WELCOME
Eglinton Crosstown West Extension Information Session
Why We Are HereAn Environmental Project Report (EPR) for this transit project was completed in 2010 between Kennedy Road and Pearson International Airport along the Eglinton Avenue West corridor. In 2012, Metrolinx became the sole proponent for the Project and initiated an EPR Addendum for changes to the approved project between Keele Street to Jane Street, as well as the Maintenance and Storage Facility at Black Creek. Assessment of these changes to the 2010 EPR was documented in the 2013 EPR Addendum.
In 2019, the Government of Ontario announced an extension for Eglinton Crosstown between Mount Dennis Station and Renforth Drive. Metrolinx is currently completing an EPR Addendum to address changes to existing environmental conditions, vertical and horizontal alignments, and stations from what was assessed in the 2010 EPR.
The EPR Addendum will contain the following information:• a description of planned changes;• assessment and evaluation of any potential impacts the changes may
have on the environment and public;• description of the proposed mitigation measures to address potential
impacts; and• a statement of opinion on the significance of the proposed changes.
The EPR Addendum will be available for public review in Spring 2020.
Have your say! We’re here to:• introduce the Eglinton Crosstown West Extension;• provide background information and details on studies underway; and• gather feedback from the community.
Who is Metrolinx?Our Services
• GO serves a population of more than seven million across more than 11,000 square kilometres stretching from Hamilton and Kitchener-Waterloo in the west to Newcastle and Peterborough in the east, and from Orangeville and Beaverton in the north to Niagara Falls in the south.
• GO has been in operation since 1967, and now accommodates more than 81 million customer journeys a year.
• PRESTO is the smart card fare payment system seamlessly connecting 11 transit agencies across the Greater Toronto and Hamilton Area (GTHA) and Ottawa.
• PRESTO replaces the need for tickets, tokens, passes or cash.
• PRESTO currently has over 2 million PRESTO cards in use.
• UP Express connects the country's two busiest transportation hubs, Toronto Pearson International Airport and Union Station in downtown Toronto, offering a 25-minute journey from end to end, with trains departing every 15 minutes.
What is the Eglinton Crosstown West Extension?The Eglinton Crosstown West Extension will extend the under-construction Eglinton Crosstown LRT from the existing Mount Dennis Station to Renforth Drive. Operating mainly underground, this line will bring more rapid transit to Etobicoke and Mississauga to make it easier for people to get where they need to be. We’re also working with the Greater Toronto Airport Authority to explore a connection to Pearson International Airport, opening up even more travel possibilities for airport customers and workers.
Number of proposed stations
Seven (7) from Jane Street to Renforth Drive. The number of stations on the planned connection
to Pearson Airport is to be determined.
Connections to existing
transit
Mississauga Transitway Bus Rapid Transit (BRT)
at Renforth Station
Toronto Transit Commission (TTC) Bus Routes
at all station locations
GO Transit Bus at Renforth Station
GO Transit Kitchener Line at Mount Dennis Station
UP Express at Mount Dennis Station
Approximate number of route
kilometres
9.2 km(up to 4.7 km for planned Pearson connection)
Ridership 37,000 weekday daily boardings *
Access to transit 50,000 people within walking distance to transit *
Access to jobs 31,000 jobs within walking distance to transit *
* Source: Eglinton Crosstown West Extension Initial Business Case, February 2020
Mount Dennis
JaneScar
lettRoyal York
Islington
Kipling
Renforth
Pearson
Martin Grove
Etobicoke North
Weston
Eglinton CrosstownLRT (in construction)
Transition toElevated Elevated
Transition toUnderground
UndergroundTransition to
At Grade
0 1 2 km
Eglinton Crosstown West Extension
Elevated Section
Station LocationEglinton CrosstownLRT (in construction)
Existing GO Rail
Existing UP Express
Mississauga Transitway
Underground Section
Planned Pearson Connection(conceptual alignment)
All alignments and stations areconceptual and subject to change.
MA
RTIN
GR
OV
E R
OA
D
DIXON ROAD
RATHBURN ROAD
HIG
HW
AY 427
HIG
HW
AY 427
HIGHW
AY 401
HIGHWAY 409
KIP
LING
AV
EN
UE
RO
YA
L YO
RK
RO
AD
JAN
E S
TRE
ET
SCAR
LETT RO
AD
ROAD
WESTO
N
ISLIN
GTO
N A
VE
NU
E
EGLINTON AVENUE
At Grade Section
Ontario’s New Subway Transit Plan for the GTHAThe Province and Metrolinx are building new and better ways to move you around the region.
Benefits of the Eglinton Crosstown West Extension
The Eglinton Crosstown West Extension contributes to the Frequent Rapid Transit Network, connecting Urban Growth Centres and key Mobility Hubs.
Regional Transportation Plan (RTP) 2041
Eglinton Crosstown West Extension’s Strategic Outcomes
Strong connectionsImproving the present GTHA rapid transit network to connect more people to more jobs and services, and to make their lives better through reduced auto dependency and more efficient transit
Complete travel experiences
Providing a hassle-free, accessible, reliable and comfortable door-to-door travel experience that improves transit use attractiveness for the served residents and businesses
Sustainable and healthy communities
Promoting higher quality of life to the served residents and businesses through more sustainable mobility and land use options that support healthier communities and more prosperous economy
Eglinton Crosstown LRT Construction Update
• Majority of surface section stops are currently under construction with completion by the end of 2020 (Mount Dennis, Keelesdale Station, Caledonia Station and Science Centre Station).
• Mining at Avenue Station is anticipated to be completed this summer.
• Vehicle testing to start between Mount Dennis Station and Caledonia Station.
• Track installation reached 50% completion in January 2020. By the end of 2020, track will be installed in most of the underground stations.
COVID19 Impact: Work continues as Crosstown construction deemed an essential service, but Metrolinx will continue to monitor for impacts to delivery timeline.
This view shows the mining at Laird Station, with completed sections of floors and roof archway.Source: Metrolinx.com
This view is looking under the Kennedy and Eglinton intersection, with formwork in place for more concrete pours.Source: Metrolinx.com
What’s Next?
Having released the Initial Business Case (IBC) for the project in February 2020, planning for the project continues, including further reining the design and engineering work, and seeking environmental approvals.
Connect More People to More Places in Less TimeThe Eglinton Crosstown West Extension Initial Business Case (IBC) found that the Project could:
With Midtown Toronto - DowntownMississauga transit options, trips will be14 minutes faster.
37,000weekday corridor boardings
Attract 37,000 weekday boardings and add 18% more jobs accessible by transit in 45 minutes along the corridor.
The Eglinton Crosstown West Extension will bridge the gap between the Mississauga Transitway to the under-construction Eglinton Crosstown LRT making transit more appealing for people in Mississauga and Toronto and increasing weekday boardings by 23% on both of these lines.
14minutes faster between Midtown
Toronto and Downtown Mississauga
23%increase in weekday boardings
on connecting transit
Source: Eglinton Crosstown West Extension Initial Business Case, February 2020Source: Eglinton Crosstown West Extension Initial Business Case, February 2020
Attractive Rapid Transit SpineThe Eglinton Crosstown West Extension will expand connections and increase accessibility to the rapid transit network. The Eglinton Crosstown West Extension will see 23% increase in weekday boardings on connecting transit.
Etobicoke-based and Etobicoke-bound Line 2 subway users will benefit from the extension, as a substantial share of southbound Etobicoke bus riders and Eglinton Avenue West-bound bus riders (who would normally transfer to and from Line 2’s Kipling, Islington, Royal York and Jane Subway Stations during the morning peak under the Business as Usual scenario) will shift to the Eglinton Crosstown West Extension, bypassing the Bloor-Eglinton bus and Kipling-Jane subway segments altogether.
Almost one out of fourEtobicoke-based north-south
bus riders will shift toEglinton West LRT
Source: Eglinton Crosstown West Extension Initial Business Case, February 2020
Assessment of Design ChangesThe EPR Addendum will assess the following design changes:
Alignment
• Alignment will run mostly underground along Eglinton Avenue West from Renforth Station to Mount Dennis Station.
• Tunneled alignment between western portal at Renforth Drive and Eglinton Avenue West to eastern portal west of Scarlett Road.
• Western portal, as well as launch shaft, will be located approximately at Renforth Drive and Eglinton Avenue West.
• Eastern portal will be west of Scarlett Road.• Project will be elevated between west of
Scarlett Road and east of Jane Street with new bridge across the Humber River for the guideway. It will continue underground and connect to Mount Dennis Station.
Station & Ancillary Features
• A total of 7 new stations between Renforth Drive and Mount Dennis Station.
• Scarlett and Jane Stations will be elevated.
• Martin Grove, Kipling, Islington and Royal York Stations will be below grade and include associated at-grade ancillary features (e.g. entrance building(s) and vent shafts).
• New terminal station at Renforth will be at-grade.
Assessment of Design ChangesThe EPR Addendum will assess the following design changes:
Emergency Exit Buildings (EEBs)
• Six new emergency exit buildings are located along the underground portion.
Traction Power Substations
• 7 locations along alignment
Construction
• Tunnel boring machine (TBM) launch shaft adjacent to Renforth Station.
• Extraction shaft construction approximately 500 m west of Scarlett Road. This will include a portal where the guideway is elevated towards the east.
• Cut and cover construction at all underground stations.
What is cut-and-cover? Cut-and-cover is a method of construction for tunnels. It means that excavation is performed then covered with wooden decking while crews continue digging underneath. Once complete, the surface is returned to its original state.
Eglinton Crosstown West Extension Location Concepts
Cycle Path Realignment
Eglinton Avenue Realignment
SCARLETT RD.
EGLIN
TON
AVE.
Station
Sidewalk Realignment
LRT Portal
View looking West along Eglinton Avenue at Scarlett Road.(preliminary, subject to change)
Cycle Path Realignment
Eglinton Avenue Realignment
Station
Sidewalk Realignment
LRT Portal
View looking East along Eglinton Avenue at Scarlett Road.(preliminary, subject to change)
SCARLETT RD.
EGLI
NTO
N A
VE.
Elevated Alignment Concept Examples
Valley Line LRT, City of EdmontonSource: City of Edmonton
Burquitlam Skytrain Station, Evergreen LineSource: Andrew Latrielle / Courtesy of Perkins and Will
Brighouse Station, Canada Line (Vancouver)Source: Martin Tessler / Courtesy of Perkins and Will
Portal, Canada Line (Vancouver)Source: Martin Tessler / Courtesy of Perkins and Will
Environmental Studies UnderwayWe are completing environmental studies to establish baseline conditions, complete impact assessments and develop mitigation measures to address design changes from the 2010 Environmental Project Report (EPR). These studies build off previous studies completed for the 2010 EPR.
Natural Environment
• Plant inventories• Aquatic habitat
surveys• Species at risk
habitat screening• Significant wildlife
habitat assessment
Cultural Heritage
• Historical research, review of heritage registers and field surveys
• Stage 1-2 Archaeological Assessment
Air Quality
• Review data from air quality monitoring stations, determine air contaminant sources and identify sensitive receptors
• Conduct air dispersion modelling to determine contaminant levels at sensitive receptor locations
Noise and Vibration
• Identification of sensitive receptors
• Compile baseline conditions
• Analysis and modelling of future conditions
• Identify appropriate mitigation
Traffic
• Characterize existing transportation network
• Identify potential changes to access, travel patterns, and traffic
TrafficA review of qualitative impacts to automobiles, transit service, pedestrians and cyclists resulting from construction and operations of the Eglinton Crosstown West Extension has been conducted.
Construction
Potential Impacts
• Partial road closures and presence of heavy construction vehicles on roadways resulting in reduction of road capacity and potential delays
• Impacts to pedestrian and cycling access during and after construction activities
• Impacts to existing bus stops during construction activities
Examples of Mitigation Measures & Further Studies
• Development of a construction traffic management plan which will maintain as many lanes as possible and limit turn restrictions
• When temporary closures are required to pedestrian and cycling facilities, provide safe and accessible detour routes
• Maintain connectivity along the existing east-west pathway along Eglinton Avenue West, north-south pathway along Scarlett Road and all other pedestrian and cycling facilities during and post-construction
• Maintain access to existing TTC and other bus services during construction activities by temporary re-locating bus stops as required
Operations
Potential Impacts
• Increased transit service may impact traffic operations at adjacent intersections and surrounding roadways
• Impacts to pedestrians / cyclists are expected to be minimal
Examples of Mitigation Measures & Further Studies
• Implementation of traffic staging plans and modifications to existing signal timings
• Implementation of appropriate signage and advanced notifications
Cycling Pathway at Eglinton Avenue West and Renforth Drive, Looking East.Source: Field Investigations 2019
Local Bus ServiceSource: Field Investigations 2019
Traffic Studies
Construction
Potential Impacts
• Noise and vibration from construction activities including tunnel boring and truck movements
Examples of Mitigation Measures & Further Studies
• Metrolinx will develop and implement a construction Noise and Vibration Management Plan that includes a process to address public complaints in a timely manner
• Preconstruction inspections and/or continuous vibration monitoring for buildings particularly close to construction sites
Operations
Potential Impacts
• Noise from Eglinton Crosstown West Extension surface operations is predicted to meet guideline limits at all noise sensitive locations
Examples of Mitigation Measures & Further Studies
• Specific mitigation measures will be selected during the next phase of design, and may include:
• Continuously welded rail, resiliently supported rail ties, high-resilience fasteners and floating slabs
• Designing subway stationary facilities (e.g., traction power substations) such that noise and vibration are minimized
• Optimal maintenance, timely monitoring and inspections of railway tracks and trains, track continuity
Noise logger capturing ambient noiseSource: Field Investigations 2019
Noise and Vibration Studies
A noise and vibration assessment is being completed for the Eglinton Crosstown West Extension to evaluate construction and operational noise and vibration associated with the project.
Noise and Vibration
Noise and VibrationMetrolinx is committed to minimizing and managing the effects of noise and vibration on its neighbours. Metrolinx’s Subway Program noise and vibration management approach will follow:
• Ontario Ministry of Environment and Energy/ GO Transit Draft Protocol for Noise and Vibration Assessment Guide (MOEE/GO Transit, 1995)
• Ontario Ministry of Environment and Energy/ Toronto Transit Commission Protocol for Noise and Vibration Assessment (MOEE/TTC, 1993)
0 20 40 60 80 100 120
0 14020 40 60 80 100 120
Comparing Sources of Noise (dBA)
Comparing Sources of Vibration (VdB)
Threshold of hearing(0 dBA)
Rustling leaves(10 dBA)
Military jet take-off at 25m (140 dBA)
Excavation equipment (e.g., bulldozer) at 15 m (up to 85 dBA)
Normal conversationat 1m (60 dBA)
Ambient noise levels in awilderness area (40 dBA)
Threshold ofpain (130 dBA)
Bus or truck,typical at 15 m
Typical backgroundvibration at 15 m
Difficulty with tasks such asreading a computer screen
Limit for vibration sensitive equipment
Approximate threshold for human perception of vibration
Typical ambient night-time noisein an urban area (49 - 62 dBA)
Typical ambient daytime noise levelin an urban area (53 - 67 dBA)
Threshold for risk of minor cosmetic damage for fragile buildings
Bulldozers and other heavy tracked construction equipment at 15 m
Blasting from construction projects at 15 m
Air Quality
An air quality assessment is being conducted to determine the potential for air quality impacts from the project.
The assessment was based on recommendations within the Ministry of Transportation’s Environmental Guide for Assessing and Mitigating the Air Quality Impacts and Greenhouse Gas Emissions of Provincial Transportation Projects, 2019.
Air Quality Assessment
Construction
Potential Impacts
• During construction, potential for temporary dust, nitrogen oxides (NOX) and VOC emissions
Examples of Mitigation Measures
• A detailed Construction Air Quality Management Plan will be developed and implemented to minimize potential impacts to air quality
• Best management practices will be implemented during construction to minimize potential impacts to air quality
Operation
Potential Impacts
• Results indicate that effects on air quality are expected to be negligible when compared to existing conditions
Examples of Mitigation Measures
• Consider implementation of multi-use path connections to increase the number of passengers that are walking or cycling to access the new GO Station at Mount Dennis
Cultural Heritage
Metrolinx is assessing potential impacts to cultural heritage resources in accordance with the Ontario Heritage Act.
Heritage Resources
Potential Impacts
• The Bank of Nova Scotia building at 1151 Weston Road may potentially be directly impacted
• Four additional cultural heritage resources may be potentially directly impacted through landscape impacts and/or minor alterations
• Three cultural heritage resources may be indirectly impacted through vibrations during construction
Examples of Mitigation Measures and Further Studies
• Avoidance by implementing setbacks, where possible
• Preparation of additional heritage reporting, including Cultural Heritage Evaluation Reports, Heritage Impact Assessments and Strategic Conservation Plans as necessary to evaluate properties for cultural heritage value or interest and determine recommendations for future protection
Mary Reid House, 4200 Eglinton Avenue West, Part IV Designated may be potentially impacted directly, including potential impacts to heritage attributes and a stone wall on the property and may be potentially impacted indirectly through vibrations during construction.
Source: Field Investigations 2019
Richview Collegiate Institute, 1738 Islington Ave, Potential Cultural Heritage Resource, no potential impacts anticipated.
Source: Field Investigations 2019
Natural EnvironmentField studies (2019-2020) included: fish and fish habitat, vegetation and wildlife.
Natural Environment Studies
Fish and Fish Habitat
Potential Impacts
Disturbance or displacement of fish and fish habitat
Examples of Mitigation Measures
• Activities will be designed and planned to minimize loss or disturbance to riparian vegetation and aquatic habitat
• Timing restrictions and sediment controls will be included for any in-water works
Vegetation
Potential Impacts
Removal of vegetation and trees
Examples of Mitigation Measures
• Removals will be kept to a minimum and limited to within the construction footprint
• Temporarily disturbed areas will be re-vegetated
• Compensation will be provided for removals, if required, and permitting/approvals will be obtained
Wildlife and Species at Risk
Potential Impacts
Disturbance or displacement of wildlife
Examples of Mitigation Measures
• If wildlife is encountered, measures will be implemented to avoid impacts or interference with the species and its habitat
• Species-specific mitigation measures will be implemented based on surveys undertaken prior to construction, and ongoing consultation with the Ministry of the Environment, Conservation and Parks (MECP)
Waterbodies
Potential Impacts
Erosion and downstream transport of sediment
Examples of Mitigation Measures
• Impacts to existing drainage system and watercourses will be managed using best management practices
• Spatial buffers around the construction zone will be established to minimize potential impacts
Humber River, viewed from Eglinton Avenue bridge looking upstream (North)Source: Field Investigations 2019
Share your feedback!
• What is most important to you about this project?
• What would you like to hear more about?
• How would you like to hear from us?
• Is there anything we missed?
Please let us know if you have additional thoughts or concerns about the Eglinton Crosstown West Extension.
Thank you!
We appreciate the time you have taken to learn more about our plans and value your opinions.
Stay involved with the Eglinton Crosstown West Extension.
Join our mailing list. Please provide your email or mailing address at [email protected].
• Email us at [email protected]
• Call us at 416-782-8118
• Visit our website: www.metrolinx.com/eglintonwest
• Participate online: www.metrolinxengage.com