Eoi for 50 Side Track05314143919

Embed Size (px)

Citation preview

  • 7/29/2019 Eoi for 50 Side Track05314143919

    1/15

    ONGC is planning to undertake fast track project for

    ONGC seeks Expression of Interest from the potential reputed bidders havingexperience and expertise of carrying out similar projects .

    -Assam Asset has embarked on a strategy to increase oil production fromexisting fields by way of sidetracking of non-flowing/idle/sub-optimal flowing

    wells. About 50 such wells which have potential to produce oil from Lakwa-Lakhmani, Rudrasagar and Geleki fields have been identified for sidetracking.In most of these wells, work over jobs have been attempted in the pastwithout any fruitful results and as such sidetrack of these wells in the samelayer towards better area away from the current position or to otherpromising layers have been planned. Among these 50 wells, about 10 wellsare to be sidetracked as horizontal wells and the remaining 40 wells are to besidetracked as high angle wells.

    The details of Scope of Work for side tracking of 50 wells are available on

    www.ongctenders.net.

    The potential bidders need to submit the following documents by 28.3.05in the Office of I/c MM, Assam Asset, ONGC, Nazira, Assam 785685 (Tel.no. 03772-252372). However, no price details are to be submitted at thisstage :

    (a) Company profile, organizational set up with details of professionaltechnical and financial capabilities for executing scope of work coveredin above EOI.

    (b) List of similar projects executed by the agency in past, clearlyindicating the minimum details like Scope of work, Type of Wells,Cost, End User (Client), Schedule, Sub contracting / consortiumarrangements made by the agency.

    (c) Detailed plan for executing entire scope of work.(d) Equipment list, technical specification and capability.(e) Work history for the last 24 months including experience in line.(f) Brief of Heath, Safety, Environment and Quality Assurance and Control

    systems followed.(g) List of similar contracts executed with value and brief scope of work.(h) Company profile with details of professional technical and financial

    capabilities of participating companies in case of consortium.

    http://www.ongctenders.net/http://www.ongctenders.net/
  • 7/29/2019 Eoi for 50 Side Track05314143919

    2/15

    The presentations can also be sent in soft copy by e-mail [email protected].

    The Professional/Technical experts meet shall be held from 10 AM onwardson 4.4.05 at Hotel Taj Bengal, Kolkotta. Detail schedule of the EOI meet is

    also available on the website www.ongctenders.net. The participating partiesare requested to give a presentation in the above structured format.

    http://www.ongctenders.net/http://www.ongctenders.net/
  • 7/29/2019 Eoi for 50 Side Track05314143919

    3/15

    A total of 50 wells are available for side tracking in Lakwa, Rudrasagar

    and Geleki oil fields of ONGC, Assam Asset in Assam state of India.

    Side tracking to be under taken in existing well which are both vertical

    and deviated with S profile. Side tracking to be under taken in the

    vertical section preferably below 9 5/8 shoe. Drilling is to be carried

    out by Professional/technical experts by providing their own suitable

    onshore rigs and equipments in one/two year time frame. Type and

    number of rigs are to be indicated by the prospective bidders.

    Professional/technical experts are required to provide all the services

    required to side track these wells as a single point responsibility i.e.

    trained manpower, equipment and all services including MWD &

    SDMM, Mud, Cementing, Completion, Logging etc. In this regard,

    prospective Professional/technical expert may note the following:

    1. :

    a) TVD : 2300 m 4000 m

    b) HD : 100 m - 1000 m

    c) Number of Side track wells

    i. High angle section around 40 nos

    ii. Horizontal section around 10 nos

    d) Kick off

    i. Either below 9 5/8 casing shoe

    ii. Or in 9 5 /8 casing using whipstock

  • 7/29/2019 Eoi for 50 Side Track05314143919

    4/15

    2. :

    Drilling is to be carried out by Professional/technical experts by

    providing their own complete onshore drilling rigs and equipments(Type and number of rigs are to be indicated by the prospective

    bidders) along with capable and experienced Rig crew personnel for

    supervision, operation and maintenance for effective side track drilling

    and completion of desired high angle / horizontal drain holes in

    accordance with best oil field practices.

    3. :

    Professional/technical expert has to plan and execute all the operations

    and services from 5 casing retrieval, window cutting, side tracking

    with 8 bit and 6 drain hole drilling in horizontal section, where

    ever applicable, to well completion for successful side tracking as per

    geological objective including pilot hole drilling in case of horizontal

    wells, wherever required, to ascertain the current geological

    information. He shall be responsible for arranging the required services

    and ensure their timely availability.

    4. :

    Professional/technical expert has to plan and provide all allied

    services required for side tracking the wells to the desired sub

    surface target such as:

    a) :

    Professional/technical expert has to provide MWD and SDMM

    equipment, whip stock setting ( where ever required ), window

    milling and services as per well/geological requirement (including

    operators/ engineers /directional drillers) along with drilling jars and

    motor bits for drilling 8 to 6 hole.

  • 7/29/2019 Eoi for 50 Side Track05314143919

    5/15

    b) :

    Professional/technical expert has to plan and execute the mud

    services with their own chemicals, manpower and laboratory testingequipment. He has to design the different mud systems required for

    each phase of the well such as KOP to 70 degree angle phase

    covering the key seat prone Girujan clay, the landing point to

    drilling to 90 degrees drain hole section covering the hydrostatic to

    depleted Tipam sands and the caving prone BCS coal shale section.

    The pay zone section, both high angle and horizontal drain hole

    needs to be drilled with formation friendly non-damaging drilling

    fluid using bio degradable polymers etc., with no Barite and

    Bentonite. The high angle wells in Lakwa and Rudrasagar fields are

    to be drilled in a single section with 81/2 bit with suitable non

    damaging formation friendly mud system. In the case of horizontal

    well and high angle well of BMS pay sand of Geleki field and also in

    case of high angle wells in Lakwa, Rudrasagar and Geleki fields

    where kick off is not feasible below 1200 m or so, two casing policy

    is to be adopted i.e. kick off to landing point in the case of

    horizontal wells and kick of to zone top in case of High Angle wells.

    Of the high angle wells, about 50% of wells are likely to have a

    single casing policy i.e. 7 casing and remaining 50 % shall have 7

    liner with 5 1/2X5 combination casing. The rigs are to be

    equipped with solids control equipment such as linear motion shale

    shakers, de-sander and linear motion mud cleaner. The proposed

    mud programme is placed at table no 7

    c) :

    Professional/technical expert has to plan, provide slurry designs,

    supervise and execute all primary and secondary cementation

    operations ( and auxiliary operations) required for completion of

    wells, with their own equipment, materials, chemicals, additives,special mechanical aids, pre job simulation etc.

  • 7/29/2019 Eoi for 50 Side Track05314143919

    6/15

    Only Class G cement will be provided by ONGC

    d)

    Professional/technical expert has to plan and execute the logging

    and peroration services with their own logging unit , tools,

    manpower , equipment and materials. Storing facilities for Explosive

    may be provided by ONGC if requested. Proposed logging

    programme is placed at table 8

    e)

    Professional/technical expert has to plan and execute the wellcompletion services with their own manpower, equipment and

    required material including handling tools. The entire completion

    work would entail completion design, provision of down hole

    equipment including production tubing (2 7/8), surface equipments

    including choke manifold, separator and chikson and swivels , well

    completion fluids, etc. Technical expertise for execution of job

    including services like slick lines (manpower and material),

    stimulation expertise and flow measurement services to be provided

    by the bidder. Prepack sand screen will be required to complete

    the wells prone to sand production specially in wells of Rudrasagar

    field

    In case of any complication, professional/technical expert has to

    provide services for fishing with their own manpower, equipment

    and material, if required. Professional/technical expert will also

    provide any other services, manpower and equipment including

    specialized tubular like HWDPs etc. required for successful

    completion of the well.

  • 7/29/2019 Eoi for 50 Side Track05314143919

    7/15

    a. High angle wells to be completed with 7 production casing

    while the 6 horizontal drain holes are to be completed with

    5 slotted liners.

    b. Wells in Rudrasagar field would need sand control measures

    (Prepack Sand screen).

    c. General stratigraphy of Lakwa-Lakhmani, Rudrasagar and

    Geleki fields are placed in Annexure (Table-1, Table-3 and

    Table-5)

    d. Clay Mineralogical Composition of Lakwa-Lakhmani,

    Rudrasagar and Geleki are placed in Annexure (Table-2,

    Table-4 and Table-6)

    e. Typical well profile for both high angle / horizontal wells for

    each field are annexed( Figs 1 to 6 )

    f. Materials like 7 casing, well heads, X-Mas tree are to be

    provided by bidders.

    g. All sizes of Drill pipe ( including 2 3/8 for 5 liner) and drill

    collar to be provided by the bidders.

    h. All floating equipments to be provided by bidders.

    6. :

    The Professional/technical expert should be of international repute

    having experience in directional drilling and completion high angle

    and horizontal wells.

    The professional/technical expert should also have the experience

    in handling similar type of projects.

  • 7/29/2019 Eoi for 50 Side Track05314143919

    8/15

    Table - 2

    General Stratigraphy Pressure TemperatureCorrelation (Lakwa Lakhmani)

    OIL

    3150 MTS - 6 270 92 OIL

    MAY BEGAS

    2300 M TS - 2 230 76 OIL

    2500 MTS - 3,4,5 240 82

    1400 M UPPER

    SANDSTONE 140 58.51600 M

    GIRUJAN CLAY 200 66.5

    1000 M NAMSANG

    CLAY140 52.5

    ALLUVIUM 38.5

    LITHOLOGYPRESSURE

    Kg/Cm2TEMP(C)

    EXPT.

    OIL/GAS

    ** Above may vary from well to well** Above may vary from well to well

    General Stratigraphy Pressure TemperatureCorrelation (Lakwa Lakhmani)

    OIL

    3150 MTS - 6 270 92 OIL

    MAY BEGAS

    2300 M TS - 2 230 76 OIL

    2500 MTS - 3,4,5 240 82

    1400 M UPPER

    SANDSTONE 140 58.51600 M

    GIRUJAN CLAY 200 66.5

    1000 M NAMSANG

    CLAY140 52.5

    ALLUVIUM 38.5

    LITHOLOGYPRESSURE

    Kg/Cm2TEMP(C)

    EXPT.

    OIL/GAS

    ** Above may vary from well to well** Above may vary from well to well

    BMS

    BCS

    LCM + TS-4

    TIPAM

    GIRUJAN CLAY

    UPPER SAND

    STONE

    NAMSANG

    ALLUVIUM &

    OLDER ALLUVIUM

    BMS

    BCS

    LCM + TS-4

    TIPAM

    GIRUJAN CLAY

    UPPER SAND

    STONE

    NAMSANG

    ALLUVIUM &

    OLDER ALLUVIUM

    295295 80

    75

    64

    53

    52

    48

    38

    80

    75

    64

    53

    52

    48

    38

    OIL

    May be

    gas

    -

    -

    -

    -

    -

    OIL

    May be

    gas

    -

    -

    -

    -

    -925925

    13751375

    LITHOLOGYLITHOLOGYPRESSURE

    Kg/cm2

    PRESSURE

    Kg/cm2

    TEMP

    ( 0C )

    TEMP

    ( 0C )

    19201920

    EXP. OIL /

    GAS

    EXP. OIL /

    GAS

    General Stratigraphy Pressure Temperature

    Correlation (Rudrasagar)

    ** Above may vary from well to well** Above may vary from well to well

    19701970

    23922392

    27892789

    29802980

    Sl No Format ion pay

    Sand

    W ell Stud iedCo re No /Intervals

    m ts

    Clay mineral comp ostion in

    o f abundance

    1 T S-1 Lakwa#231 C C -1(2440 .23-24 .Montmori l loni te>Kaol in i te>Il l

    wi th traces o f Ch lor ite

    2 T S-2 Lakwa#231 C C -3(2526 .37-25 .Montmori l loni te>Kaol in i te>Il l

    wi th traces o f Ch lor ite

    3 T S-3 Lakwa#413 S W C(2582-2635)Montmori l loni te>Il l i te>Chlor i

    wi th M ontm ori lloni te

    4 T S-4 L ak wa #1 31 C C -1 (2 96 0.4 0-2 9 .Montmori l loni te>Kaol in i te>Il l

    with Chlorite in traces

    5 T S-5 Lakwa#162 S W C(3048 .36-30 .Kolinite>Il l i te

    6 T S-6 Lakwa#413 S W C 3112 Illite>C hlo rite

    7 B ara il La kw a# 40 0 C uttin gs (4 07 5-4 11 0)Kaol in i te>Chlor i te

    8 K op ili La kw a# 40 0 C uttin gs (4 34 5-4 61 0)Il l i te>Chlorite>Kaolinite

    Clay Mineralogical Composit ion in Wells of Lakwa-Lakhm ani Fie l

  • 7/29/2019 Eoi for 50 Side Track05314143919

    9/15

    Table - 3

    Table - 4

    Table - 5

    Sl No Format ion pay

    Sand

    W ell Stud iedC ore N o/Interv als i

    m ts

    Clay m ineral comp ost ion in o

    of abundance

    1 N azira S .S t PD A B SW C -2353Il l i te>Kaol ini te>Montmori l loni

    with C hlori te

    2 G iru jan PD AB SW C -2697 .5 M ontm orillon ite>K aolin ite>Illi

    3 Lakwa S .S t PD A B SW C -2898Il l i te>Kaol ini te>Chlori te>Mon

    llonite

    4 B ara il R DS#80 C C-1(3335 -3360) K ao lon ite>Illite

    5 K op ili D KH #3 C C-11(345 4-3456)K aolon ite>Illite

    Clay Mineralogical Com position in W ells of Rudrasag ar Field

    PRESSUREKg/cm2

    ALLUVIUM 38.5

    NAMSANG

    CLAY140 52.5

    UPPER

    SANDSTONE140 58.5

    GIRUJAN

    CLAY200 66.5

    TS-1 200-220 70 OIL

    TS-2 140-160 70-75 OILTS-3 210-220 74 OIL

    TS-4 160-180 75 OIL

    TS-5 180-200 78 OIL

    TS-6 270-300 79 OIL

    BCS 250-300 80 OIL

    BMS 240-260 85 OIL

    540 m

    1120 m

    1620 m

    2325 m

    2340 m

    2375 m2820 m

    3350 m

    3200 m

    3500 m

    3700 m

    4000 m

    LITHOLOGY TEMP (oC) EXPT.OIL/GAS

    General Stratigraphy- Pressure Temperature

    Correlation (Geleki)

    PRESSUREKg/cm2

    ALLUVIUM 38.5

    NAMSANG

    CLAY140 52.5

    UPPER

    SANDSTONE140 58.5

    GIRUJAN

    CLAY200 66.5

    TS-1 200-220 70 OIL

    TS-2 140-160 70-75 OILTS-3 210-220 74 OIL

    TS-4 160-180 75 OIL

    TS-5 180-200 78 OIL

    TS-6 270-300 79 OIL

    BCS 250-300 80 OIL

    BMS 240-260 85 OIL

    540 m

    1120 m

    1620 m

    2325 m

    2340 m

    2375 m2820 m

    3350 m

    3200 m

    3500 m

    3700 m

    4000 m

    LITHOLOGY TEMP (oC)

    ALLUVIUM 38.5

    NAMSANG

    CLAY140 52.5

    UPPER

    SANDSTONE140 58.5

    GIRUJAN

    CLAY200 66.5

    TS-1 200-220 70 OIL

    TS-2 140-160 70-75 OILTS-3 210-220 74 OIL

    TS-4 160-180 75 OIL

    TS-5 180-200 78 OIL

    TS-6 270-300 79 OIL

    BCS 250-300 80 OIL

    BMS 240-260 85 OIL

    540 m

    1120 m

    1620 m

    2325 m

    2340 m

    2375 m2820 m

    3350 m

    3200 m

    3500 m

    3700 m

    4000 m

    LITHOLOGY TEMP (oC) EXPT.OIL/GAS

    General Stratigraphy- Pressure Temperature

    Correlation (Geleki)

  • 7/29/2019 Eoi for 50 Side Track05314143919

    10/15

    Table - 6

    Table - 7

    Proposed Mud System

    S.No

    Holesize

    Interval Type of Mudsystem

    Remarks

    1 8 Kick off point toPay zone top /TD

    KCL PHPA XC CP Glycol or anyother suitableformation friendlynon damagingmud system

    Specialized mud

    2 6 Pay zone top toTarget depth

    Clay Free NonDamaging drillingfluid (NDDF )

    Specialized mud

    Table - 8

    Proposed Logging Program

    S.No Holedia

    Section Log type

    1. 8 hole Landing hole

    7 liner

    - TLC logs

    -Angle-Azimuth

    Sl No Formation pay

    Sand

    Well Studied Core No/Intervals in

    mts

    Clay mineral compostion in order

    of abundance

    1 TS-1 Geleki#16 I(2450.3-2456.3) Montmorillonite>Illite>Kaolinite

    2 TS-2 Geleki# 247 1(2635-2644) Montmorillonite>Illite>Kaolinite

    3 TS-3 Geleki# 76 1(2543.49-2552.54) Montmorillonite>Kaolinite>Illite

    4 TS-4 Geleki# 47 1(2816.16-2821.16) Kaolinite>Montmorillonite>Illite

    5 TS-5A Geleki# 154 1(2821-2830) Montmorillonite>Kaolinite>Illite

    6 TS-5B Geleki# 44 1(2876-2889) Montmorillonite>Kaolinite>Illite

    7 TS-6 Geleki# 62 1(2921.43-2936.43) Montmorillonite>Kaolinite>Illite

    8 Barail Geleki# 201 1(3754-3768) Kaolinite>Illite>Chlorite

    9 Kopili Geleki# 174 1(4299.5-4308.5) Kaolinite>Illite>Chlorite

    Clay Mineralogical Composition in Wells of Geleki Field

  • 7/29/2019 Eoi for 50 Side Track05314143919

    11/15

    -Gamma Ray-Resitivity-Neutron-Density Caliper-CBL - VDL

    2 6hole Drain hole - TLC logs-Angle-Azimuth-Gamma Ray-Resitivity-Neutron-Density Caliper

    3 Perforation Perforation by TCP

    Figure-1

    1 9 0 0

    2 0 0 0

    2 1 0 0

    2 2 0 0

    2 3 0 0

    2 4 0 0

    0 1 0 0 2 0 0 3 0 0 4 0 0 5 0 0 6 0 0

    T V

    TVD

    PROFILE AND LIKELY CASING POLICY OF A TYPICAL

    HORIZONTAL WELL TO BE SIDE TRACKED IN LAKWA FIELD

    2708-5 " Slotted liner

    -19135 1/2" cement raise

    -2562.165 1/2" Casing shoe

    2508-7" Shoe

    704.48704.489 5/8" Shoe

    80-Azimuth

    90-Max Inclination

    316.4-Hor. Drift

    5.35-DLS

    2004-KOP

    DVType of well

    NEWOLDWELL DETAILS

    G

    I

    R

    U

    J

    A

    NC

    L

    A

    Y

    TS-2

    7CSGSH

    OE

    DLS 5.35/30M

    Figure-2

  • 7/29/2019 Eoi for 50 Side Track05314143919

    12/15

    2700

    2800

    2900

    3000

    3100

    3200

    3300

    0 100 200 300 400 500HD

    TVD

    PROFILE AND LIKELY CASING POLICY OF A TYPICAL HIGH

    ANGLE WELL TO BE SIDE TRACKED IN LAKWA FIELD

    7 CSG SHOE

    DLS 4.25/30M

    TS-4,5

    TS-6

    -26105 1/2" cement raise

    -33675 1/2" Casing shoe

    3200-7" Shoe

    1001.071001.079 5/8" Shoe

    200-Azimuth

    75-Max Inclination

    401-Hor. Drift

    4.25-DLS

    2782-KOP

    DVType of well

    NEWOLDWELL DETAILS

    Figure-3

    TS-4

    TS-5

    &

    TS-6

    BCS

    BMS

    R-3 OPTION-2

    2400

    2500

    2600

    2700

    2800

    2900

    3000

    3100

    3410 M-

    6" SECTION (PRE

    PACKED SAND

    SCREEN

    -2215 M5 3/4" CEMENT RAISE

    -3206 M5 3/4" SHOE

    3310 M-7" Shoe

    796.9 M796.9

    M9 5/8" Shoe

    271-Azimuth

    90-Max Inclination

    580 M-Hor. Drift

    3/30 M-DLS

    2402.1M-KOP

    DVType of well

    NEWOLDWELL DETAILS

    PROFILE AND LIKELY CASING POLICY OF A TYPICAL

    HORIZONTAL WELL TO BE SIDE TRACKED IN RDS FIELD

    DLS 3/30M

    7 CSG SHOE

    TVS0 100 200 300 400 500 600 700 800

    Figure-4

  • 7/29/2019 Eoi for 50 Side Track05314143919

    13/15

    2600

    2700

    2800

    2900

    3000

    3100

    0 100 200 300 400TVS

    TVD

    PROFILE AND LIKELY CASING POLICY OF A TYPICAL HIGH

    ANGLE WELL TO BE SIDE TRACKED IN RDS FIELD

    3146.1 M-7" Shoe

    -25005 3/4" Cement Rise

    -32335 3/4" Shoe

    700.3 M7039 5/8" Shoe

    279Azimuth

    70Max Inclination

    303 MHor. Drift

    4.58/30 MDLS

    2627.6 MKOP

    DVType of well

    NEWOLDWELL DETAILS

    BCS

    TS-5

    &

    TS-6

    BMS

    7 CSG SHOE

    DLS 4.58/30M

    Figure-5

    TS-2

    TS-3&

    TS-4

    GIRU

    JAN

    TS-5

    7 CSG SHOE

    2300

    2400

    2500

    2600

    2700

    2800

    0 1 00 2 00 300 400 500 6 00 7 00 800

    T V S

    TVD

    -2650 M5 1/2" CEMENT

    RAISE

    -3085.5

    8 M5 1/2" SHOE

    2918.7

    M-7" Shoe

    1230.5

    M

    1230.5

    M9 5/8" Shoe

    210-Azimuth

    70-Max Inclination

    641 M-Hor. Drift

    4.58/3

    0 M-DLS

    2402.6

    M-KOP

    DVType of well

    NEWOLDWELL DETAILS

    7 Shoe

    DLS

    4.58/30 m

    PROFILE AND LIKELY CASING POLICY OF A TYPICAL HIGH

    ANGLE WELL TO BE SIDE TRACKED IN GELEKI FIELD

  • 7/29/2019 Eoi for 50 Side Track05314143919

    14/15

    Figure-6

    PROFILE AND LIKELY CASING POLICY OF A TYPICAL HIGH

    ANGLE WELL TO BE SIDE TRACKED GELEKI FIELD

    BCS

    TS-6

    BMS

    7 CSG SHOE

    DLS 4.58/30M

    3500

    3550

    3600

    3650

    3700

    3750

    3800

    3850

    0 100 200 300 400 500 600 700 800TVS

    TV

    -3650

    M

    5 1/2" CEMENT

    RAISE

    3951 M4190

    M5 1/2" SHOE

    3860 M-7" Shoe

    3506 M3506

    M9 5/8" Shoe

    275.05-Azimuth

    70-Max Inclination

    502.3 M-Hor. Drift

    6.24/30

    M-DLS

    3526 M-KOP

    DVType of well

    NEWOLDWELL DETAILS

    7 Shoe

    DLS

    6.24/30 m

    5 csg SHOE

  • 7/29/2019 Eoi for 50 Side Track05314143919

    15/15

    SCHEDULE OF EOI

    Venue: Hotel Taj Bengal, Kolkata

    Date:

    Time Event

    10.00 to 11.00 Hours Registration11.00 to 11.30 Hours Presentations by ONGC

    11.45 to 14.30 Hours Presentations by prospective bidders and

    discussion on sidetrack of 50 wells on

    Integrated Well completion Basis in

    Assam Asset.

    14.00 to 14.30 Hours Working Lunch

    14.30 to 17.00 Hours Presentations and discussion on sidetrack

    of 50 wells on Integrated Well

    completion Basis in Assam Asset.