52
Air Navigation Plan 1 of 52 EL SALVADOR State Air Navigation Plan Date: AUGUST 07, 2018 –Draft Prepared by: CIVIL AVIATION AUTHORITY CAA

EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 1 of 52

EL SALVADOR

State Air Navigation Plan

Date: AUGUST 07, 2018 –Draft Prepared by: CIVIL AVIATION AUTHORITY CAA

Page 2: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 2 of 52

Document History Record

Release Date Author(s)/Comments

Draft AUGUST 07, 2018 Marco Henríquez, Rolando Hernandez y Danilo Ramírez

Version 1.0 AUGUST 07, 2018

Page 3: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 3 of 52

Table of Contents 1. Introduction ............................................................................................................................................................ 4

1.1 Background ........................................................................................................................................................ 4 1.2 Environment ....................................................................................................................................................... 4

1.2.1 El Salvador/Civil Aviation Authority AAC ................................................................................................ 4 1.2.2 Airspace ...................................................................................................................................................... 5 1.2.3 Aerodromes ................................................................................................................................................. 7 1.2.4 Traffic Forecast ........................................................................................................................................... 7

1.3 Planning Methodology ....................................................................................................................................... 8 1.4 Air Navigation Planning Process ....................................................................................................................... 8

1.4.1 Analysis and Work Flow Process ............................................................................................................... 8 1.4.2 Monitoring and Reporting Results .............................................................................................................. 9

1.5 Problem Identification ...................................................................................................................................... 10 1.5.1 Existing Problems ..................................................................................................................................... 10 1.5.2 Future Problems ........................................................................................................................................ 11

2. El Salvador/Civil Aviation Authority AAC Aviation System Block Upgrade (ASBU) Implementation Status .......................................................................................................................................................................... 12

2.1 ASBU Block 0 Implementation Metrics, Targets, and Status ........................................................................... 12 2.1.1 ASBU B0 Implementation Metrics and Targets ....................................................................................... 12 2.1.2 ASBU B0 Implementation Status Summary ............................................................................................. 20

2.2 ASBU Block 1 Implementation Targets and Status .......................................................................................... 21 2.3 ASBU Block 2 Implementation Targets and Status .......................................................................................... 22 2.4 ASBU Block 3 Implementation Targets and Status .......................................................................................... 22

3. ICAO NACC Regional Aviation System Improvements (RASI) Status .......................................................... 23 4. El Salvador/Civil Aviation Authority CAA State Aviation System Improvements (SASI) Status ................ 23

4.1 Equipment Upgrades ........................................................................................................................................ 23 4.2 Procedure Upgrades ........................................................................................................................................ 23 4.3 Infrastructure Upgrades ................................................................................................................................... 23

5. El Salvador/Civil Aviation Authority CAA State ANP Next Review Schedule ............................................... 23 Appendix A: ANRF Explained ................................................................................................................................. 24 Appendix B: ASBU ANRF Template ....................................................................................................................... 26 Appendix C: RASI and SASI ANRF Templates ..................................................................................................... 27 Appendix D: Civil Aviation Authority CAA ASBU Block 0 ANRFs .................................................................... 28 Appendix E: Civil Aviation Authority CAA ASBU Block 1 ANRFs ..................................................................... 48 Appendix F: Civil Aviation Authority CAA ASBU Block 2 ANRFs ..................................................................... 48 Appendix G: Civil Aviation Authority CAA ASBU Block 3 ANRFs .................................................................... 48 Appendix H: Civil Aviation Authority CAA RASI ANRFs ................................................................................... 49 Appendix I: Civil Aviation Authority CAA SASI ANRFs .................................................................................... 51

Page 4: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 4 of 52

1. Introduction

This document is El Salvador/Civil Aviation Authority CAA State Air Navigation Plan (ANP) describing the plan and status of aviation technology implementation. The background of the State ANP and the environment of our air navigation system are presented along with the method and process to evaluate and monitor aviation technology implementation. 1.1 Background The ICAO Global Air Navigation Plan (Doc 9750, GANP) provides ICAO’s vision to achieve sustainable growth of the global civil aviation system. It also presents all States with a comprehensive planning tool supporting a harmonized global air navigation system. The GANP is an overarching framework that includes key civil aviation policy principles to assist ICAO Regions and States with the preparation of their Regional and State Air Navigation Plans (ANPs). Planning and Implementation Regional Groups (PIRGs) are expected to develop the regional ANPs reflecting the regional requirements. GANP obligates States to map their individual or regional programmes against the harmonized GANP, but provides them with far greater certainty of investment. GANP requires active collaboration among States through the PIRGs in order to coordinate initiatives within applicable regional ANPs. The GANP introduces the Aviation System Block Upgrades (ASBU) methodology. The ASBU methodology and its description of future aviation capabilities define programmatic and flexible global systems engineering approaches allowing all States to advance their air navigation capacities based on their specific operational requirements. To this extent, the North American, Central American and Caribbean (NACC) Regional Office (RO), has published the NAM/CAR Regional Performance-Based Air Navigation Implementation Plan (RPBANIP, v3.1 in April 2014) aligning the activities and strategies with the ICAO ASBU methodology. This document is the ANP for El Salvador/Civil Aviation Authority CAA aligning activities and strategies to the GANP and RPBANIP. The information contained in the El Salvador/Civil Aviation Authority CAA ANP is related mainly to:

• Planning: objectives set, priorities and targets planned at the state level

• Implementation monitoring and reporting: monitoring the progress of implementation towards targets planned. This information should be used for reporting purposes (i.e.: global and regional air navigation reports and performance dashboards); and/or

• Guidance: providing state guidance material for the implementation of specific system/procedures in a harmonized manner.

The El Salvador/Civil Aviation Authority CAA ANP would be used as a tool for planning, monitoring, and reporting the status of implementation of the aviation capabilities. 1.2 Environment

The environments of Air Navigation of El Salvador/Civil Aviation Authority CAA, such as authority, airspace and airports, and air traffic are described in this section. 1.2.1 Authority of El Salvador/Civil Aviation Authority CAA

Page 5: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 5 of 52

STRUCTURE organizing the Civil Aviation Authority, which in the future will be called by its acronym AAC, with autonomous institution of public service and nonprofit. The highest authority of the AAC will be the Board of Directors of Civil Aviation (CDAC) and headed by a Director appointed by the President and the Republic, who shall exercise the functions of President. The Executive Director of the AAC will be elected by the CDAC, who shall exercise the functions attributed to it by the organic law of Civil Aviation, as well as all those delegated by the President of the CDAC. In addition to the Executive Director for the performance of their duties have managements in administrative and technically, line and support area.

ORGNIGRAMA OF THE AUTHORITY OF CIVIL AVIATION

Figure 1.2.1: Organizational Structure of El Salvador 1.2.2 Airspace

El Salvador is located within the CENAMER Flight Information Region (FIR) Circle of 40 NM of radius with center in VOR/DME/EL SALVADOR (132629.0262N 0890251.9311W) that is managed by EL SALVADOR CONTROL between 19500FT AMSL 2500FT AMSL. This air space includes Ilopango Airport. Refer to Figure 1.2.2 for the airspace around El Salvador EL SALVADOR TMA CLASS D

Page 6: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 6 of 52

Figure 1.2.2: TMA, CTR and ROUTES within FIR and El Salvador

Figure 1.2.1 Flouw Arrivals and Dapartures

Page 7: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 7 of 52

1.2.3 Aerodromes

One major aerodrome in El Salvador is: El Salvador International Airport. This aerodrome is listed in the ICAO’s regional ANP titled, “Caribbean and South American Air Navigation Plan, Volume I (dated October 2015), Table AOP I-1, International Aerodromes Required in the CAR/SAM Regions”. The MSLP has the capacity of 8-10 air traffic movements per hour Runway Information on El Salvador International Airport (MSLP)

Runway 07 Runway 25 Length x Width 3200 M X 45 M 3200 M 45 M Surface Type asphalt asphalt TDZ-Elev 20.88 M / 69 FT 30 M / 101 FT Lighting edge edge

1.2.4 Traffic Forecast

Number of typical daily operation (arrivals/departures) at El Salvador International Airport (MSLP) is 25/25 (total of 50 movements) respectively. The RPBANIP forecasted that average annual growth of air traffic in the Central America region would increase 3.0% during 2018-2032. The Civil Aviation Authority believes that this overall Central American regional forecast of annual increase of 3.0% is too optimistic for Civil Aviation Authority and more moderate number of 3.0% annual increase might realistic anticipation. Estimated daily operations at MSLP are shown in Tables 1.2.4a and 1.2.4b applying the increase forecasts to each year from 2018 to 2032.

Year MSLP

2018 139 2019 143 2020 147 2021 152 2022 156 2023 161 2024 166 2025 171 2026 176 2027 181 2028 187 2029 192 2030 198 2031 204 2032 210

Table 1.2.4: Air Traffic Forecasts at MSLP (200 daily operation) using annual increase rate of 3.0%

Page 8: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 8 of 52

1.3 Planning Methodology

Guided by the GANP and RPBANIP, the state planning process starts by identifying the state responsible ATM areas, major traffic flows and international aerodromes. An analysis of this data leads to the identification of opportunities for performance improvement. Available technologies and ASBU Elements are evaluated to identify which Elements best provide the needed operational improvements. Depending on the complexity of the selected technology or Elements, additional planning steps may need to be undertaken including financing and training needs. Finally, state plans would be developed for the deployment of improvements and supporting requirements. This is an iterative planning process which may require repeating several steps until a final plan with specific regional targets is in place. This planning methodology requires full involvement of States, service providers, airspace users and other stakeholders, thus ensuring commitment by all for implementation. Considering that some of the ASBU Modules contained in the GANP are specialized packages of implementable capabilities, called Elements, that may be applied where specific operational requirements or corresponding benefits exist, States will decide how each ASBU Element would fit into national and regional plans. In establishing and updating the implementation priorities detailed in the Authority of El Salvador/Civil Aviation Authority CAA ANP, due consideration should be given to the safety priorities set out in the Global Aviation Safety Plan (GASP) and the NAM/CAR regional safety strategy. Authority of El Salvador/Civil Aviation Authority CAA would establish its own air navigation objectives, priorities and targets to meet its individual needs and circumstances in line with the global and regional air navigation objectives, priorities, and targets. 1.4 Air Navigation Planning Process

The air navigation planning process prescribes evaluation, implementation, reviewing, reporting, and monitoring activities. It is recommended to conduct the process on a cyclical, annual basis. An Air Navigation Reporting Form (ANRF) is a tool to monitor and report the implementation status of capabilities. The Authority of El Salvador/Civil Aviation Authority CAA ANRF is a customized tool for the application of setting planning targets, monitoring implementation, and identifying challenges, measuring implementation/performance and reporting. The ANRF reflects selected key performance areas as defined in the Manual on Global Performance of the Air Navigation System (ICAO Doc 9883). Many of the future capabilities are described in terms of ASBU Elements. Some capabilities are specific to the need of the Caribbean Region and/or the State needs. These specific needs are described as Regional Aviation System Improvements (RASI) and State Aviation System Improvements (SASI). Both Analysis and Work Flow and ANRF are useful to manage the implementation status of ASBU, RASI, and SASI capabilities. 1.4.1 Analysis and Work Flow Process

Figure 1.4.1 depicts the workflow for analyzing and implementing ASBU Elements. This flow process should be applied to each of the ASBU Elements. If the Element is applicable to an airport, each airport needs to be evaluated through this flow process. This same flow process is applicable to RASI and SASI. The significance of each step in the workflow as it pertains to regional planning is as follows:

• Analysis Not Started – The requirement to implement this ASBU Element has not yet been assessed

Page 9: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 9 of 52

• Analysis In Progress – A Need Analysis as to whether or not this ASBU Element is required, is in progress

• N/A – The ASBU Element is not required • Need - The Need Analysis concluded that the ASBU Element is required, but planning for

the implementation has not yet begun • Planning – Implementation of this ASBU Element is planned, but not yet started • Developing – Implementation of this ASBU Element is in the development phase, but not yet

operational • Partially Implemented – Implementation of this ASBU Element is partially completed

and/or operational but all planned implementations are not yet complete • Implemented - Implementation of this ASBU Element has been completed and/or is fully

operational everywhere the need was identified

Figure 1.4.1: Analysis and Work Flow

The Need Analysis of ASBU Elements will identify which ASBU Elements are required. In this context, “required” means that the benefits estimated from the implementation would justify the associated implementation costs, or, the potential safety benefits are deemed to justify the implementation costs. The implementation status of ASBU Elements which are not required should be indicated as “N/A”, meaning “not applicable”. The analysis and implementation status determined in accordance with the above is reflected in the applicable ANRFs and in the ASBU Implementation Status Tables. 1.4.2 Monitoring and Reporting Results

Monitoring and reporting results will be analyzed by the Regions, States and the ICAO Secretariat to steer the air navigation improvements, take corrective actions and review the allocated objectives, priorities

Page 10: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 10 of 52

and targets if needed. The results will also be used by ICAO and aviation partner stakeholders to develop the annual Global Air Navigation Report. The report results will provide an opportunity for the international civil aviation community to compare progress across different ICAO regions in the establishment of air navigation infrastructure and performance-based procedures. The reports will also provide the ICAO Council with detailed annual results on the basis of which tactical adjustments will be made to the performance framework work programme, as well as triennial policy adjustments. The information provided in the Authority of El Salvador/Civil Aviation Authority CAA ANRFs should be periodically reviewed and updated if subsequent analysis results in a change to the applicability of any ASBU Elements, whether or not they were selected. The explanation of ANRF is provided in Appendix A. The customized Authority of El Salvador/Civil Aviation Authority CAAASBU Air Navigation Reporting Form Template is provided in Appendix B. The Authority of El Salvador/Civil Aviation Authority CAA RASI and SASI Air Navigation Reporting Form Templates are provided in Appendix C.

1.5 Problem Identification

To provide and promote safe and efficient aviation services to the customers, it is important to resolve ongoing challenges that hindering the mission. It is also important to anticipate and address the potential problems in the future. 1.5.1 Existing Problems

The demands for (MSLP) are only expected to increase in the future. The current infrastructure at one airport, notwithstanding upgrades and expansions over the years, does not adequately meet peak capacity demand. The solution requires a huge investment in airport infrastructure. This includes airport terminal development, runway and turning bay reconstruction and rehabilitation, total drainage redevelopment, construction of de new terminal with five gates and taxiway construction design and continuous modernization of communication, navigation, and surveillance equipment (e.g. Performance Based Navigation procedures (PBN). The formal implementation of Standard Instrument Departure procedures (SIDs) would improve on the safety, efficiency and management of airspace capacity. In addition, airport operations need to be improved by introducing capabilities such as Airport Collaborative Decision Making (ACDM). To support airport operations, having accurate and timely weather and aeronautical information is essential. Information such as aerodrome warnings and wind shear warnings/alerts will increase safety of operations. Securing quality data should also be accomplished by introducing the Quality Management System (QMS) to both weather and aeronautical data. A fundamental component which is critical concern, is the availability of human resource to meet the wide-ranging needs of airport operations. The provision of relevant training for that human resource is paramount.

Inconsistency in the database of the Radar System of INDRA, currently the AMHS database used by the AIS office of MSLP, is not compatible with the ATS routes database of the radar control center, this generates delays, load of work, poor coordination between control centers, rejection of flight plans etc. The database update will be managed in the CCR Control Center of MSLP.

Page 11: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 11 of 52

1.5.2 Future Problems Anticipating heavier demand at the MSLP airport, the introduction of a ILS/DME for Runway 25 landing system procedure would be effective. In addition, to date there is no technological equipment for the preparation of warnings of wind shear, so it will be managed the installation or a meteorological radar Doppler band C. The human resource issues, if not addressed in tandem with the infrastructure and procedure development, could result in deficient service provision and delivery. Human resource acquisition and development must coincide with the infrastructure and procedure development.

Page 12: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 12 of 52

2. Authority of El Salvador/Civil Aviation Authority CAA’s Aviation System Block Upgrade (ASBU) Implementation Status The status of ASBU implementation is provided in this section. Though there are Block 0 to Block 4 (B0, B1, B2, and B3), only B0 capacities are ready to be implemented with supporting documents such as standards, procedures, specifications, and training materials. ICAO will provide supporting documents for B1 in 2019, B2 in 2025, and B3 in 2031. 2.1 ASBU Block 0 Implementation Metrics, Targets, and Status ASBU B0 Implementation Targets and Status are presented in this section. Authority of El Salvador/Civil Aviation Authority CAA considers one airport, El Salvador International Airport (MSLP) “Monseñor Oscar Arnulfo Romero y Galdámez” for airport oriented Elements. 2.1.1 ASBU B0 Implementation Metrics and Targets Table 2.1.1 provides the ASBU B0 Implementation Metrics, Targets, and Progress for each B0 Element.

Block 0 Modules Elements Metrics Targets Status & Remarks

Performance Improvement Area 1: Airport Operations ACDM 1. Interconnection

between aircraft operator & ANSP systems to share surface operations information

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes, or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-ACDM-1 Target 1: Assessed in August 2018 a. Yes b. 1 B0-ACDM-1 Target 2: Implement by Dec 2020 c. None

Status – Need

2. Interconnection between aircraft operator & airport operator systems to share surface operations information

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-ACDM-2 Target 1: Assessed in Aug 2018 a. Yes b. 1 B0-ACDM-2 Target 2: Implement by Dec 2020 c. None

Status – Need

3. Interconnection between airport operator & ANSP systems to share surface operations information

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-ACDM-3 Target 1: Assessed in Aug 2018 a. Yes b. 1 B0-ACDM-3 Target 2: Implement by Dec 2020 c. None

Status – Need

4. Interconnection between airport operator, aircraft operator & ANSP systems to share surface operations information

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-ACDM-4 Target 1: Assessed in Aug 2018 a. Yes b. 1 B0-ACDM-4 Target 2: Implement by Dec 2020 c. None

Status – Need

5. Collaborative departure queue management

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-ACDM-5 Target 1: Assessed in Aug 2018 a. No b. None B0-ACDM-5 Target 2: Implement by: N/A c. None

Status –N/A

Page 13: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 13 of 52

APTA 1. PBN approach procedures with vertical guidance to LNAV/VNAV minima

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-APTA-1 Target 1: Assessed in Aug 2018 a. Yes b. None B0-APTA-1 Target 2: Implemented in date: N/A c. None

Status – N/A

2. PBN approach procedures with vertical guidance to LPV minima

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-APTA-2 Target 1: Assessed in Aug 2018 a. Yes b. None Implemented in date: N/A c. None

Status – N/A

3. PBN Approach Procedures without vertical guidance (LP, LNAV minima; using SBAS)

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-APTA-3. Target 1: Assessed in Aug 2018 a. Yes b. None B0-APTA-3 Target 2: Implemented in date: N/A c. None

Status – N/A

4. GBAS Landing System (GLS) Approach procedures

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-APTA-4. Target 1: Assessed in Aug 2018 a. Yes b. None B0-APTA-4. Target 2: Implemented in date: N/A c. None

Status – N/A

RSEQ 1. AMAN via controlled time of arrival to a reference fix

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-RSEQ-1. Target 1: Assessed in Aug 2018 a. No b. None B0- RSEQ-1 Target 2: c. None

Status – N/A

2. Departure management

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-RSEQ-2. Target 1: Assessed in Aug 2018 a. No b. None B0-RSEQ-2. Target 2: c. None

Status – N/A

3. Departure flow management

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-RSEQ-3. Target 1: Assessed in Aug 2018 a. No b. None B0-RSEQ-3. Target 2: c. None

Status – N/A

4. Point merge Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-RSEQ-4. Target 1: Assessed in Aug 2018 a. No b. None B0-RSEQ-4. Target 2: Implemented in date: N/A c. None

Status – N/A

Page 14: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 14 of 52

SURF 1. A-SMGCS with at least one cooperative surface surveillance system

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-SURF-1. Target 1: Assessed in Aug 2018 a. No b. None B0-SURF-1. Target 2: Implemented in date: N/A c. None

Status – N/A

2. Including ADS-B APT as an element of A-SMGCS

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-SURF-2. Target 1: Assessed in Aug 2018 a. No b. None B0-SURF-2. Target 2: Implemented in date: N/A c. None

Status – N/A

3. A-SMGCS alerting with flight identification information

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-SURF-3. Target 1: Assessed in Aug 2018 a. No b. None B0-SURF-3. Target 2: Implemented in date: N/A c. None

Status – N/A

4. EVS for taxi operations

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-SURF-4. Target 1: Assessed in Aug 2018 a. No b. None B0-SURF-4. Target 2: Implemented in date: N/A c. None

Status – N/A

5. Airport vehicles equipped with transponders

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-SURF-5. Target 1: Assessed in Aug 2018 a. No b. None B0-SURF-5. Target 2: Implemented in date: N/A c. None

Status – N/A

WAKE 1. New PANS-ATM wake turbulence categories and separation minima

ICAO has not developed new minima. N/A

Status – N/A

2. Dependent diagonal paired approach procedures for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-WAKE-2. Target 1: Assessed in Aug 2018 a. No b. None B0-WAKE-2. Target 2: Implemented in date: N/A c. None

Status – N/A

3. Wake independent departure and arrival procedures for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-WAKE-3. Target 1: Assessed in Aug 2018 a. No b. None B0-WAKE-3. Target 2: Implemented in date: N/A c. None

Status – N/A

Page 15: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 15 of 52

4. Wake turbulence mitigation for departures procedures for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-WAKE-4. Target 1: Assessed in Aug 2018 a. No b. None B0-WAKE-4. Target 2: Implemented in date: N/A c. None

Status – N/A

5. 6 wake turbulence categories and separation minima

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-WAKE-5. Target 1: Assessed in Aug 2018 a. No b. None B0-WAKE-5. Target 2: Implemented in date: N/A c. None

Status – N/A

Performance Improvement Area 2: Globally Interoperable Systems and Data AMET 1. WAFS a. Have we assessed the need?

Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-AMET-1. Target 1: Assessed in Dec 2016 a. Yes b. Yes B0-AMET-1. Target 2: Implemented in Jan 2012 c. Yes

Status – Implemented

2. IAVW a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-AMET-2. Target 1: Assessed in Dec 2016 a. Yes b. Yes B0-AMET-2. Target 2: Implemented in Jan 2004 c. Yes

Status – Implemented

3. TCAC forecasts a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-AMET-3. Target 1: Assessed in Dec 2016 a. Yes b. Yes B0-AMET-3.Target 2: Implemented in Dec 2013 c. Yes

Status – Partially Implemented

4. Aerodrome warnings

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-AMET-4. Target 1: Assessed in Dec 2004 a. Yes b. 1 B0-AMET-4.Target 2: Implement by Dec 2004 c. 1

Status –Implemented

5. Wind shear warnings and alerts

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-AMET-5. Target 1: Assessed in Dec 2004 a. Yes b. 1 B0-AMET-5.Target 2: Implement by Dec 2004 c. 1

Status - Partially Implemented

6. SIGMET a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-AMET-6. Target 1: Assessed in Dec 2004 a. Yes b. Yes B0-AMET-6. Target 2: Implement by Dec 2004 c. Yes

Status – Implemented

Page 16: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 16 of 52

7. Other OPMET information (METAR, SPECI and/or TAF)

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-AMET-7. Target 1: Assessed in Dec 2000 a. Yes b. Yes B0-AMET-7.Target 2: Implement by Dec 2000 c. Yes

Status – Implemented

8. QMS for MET a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-AMET-8. Target 1: Assessed in Aug 2018 a. Yes b. Yes B0-AMET-8.Target 2: Implement by Aug 2018 c. Yes

Status - Implemented

DATM 1. Aeronautical Information Exchange Model (AIXM)

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-DATM-1. Target 1: Assessed in Feb 2017 a. Yes b. Yes B0-DATM-1. Target 2: Implement by Feb 2017 c. Yes

Status - Implemented

2. eAIP a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-DATM-2. Target 1: Assessed in Sep 2018 a. Yes b. Yes B0-DATM-2. Target 2: Implemented in Sep 2018 c. Yes

Status – Implemented

3. Digital NOTAM a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-DATM-3. Target 1: Assess by Feb 2017 a. Yes b. Yes B0-DATM-3. Target 2: Implement by Feb 2017 c. Yes

Status – Implemented

4. eTOD Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-DATM-4. Target 1: Assess by Agu 2018 a. Yes b. 1 B0-DATM-4. Target 2: Implement by Dec 2024 c. 1

Status - Analysis Not Started

5. WGS-84 a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-DATM-5. Target 1: Assessed in Jan 2001 a. Yes b. Yes B0-DATM-5. Target 2: Implemented in Jan 1993 c. Yes

Status – Implemented

6. QMS for AIM a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-DATM-6. Target 1: Assessed in Aug 2018 a. Yes b. Yes B0-DATM-6. Target 2: Implement by Aug 2018 a. No

Status – Implemented

FICE 1. AIDC to provide initial flight data to adjacent ATSUs

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-FICE-1. Target 1: Assessed in Dec 2016 a. Yes b. Yes B0-FICE-1. Target 2: c. Yes

Status – Implemented

Page 17: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 17 of 52

2. AIDC to update previously coordinated flight data

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-FICE-2. Target 1: Assessed in Dec 2016 a. Yes b. Yes B0-FICE-2. Target 2: c. Yes

Status - Implemented

3. AIDC for control transfer

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-FICE-3. Target 1: Assessed in Dec 2016 a. Yes b. Yes B0-FICE-3. Target 2: c. Yes

Status - Implemented

4. AIDC to transfer CPDLC logon information to the Next Data Authority

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-FICE-4. Target 1: Assessed in Dec 2016 a. No b. No B0-FICE-4. Target 2: c. N/A

Status –N/A

Performance Improvement Area 3: Optimum Capacity and Flexible Flights ACAS 1. ACAS II (TCAS

version 7.1) a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-ACAS-1. Target 1: Assessed in Aug 2018 a. Yes b. Yes B0-ACAS-1. Target 2: Implement by Dec 2020 c. Yes

Status – Developing

2. Auto Pilot/Flight Director (AP/FD) TCAS

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-ACAS-2. Target 1: Assessed in Aug 2018 a. Yes b. Yes B0-ACAS-2. Target 2: Implement by Dec 2020 c. Yes

Status – Developing

3. TCAS Alert Prevention (TCAP)

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-ACAS-3. Target 1: Assessed in Aug a. No b. No B0-ACAS-3. Target 2: c. N/A

Status - N/A

ASEP 1. ATSA-AIRB a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-ASEP-1. Target 1: Assessed in Aug 2018 a. Yes b. No B0-ASEP-1. Target 2: c. N/A

Status - N/A

2. ATSA-VSA a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-ASEP-2. Target 1: Assessed in Aug 2018 a. Yes b. No B0-ASEP-2. Target 2: c. N/A

Status - N/A

ASUR 1. ADS-B a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-ASUR-1. Target 1: Assessed in Aug 2018 a. Yes b. Yes B0-ASUR-1. Target 2: Implement by Dec 2019 c. Yes

Status – Developing

2. Multilateration (MLAT)

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-ASUR-2. Target 1 Assessed in Aug 2018 a. No b. No B0-ASUR-2. Target 2: c. N/A

Status - N/A

Page 18: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 18 of 52

FRTO 1. CDM incorporated into airspace planning

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-FRTO-1. Target 1: Assessed in Aug 2018 a. Yes b. No B0-FRTO-1. Target 2: c. N/A

Status - N/A

2. Flexible Use of Airspace (FUA)

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-FRTO-2. Target 1: Assessed in Aug 2018 a. Yes b. No B0-FRTO-2. Target 2: c. N/A

Status - N/A

3. Flexible route systems

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-FRTO-3. Target 1 Assessed in Aug 2018: a. Yes b. No B0-FRTO-3. Target 2: c. N/A

Status - N/A

4. CPDLC used to request and receive re-route clearances

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-FRTO-4. Target 1: Assessed in Aug 2018 a. No b. No B0-FRTO-4. Target 2: c. N/A

Status - N/A

NOPS 1. Sharing prediction of traffic load for next day

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-NOPS-1. Target 1: Assessed in Aug 2018 a. Yes b. Yes B0-NOPS-1. Target 2: Implement by Dec 2019 c. No

Status – Developing

2. Proposing alternative routings to avoid or minimize ATFM delays

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-NOPS-2. Target 1: Assessed in Aug 2018 a. Yes b. No B0-NOPS-2. Target 2: c. N/A

Status - N/A

OPFL 1. ITP using ADS-B a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-OFTL-1. Target 1: Assessed in Aug 2018 a. No b. No B0-OFTL-1. Target 2: c. N/A

Status – N/A

SNET 1. Short Term Conflict Alert (STCA)

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-SNET-1. Target 1: Assessed in Sep 2014 a. Yes b. Yes B0-SNET-1. Target 2: c. Yes

Status – Implemented

2. Area Proximity Warning (APW)

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-SNET-2. Target 1: Assessed in Sep 2014 a. Yes b. No B0-SNET-2. Target 2: c. Yes

Status – Implemented

3. Minimum Safe Altitude Warning (MSAW)

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-SNET-3. Target 1: Assessed in Sep 2014 a. Yes b. No B0-SNET-3. Target 2: c. Yes

Status – Implemented

4. Medium Term Conflict Alert (MTCA)

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-SNET-4. Target 1: Assessed in Sep 2014 a. Yes b. No B0-SNET-4. Target 2: c. Yes

Status – Implemented

Performance Improvement Area 4: Efficient Flight Paths

Page 19: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 19 of 52

CCO 1. Procedure changes to facilitate CCO

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-CCO-1. Target 1: Assessed in Jan 2016 a. Yes b. 1 B0-CCO-1. Target 2: c. 1

Status – Implemented

2. Route changes to facilitate CCO

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-CCO-2. Target 1: Assessed in Jan 2016 a. Yes b. 1 B0-CCO-2. Target 2: c. 1

Status – Implemented

3. PBN SIDs Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-CCO-3. Target 1: Assessed in Sep 2014 a. Yes b. 1 B0-CCO-3. Target 2: Implement by Sep 2014 c. 1

Status – Implemented

CDO 1. Procedure changes to facilitate CDO

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-CDO-1. Target 1: Assessed in Jan 2016 a. Yes b. 1 B0-CDO-1. Target 2: c. 1

Status – Implemented

2. Route changes to facilitate CDO

Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-CDO-2. Target 1: Assessed in Jan 2016 a. Yes b. 1 B0-CDO-2. Target 2: c. 1

Status – Implemented

3. PBN STARs Number of aerodromes to be considered: 1 a. Have we assessed the need? Yes or No b. How many aerodromes need this capability? None, or 1 c. How many aerodromes implemented the

capability? None, or 1

B0-CDO-3. Target 1: Assessed in Sep 2014 a. Yes b. 1 B0-CDO-3. Target 2: Implemented in Sep 2014 c. 1

Status – Implemented

TBO 1. ADS-C over oceanic and remote areas

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-TBO-1. Target 1: Assessed in Aug 2018 a. Yes b. None B0-TBO-1. Target 2: c. N/A

Status - N/A

2. CPDLC over continental areas

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-TBO-2. Target 1: Assessed in Aug 2018 a. Yes b. None B0-TBO-2. Target 2: c. N/A

Status - N/A

3. CPDLC over oceanic and remote areas

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-TBO-3. Target 1: Assessed in Aug 2018 a. Yes b. None B0-TBO-3. Target 2: c. N/A

Status - N/A

Page 20: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 20 of 52

Table 2.1.1: ASBU B0 Implementation Metrics and Targets

2.1.2 ASBU B0 Implementation Status Summary

The summary of ASBU B0 implementation status is provided in the Table 2.1. The details of ASBU B0 implementation status is recorded using ANRFs and provided in Appendix D.

Module Elements

Need Analysis Implementation Status (if Element is needed)

Not

Sta

rted

In P

rogr

ess

Nee

d

N/A

Plan

ning

Dev

elop

ing

Parti

ally

Im

plem

ente

d

Impl

emen

ted

Performance Improvement Area 1: Airport Operations ACDM 1. Interconnection between aircraft operator & ANSP systems to share

surface operations information 1

2. Interconnection between aircraft operator & airport operator systems to share surface operations information 1

3. Interconnection between airport operator & ANSP systems to share surface operations information 1

4. Interconnection between airport operator, aircraft operator & ANSP systems to share surface operations information 1

5. Collaborative departure queue management 1 APTA 1. PBN approach procedures with vertical guidance to LNAV/VNAV

minima 1

2. PBN approach procedures with vertical guidance to LPV minima 1 3. PBN approach procedures without vertical guidance to LNAV

minima 1

4. GBAS Landing System (GLS) procedures to CAT I minima 1 RSEQ 1. AMAN via controlled time of arrival to a reference fix 1

2. Departure management 1 3. Departure flow management 1 4. Point merge 1

SURF 1. A-SMGCS with at least one cooperative surface surveillance system 1 2. Including ADS-B APT as an element of A-SMGCS 1 3. A-SMGCS alerting with flight identification information 1 4. EVS for taxi operations 1 5. Airport vehicles equipped with transponders 1

WAKE 1. New PANS-ATM wake turbulence categories and separation minima 1 2. Dependent diagonal paired approach procedures for parallel runways

with centrelines spaced less than 760 meters (2,500 feet) apart 1

3. Wake independent departure and arrival operations (WIDAO) for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart

1

4. Wake turbulence mitigation for departures (WTMD) procedures for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart based on observed crosswinds

1

5. 6 wake turbulence categories and separation minima 1 Performance Improvement Area 2: Globally Interoperable Systems and Data

AMET 1. WAFS √ 2. IAVW √ 3. TCAC forecasts √

4. SATVOICE direct controller-pilot communication (DCPC)

a. Have we assessed the need? Yes or No b. Do we need this capability? Yes or No c. Have we implemented the capability? Yes or No

B0-TBO-4. Target 1: Assessed in Aug 2018 a. Yes b. None B0-TBO-4. Target 2: c. N/A

Status - N/A

Page 21: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 21 of 52

Module Elements

Need Analysis Implementation Status (if Element is needed)

Not

Sta

rted

In P

rogr

ess

Nee

d

N/A

Plan

ning

Dev

elop

ing

Parti

ally

Im

plem

ente

d

Impl

emen

ted

4. Aerodrome warnings 1 5. Wind shear warnings and alerts 1 6. SIGMET √ 7. Other OPMET information (METAR, SPECI and/or TAF) 1 8. QMS for MET √

DATM 1. Standardized Aeronautical Information Exchange Model (AIXM) √ 2. eAIP √ 3. Digital NOTAM √ 4. eTOD 1 5. WGS-84 √ 6. QMS for AIM √

FICE 1. AIDC to provide initial flight data to adjacent ATSUs √ 2. AIDC to update previously coordinated flight data √ 3. AIDC for control transfer √ 4. AIDC to transfer CPDLC logon information to the Next Data

Authority √

Performance Improvement Area 3: Optimum Capacity and Flexible Flights ACAS 1. ACAS II (TCAS version 7.1) √

2. AP.FD function √ 3. TCAP function √

ASEP 1. ATSA-AIRB √ 2. ATSA-VSA √

ASUR 1. ADS-B √ 2. Multilateration (MLAT) 1

FRTO 1. CDM incorporated into airspace planning √ 2. Flexible Use of Airspace (FUA) √ 3. Flexible routing √ 4: CPDLC used to request and receive re-route clearances √

NOPS 1. Sharing prediction of traffic load for next day √ 2. Proposing alternative routings to avoid or minimize ATFM delays √

OPFL 1. ITP using ADS-B √ SNET 1. Short Term Conflict Alert implementation (STCA) √

2. Area Proximity Warning (APW) √ 3. Minimum Safe Altitude Warning (MSAW) √ 4. Medium Term Conflict Alert (MTCA) √

Performance Improvement Area 4: Efficient Flight Paths CCO 1. Procedure changes to facilitate CCO 1

2. Airspace changes to facilitate CCO 1 3. PBN SIDs 1

CDO 1. Procedure changes to facilitate CDO 1 2. Airspace changes to facilitate CDO 1 3. PBN STARs 1

TBO 1. ADS-C over oceanic and remote areas √ 2. CPDLC over continental areas √ 3. CPDLC over oceanic and remote areas √ 3. SATVOICE direct controller-pilot communication (DCPC) √

Table 2.1.2 ASBU B0 Implementation Status Summary 2.2 ASBU Block 1 Implementation Targets and Status

Page 22: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 22 of 52

This section will be written after 2019. Appendix E is reserved for ASBU B1 ANRFs. 2.3 ASBU Block 2 Implementation Targets and Status

This section will be written after 2025. Appendix F is reserved for ASBU B2 ANRFs. 2.4 ASBU Block 3 Implementation Targets and Status

This section will be written after 2031. Appendix G is reserved for ASBU B3 ANRFs.

Page 23: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 23 of 52

3. ICAO NACC Regional Aviation System Improvements (RASI) Status The RPBANIP is aligned with GANP and provides guidance to States in the NACC region. The ICAO NACC RO also provides guidance to implement certain capabilities outside the ASBU scope, yet regionally important improvements. Currently 4 aerodrome associated NACC region specific improvements are identified and shown below. RASI ANRF for ICAO NACC Regional Initiatives is prepared and provided in Appendix H.

• Aerodrome certification – Status: El Salvador International Airport (MSLP) “Monseñor Oscar Arnulfo Romero y Galdámez” Implemented

• Heliport operational approval – Status: N/A • Visual aids for navigation – Status: Implemented • Aerodrome Bird/Wildlife Organization and Control Programme – Status: Implemented

4. Authority of El Salvador/Civil Aviation Authority CAA’s State Aviation System Improvements (SASI) Status Authority of El Salvador/Civil Aviation Authority CAA’s State Aviation System Improvements (SASI) are broken into three categories; (1) Equipment upgrades; (2) Procedure upgrades; and (3) Infrastructure upgrades. The details of upgrades were recorded using SASI ANRFs and provided in Appendix I. 4.1 Equipment Upgrades

Equipment upgrades are not identified at this time. 4.2 Procedure Upgrades

Procedure upgrades are not identified at this time. 4.3 Infrastructure Upgrades

There are three infrastructure upgrades, shown below, which have been identified to address anticipated airport and airspace demand growth. SASI ANRF for Infrastructure Upgrades is prepared and provided in Appendix I.

• Airport Terminal Development – Status: Analysis in Progress • Airport Rwy Rehabilitation and extension – Status: Analysis in Progress • Control Tower and Technical Building upgrade – Status: Analysis in Progress

5. Authority of El Salvador/Civil Aviation Authority CAA State ANP Next Review Schedule The next review and revision of this document is scheduled in September 2018.

Page 24: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 24 of 52

Appendix A: ANRF Explained An ASBU ANRF should be completed for each applicable ASBU Module as follows:

PIA The Performance Improvement Area (1, 2, 3 or 4) for the ASBU Module, as per the NAM ASBU Handbook.

Block - Module The Module Designation for the ASBU Module, as per the NAM ASBU Handbook.

Date The date when the form was completed or updated.

Module Description The Summary Description for the ASBU Module, as per the NAM ASBU Handbook.

Element The descriptive text for each Element, as per the NAM ASBU Handbook. It is not necessary to include the Defined, Derived from or Identified By information. Insert additional rows, if necessary, to accommodate all of the Elements listed for the ASBU Module.

Date Planned or Implemented The month and year when the Element was fully implemented or the year when it is planned for the Element to be fully implemented by all applicable States or at all applicable aerodromes. This field should be left blank if the Status for the Element is “Analysis Not Started” or “Not Applicable” for all States or aerodromes in the Region.

Status The Need Analysis or Implementation status for the Element, in accordance with Table NAM ASBU III-1, III-2, III-3 or III-4. Indicate the status as follows:

Not Started: if the Need Analysis has not been started for any of the States or aerodromes

In Progress: if at least one Need Analysis has been started but none have yet been completed

Need: if at least on Need Analysis has determined a requirement for the Element, but no implementation planning has yet been initiated

Not Applicable: 1) if all of the Need Analyses completed to date have concluded the Element is not required, or 2) if the Element is not an aerodrome-related improvement and the Region has not adopted the improvement for region-wide implementation.

Planning: if at least one implementation is in the Planning phase and no implementations have yet been completed.

Developing: if at least one implementation is in the Developing phase but no implementations have yet been completed.

Partially Implemented: if at least one, but not all, implementations have been completed.

Implemented: if all of Needed implementations have been completed.

Status Details Further information to support or explain the reported status. The reason(s) an Element was found to be “Not Applicable” for all the aerodromes (or States) in the Region. The reason(s) why the Need Analysis has not been completed for all or some of the aerodromes (or States) in the Region. Information on where

Page 25: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 25 of 52

implementation has or has not been completed (as appropriate) if the reported status is “Partially Implemented”.

Achieved Benefits Describe the achieved benefits for the entire Module or particular Elements. The benefits can be quantitative or qualitative. The benefits should be described for the following 5 of the 11 Key Performance Areas (KPAs) defined the Manual on Global Performance of the Air Navigation System (Doc 9883):

Access & Equity: Improving the operating environment so as to ensure all airspace users have the right of access to ATM resources needed to meet their specific operational requirements; and ensuring that the shared use of the airspace for different airspace users can be achieved safely. Providing equity for all airspace users that have access to a given airspace or service. Generally, the first aircraft ready to use the ATM resources will receive priority, except where significant overall safety or system operational efficiency would accrue or national defence considerations or interests dictate by providing priority on a different basis.

Capacity: Improving the ability to meet airspace user demand at peak times and locations while minimizing restrictions on traffic flow. Responding to future growth by increasing capacity, efficiency, flexibility, and predictability while ensuring that there are no adverse impacts to safety and giving due consideration to the environment. Increasing resiliency to service disruption and minimising resulting temporary loss of capacity.

Efficiency: Improving the operational and economic cost effectiveness of gate-to-gate flight operations from the airspace users’ perspective. Increasing the ability for airspace users to depart and arrive at the times they select and fly the trajectory they determine to be optimum in all phases of flight.

Environment: Contributing to the protection of the environment by minimizing or reducing noise, gaseous emissions, and other negative environmental effects in the implementation and operation of the air navigation system.

Safety: Reducing the likelihood or severity of operational safety risks associated with the provision or use of air navigation services.

Implementation Challenges A description of any circumstances that have been encountered or are foreseen that might prevent or delay implementation. Challenges should be categorized and described under the applicable subject area.

Notes Any further information as deemed appropriate.

Page 26: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 26 of 52

Appendix B: ASBU ANRF Template Authority of El Salvador/Civil Aviation Authority CAA ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - CDO Date August 2018 Module Description: To use performance-based airspace and arrival procedures allowing an aircraft to fly its optimum profile using continuous descent operations. This will optimize throughput, allow fuel efficient descent profiles, and increase capacity in terminal areas. The application of PBN enhances CDO. Element Implementation Status 1 Element Description:

Procedure changes to facilitate CDO Date Planned/Implemented September 2014

Status Implemented

Status Details

2 Element Description Route changes to facilitate CDO

Date Planned/Implemented September 2014

Status Implemented

Status Details

3 Element Description PBN STARs

Date Planned/Implemented September 2014

Status Implemented

Status Details

Achieved Benefits Access and Equity Element 1: Describe if you can, else leave it blank. Element 3: Describe if you can, else leave it blank. Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes Provide notes if applicable.

Page 27: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 27 of 52

Appendix C: RASI and Civil Aviation Authority CAA ANRF Templates RASI and Civil Aviation Authority CAA ANRF templates are the same with ASBU ANRF template with exception of the header as shown in this Appendix. The first header is for the ICAO NACC Regional Office specific improvements while the second header is for the State specific improvements. Section C.1: Regional Aviation System Improvements (RASI) ANRF Header

Enter appropriate State Name and Date. Describe the Module (i.e., improvement group description.)

Authority of El Salvador/Civil Aviation Authority CAA RASI Air Navigation Reporting Form (ANRF) ICAO NACC Regional Initiatives Date September 1, 2017 Module Description: ICAO NACC RO has identified airport improvements. Refer to the ASBU ANRF for the remaining sections (i.e., Element Implementation Status, Achieved Benefits, Implementation Challenges, and Notes) Section C.2: State Aviation System Improvements (RASI) ANRF Header

Enter appropriate State Name, Upgrades category (i.e., Equipment, Procedure, Infrastructure, etc.), Date. Describe the Module (i.e., Upgrades category description.)

Authority of El Salvador/Civil Aviation Authority CAA SASI Air Navigation Reporting Form (ANRF) Infrastructure Upgrades Date September 1, 2017 Module Description: Describe module. Refer to the ASBU ANRF for the remaining sections (i.e., Element Implementation Status, Achieved Benefits, Implementation Challenges, and Notes)

Page 28: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 28 of 52

Appendix D: Authority of El Salvador/Civil Aviation Authority CAA ASBU Block 0 ANRFs

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 1 Block - Module B0 - ACDM Date August - 06, 2018 Module Description: To implement collaborative applications that will allow the sharing of surface operations data among the different stakeholders on the airport. This will improve surface traffic management reducing delays on movement and manoeuvring areas and enhance safety, efficiency and situational awareness. Element Implementation Status 1 Element Description:

Interconnection between aircraft operator and ANSP systems to share surface operations information

Date Planned/Implemented December 2020

Status Need

Status Details Coordinations have been made between the aircraft operator and the ANSP, to implement an ordering of the aircraft on the ground according to their scheduled departure time.

2 Element Description: Interconnection between aircraft operator and airport operator systems to share surface operations information

Date Planned/Implemented December 2020

Status Need

Status Details Interconnection monitoring is carried out between the aircraft operator and airport operator, to guarantee an effective implementation.

3 Element Description: Interconnection between airport operator and ANSP systems to share surface operations information

Date Planned/Implemented December 2020

Status Need

Status Details Interconnection monitoring is carried out between the aircraft operator and airport operator, to guarantee an effective implementation

4 Element Description: Interconnection between airport operator, aircraft operator and ANSP systems to share surface operations information

Date Planned/Implemented December 2020

Status Need

Status Details Interconnection monitoring is carried out between the aircraft operator and airport operator and ANSP, to guarantee an effective implementation

5 Element Description: Collaborative departure queue management

Date Planned/Implemented No applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation

Page 29: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 29 of 52

Procedures Availability Operational Approvals Notes

Page 30: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 30 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 1 Block - Module B0 - APTA Date August - 06, 2018 Module Description: The use of Performance-based Navigation (PBN) and ground-based augmentation system (GBAS) landing system (GLS) procedures will enhance the reliability and predictability of approaches to runways, thus increasing safety, accessibility and efficiency. This is possible through the application of basic global navigation satellite system (GNSS), Baro-vertical navigation (VNAV), satellite-based augmentation system (SBAS) and GLS. The flexibility inherent in PBN approach design can be exploited to increase runway capacity. Element Implementation Status 1 Element Description:

PBN approach procedures with vertical guidance to LNAV/VNAV minima

Date Planned/Implemented No applicable

Status N/A

Status Details We have RNAV RNP AR procedures

2 Element Description: PBN approach procedures with vertical guidance to LPV minima

Date Planned/Implemented No applicable

Status N/A

Status Details We have RNAV RNP AR procedures

3 Element Description: PBN approach procedures without vertical guidance to LNAV minima

Date Planned/Implemented No applicable

Status N/A

Status Details We have RNAV RNP AR procedures

4 Element Description: GBAS Landing System (GLS) procedures to CAT I minima

Date Planned/Implemented No applicable

Status N/A

Status Details We have RNAV RNP AR procedures

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 31: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 31 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 1 Block - Module B0 - RSEQ Date August - 06, 2018 Module Description: To manage arrivals and departures (including time-based metering) to and from a multi-runway aerodrome or locations with multiple dependent runways at closely proximate aerodromes, to efficiently utilize the inherent runway capacity. Element Implementation Status 1 Element Description:

AMAN via controlled time of arrival to a reference fix Date Planned/Implemented No Applicable

Status N/A

Status Details

2 Element Description: Departure management

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

3 Element Description: Departure flow management

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

4 Element Description: Point merge

Date Planned/Implemented No applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 32: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 32 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 1 Block - Module B0 - SURF Date August - 06, 2018 Module Description: First levels of advanced-surface movement guidance and control systems (A-SMGCS) provides surveillance and alerting of movements of both aircraft and vehicles at the aerodrome, thus improving runway/aerodrome safety. Automatic dependent surveillance-broadcast (ADS-B) information is used when available (ADS-B APT). Enhanced vision systems (EVS) is used for low-visibility operations. Element Implementation Status 1 Element Description:

A-SMGCS with at least one cooperative surface surveillance system

Date Planned/Implemented No applicable

Status N/A

Status Details El Salvador International Airport do not need A-SMGCS

2 Element Description: ADS-B APT

Date Planned/Implemented No applicable

Status N/A

Status Details El Salvador International Airport do not need ADS-BAPT

3 Element Description: A-SMGCS alerting with flight identification information

Date Planned/Implemented No applicable

Status N/A

Status Details El Salvador International Airport do not need A-SMGCS

4 Element Description: EVS for taxi operations

Date Planned/Implemented No applicable

Status N/A

Status Details El Salvador International Airport do not need EVS

5 Element Description: Airport vehicles equipped with transponders

Date Planned/Implemented No applicable

Status N/A

Status Details It is not necessary that type of transponders

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 33: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 33 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 1 Block - Module B0 - WAKE Date August - 06, 2018 Module Description: Improved throughput on departure and arrival runways through optimized wake turbulence separation minima, revised aircraft wake turbulence categories and procedures. Element Implementation Status 1 Element Description:

New PANS-ATM wake turbulence categories and separation minima

Date Planned/Implemented No applicable

Status N/A

Status Details Wait for the ICAO document to be published

2 Element Description: Dependent diagonal paired approach procedures for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart

Date Planned/Implemented No applicable

Status N/A

Status Details N/A

3 Element Description: Wake independent departure and arrival operations (WIDAO) for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart

Date Planned/Implemented No applicable

Status N/A

Status Details N/A

4 Element Description: Wake turbulence mitigation for departures (WTMD) procedures for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart based on observed crosswinds

Date Planned/Implemented No applicable

Status N/A

Status Details N/A

5 Element Description: 6 wake turbulence categories and separation minima

Date Planned/Implemented No applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 34: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 34 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 1 Block - Module B0 - AMET Date August - 06, 2018 Module Description: Global, regional and local meteorological information:

a) forecasts provided by world area forecast centres (WAFC), volcanic ash advisory centres (VAAC) and tropical cyclone advisory centres (TCAC);

b) aerodrome warnings to give concise information of meteorological conditions that could adversely affect all aircraft at an aerodrome including wind shear; and

c) SIGMETs to provide information on occurrence or expected occurrence of specific enroute weather phenomena which may affect the safety of aircraft operations and other operational meteorological (OPMET) information, including METAR/SPECI and TAF, to provide routine and special observations and forecasts of meteorological conditions occurring or expected to occur at the aerodrome.

This information supports flexible airspace management, improved situational awareness and collaborative decision making, and dynamically optimized flight trajectory planning. This module includes elements which should be viewed as a subset of all available meteorological information that can be used to support enhanced operational efficiency and safety. Element Implementation Status 1 Element Description:

WAFS Date Planned/Implemented January 2012

Status Implemented

Status Details

2 Element Description: IAVW

Date Planned/Implemented January 2004

Status Implemented

Status Details

3 Element Description: TCAC forecasts

Date Planned/Implemented December 2013

Status Implemented

Status Details

4 Element Description: Aerodrome warnings

Date Planned/Implemented December 2004

Status Implemented

Status Details

5 Element Description: Wind shear warnings and alerts

Date Planned/Implemented December 2004

Status Implemented

Status Details

6 Element Description: SIGMET

Date Planned/Implemented December 2004

Status Implemented

Status Details

7 Element Description: Other OPMET information (METAR, SPECI and/or TAF)

Date Planned/Implemented December 2000

Status Implemented

Status Details

8 Element Description: QMS for MET

Date Planned/Implemented August 2018

Status Implemented

Page 35: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 35 of 52

Status Details

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 36: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 36 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 2 Block - Module B0 - DATM Date August - 06, 2018 Module Description: The initial introduction of digital processing and management of information, from origination to publication, through aeronautical information service (AIS)/aeronautical information management (AIM) implementation, use of aeronautical exchange model (AIXM), migration to electronic aeronautical information publication (AIP) and better quality and availability of data. Element Implementation Status 1 Element Description:

Standardized Aeronautical Information Exchange Model (AIXM)

Date Planned/Implemented February 2017

Status Implemented

Status Details

2 Element Description: eAIP

Date Planned/Implemented September 2018

Status Implemented

Status Details

3 Element Description: Digital NOTAM

Date Planned/Implemented February 2017

Status Implemented

Status Details

4 Element Description: eTOD

Date Planned/Implemented December 2024

Status Analysis Not Started

Status Details there is not technological equipment

5 Element Description: WGS-84 Date Planned/Implemented January 2001

Status Implemented

Status Details

6 Element Description: QMS for AIM

Date Planned/Implemented August 2018

Status Implemented

Status Details

Achieved Benefits Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Notes

Page 37: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 37 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 2 Block - Module B0 - FICE Date August - 06, 2018 Module Description: To improve coordination between air traffic service units (ATSUs) by using ATS interfacility data communication (AIDC) defined by ICAO’s Manual of Air Traffic Services Data Link Applications (Doc 9694). An additional benefit is the improved efficiency of the transfer of communication in a data link environment. Element Implementation Status 1 Element Description:

AIDC to provide initial flight data to adjacent ATSUs Date Planned/Implemented December 2016

Status Implemented

Status Details

2 Element Description: AIDC to update previously coordinated flight data

Date Planned/Implemented December 2016

Status Implemented

Status Details .

3 Element Description: AIDC for control transfer

Date Planned/Implemented December 2016

Status Implemented

Status Details .

4 Element Description: AIDC to transfer CPDLC logon information to the Next Data Authority

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 38: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 38 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - ACAS Date August - 06, 2018 Module Description: To provide short-term improvements to existing airborne collision avoidance systems (ACAS) to reduce nuisance alerts while maintaining existing levels of safety. This will reduce trajectory deviations and increase safety in cases where there is a breakdown of separation. Element Implementation Status 1 Element Description:

ACAS II (TCAS version 7.1) Date Planned/Implemented December 2020

Status Developing

Status Details It has ACAS and TCAS applicable regulations, but not in version 7.1

2 Element Description: AP/FD function

Date Planned/Implemented December 2020

Status Developing

Status Details The regulations for its implementation are being developed

3 Element Description: TCAP function

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 39: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 39 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - ASEP Date August - 06, 2018 Module Description: Two air traffic situational awareness (ATSA) applications which will enhance safety and efficiency by providing pilots with the means to enhance traffic situational awareness and achieve quicker visual acquisition of targets: a) AIRB (basic airborne situational awareness during flight operations). b) VSA (visual separation on approach). Element Implementation Status 1 Element Description:

ATSA-AIRB Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

2 Element Description: ATSA-VSA

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 40: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 40 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - ASUR Date August - 06, 2018 Module Description: To provide initial capability for lower cost ground surveillance supported by new technologies such as ADS-B OUT and wide area multilateration (MLAT) systems. This capability will be expressed in various ATM services, e.g. traffic information, search and rescue and separation provision. Element Implementation Status 1 Element Description:

ADS-B Date Planned/Implemented December 2019

Status Developing

Status Details The total implementation of the COCESNA ADS-B is waiting

2 Element Description: MLAT

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 41: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 41 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - FRTO Date August - 09, 2018 Module Description: To allow the use of airspace which would otherwise be segregated (i.e. special use airspace) along with flexible routing adjusted for specific traffic patterns. This will allow greater routing possibilities, reducing potential congestion on trunk routes and busy crossing points, resulting in reduced flight lengths and fuel burn. Element Implementation Status 1 Element Description:

CDM incorporated into airspace planning Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

2 Element Description: Flexible Use of Airspace (FUA)

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

3 Element Description: Flexible routing

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A.

4 Element Description: CPDLC used to request and receive re-route clearances

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 42: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 42 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - NOPS Date August - 06, 2018 Module Description: Air traffic flow management (ATFM) is used to manage the flow of traffic in a way that minimizes delays and maximizes the use of the entire airspace. Collaborative ATFM can regulate traffic flows involving departure slots, smooth flows and manage rates of entry into airspace along traffic axes, manage arrival time at waypoints or flight information region (FIR)/sector boundaries and re-route traffic to avoid saturated areas. ATFM may also be used to address system disruptions including a crisis caused by human or natural phenomena. Element Implementation Status 1 Element Description:

Sharing prediction of traffic load for next day Date Planned/Implemented December 2019

Status Developing

Status Details You have the ATFM Platform, lack of personnel training

2 Element Description: Proposing alternative routings to avoid or minimize ATFM delays

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 43: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 43 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - OPFL Date August - 06, 2018 Module Description: To enable aircraft to reach a more satisfactory flight level for flight efficiency or to avoid turbulence for safety. The main benefit of ITP is fuel/emissions savings and the uplift of greater payloads. Element Implementation Status 1 Element Description:

ITP using ADS-B Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 44: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 44 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - SNET Date August - 06, 2018 Module Description: To enable monitoring of flights while airborne to provide timely alerts to air traffic controllers of potential risks to flight safety. Alerts from short-term conflict alert (STCA), area proximity warnings (APW) and minimum safe altitude warnings (MSAW) are proposed. Ground-based safety nets make an essential contribution to safety and remain required as long as the operational concept remains human centred. Element Implementation Status 1 Element Description:

Short Term Conflict Alert (STCA) Date Planned/Implemented December 2014

Status Implemented

Status Details

2 Element Description: Area Proximity Warning (APW)

Date Planned/Implemented December 2014

Status Implemented

Status Details

3 Element Description: Minimum Safe Altitude Warning (MSAW)

Date Planned/Implemented December 2014

Status Implemented

Status Details

4 Element Description: Medium Term Conflict Alert (MTCA)

Date Planned/Implemented December 2014

Status Implemented

Status Details

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 45: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 45 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - CCO Date August - 06, 2018 Module Description: To implement continuous climb operations in conjunction with performance-based navigation (PBN) to provide opportunities to optimize throughput, improve flexibility, enable fuel-efficient climb profiles, and increase capacity at congested terminal areas. The application of PBN enhances CCO. Element Implementation Status 1 Element Description:

Procedure changes to facilitate CCO Date Planned/Implemented January 2016

Status Implemented

Status Details

2 Element Description: Airspace changes to facilitate CCO

Date Planned/Implemented January 2016

Status Implemented

Status Details

3 Element Description: PBN SIDs

Date Planned/Implemented September 2014

Status Implemented

Status Details

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 46: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 46 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - CDO Date August 06, 2018 Module Description: To use performance-based airspace and arrival procedures allowing an aircraft to fly its optimum profile using continuous descent operations. This will optimize throughput, allow fuel efficient descent profiles, and increase capacity in terminal areas. The application of PBN enhances CDO. Element Implementation Status 1 Element Description:

Procedure changes to facilitate CDO Date Planned/Implemented January 2016

Status Implemented

Status Details

2 Element Description: Airspace changes to facilitate CDO

Date Planned/Implemented January 2016

Status Implemented

Status Details

3 Element Description: PBN STARs

Date Planned/Implemented September 2014

Status Implemented

Status Details

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 47: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 47 of 52

EL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications supporting surveillance and communications in air traffic services, which will lead to flexible routing, reduced separation and improved safety. Element Implementation Status 1 Element Description:

ADS-C over oceanic and remote areas Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

2 Element Description: CPDLC over continental areas

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

3 Element Description: CPDLC over oceanic and remote areas

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

4 Element Description: SATVOICE direct controller-pilot communication (DCPC)

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes

Page 48: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 48 of 52

Appendix E: Authority of El Salvador/Civil Aviation Authority CAA ASBU Block 1 ANRFs Insert ASBU B1 ANRFs in the future. Appendix F: Authority of El Salvador/Civil Aviation Authority CAA SBU Block 2 ANRFs Insert ASBU B2 ANRFs in the future. Appendix G: Authority of El Salvador/Civil Aviation Authority CAA ASBU Block 3 ANRFs Insert ASBU B3 ANRFs in the future.

Page 49: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 49 of 52

Appendix H: Authority of El Salvador/Civil Aviation Authority CAA ANRFs Civil Aviation Authority CAA ANRF

Authority of El Salvador/Civil Aviation Authority CAA Air Navigation Reporting Form (ANRF) ICAO NACC Regional Initiatives Date August – 07, 2018 Module Description: ICAO NACC RO has identified airport improvements. Element Implementation Status 1 Element Description:

Aerodrome certification Date Planned/Implemented Dec 2019

Status Developing

Status Details ICAO NACC region has a goal to have CAR aerodromes in its regional ANP Table AOP I-1 be certified. My Organization’s one airport, MSLP. They is in the process.

2 Element Description: Heliport operational approval

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

3 Element Description: Visual aids for navigation

Date Planned/Implemented Sep 1981

Status Implemented

Status Details ICAO NACC region has a goal to have CAR airports in its ANP Table AOP I-1 compliant with Annex 14 requirements. This capability is implemented at MSLP.

4 Element Description: Aerodrome Bird/Wildlife Organization and Control Programme

Date Planned/Implemented Dec 2009

Status Implemented

Status Details ICAO NACC region has a goal to have CAR airports in its ANP Table AOP I-1 have an aerodrome bird/wildlife organization and control programme. MSLP is developing the manual to address this issue.

Achieved Benefits Access and Equity Element 1 - Aerodrome certification: International operators may not be permitted to operate to aerodromes that are not certified Element 2. Heliport operational approval: International operators may not be permitted to operate to heliports that are not approved Element 3. Visual aids for navigation: International operators may not be permitted to operate to aerodromes that are not compliant with Annex 14 Capacity: No report Efficiency Element 3. Visual aids for navigation: Annex 14 compliant visual aids for navigation assist flights to more efficiently complete ground movements Environment: No report Safety Element 1 - Aerodrome certification: Certification should be contingent upon the airport complying with applicable ICAO SARPs. Certification and the associated regulatory oversight should increase the effectiveness of SSP and SMS processes to identify and correct safety issues at certified aerodromes. Element 2. Heliport operational approval: Certification should be contingent upon the heliport complying with applicable ICAO SARPs. Approval and the associated regulatory oversight should increase the effectiveness of SSP and SMS processes to identify and correct safety issues at approved heliports. Element 3. Visual aids for navigation: Annex 14 compliant visual aids for navigation reduce flight crew confusion and assist in avoiding runway incursions or other ground movement errors. Element 4. Aerodrome Bird/Wildlife Organization and Control Programme: An effective organization and control Programme reduces the potential for aircraft to strike wildlife or ingest wildlife into engines or propellers. Implementation Challenges Ground system Implementation: No report: No report

Page 50: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 50 of 52

Avionics Implementation: No report Procedures Availability: No report Operational Approvals: No report Notes Element 1: Airport Terminal Development will also address the airport terminal security issues.

Page 51: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 51 of 52

Appendix I: Authority of El Salvador/Civil Aviation Authority CAA ANRFs Replace with your Civil Aviation Authority CAA ANRF.

Civil Aviation Authority CAA Air Navigation Reporting Form (ANRF) Infrastructure Upgrades Date September 1, 2017 Module Description: Development of major components of the overall Airport/Aerodrome to meet the demands of the growing Aviation Industry. This will improve capacity and safety in the in terminal and allow seamless maneuvering of wide body Aircraft (example B777) at the turning bay. Such maneuvering will reduce runway occupancy time and reduce surface wear and tear. New ATC facility is required to meet the demands of increase staffing. Improving operational space is vital to meet the need of increased traffic. The benefits of such infrastructure upgrades will increase an overall traffic management efficiency and enhance safety. Element Implementation Status 1 Element Description:

Airport Terminal Development Date Planned/Implemented December 2019

Status Developing

Status Details Current terminal building does not meeting the passenger demands during peak periods. With the current airport terminal situation, the security and safety are likely to be compromised.

2 Element Description: Airport Runway Rehabilitation and Extension

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

3 Element Description: Control Tower and Technical Building Upgrades

Date Planned/Implemented No Applicable

Status N/A

Status Details N/A

Achieved Benefits Access and Equity Capacity Element 1 - Airport Terminal Development: Increase the capacity to handle passengers smoothly at the peak arrival periods. Efficiency Environment Safety Element 2 - Airport Runway Rehabilitation and Extension: Improve operational safety of aircraft. Element 3 - Control Tower and Technical Building Upgrades: Improve operational safety of aircraft and ATCOs. Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes Element 1 - Airport Terminal Development: Address the airport terminal security issues.

Page 52: EL SALVADOR State Air Navigation PlanEL SALVADOR ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - TBO Date Module Description: To implement a set of data link applications

Air Navigation Plan 52 of 52

(This page must be an even page.) (Insert blank page if needed.)