ONGC is planning to undertake fast track project for
ONGC seeks Expression of Interest from the potential reputed bidders havingexperience and expertise of carrying out similar projects .
-Assam Asset has embarked on a strategy to increase oil production fromexisting fields by way of sidetracking of non-flowing/idle/sub-optimal flowing
wells. About 50 such wells which have potential to produce oil from Lakwa-Lakhmani, Rudrasagar and Geleki fields have been identified for sidetracking.In most of these wells, work over jobs have been attempted in the pastwithout any fruitful results and as such sidetrack of these wells in the samelayer towards better area away from the current position or to otherpromising layers have been planned. Among these 50 wells, about 10 wellsare to be sidetracked as horizontal wells and the remaining 40 wells are to besidetracked as high angle wells.
The details of Scope of Work for side tracking of 50 wells are available on
www.ongctenders.net.
The potential bidders need to submit the following documents by 28.3.05in the Office of I/c MM, Assam Asset, ONGC, Nazira, Assam 785685 (Tel.no. 03772-252372). However, no price details are to be submitted at thisstage :
(a) Company profile, organizational set up with details of professionaltechnical and financial capabilities for executing scope of work coveredin above EOI.
(b) List of similar projects executed by the agency in past, clearlyindicating the minimum details like Scope of work, Type of Wells,Cost, End User (Client), Schedule, Sub contracting / consortiumarrangements made by the agency.
(c) Detailed plan for executing entire scope of work.(d) Equipment list, technical specification and capability.(e) Work history for the last 24 months including experience in line.(f) Brief of Heath, Safety, Environment and Quality Assurance and Control
systems followed.(g) List of similar contracts executed with value and brief scope of work.(h) Company profile with details of professional technical and financial
capabilities of participating companies in case of consortium.
http://www.ongctenders.net/http://www.ongctenders.net/7/29/2019 Eoi for 50 Side Track05314143919
2/15
The presentations can also be sent in soft copy by e-mail [email protected].
The Professional/Technical experts meet shall be held from 10 AM onwardson 4.4.05 at Hotel Taj Bengal, Kolkotta. Detail schedule of the EOI meet is
also available on the website www.ongctenders.net. The participating partiesare requested to give a presentation in the above structured format.
http://www.ongctenders.net/http://www.ongctenders.net/7/29/2019 Eoi for 50 Side Track05314143919
3/15
A total of 50 wells are available for side tracking in Lakwa, Rudrasagar
and Geleki oil fields of ONGC, Assam Asset in Assam state of India.
Side tracking to be under taken in existing well which are both vertical
and deviated with S profile. Side tracking to be under taken in the
vertical section preferably below 9 5/8 shoe. Drilling is to be carried
out by Professional/technical experts by providing their own suitable
onshore rigs and equipments in one/two year time frame. Type and
number of rigs are to be indicated by the prospective bidders.
Professional/technical experts are required to provide all the services
required to side track these wells as a single point responsibility i.e.
trained manpower, equipment and all services including MWD &
SDMM, Mud, Cementing, Completion, Logging etc. In this regard,
prospective Professional/technical expert may note the following:
1. :
a) TVD : 2300 m 4000 m
b) HD : 100 m - 1000 m
c) Number of Side track wells
i. High angle section around 40 nos
ii. Horizontal section around 10 nos
d) Kick off
i. Either below 9 5/8 casing shoe
ii. Or in 9 5 /8 casing using whipstock
7/29/2019 Eoi for 50 Side Track05314143919
4/15
2. :
Drilling is to be carried out by Professional/technical experts by
providing their own complete onshore drilling rigs and equipments(Type and number of rigs are to be indicated by the prospective
bidders) along with capable and experienced Rig crew personnel for
supervision, operation and maintenance for effective side track drilling
and completion of desired high angle / horizontal drain holes in
accordance with best oil field practices.
3. :
Professional/technical expert has to plan and execute all the operations
and services from 5 casing retrieval, window cutting, side tracking
with 8 bit and 6 drain hole drilling in horizontal section, where
ever applicable, to well completion for successful side tracking as per
geological objective including pilot hole drilling in case of horizontal
wells, wherever required, to ascertain the current geological
information. He shall be responsible for arranging the required services
and ensure their timely availability.
4. :
Professional/technical expert has to plan and provide all allied
services required for side tracking the wells to the desired sub
surface target such as:
a) :
Professional/technical expert has to provide MWD and SDMM
equipment, whip stock setting ( where ever required ), window
milling and services as per well/geological requirement (including
operators/ engineers /directional drillers) along with drilling jars and
motor bits for drilling 8 to 6 hole.
7/29/2019 Eoi for 50 Side Track05314143919
5/15
b) :
Professional/technical expert has to plan and execute the mud
services with their own chemicals, manpower and laboratory testingequipment. He has to design the different mud systems required for
each phase of the well such as KOP to 70 degree angle phase
covering the key seat prone Girujan clay, the landing point to
drilling to 90 degrees drain hole section covering the hydrostatic to
depleted Tipam sands and the caving prone BCS coal shale section.
The pay zone section, both high angle and horizontal drain hole
needs to be drilled with formation friendly non-damaging drilling
fluid using bio degradable polymers etc., with no Barite and
Bentonite. The high angle wells in Lakwa and Rudrasagar fields are
to be drilled in a single section with 81/2 bit with suitable non
damaging formation friendly mud system. In the case of horizontal
well and high angle well of BMS pay sand of Geleki field and also in
case of high angle wells in Lakwa, Rudrasagar and Geleki fields
where kick off is not feasible below 1200 m or so, two casing policy
is to be adopted i.e. kick off to landing point in the case of
horizontal wells and kick of to zone top in case of High Angle wells.
Of the high angle wells, about 50% of wells are likely to have a
single casing policy i.e. 7 casing and remaining 50 % shall have 7
liner with 5 1/2X5 combination casing. The rigs are to be
equipped with solids control equipment such as linear motion shale
shakers, de-sander and linear motion mud cleaner. The proposed
mud programme is placed at table no 7
c) :
Professional/technical expert has to plan, provide slurry designs,
supervise and execute all primary and secondary cementation
operations ( and auxiliary operations) required for completion of
wells, with their own equipment, materials, chemicals, additives,special mechanical aids, pre job simulation etc.
7/29/2019 Eoi for 50 Side Track05314143919
6/15
Only Class G cement will be provided by ONGC
d)
Professional/technical expert has to plan and execute the logging
and peroration services with their own logging unit , tools,
manpower , equipment and materials. Storing facilities for Explosive
may be provided by ONGC if requested. Proposed logging
programme is placed at table 8
e)
Professional/technical expert has to plan and execute the wellcompletion services with their own manpower, equipment and
required material including handling tools. The entire completion
work would entail completion design, provision of down hole
equipment including production tubing (2 7/8), surface equipments
including choke manifold, separator and chikson and swivels , well
completion fluids, etc. Technical expertise for execution of job
including services like slick lines (manpower and material),
stimulation expertise and flow measurement services to be provided
by the bidder. Prepack sand screen will be required to complete
the wells prone to sand production specially in wells of Rudrasagar
field
In case of any complication, professional/technical expert has to
provide services for fishing with their own manpower, equipment
and material, if required. Professional/technical expert will also
provide any other services, manpower and equipment including
specialized tubular like HWDPs etc. required for successful
completion of the well.
7/29/2019 Eoi for 50 Side Track05314143919
7/15
a. High angle wells to be completed with 7 production casing
while the 6 horizontal drain holes are to be completed with
5 slotted liners.
b. Wells in Rudrasagar field would need sand control measures
(Prepack Sand screen).
c. General stratigraphy of Lakwa-Lakhmani, Rudrasagar and
Geleki fields are placed in Annexure (Table-1, Table-3 and
Table-5)
d. Clay Mineralogical Composition of Lakwa-Lakhmani,
Rudrasagar and Geleki are placed in Annexure (Table-2,
Table-4 and Table-6)
e. Typical well profile for both high angle / horizontal wells for
each field are annexed( Figs 1 to 6 )
f. Materials like 7 casing, well heads, X-Mas tree are to be
provided by bidders.
g. All sizes of Drill pipe ( including 2 3/8 for 5 liner) and drill
collar to be provided by the bidders.
h. All floating equipments to be provided by bidders.
6. :
The Professional/technical expert should be of international repute
having experience in directional drilling and completion high angle
and horizontal wells.
The professional/technical expert should also have the experience
in handling similar type of projects.
7/29/2019 Eoi for 50 Side Track05314143919
8/15
Table - 2
General Stratigraphy Pressure TemperatureCorrelation (Lakwa Lakhmani)
OIL
3150 MTS - 6 270 92 OIL
MAY BEGAS
2300 M TS - 2 230 76 OIL
2500 MTS - 3,4,5 240 82
1400 M UPPER
SANDSTONE 140 58.51600 M
GIRUJAN CLAY 200 66.5
1000 M NAMSANG
CLAY140 52.5
ALLUVIUM 38.5
LITHOLOGYPRESSURE
Kg/Cm2TEMP(C)
EXPT.
OIL/GAS
** Above may vary from well to well** Above may vary from well to well
General Stratigraphy Pressure TemperatureCorrelation (Lakwa Lakhmani)
OIL
3150 MTS - 6 270 92 OIL
MAY BEGAS
2300 M TS - 2 230 76 OIL
2500 MTS - 3,4,5 240 82
1400 M UPPER
SANDSTONE 140 58.51600 M
GIRUJAN CLAY 200 66.5
1000 M NAMSANG
CLAY140 52.5
ALLUVIUM 38.5
LITHOLOGYPRESSURE
Kg/Cm2TEMP(C)
EXPT.
OIL/GAS
** Above may vary from well to well** Above may vary from well to well
BMS
BCS
LCM + TS-4
TIPAM
GIRUJAN CLAY
UPPER SAND
STONE
NAMSANG
ALLUVIUM &
OLDER ALLUVIUM
BMS
BCS
LCM + TS-4
TIPAM
GIRUJAN CLAY
UPPER SAND
STONE
NAMSANG
ALLUVIUM &
OLDER ALLUVIUM
295295 80
75
64
53
52
48
38
80
75
64
53
52
48
38
OIL
May be
gas
-
-
-
-
-
OIL
May be
gas
-
-
-
-
-925925
13751375
LITHOLOGYLITHOLOGYPRESSURE
Kg/cm2
PRESSURE
Kg/cm2
TEMP
( 0C )
TEMP
( 0C )
19201920
EXP. OIL /
GAS
EXP. OIL /
GAS
General Stratigraphy Pressure Temperature
Correlation (Rudrasagar)
** Above may vary from well to well** Above may vary from well to well
19701970
23922392
27892789
29802980
Sl No Format ion pay
Sand
W ell Stud iedCo re No /Intervals
m ts
Clay mineral comp ostion in
o f abundance
1 T S-1 Lakwa#231 C C -1(2440 .23-24 .Montmori l loni te>Kaol in i te>Il l
wi th traces o f Ch lor ite
2 T S-2 Lakwa#231 C C -3(2526 .37-25 .Montmori l loni te>Kaol in i te>Il l
wi th traces o f Ch lor ite
3 T S-3 Lakwa#413 S W C(2582-2635)Montmori l loni te>Il l i te>Chlor i
wi th M ontm ori lloni te
4 T S-4 L ak wa #1 31 C C -1 (2 96 0.4 0-2 9 .Montmori l loni te>Kaol in i te>Il l
with Chlorite in traces
5 T S-5 Lakwa#162 S W C(3048 .36-30 .Kolinite>Il l i te
6 T S-6 Lakwa#413 S W C 3112 Illite>C hlo rite
7 B ara il La kw a# 40 0 C uttin gs (4 07 5-4 11 0)Kaol in i te>Chlor i te
8 K op ili La kw a# 40 0 C uttin gs (4 34 5-4 61 0)Il l i te>Chlorite>Kaolinite
Clay Mineralogical Composit ion in Wells of Lakwa-Lakhm ani Fie l
7/29/2019 Eoi for 50 Side Track05314143919
9/15
Table - 3
Table - 4
Table - 5
Sl No Format ion pay
Sand
W ell Stud iedC ore N o/Interv als i
m ts
Clay m ineral comp ost ion in o
of abundance
1 N azira S .S t PD A B SW C -2353Il l i te>Kaol ini te>Montmori l loni
with C hlori te
2 G iru jan PD AB SW C -2697 .5 M ontm orillon ite>K aolin ite>Illi
3 Lakwa S .S t PD A B SW C -2898Il l i te>Kaol ini te>Chlori te>Mon
llonite
4 B ara il R DS#80 C C-1(3335 -3360) K ao lon ite>Illite
5 K op ili D KH #3 C C-11(345 4-3456)K aolon ite>Illite
Clay Mineralogical Com position in W ells of Rudrasag ar Field
PRESSUREKg/cm2
ALLUVIUM 38.5
NAMSANG
CLAY140 52.5
UPPER
SANDSTONE140 58.5
GIRUJAN
CLAY200 66.5
TS-1 200-220 70 OIL
TS-2 140-160 70-75 OILTS-3 210-220 74 OIL
TS-4 160-180 75 OIL
TS-5 180-200 78 OIL
TS-6 270-300 79 OIL
BCS 250-300 80 OIL
BMS 240-260 85 OIL
540 m
1120 m
1620 m
2325 m
2340 m
2375 m2820 m
3350 m
3200 m
3500 m
3700 m
4000 m
LITHOLOGY TEMP (oC) EXPT.OIL/GAS
General Stratigraphy- Pressure Temperature
Correlation (Geleki)
PRESSUREKg/cm2
ALLUVIUM 38.5
NAMSANG
CLAY140 52.5
UPPER
SANDSTONE140 58.5
GIRUJAN
CLAY200 66.5
TS-1 200-220 70 OIL
TS-2 140-160 70-75 OILTS-3 210-220 74 OIL
TS-4 160-180 75 OIL
TS-5 180-200 78 OIL
TS-6 270-300 79 OIL
BCS 250-300 80 OIL
BMS 240-260 85 OIL
540 m
1120 m
1620 m
2325 m
2340 m
2375 m2820 m
3350 m
3200 m
3500 m
3700 m
4000 m
LITHOLOGY TEMP (oC)
ALLUVIUM 38.5
NAMSANG
CLAY140 52.5
UPPER
SANDSTONE140 58.5
GIRUJAN
CLAY200 66.5
TS-1 200-220 70 OIL
TS-2 140-160 70-75 OILTS-3 210-220 74 OIL
TS-4 160-180 75 OIL
TS-5 180-200 78 OIL
TS-6 270-300 79 OIL
BCS 250-300 80 OIL
BMS 240-260 85 OIL
540 m
1120 m
1620 m
2325 m
2340 m
2375 m2820 m
3350 m
3200 m
3500 m
3700 m
4000 m
LITHOLOGY TEMP (oC) EXPT.OIL/GAS
General Stratigraphy- Pressure Temperature
Correlation (Geleki)
7/29/2019 Eoi for 50 Side Track05314143919
10/15
Table - 6
Table - 7
Proposed Mud System
S.No
Holesize
Interval Type of Mudsystem
Remarks
1 8 Kick off point toPay zone top /TD
KCL PHPA XC CP Glycol or anyother suitableformation friendlynon damagingmud system
Specialized mud
2 6 Pay zone top toTarget depth
Clay Free NonDamaging drillingfluid (NDDF )
Specialized mud
Table - 8
Proposed Logging Program
S.No Holedia
Section Log type
1. 8 hole Landing hole
7 liner
- TLC logs
-Angle-Azimuth
Sl No Formation pay
Sand
Well Studied Core No/Intervals in
mts
Clay mineral compostion in order
of abundance
1 TS-1 Geleki#16 I(2450.3-2456.3) Montmorillonite>Illite>Kaolinite
2 TS-2 Geleki# 247 1(2635-2644) Montmorillonite>Illite>Kaolinite
3 TS-3 Geleki# 76 1(2543.49-2552.54) Montmorillonite>Kaolinite>Illite
4 TS-4 Geleki# 47 1(2816.16-2821.16) Kaolinite>Montmorillonite>Illite
5 TS-5A Geleki# 154 1(2821-2830) Montmorillonite>Kaolinite>Illite
6 TS-5B Geleki# 44 1(2876-2889) Montmorillonite>Kaolinite>Illite
7 TS-6 Geleki# 62 1(2921.43-2936.43) Montmorillonite>Kaolinite>Illite
8 Barail Geleki# 201 1(3754-3768) Kaolinite>Illite>Chlorite
9 Kopili Geleki# 174 1(4299.5-4308.5) Kaolinite>Illite>Chlorite
Clay Mineralogical Composition in Wells of Geleki Field
7/29/2019 Eoi for 50 Side Track05314143919
11/15
-Gamma Ray-Resitivity-Neutron-Density Caliper-CBL - VDL
2 6hole Drain hole - TLC logs-Angle-Azimuth-Gamma Ray-Resitivity-Neutron-Density Caliper
3 Perforation Perforation by TCP
Figure-1
1 9 0 0
2 0 0 0
2 1 0 0
2 2 0 0
2 3 0 0
2 4 0 0
0 1 0 0 2 0 0 3 0 0 4 0 0 5 0 0 6 0 0
T V
TVD
PROFILE AND LIKELY CASING POLICY OF A TYPICAL
HORIZONTAL WELL TO BE SIDE TRACKED IN LAKWA FIELD
2708-5 " Slotted liner
-19135 1/2" cement raise
-2562.165 1/2" Casing shoe
2508-7" Shoe
704.48704.489 5/8" Shoe
80-Azimuth
90-Max Inclination
316.4-Hor. Drift
5.35-DLS
2004-KOP
DVType of well
NEWOLDWELL DETAILS
G
I
R
U
J
A
NC
L
A
Y
TS-2
7CSGSH
OE
DLS 5.35/30M
Figure-2
7/29/2019 Eoi for 50 Side Track05314143919
12/15
2700
2800
2900
3000
3100
3200
3300
0 100 200 300 400 500HD
TVD
PROFILE AND LIKELY CASING POLICY OF A TYPICAL HIGH
ANGLE WELL TO BE SIDE TRACKED IN LAKWA FIELD
7 CSG SHOE
DLS 4.25/30M
TS-4,5
TS-6
-26105 1/2" cement raise
-33675 1/2" Casing shoe
3200-7" Shoe
1001.071001.079 5/8" Shoe
200-Azimuth
75-Max Inclination
401-Hor. Drift
4.25-DLS
2782-KOP
DVType of well
NEWOLDWELL DETAILS
Figure-3
TS-4
TS-5
&
TS-6
BCS
BMS
R-3 OPTION-2
2400
2500
2600
2700
2800
2900
3000
3100
3410 M-
6" SECTION (PRE
PACKED SAND
SCREEN
-2215 M5 3/4" CEMENT RAISE
-3206 M5 3/4" SHOE
3310 M-7" Shoe
796.9 M796.9
M9 5/8" Shoe
271-Azimuth
90-Max Inclination
580 M-Hor. Drift
3/30 M-DLS
2402.1M-KOP
DVType of well
NEWOLDWELL DETAILS
PROFILE AND LIKELY CASING POLICY OF A TYPICAL
HORIZONTAL WELL TO BE SIDE TRACKED IN RDS FIELD
DLS 3/30M
7 CSG SHOE
TVS0 100 200 300 400 500 600 700 800
Figure-4
7/29/2019 Eoi for 50 Side Track05314143919
13/15
2600
2700
2800
2900
3000
3100
0 100 200 300 400TVS
TVD
PROFILE AND LIKELY CASING POLICY OF A TYPICAL HIGH
ANGLE WELL TO BE SIDE TRACKED IN RDS FIELD
3146.1 M-7" Shoe
-25005 3/4" Cement Rise
-32335 3/4" Shoe
700.3 M7039 5/8" Shoe
279Azimuth
70Max Inclination
303 MHor. Drift
4.58/30 MDLS
2627.6 MKOP
DVType of well
NEWOLDWELL DETAILS
BCS
TS-5
&
TS-6
BMS
7 CSG SHOE
DLS 4.58/30M
Figure-5
TS-2
TS-3&
TS-4
GIRU
JAN
TS-5
7 CSG SHOE
2300
2400
2500
2600
2700
2800
0 1 00 2 00 300 400 500 6 00 7 00 800
T V S
TVD
-2650 M5 1/2" CEMENT
RAISE
-3085.5
8 M5 1/2" SHOE
2918.7
M-7" Shoe
1230.5
M
1230.5
M9 5/8" Shoe
210-Azimuth
70-Max Inclination
641 M-Hor. Drift
4.58/3
0 M-DLS
2402.6
M-KOP
DVType of well
NEWOLDWELL DETAILS
7 Shoe
DLS
4.58/30 m
PROFILE AND LIKELY CASING POLICY OF A TYPICAL HIGH
ANGLE WELL TO BE SIDE TRACKED IN GELEKI FIELD
7/29/2019 Eoi for 50 Side Track05314143919
14/15
Figure-6
PROFILE AND LIKELY CASING POLICY OF A TYPICAL HIGH
ANGLE WELL TO BE SIDE TRACKED GELEKI FIELD
BCS
TS-6
BMS
7 CSG SHOE
DLS 4.58/30M
3500
3550
3600
3650
3700
3750
3800
3850
0 100 200 300 400 500 600 700 800TVS
TV
-3650
M
5 1/2" CEMENT
RAISE
3951 M4190
M5 1/2" SHOE
3860 M-7" Shoe
3506 M3506
M9 5/8" Shoe
275.05-Azimuth
70-Max Inclination
502.3 M-Hor. Drift
6.24/30
M-DLS
3526 M-KOP
DVType of well
NEWOLDWELL DETAILS
7 Shoe
DLS
6.24/30 m
5 csg SHOE
7/29/2019 Eoi for 50 Side Track05314143919
15/15
SCHEDULE OF EOI
Venue: Hotel Taj Bengal, Kolkata
Date:
Time Event
10.00 to 11.00 Hours Registration11.00 to 11.30 Hours Presentations by ONGC
11.45 to 14.30 Hours Presentations by prospective bidders and
discussion on sidetrack of 50 wells on
Integrated Well completion Basis in
Assam Asset.
14.00 to 14.30 Hours Working Lunch
14.30 to 17.00 Hours Presentations and discussion on sidetrack
of 50 wells on Integrated Well
completion Basis in Assam Asset.