    A Sunrise Project for a Sunshine FutureCore Group

    A Sunrise Project for a Sunshine Future

    Captive Power Plant-Encon Measures

  • 8/12/2019 Encon Measures CPP

    2/20

    A Sunrise Project for a Sunshine FutureCore Group A Sunrise Project for a Sunshine FutureCore Group

    CONTROL ROOM

    CMY-

    1/2

    TOSHIBA

    GIS (66KV)

    UB-2UB-1

    GTG-2

    C

    M

    Y

    HRSG-2

    STG-2

    STG-1

    GTG-1

    C

    M

    Y

    HRSG-1

    GTG-3

    DB

    HRSG-3

    C

    M

    Y

    DB DBDEAREATOR-2

    DEAREATOR-1

    BFPs

    To Process

    CPP CONFIGURATION AT PARADIP

    BSDG

    N

    A

    P

    N

    A

    P

    H

    S

    D

    H

    S

    D

    H

    S

    D

    H

    S

    D

    F

    O

    F

    O

    FRP CT

    FO/HSD/

    NAPHTHA

    PUMP BOP

    CMY-

    3/4

    UB-4UB-3

    SIEMENS

    GIS (66KV)

  • 8/12/2019 Encon Measures CPP

    3/20

    A Sunrise Project for a Sunshine FutureCore Group

    CPP MAJOR EQUIPMENTS & EFFICIENCY

    Sl.

    No.

    Description Qty. CapacityStandalone

    Design

    eff.(%)

    Cogeneration/Combined

    Cycle design

    eff.(%)

    ExpectedCPP

    efficiency(%)*

    1Gas Turbine

    (GE Frame 9E)3

    103.98MW@ 39C

    31

    79.2

    76.1(2GT+2STG+2UB)

    79.3(2GT+1STG+2UB)

    81.4(3GT+1UB)

    2Heat Recovery Steam

    Generator (HRSG)(Single Pressure drum)

    3 220 T/H 70

    3 Utility Boiler (UB) 4 300 T/H 86

    74

    4Steam Turbine

    (2Stages extractioncum condensing Type)

    2 30 MW 86

    *Expected Power load 186.5MW (Including CPP consumption),

    Net export to process units HHP 416 TPH, HP 175 TPH ,MP 144 TPH & LP 0 TPH

  • 8/12/2019 Encon Measures CPP

    4/20

    A Sunrise Project for a Sunshine FutureCore Group A Sunrise Project for a Sunshine FutureCore Group

    Salient Features of Frame 9E Gas Turbine

    S. No. GT Frame

    Size

    MW Rating

    (ISO)

    Design Heat

    Rate (kcal/ kWH)

    Remarks

    1 Frame5e 26 3250 Efficiency of Frame-9e m/c will

    be greater than Frame-5e m/c if

    the load is above 64MW and

    greater than Frame-6e m/c if

    the load is greater than 95MW

    2 Frame6e 42 2850

    3 Frame9e 126 2545

    GT rated for 103.98MW at 39C ambient

    Ambient temperature of Paradip in the range of 28 32C for majority of

    the time

    Hence, GT output assured in the range of 110

    115MW with the Generator

    (GTG) capacity at 118.3MW .

  • 8/12/2019 Encon Measures CPP

    5/20

    A Sunrise Project for a Sunshine FutureCore Group A Sunrise Project for a Sunshine FutureCore Group

    Salient Features of Utility Boilers &Flue Gas

    Desulphurization System

    Utility Boiler (UB): Designed to operate on low cost High Sulphur Fuel Oil (HSFO) with 4.9%

    Sulphur wt./wt.

    Corner fired Burners for improved combustion efficiency (overall boiler

    efficiency 86%)

    Regenerative Air Pre-Heater for improved reliability & efficiency

    2 ID & 2 FD Fans for each UB (All drives are Turbo & Motor Driven) Flexibility in Fuel (Gas Oil, HSFO, Refinery Gas)

    Electrostatic Precipitator (ESP) provided for ash absorption from Flue Gas

    & meeting FGDS input requirement

    Flue Gas Desulphurization System (FGDS): Desulphurization of Utility Boiler (UB) Flue Gas to meet stringentenvironment regulations for Paradip Refinery fixed at 1000kg/hr SO2.

    Capacity of absorption of 12576 kg/hr SO2from Flue Gas (96% efficiency,

    rated SO2flow 13100 kg/hr. in Flue Gas)

  • 8/12/2019 Encon Measures CPP

    6/20

  • 8/12/2019 Encon Measures CPP

    7/20A Sunrise Project for a Sunshine FutureCore Group

    Major areas Identified (Long term)

    Utilization of Natural gas instead of naphtha / HSD in GT/HRSG/UB

    Installation of chiller at GT Inlet to Augment power output &Efficiency( if there is LP steam surplus in the refinery post HRSGs WPH addition)

    Adoption of Coal Water Slurry Fuel(CWSF) technology of M/s. LemarLCC, USA to burn pet coke in existing UBs

    OrInstallation of pet-coke based CFBC UB

    http://localhost/var/www/apps/conversion/tmp/scratch_7/Payback_analysis_GT%20Inlet%20air%20chilling.pptx
  • 8/12/2019 Encon Measures CPP

    8/20A Sunrise Project for a Sunshine FutureCore Group

    Energy Conservation Initiatives in

    Electrical Distribution SystemVariable Speed Drives being installed in process units & offsite (for

    process control) provide substantial energy saving Total capacity of VSDs being installed in Refinery 76.7MW (225 drives ranging

    from 1.1 KW to 110KW at 0.4kV level & from 315KW to 8.2MW at 6.6kV level)

    Even 10% energy conservation would result in recurring savings equivalent to

    7.7MW. Actual savings would be much higher.

    Capacitor Banks being installed for Power Factor (p.f.) Improvement

    Total capacity of Capacitor Banks in the entire refinery equal to 50.64MVAR

    Designed for Power Factor improvement from 0.9 to 0.93

    Synchronous Motors of 7.927MW & 15.2MW installed which aid in p.f.

    improvement

    Improvement in capacity utilization of generators & reduced losses in distribution

    network

    Power Recovery Turbine Generator (PRTG) of 19MW being installed in

    Indmax Unit for power generation from Process Flue Gas

  • 8/12/2019 Encon Measures CPP

    9/20A Sunrise Project for a Sunshine FutureCore Group

    Energy Conservation Initiatives in

    Electrical Distribution System

    Lighting Transformers for the entire lighting system being installed inthe refinery

    Total 82 nos. Lighting Transformers being installed in the Refinery

    Improved power system reliability through isolation of lighting circuit faults

    Reduced voltage results in improved life of luminaires maintaining the desired light

    output

    Solar LED Street Lights installed in Township

    26 nos. of 14W Solar LED lights installed in place of 70W LPSV Lights

    Recurrent energy saving of Rs. 2.9 Lacs/ annum, payback period 3 yrs.

  • 8/12/2019 Encon Measures CPP

    10/20A Sunrise Project for a Sunshine FutureCore Group

    Energy Conservation Initiatives in

    Electrical Distribution System

    Adoption of Compact Fluorescent Lamps (CFL) in place of Fluorescent

    Tube Light (FTL) in Township Total 3393 nos. CFL being installed in place of FTL, energy saving & payback period

    < 1 year

    Adoption of CFL in place of FTL in all building lighting inside the Refinery on the

    same lines

    Illumination of entire refinery area through High Masts

    Total 293 nos. of High Masts (each 8 x 1kW luminaires) installed for coverage of

    entire area of about 2945 acres.

    Localised area lighting & street lighting eliminated

  • 8/12/2019 Encon Measures CPP

    11/20A Sunrise Project for a Sunshine FutureCore Group A Sunrise Project for a Sunshine FutureCore Group

    11

  • 8/12/2019 Encon Measures CPP

    12/20A Sunrise Project for a Sunshine FutureCore Group A Sunrise Project for a Sunshine FutureCore Group

    Utilization of Grid Power to non-critical loads

    for operating cost reductionPower supply arrangement to non-critical loads

    The power supply to Administration Block, Township,

    Mechanical Workshop, Electrical Workshop, CISF, Pipelines &

    Marketing are fed from S/S#311N, S/S#311AN & S/S#312AN

    The modification in power supply arrangement for utilizing grid

    power is done with the existing resources and does not require

    additional capital expenditure.

    Grid Power is cheaper than incremental cost of generation in

    Captive Power Plant

    The cost differential works out to be approx. Rs. 3/- per unit

    (kWH)

    Hence, Total Cost Saving per annum for 15MW load

    amounts to Rs.39.42 Crores

  • 8/12/2019 Encon Measures CPP

    13/20A Sunrise Project for a Sunshine FutureCore Group

    Flue Gas Desulphurization System (FGDS)

    UBs

    C

    h

    i

    m

    n

    e

    y

    SO2

    Absorption

    Tower(=96%)(Unit 107)

    HSFO

    4.9% (wt./wt.)

    SO2Stripper(Unit 109)

    SRU

    SO2

    SO2

    absorbed

    Rich Amine

    Lean

    Amine

    315

    m3/hr

    FG

    180 deg c QuenchTower

    (Unit 107)

    Quench Water

    Circulation

    (Service/Fire)

    FG

    56 deg C FG SO2

  • 8/12/2019 Encon Measures CPP

    14/20A Sunrise Project for a Sunshine FutureCore Group

    FG HEADER OF CPP

    Existing FG Header

    Proposed FG Header

    Utility Boilers

    HRSG

  • 8/12/2019 Encon Measures CPP

    15/20A Sunrise Project for a Sunshine FutureCore Group

    Scheme Proposed Potential Savings Action Plan

    FG header extension up to existingindividual FG skid of

    Supplementary firing of HRSG

    102 Crores /Yr FG header is not erected for

    UBs. Header extension job will

    be carried out by TS.

    Present scheme

    FG Header is existing for UBs.

    Proposed scheme

    For HRSG Supplementary firing FG header is to be extended up to

    existing FG skid of each HRSG.

    Benefits

    HRSG Naphtha firing will be reduced and steam flow will be maintained

    by FG firing. At UBs, FG firing will be reduced with increase in HSFO

    consumption. The cost differential of Naphtha &HSFO for 33 Mkcal

    supp. Firing works out to be 102 Crs/yr.

  • 8/12/2019 Encon Measures CPP

    16/20A Sunrise Project for a Sunshine FutureCore Group

    DM water line

    Condensate storage tank

    Condensate transfer pump (3)

    12 kg/sqcm

    LCV

    LCV

    LCV

    W/W heat exchanger

    HRSG MUH

    Deaerator 2

    Condensate receiving line

    W/W heat exchanger

    MUH transfer pump (3)

    Deaerator 1

    Bypass line

    Equipment to be bypassed

    7 kg/sqcm

    Condensate transfer pump bypass scheme

    Potential Savings by stopping 2 Nos CTP(385 KW) works out to be 4.3 crs/yr

  • 8/12/2019 Encon Measures CPP

    17/20

    A Sunrise Project for a Sunshine FutureCore Group

    Scheme Proposed Potential Savings Action Plan

    Additional module of MUH in allthree HRSGs

    64.00Crores/Yr

    (for 2 HRSGs

    Operation)

    Offer sought from BHELTrychiin May2013.

    Present scheme

    Design Flue gas temperature from HRSG is 170 Deg C which is very high if we

    burn SR Naphtha (Sulphur 250 to 400 ppm) instead of design fuel SR GO.

    This temperature can be reduced up to 130 Deg C

    Proposed scheme

    This can be achieved by adding additional module of MUH in HRSG after existing

    MUH Module.

    Condensate after W/W exchanger can be routed to De-aerator through this

    module This scheme is discussed with M/s BHEL. Offer is sought in May2013.However

    M/s BHEL, Trychi agreed to execute it after PGTR.

    Benefits

    Flue gas temperature can be reduced by 40 Deg C ( 170 to 130 Deg C)

    Condensate Water temperature to De-aerator can be increased from 78 to 108

  • 8/12/2019 Encon Measures CPP

    18/20

    A Sunrise Project for a Sunshine FutureCore Group

    Scheme Proposed Potential Savings Action Plan

    Utilization of untreated naphthafor firing in Gas Turbines

    30.00 Crores/Yr Implemented.

    Present scheme

    Facilities available with hydro-treated naphtha and HSD utilization

    Hydro-treated naphtha is obtained after hydro-treatment andsplitting

    Proposed scheme

    Facilities for utilizing untreated naphtha in gas turbines

    Utilizing the untreated straight run naphtha (SO2 content -500 ppm

    max)

    Benefits

    Savings on the treating cost for the naphtha

  • 8/12/2019 Encon Measures CPP

    19/20

    A Sunrise Project for a Sunshine FutureCore Group

    HRSG BFP

    FLOW: 295 m3/h(Each pump)

    P

    UB BFP

    FLOW: 585 m3/h(Each pump)

    UBs HRSGs

    Scheme Proposed Potential Savings Action Plan

    UB and HRSG discharge headers

    interconnection to optimizeoperation. 2 UBs and 2 HRSGs

    load will be met by running 2 UB

    BFPs and HRSG BFP (2.1 MW)

    would be stopped.

    14 Crs /Yr Scheme implemented

  • 8/12/2019 Encon Measures CPP

    20/20

    A Sunrise Project for a Sunshine FutureCore Group

    GT Power without chiller MW 114

    Relative Humidity % 60 60 60 60 85 85 85 85

    Temp U/S of Chiller DegC 33 33 33 33 33 33 33 33

    Temp D/S of chiller DegC 25 22 20 18 25 22 20 18

    Refrigeration capacity Tr 641 157 2826 3610 3073 4053 5338 6148

    Electrical power reqd for

    refrigeration

    KW 100 245 441 563 479 632 833 959

    Net GT Powerv (Less chiller

    power)

    MW 120 122 123.5 125 120 122 123 125

    Incremental power due to chiller MW 6 8 9.5 11 6 8 9 11

    Capital cost of chiller plant Rs Cr 2.9 7.1 12.7 16.2 13.8 18.2 24 27.7

    PAYBACK ANALYSIS

    Heat Rate Saving Kcal/Kwh 37.63(Heat [email protected])

    Heat rate saving@90MW for8000Hrs

    KCal 27093600000

    Naptha Fuel saaving/Year RsCR 12.54 (Calorific value-10800Kcal/Kg,Cost-Rs 50000/MT)

    Payback Period Year 2.2

    I/L heat reqd for Chiller of 6148Tr Kcal 18444000(1TR~3000KCal)

    Heat Saved Kcal 3386700

    % of I/L Heat saved % 18.36

    GT Fr9E-I/L air cooling PaybackWaste Heat-HRSG Stack