2/21/2014 1 Energy Performance Contracting Workshop February 13, 2014

Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

1

Energy Performance Contracting Workshop p

February 13, 2014

Page 2: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

2

25000Total South Carolina Energy Expenditures ('70-'11)

15000

20000

n (Nominal)

5000

10000

$ M

illion

0

1970

1971

1972

1973

1974

1975

1976

1977

1978

1979

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

Energy Expenditures Historical Trend

Page 3: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

3

Why Are We Here? Nearly 40% of total U.S. energy y gyconsumption in 2012 was consumed in residential and commercial buildings, or about 40 quadrillion British thermal units (EIA)British thermal units. (EIA)

Portion of energy in buildings used inefficiently or unnecessarily:inefficiently or unnecessarily: 30 percent (EPA)

Page 4: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

4

Organization Type

Average Energy Use per Square Foot

(kBTU)

Average Energy Spending per Square

Foot ($)(kBTU) Foot ($)

FY20132000-2013 %

changeFY2013

2000-2013 % change

State Agencies 103 -9% $1.74 -3%

Residential Colleges and Universities

113 -21% $1.89 +7%

Non-Residential Colleges and Universities

64 -20% $1.55 -2%

School Districts 38 -15% $1.08 -5%

Total 62 -17% $1.34 -3%

Note: These statistics are based on self-reported data submitted by public entities. SCEO makes no representation regarding the accuracy of these data.

Page 5: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

5

"Now, here, you see, it takes all the running you can do, to keepthe running you can do, to keep in the same place. If you want to get somewhere else, you must run at least twice as fast as that!“

Red Queen to Alice, in Lewis Carroll’s Through the Looking Glass

Page 6: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

6

DefinitionsEnergy Savings Performance Contracting

“The use of GUARANTEED savings from the maintenance and operations budgets as capital to make needed upgrades and modernizations to

b ildi i l fi dyour building environmental systems, financed over a specified period of time.”

-- US Department of Energy

Jim Ploger, Energy Services Coalition

Page 7: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

7

Survey

• Sent to approximately 75 participants in the performance contracting workshop

• Received 65 responses

S ASC li h f i h• Sent to ASCEM list, to hear from anyone with opinions who was not able to attend

• Many detailed responses to questions

Page 8: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

8

Responses

Page 9: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

9

Have you, now or in the past, been party to an Energy Performance

Contract in South Carolina?

Page 10: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

10

Did you go through the state procurement process? p p

Page 11: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

11

Did any RFPs require offerors to perform a preliminary audit and

include those results in their proposal?include those results in their proposal?

Page 12: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

12

How can we help? Select all that would apply

Option %

Assessments to determine needs 49%

RFP preparation 39%

Measurement and verification 39%

Standard contract documents 35%

Advice about financing 33%

E l i f l 31%Evaluation of proposals 31%

No help needed 22%

Page 13: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

13

Interested in continuing to meet to discuss Energy Performance Contracting?

Page 14: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

14

SC EPC Steering Committee

Name and Organization Representing

James Berry, SC Dept. of Mental Health State Agencies

Keith Byrom, Siemens ESCO

Paul Cantrell, The Citadel Higher Education

Delisa Clark Office of School Facilities K-12Delisa Clark, Office of School Facilities K-12

Bill Crompton, Georgetown Schools K-12

Ashlie Lancaster, General Services State Agencies

Larry Landry, Ameresco ESCO

Kimberly Smith, JCI ESCO

Brad Van Meter, Trane ESCO

John St. Clair White, State Engineer State Engineer

Page 15: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

15

Performance Contracts 101

Page 16: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

16

SC Code of Laws 48-52-670

• Performance Contracting

• An agency may enter into a performance contract with a vendor;-financing may be provided by the vendor, internally, or another party;

-repayment may be made from savings on the agency utility budgetp y y g g y y g

The Performance Contract may include:

Training Programs Facility Alteration

Technology Upgrades Building Insulation

Wi d U d d C ti E C t l S tWindow Upgrades and Coatings Energy Control Systems

HVAC Upgrades Lighting Upgrades

Cogeneration Systems Energy Recovery Systems

Plumbing Upgrades Other

Page 17: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

17

Understand the Process• An agency identifies a problem or needAn agency identifies a problem or need

• It wants to explore entering into a performance contract

• Now what?

Page 18: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

18

Documents Involved• Proposed schedules 801,

810, 821, 830, 860, Appendices A-G, SC consolidated procurement code and regulations, 48-code and regulations, 4852 of procurement code, 15-30 of RFP process, RFPs, RFQs, Title 2 h 7 f Pchapter 7 of Permanent

Improvement Project Process, Selection Plan...

Page 19: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

19

Approvals Involved

• Authority and Review

• Joint Bond Review Committee

• Office of the State Engineer

• Selection Committee

• Procurement Officer

Page 20: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

20

Performance Contracting

• The process can be daunting and complicated

• How do we make it better?

Page 21: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

21

Simple or Complex?

• Step 1 Identify a problem or need

• A. -The solution seems straightforward -Project management can be done in-house

Fi i i ’ bl-Financing isn’t a problem

-The project is small in scope or cost

-Contact SCEO for funding opportunities

-Go forth and improveGo forth and improve

Page 22: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

22

Simple or Complex?

• B. -The solution seems complex or unclear-You need project management help

-Financing is an issue

Yo r organi ation ants to mitigate risk-Your organization wants to mitigate risk

-Think about entering into a Performance Contract

Page 23: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

23

Selection Committee

• Step 2– Must have at least 3 voting members

– OSE appoints the non-voting chair

OSE ill o ersee the process– OSE will oversee the process

Page 24: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

24

Selection Plan

• Selection Plan is approved by the Committee

• Explains how the agency will:– solicit proposals

d i i– conduct negotiations

– evaluate proposals

– create milestone dates

Document 801

Page 25: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

25

Options

• Step 3

• After the development of the Selection Plan and creation of the Selection Committee, the agency may:agency may:

1. Solicit Request for Qualifications, or

2. Go straight to RFPs, or

3 C d t P l ti f ll d3. Conduct Pre-proposal meetings followed by RFQ

Page 26: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

26

Request for Qualifications

• assists in creating a short list of applicants to complete a full RFP; can speed the process along

• introduces the firms to the agency• introduces the firms to the agency

RFQMust be advertised in SCBO Design requirements and 

compliance

Financial capacity Project Schedule

Price and life‐cycle costs Offeror’s Qualifications

Any other important factors

Documents 801810821

Page 27: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

27

Pre-Proposal Meeting

• to clarify expectations

• to obtain feedback

• to perform a walkthrough of the facilities

• to assist with timelines

Page 28: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

28

Post-meeting and RFP

• Selection Committee picks 3-5 firms to prepare a RFP

• firms will have access to agency audit/studies or may perform their own auditsor may perform their own audits

• the short list of candidates is announced publically

Page 29: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

29

Request for Proposal

• Step 4– must include design requirements

– must include proposal documents

stipends ma be paid to ns ccessf l bidders if– stipends may be paid to unsuccessful bidders if they performed an investment grade audit

Documents 830860

Schedules A-G

Page 30: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

30

Rank, Select, Negotiate

• Step 5– Selection Committee follows the Selection Plan

and ranks the proposals

– Procurement Officer begins negotiationsProcurement Officer begins negotiations

– Procurement Officer may move down the list if a deal cannot be reached

Documents 860

Schedules B-G

Page 31: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

31

The contract is prepared

Page 32: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

32

Financing

• State agencies (but not school districts or local governments) must manage financing through the State Treasurer’s Office

Falls under Master Lease Program– Falls under Master Lease Program

– Consult Rick Harmon 803-734-2114

Page 33: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

33

Contract Review and Approval

• for state agencies, the Joint Bond Review Committee and Budget and Control Board (successor)Board (successor)

• for colleges/universities, the Commission on Higherthe Commission on Higher Education, JBRC, and B&CB

Page 34: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

34

Experienced Agencies

School DistrictsAnderson 5 Barnwell 29

Barnwell 45 Marion

Orangeburg 5 Richland 2

Spartanburg 3 Spartanburg 7Spartanburg 3 Spartanburg 7

York 3 (Rock Hill)

Universities and Colleges

MUSC College of Charleston

The Citadel USC-Columbia

Winthrop

State Agencies Department of Corrections

Page 35: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

35

Questions or Suggestions?

John White

State Engineer

803-737-0768

[email protected]

Page 36: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

36

Palmetto Energy Efficiency Retrofits (PEER)

• Document and market the value of retrofits

• Remove barriers– Energy consultants to assist with needs

assessments and assist as needed duringassessments and assist as needed during preparation of loan applications and/or performance contracting documents

• Measure and benchmark success

• Assisted by an advisory committee

Page 37: Energy Performance Contracting Worksho p · Plumbing Upgrades Other. 2/21/2014 17 ... Simple or Complex? • B. -The solution seems complex or unclear-You need project management

2/21/2014

37

PEER Advisory CommitteeCategory Name

Division Of General Services Ashlie Lancaster, Bobby Banks

Office of the State Engineer John White

Office of School Facilities Delisa Clark

ASCEM Walter Hardin

USGBC‐SC Douglas Rackley

AIA‐SC Adrienne Montare

SC Clean Business Alliance Clare Morris

Palmetto Green Schools Alan Hancock

Energy Managers/Agencies James Berry, Paul Cantrell, Bill CromptonCrompton

ESCOs Rotating among companies 

Utility Representatives Bob Long, Maryann McGowan, Mike Smith