum Gudelsky Veterinary Center
Retention Pond ImprovementsLandscape
OP_L4
Wetland Marsh Nature Walk and
Perimeter Landscape
Improvements University
Boulevard
Landscape
OP_T1 Bicycle Trail Improvements Transportation
Planning Period 2
Planning Period 1
Planning Period 2
Planning Period 2
2015 FMP Landscape and Transportation
South Site Project Project Type
S_L1Lehigh Road Gateway and
Pedestrian EnhancementsLandscape & Transportation
S_T1East‐West Pedestrian Boulevard
ImprovementsTransportation
West
W_L2
Garden Walk at Clarice Smith
Performing Arts Center and
Perimeter Landscape
Improvements University
Boulevard
Landscape
W_L3Garden of Peace and Friendship ‐
Phase 2Landscape
W_L4Botanical Garden and Landscape
Improvements ‐ Phase 1Landscape
W_L5Arboretum Outreach Center
Landscape ImprovementsLandscape
W_L6Field Turf Extension and Site
ImprovementsSports Field
W_T1Lot 1 Road/Pedestrian/Bicycle
Safety ImprovementsTransportation
W_T2Campus Drive West Gateway
EnhancementsLandscape & Transportation
W_T3Stadium Drive and Golf Course
Gateway EnhancementsLandscape & Transportation
W_T4
Purple Line and
Streetscape/Landscape
Improvements
Transportation
W_L7 Botanical Garden ‐ Phase 2 Landscape
W_T5Stadium and Farm Drives
EnhancementsTransportation
Planning Period 1
Planning Period 1
Planning Period 2
Facilities Planning Date: 11/17/2015
±
EXISTING CAMPUS
ATTACHMENT
A2015 UPDATEFACILITIES MASTER PLAN 2011-2030:
0 ¼Mile
Legend
ExistingProjects Completed Post - FMP 2011- 2030 Approval (January 2011 - June 2015)
Facilities Planning Date: 11/12/2015
±
PLANNING PERIOD 1(JULY 2015 - DECEMBER 2020)
ATTACHMENT
B2015 UPDATEFACILITIES MASTER PLAN 2011-2030:
LegendExistingPlanning Period 1
0 ¼Mile
Facilities Planning Date: 11/12/2015
±
PLANNING PERIOD 2 (JANUARY 2021 - DECEMBER 2030)
ATTACHMENT
CLegend
ExistingPlanning Period 1 July 2015 - December 2020Planning Period 2 January 2021 - December 2030
2015 UPDATEFACILITIES MASTER PLAN 2011- 2030:
0 ¼Mile
Facilities Planning Date: 11/12/2015
±
ATTACHMENT
D2015 UPDATEFACILITIES MASTER PLAN 2015 UPDATE:
FRAMEWORK PLAN - BEYOND 20300 ¼
Mile
LegendExistingPlanning Period 1 July 2015 - December 2020Planning Period 2 January 2021 - December 2030Planning Period Beyond January 2030+