    EN Area Plans

    /Other City

    Projects &

    Plans

    ENTRIPS

    Existing

    Conditions

    Analysis

    Modeling

    Scenarios

    Existing

    System

    Deficiencies

    Universeof

    Potential

    Projects

    Model

    Traffic (No

    Project)

    Circulation

    Alternatives

    Model

    Traffic

    (Project)

    Develop/

    Refine

    Corridor

    Project

    Concepts

    EVALUATION

    FRAMEWORK

    TRACK1 NetworkCirculationProjects

    MAJOR

    NETWORK

    PROJECT

    PACKAGES

    Future

    Conditions

    Modal

    Analysis

    Future

    System

    Deficiencies

    / Universe of

    PotentialProjects

    Included in

    another

    plan?

    TRACK2 NeighborhoodScaleProjects

    NEIGHBORHOOD

    SCALE

    PROJECT

    PACKAGES

    TRACK3 AreawidePolicy

    Goods Movement Policy

    Shuttle Policy

    Parking Policy

    TDM Policy

    EN TRIPS

    Potential

    Projects

    List

    Conceptual

    Design

    Environmental

    Review

    Prioritized List

    of Future

    Investments

    (Capital and

    Programming)

    Fast Track

    Improvements/

    Pilots

    BSP

    Street

    Typology

    Street

    Design

    Guidance

    City Policy,

    FuturePlanning

    Studies

    DRAFT Project Development Work Flow

  • 8/9/2019 ENTRIPS Evaluation Framework Presentation

    3/13

    3

    Preliminary Evaluation Framework Mix of qualitative & quantitative criteria

    Key Goals-identifies the issue

    Evaluation Criteria-identifies the objective:

    Three Integrated Sets of Priority Settings:

    1. Systemwide Network (operational, modalcapacity/priority, right of way reconfiguration,directional changes)

    2. Neighborhood/specific (cross-walks, parking,

    loading, specific traffic calming)3. Policies to aid street design/land-use

    (shuttles, parking, loading & travel demand

    management)

  • 8/9/2019 ENTRIPS Evaluation Framework Presentation

    4/13

    4

    Model

    Traffic (No

    Project)

    Circulation

    Alternatives

    Model

    Traffic

    (Project)

    Develop/Refine

    Corridor

    Project

    Concepts

    EVALUATION

    FRAMEWORK

    TRACK1 NetworkCirculationProjects

    MAJOR

    NETWORK

    PROJECT

    BUNDLES

    Future

    Conditions

    Modal

    Analysis

    Future

    System

    Deficiencies

    / Universe of

    PotentialProjects

    Included in

    another

    plan?

    TRACK2 NeighborhoodScaleProjects

    NEIGHBORHOOD

    SCALE

    PROJECT

    PACKAGES

    TRACK3 AreawidePolicy

    Goods Movement Policy

    Shuttle Policy

    Parking Policy

    TDM Policy

    EN TRIPS

    Potential

    Projects

    List

    Conceptual

    Design

    Environmental

    Review

    Prioritized List

    of Future

    Investments

    (Capital and

    Programming)

    Fast Track

    Improvements/

    Pilots

    BSP

    Street

    Typology

    Street

    Design

    Guidance

    City Policy,

    FuturePlanning

    Studies

    DRAFT Project Development Work Flow

    EN Area Plans

    /Other City

    Projects &

    Plans

    ENTRIPS

    Existing

    Conditions

    Analysis

    Modeling

    Scenarios

    Existing

    System

    Deficiencies

    Universeof

    Potential

    Projects

  • 8/9/2019 ENTRIPS Evaluation Framework Presentation

    5/13

    5

    Model

    Traffic (No

    Project)

    Circulation

    Alternatives

    Model

    Traffic

    (Project)

    Develop/Refine

    Corridor

    Project

    Concepts

    EVALUATION

    FRAMEWORK

    TRACK1 NetworkCirculationProjects

    SYSTEMWIDE

    NETWORK

    PROJECT

    BUNDLES

    Future

    Conditions

    Modal

    Analysis

    Future

    System

    Deficiencies

    / Universe of

    PotentialProjects

    Included in

    another

    plan?

    TRACK2 NeighborhoodScaleProjects

    NEIGHBORHOOD

    SCALE

    PROJECT

    PACKAGES

    TRACK3 AreawidePolicy

    Goods Movement Policy

    Shuttle Policy

    Parking Policy

    TDM Policy

    EN TRIPS

    Potential

    Projects

    List

    Conceptual

    Design

    Environmental

    Review

    Prioritized List

    of Future

    Investments

    (Capital and

    Programming)

    Fast Track

    Improvements/

    Pilots

    BSP

    Street

    Typology

    Street

    Design

    Guidance

    City Policy,

    FuturePlanning

    Studies

    DRAFT Project Development Work Flow

    EN Area Plans

    /Other City

    Projects &

    Plans

    ENTRIPS

    Existing

    Conditions

    Analysis

    Modeling

    Scenarios

    Existing

    System

    Deficiencies

    Universeof

    PotentialProjects

  • 8/9/2019 ENTRIPS Evaluation Framework Presentation

    6/13

    6

    Preliminary Evaluation Framework Evaluate the performance of the systems

    Prioritize and rank projects/policies:

    Identify & Prioritize EN-TRIPS systemsnetwork packages

    Complete major environmental clearance

    Identify EN-TRIPS neighborhood projects that canbe fast-tracked:

    Low-cost/Street Innovative type pilots/trials

    (develop toolkit) Policies that can be implemented in short-term

    (e.g. loading/ parking)

    Complete with minor environmental clearance

  • 8/9/2019 ENTRIPS Evaluation Framework Presentation

    7/13

    7

    TypicalOneWaySoMaStreetscape

    62.5FeetRoadwayWidth

    82.5FeetPropertyLinetoPropertyLineWidth

  • 8/9/2019 ENTRIPS Evaluation Framework Presentation

    8/13

    8

    TypicalSoMaStreetscapewithWiderSidewalks

    52.5FeetRoadwayWidth

    82.5FeetPropertyLinetoPropertyLineWidth

    Trade offs: travel lane or parking lane removal

  • 8/9/2019 ENTRIPS Evaluation Framework Presentation

    9/13

    9OnewaySoMaStreetscapewithDedicatedTransitLane

    49FeetRoadwayWidth

    82.5FeetPropertyLinetoPropertyLineWidth

    Trade offs: travel lane or parking/bicycle lane removal

    18.5 ft sidewalk (Bus Loading)

  • 8/9/2019 ENTRIPS Evaluation Framework Presentation

    10/13

    10OneWaySoMaStreetscapewithCycleTracks

    52.5FeetRoadwayWidth

    82.5FeetPropertyLinetoPropertyLineWidth

    Trade offs: travel lane and parking lane removal

    3-10.5 ft buffer

  • 8/9/2019 ENTRIPS Evaluation Framework Presentation

    11/13

    11OneWaySoMaStreetscapewithTwoWayToolkit

    52.5FeetRoadwayWidth

    82.5FeetPropertyLinetoPropertyLineWidth

    Trade offs: travel lane and bicycle/parking lane removal/lefts turns

    ParkingorbufferedBicycleLane 6-7.5 ft

    ParkingorbufferedBicycleLane 6-7.5 ft

  • 8/9/2019 ENTRIPS Evaluation Framework Presentation

    12/13

    12

    Next Steps

    Future Conditions Analysis

    Develop future conditions modeling inputs Perform future condition model runs using

    base network assumptions

    Identify initial key-corridor intersections forModeling analysis

  • 8/9/2019 ENTRIPS Evaluation Framework Presentation

    13/13

    13

    EN-TRIPS 6 month Look AheadTask Milestone Date

    CompleteEvaluationFramework&Sorting Sep2010

    TaskforceStreet/NeighborhoodImprovementProjectsUpdate Dec2011

    TaskforceFundingandImplementationStrategyUpdate Jan2011

    ENTRIPSFundingandImplementationStrategyReport Feb2011

    ENTRIPS

    update

    Citywide

    Community

    Meeting Mar

    2011

    BeginSystemwideEnvironmentalReview Jan2011

    BeginNeighborhood

    Pilots/Trials Jan

    2011

    ENTRIPSupdateCitywideCommunityMeeting Jan2011

    TaskforceFuture

    Conditions

    Assumptions

    Update Sep

    2010

    ENTRIPSupdateCitywideCommunityMeeting Sep2010

    FutureYearLandUse&TransportationConditionsReport Sep2010

    KeyENPriorityCorridorStreetscapesPublicWorkshops(Taskforce/Citywide) OctNov2010

    PreliminaryStreet/Neighborhood RedesignOptions/ProjectSortingPrioritization Nov2010

    KeyEasternneighborhoodsTransportationPublicRealmImprovementProjectsReport Jan2011