13
Engineer Training XL1200 Electric

Engineer Training XL1200 Electric. Engineer Training XL1200 Electric Confidential 2 Block Diagram

Embed Size (px)

Citation preview

Engineer Training

XL1200 Electric

Confidential 2

Engineer Training

XL1200 Electric

MonitorC

om

pu

ter

40 VPowerSupply

24 VPowerSupply

220 V

220V

220 V

220 V

220 V

220 V

220 V

220 V

220VPo

we

r S

plit

er

MotorCollector

Infra Red Heating System

Dri

ver

Dri

ver

Dri

ver

Dri

ver

Motor Motor

MotorMotorMotionController

EmergencyContactor

24 V in

24 V out

Ma

in E

lect

ric

Ca

bin

et

Block Diagram

Confidential 3

Engineer Training

XL1200 Electric

Open Cabin

Confidential 4

Engineer Training

XL1200 Electric

Upper P.D.U

We have the following parts:

1. Temperature Display/Control for the Heating Table.

2. Heating Hood Row Selection/OFF Switch

3. Heating Hood Zone Selection Switch.

1

2 3

Confidential 5

Engineer Training

XL1200 Electric

Mid Level P.D.U

Heating Hood 3 Phase Magnetic Relay.

Here is where the computerTurns on the Heating.

Power Pilot Lamps. (Right)

Fuses for the Pilot Lamps(Left).

Main PowerBreaker

Main PowerSwitch

Confidential 6

Engineer Training

XL1200 Electric

Lower Level P.D.U

Main PowerFilter

Surge/SpikeSuppressor

CircuitSafety SystemRelay

Heating TableRelay

UPS/MainSelector Switch

Confidential 7

Engineer Training

XL1200 Electric

New PDU (UL Certified)

New Safety Relay

New Safety relay K3 (the same relay type used for activating the Drying System) for the drivers replaces the old problematic one.

The K3 relay has been moved to a new position, and the RL3 relay is installed into its place(see Figure 4).

K3

RL3

Confidential 8

Engineer Training

XL1200 Electric

New PDU (UL Certified)

Confidential 9

Engineer Training

XL1200 Electric

New PDU (UL Certified)

New Main 3-phase Circuit Breaker

The main Circuit Breaker F1 (see green line) includes the Switch Tripped mechanism (terminals 9,10). The two phases are connected (see dashed green line) via the Emergency Switch.

When the Switch Tripped is powered, the F1 contacts are closed and the machine is connected to the power line.

When the Emergency Switch is pressed, the Switch Tripped is powered off and the F1 contacts are opened; i.e. the machine is disconnected from the power line.

Confidential 10

Engineer Training

XL1200 Electric

New PDU (UL Certified)

New Emergency Stop Button

The new PDU is equipped with its own Emergency Stop button

When pressed, the RL3 relay is activated and the electrical power is disconnected before the Main3-phase Circuit Breaker and from the UPS to the machine – see Figure (next slide).

Confidential 11

Engineer Training

XL1200 Electric

Main Safety - PDU

To UPS

Confidential 12

Engineer Training

XL1200 Electric

Main Safety - PDU

The green dash line marks the circuit UPS Emergency Switch RL3 coil UPS. When the Emergency Switch is pressed, this circuit is opened.

The cyan dot line specifies the circuitUPS RL3 contacts Drivers Left Cabinet (PC, Power Supplies) UPS. When the Emergency Switch is pressed, this circuit is opened.

The magenta dot line specifies the self-sustain loop for holding the RL3 powered in case of general electric failure(i.e. Switch Tripped is not powered and the green circuit is opened).

Confidential 13

Engineer Training

XL1200 Electric

New PDU with Heating Control Unit (External or Built-in)