Eval of Ed Needs Project

Embed Size (px)

Citation preview

  • 8/19/2019 Eval of Ed Needs Project

    1/5

    Final Project

    FRIT 7237: Evaluation of Educational Needs and Programs

    Fall 201

    !andra "rum

    #ivia $aniel

    %drian &i'son

    #aram( )ells

    Im*lementation Evaluation

  • 8/19/2019 Eval of Ed Needs Project

    2/5

    Braxton County Schools teamed up with Great Southern University (GSU) to create and utilize mathematics problem-based learning

    (B!) modules that are aligned with "ew State Standards #or $athematics ("SS$)% &eachers were trained during a #ive-day summer

    wor'shop which consisted o# small group activities with trips to local businesses and industries% #ter the wor'shop teachers will

    remain in contact with GSU sta## through email and wi'i pages% mid-implementation meeting will be conducted to address *uestions

    and concerns that may arise during implementation o# the pro+ect% t the conclusion o# the pro+ect the participants will meet once

    again to discuss the sel#-evaluations and to identi#y best practices% &he wi'i utilized during the implementation period will be opened

    to provide examples o# modules created during the process%

    Evaluation +uestions &oals,-'jectives $ata "ollected Recommendation

    P1: )ere t.e initial

    e/*eriences and follo u*

    activities im*lemented as

    *lanned

    &eachers will be trained tocreate and implement B!

    modules #or mathematics that

    are aligned with "SS$%

    ,nterviews and

    surveys

    &his is being conducted very well with the

    Great Southern sta## conducting wor'shops as

    well as continuing to remain in contact viaelectronic consultations

    P2: ).at is t.e ualit( of

    t.e initial *rogram

    &eachers will create B!

    modules #or mathematics

     based on examples #rom local businesses and industries%

    chievement data

    #rom participating

    classes%

    Student surveys should be conducted to

    determine student involvement with the

     program% ,# the students are not on board withthe program the school will not see the results

    they hope to achieve% Classroom observationsshould be conducted as well to collect data on

    student engagement%

    P3: ).o are t.e *rogram

    *artici*ants and .o

    ind ./ middle school

    teachers and administrators

    0mail and paper

    advertisements #or

    ,nterviews should be conducted with interested

     participants to determine the most *uali#ied

  • 8/19/2019 Eval of Ed Needs Project

    3/5

    ere t.e( recruited interested in creating B!

    modules integrating availableinstructional technology%

    the program% participants #or the program%

    P: ).at is t.e ualit( offollo u* and su**ort

    activities

    ,mplement and evaluate thelearning modules created%

    ,nterviews teacher1ssel#-evaluations and

     public wi'i%

    2bservations o# the participating classroomsshould be conducted to see the level o# teacher 

    and student involvement% &eacher and student pre- and post-pro+ect surveys should be

    conducted with each module%

    !ummative Evaluation

    &he B! modules #or mathematics were based on examples #rom local businesses and industries% Using interviews surveys data #rom

     participating classes and electronic communication such as e-mails the summative evaluation will address the #ollowing *uestions3

    4 &o what extent were teachers able to develop B! modules that were connected to local business and industries

    aligned with "SS$ and incorporated appropriate uses o# technology5

    4 &o what extent were teachers able to implement and evaluate those modules5

    &he #irst *uestion will be #ocused on the #irst three ob+ectives in the summative evaluation and the second *uestion on the #ourth

    ob+ective% &he data sources that will be used #or the outcome evaluation will be the B! modules "SS$ Standards the rubric

    interviews and teacher surveys% &he results #rom the evaluation report will be used to help teachers continue to re#ine and develop

    their B! modules once the wor'shop is completed%

    Evaluation +uestions -'jective Indicator $ata !ource

  • 8/19/2019 Eval of Ed Needs Project

    4/5

    -1: To .at e/tent ere

    teac.ers a'le to develo* P4#

    modules t.at ere connected

    to local 'usinesses and

    industries5 aligned it.N!!65 and incor*orated

    a**ro*riate uses of

    tec.nolog(

    Create B! modules #or

    mathematics based onexamples #rom local businesses

    and industries%

    $odules model the s'ills that

    are re*uired by business andindustry pro#essionals%

    B! module

    6ubric

    -1: To .at e/tent ere

    teac.ers a'le to develo* P4#

    modules t.at ere connected

    to local 'usinesses and

    industries5 aligned it.

    N!!65 and incor*orateda**ro*riate uses of

    tec.nolog(

    Create B! modules which

    address "SS$%

    $odule and all associated tas's

    and assessments are alignedwith the "SS$ standards

    while incorporating the use o#

    technology%

    B! $odule

     "SS$ Standards6ubric

    -1: To .at e/tent ere

    teac.ers a'le to develo* P4#

    modules t.at ere connected

    to local 'usinesses and

    industries5 aligned it.

    N!!65 and incor*orated

    a**ro*riate uses of

    tec.nolog(

    ,ntegrate available instructionaltechnology into B!

    experiences%

    B! modules exhibit thee##ective use o# technology%

    B! module6ubric

    -2: To .at e/tent ere

    teac.ers a'le to im*lement

    and evaluate t.ose modules

    ,mplement and evaluate the

    learning modules created%7ocument implementation%

    Sel# evaluation o# the

    e##ectiveness o#

    implementation%

    ,nterviews

    &eacher survey

    $ata "ollection !ummar(

  • 8/19/2019 Eval of Ed Needs Project

    5/5

    &he time#rame #or enrichment o# the B! modules will be between 8uly 9:.; and 8anuary 9:./% Communication between the GSU

    #aculty and teacher participants will be electronic% 2nce modules have been #inalized teachers will implement them and conduct a

    sel#-evaluation o# the implementation% $id-implementation meeting in "ovember 9:.; and #inal meeting in 8anuary 9:./ will be

    conducted to examine progress and any changes necessary within the process%

    $ata !et $ate of "ollection Instruments alread(

    develo*ed

    $ata "ollected '(:

    &eacher Surveys 2ctober 9:..