e eder associates consulting engineers, p. c. June 11, 1993 File #497-14 Mr. Rich Nauman National Presto Industries, Inc. 3925 North Hastings Way Eau Claire, WI 54703 Re: Chapter 30 Permit Application Dear Rich: I have enclosed three copies of the Chapter 30 permit application and attachments Eder Associates prepared for National Presto Industries' proposed groundwater discharge pipeline and outfall at Riverview Park. Please sign and date two of the applications where indicated and take them to Mr. Ken Van Es at the city of Eau Claire for co- signature and dating. The third copy is for your records. Please send or deliver the two signed copies of the application to Dan Koich at the Department of Natural Resources' Eau Claire area office. I have enclosed a cover letter to Dan Koich that should accompany the applications. If you have any questions, please call. Let me know when you send or deliver the applications to Dan. Very truly yours, EDER ASSOCIATES CONSULTING ENGINEERS, P.C. Dennis F. Kugle DFK/klj Enc. cc: W. Warren ^^Y^-nniM tfl G. Rozmus Ml/W SECTION #1 B . Fenske K. Van Es B. Amundson ^ _ M. Gifford L JUN 17 R. Reidel (iii t ^ S . Thon DFK\6L497-14.009 8025 EXCELSIOR DRIVE, MADISON. WISCONSIN 53717-1900 (608)836-1500 FAX (608 I 83 1-333'

eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

e eder associatesconsulting engineers, p. c.

June 11, 1993File #497-14

Mr. Rich NaumanNational Presto Industries, Inc.3925 North Hastings WayEau Claire, WI 54703

Re: Chapter 30 Permit Application

Dear Rich:

I have enclosed three copies of the Chapter 30 permitapplication and attachments Eder Associates prepared forNational Presto Industries' proposed groundwater dischargepipeline and outfall at Riverview Park. Please sign and datetwo of the applications where indicated and take them to Mr.Ken Van Es at the city of Eau Claire for co- signature anddating. The third copy is for your records. Please send ordeliver the two signed copies of the application to Dan Koichat the Department of Natural Resources' Eau Claire areaoffice. I have enclosed a cover letter to Dan Koich thatshould accompany the applications.

If you have any questions, please call. Let me know when yousend or deliver the applications to Dan.

Very truly yours,

EDER ASSOCIATES CONSULTING ENGINEERS, P.C.

Dennis F. KugleDFK/klj

Enc.

cc: W. Warren ^^Y^-nniM tflG. Rozmus Ml/W SECTION #1B . FenskeK. Van EsB. Amundson ^ _M. Gifford LJUN 17R. Reidel ( i i i t ^S . Thon

DFK\6L497-14.009

8025 EXCELSIOR DRIVE, MADISON. WISCONSIN 53717-1900 • (608)836-1500 • FAX (608 I 83 1 - 3 3 3 '

Page 2: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

e eder associatesconsulting engineers, p. c,

June 11, 1993File #497-14

Mr. Dan KoichWater Management SpecialistWisconsin Department of Natural Resources2004 Highland AvenueEau Claire, WI 54701-4346

Re: National Presto Industries, Inc.Chapter 30 Permit Application

Dear Dan:

On behalf of National Presto Industries, Inc. (NPI) in EauClaire, Eder Associates Consulting Engineers, P.C. (Eder) issubmitting the enclosed completed Chapter 30 permitapplication for construction of a groundwater dischargepipeline and outfall in the Chippewa River at Riverview Parkin Eau Claire. The pipeline would be used to convey treatedgroundwater to the river from an on-site remedial action atNPI that is being required by the Wisconsin Department ofNatural Resources (WDNR) and the U.S. Environmental ProtectionAgency (EPA) . The application has been signed by both NPI andthe city of Eau Claire since the proposed pipeline would belocated on city property.

Included with the application are plan drawings showing anddescribing the pipeline and outfall details. Figure 1 showsthe proposed pipeline and outfall location relative tosection, township, and range.

Where the pipeline crosses the backwater area in RiverviewPark, conventional construction support mats will be used tosupport a backhoe during trenching activities. The trenchacross the backwater area will be kept to the minimum widthpossible, and materials excavated for the trench will be usedas backfill once the pipeline is placed in the trench. Thepipeline below the bed of the Chippewa River will also beinstalled using a backhoe. Since the pipeline only needs toextend into approximately six feet of water, it should bepossible to drive the backhoe out into the river far enoughthat a barge will not be needed. Since the pipeline will onlybe eight inches in diameter, trenching activities will not beextensive, which should minimize disturbance of bottomsediments. The bottom sediments excavated for the trench willbe used as backfill once the pipeline is in place.

Continued . . .

8025 EXCELSIOR DRIVE. MADISON. WISCONSIN 53717-1900 • (608)836-1500 • FAX 16081 83 I -3337

Page 3: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

eder associates consulting engineers, p.c.

Mr. Dan KoichWDNRJune 11, 1993

-2-

Eder and NPI's contractor for this project is available tomeet with you at the site to discuss this project if you haveany questions. Eder and NPI appreciate your assistance withthis project and look forward to the WDNR's approval of theChapter 30 permit application.

Very truly yours,

EDER ASSOCIATES CONSULTING ENGINEERS, P.C.

Dennis F. KugleDFK/klj

Enc.

cc: K. Van EsB. AmundsonM. GiffordR. ReidelS. ThonG. RozmusW. WarrenR. NaumanB. Fenske

DFK\6L497-14.008

Page 4: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

State of WisconsinDepartment of Natural R(Return to appropriateDNR District/Area Office)

VS. Army Corp* of Engineers - St. Paul DistrictRegulatory Functions1421 VJS. Post Office Bldg.St. Paul Minnesota 55101-1479

STATE/FEDERAL APPLICATIONFOR WATER REGULATORYPERMTTS AND APPROVALSForm 3500-53 Rev. 9-89

PLEASE COMPLETE BOTH PAGES 1&2OF THIS APPLICATION. PRINTORTYPE. Use of this form is required by the Department for anyapplication filed pursuant to Chapter 30, Wis. Stats. The Department will not consider your application unless you complete and submitthis application form.

I. Applicant (Individual or corporate name!National Presto Industries, Inc.

Address5925 North Hastings Way

City. State, Zip CodeEau C la i re , Wl 54703

Telephone No. (Include area code)(715) 839-2121

2. Agent/Contractor (firm name)Eder Associates Consulting Engineers, P.CAddress8025 Excelsior DriveCity, State, Zip CodeMadison, Wl 53717Telephone No. (Include area code)(608) 836-1500

3. If applicant is not the fee title owner of the property where the proposed activity will be conducted, provide name and address of ownerand include letter of authorization from owner. Owner must be the applicant or coapplicant for structure, diversion and channel

change activities. A purchaser under a land contract is not considered a riparian owner until property transfer has occurred._____Owner's Name

City of Eau Cla i reAddress

203 South Farwe!City, State, Zip CodeEau Clai re, Wl 54702

4. Is the applicant a business? NoIf YES, is the permit or approval you are applying fornecessary for you to conduct this business in the Stateof Wisconsin? Q Yes EH NoIf YES. please explain why (attach additional sheets ifnecessary):

5. Project LocationAddress Riverview Park

Village/City/Town Eau C l a i r eWaterway ____Chippewa R ive r

County Eau C l a i r e

Govt Lot OR NW 1/4 NE 1/4. of

Township _27.North, Range 9 (West)6. Adjoining Riparian (Neighboring Waterfront Property Owner) Information

Name of Riparian #1(S) Thomas J. F ie ld

Address2620 Riverv iew Drive

City, State, Zip CodeEau Claire, Wl 54703

Name of Riparian i2(N) Robert M. Hays

Address3004 Riverview Drive

City, State, Zip CodeEau Claire, Wl 54703

7. Project Information (Attach additional sheets if necessary) See cover letter(a) Describe proposed activity (include how this project will be constructed)

Construction of a groundwater discharge p i p e l i n e and outfall at Riverview Park) Purpose, need and intended use of projectConveyence of treated groundwater to therequired on-site remedial action at NPI.

T>) Purpose, need and intended use of project .Conveyence of treated groundwater to the Chippewa River from a WDNR & EPA

(c) I have applied for or received permits from the following agencies: (Check V)

[D Municipal D County Q Wis. DNR D Corpt of Engineer*

(d) Date activity will begin if permit is issued When WDNR issues WPDES permit to NPI.j be completed:(e) Is any portion of the requested project now complete?

D Yes 0 NoIf yes, identify the completed portion on the enclosed drawingsand indicate here the date activity was completed:

I hereby certify that the information contained herein is true and accurate. I also certify that I am entitled to apply for a permit, or that Iam the duly authorized representative or agent of an applicant who is entitled to apply for a permit Any inaccurate informationsubmitted may result in permit revocation, the imposition of a forfeiture^) and requirement of restoration.Signature of Applicant or Duly Authorized Agent ate Signed

Corps of Engineers Process No.LEAVE BLANK - FOR RECEIVING AGEN )NLY

Wisconsin DNR File No.

Received By Date Received Date Application Was Complete

Page 5: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

DRAWINGS OF PROPOSEDACTIVITY SHOULD BE PREPAREDIN ACCORDANCE WITH SAMPLEDRAWING SHEET.

Proposed Materials:

Location Sketch (indicate scale). Show route to project site; include nearest mainroad and crossroad.Page

ht̂

Project Plans (Include top view and typical cross sections. Clearly identify features and dimensions or indicate scale.)(Use additional sheets if necessary)

Page 6: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

eder associates consulting engineers, p.c.

FIGURE 1

NE 1/4, SECTION 8, T27N, R9W,SEYMOUR TOWNSHIP, EAU CLAIRE COUNTY

SCALE: 1 INCH = 4200 FEET±

060193SW497148

PROPOSED GROUNDWATERDISCHARGE OUTFALL LOCATION

NATIONAL PRESTO INDUSTRIESEAU CLAIRE, WISCONSIN

Page 7: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

ESIGN INTERIMGROUNDWATER

D INDUSTRIES INC.;, WISCONSIN

NATIONALPRESTO

INDUSTRIESSITE

>N

Page 8: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

REMEDIAL DACTION ON-SITE

NATIONAL PRESTEAU CLA1R

EAU CLAIRECOUNTYAIRPORT

Existing 66 "0Outfall

Proposed 8~fOutfall

Page 9: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

i

Existing 66 0 •.Outfall ~^\ \

ProposedOutfall

EAU CLAIRE,

EAU CLAIRECOUNTYAIRPORT

SITE LOCATION

2000'I

Seal* In Tmt

eder associates c«NEW YORK MICHIGAN WISCONSIN

Page 10: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

NDUSTRES INC.ISCONSIN

J ' \ NATIONALPRESTO

INDUSTRIESSITE

LEGEMD— Existing Storm Sewer

— New Force Main

ling engineers, p.c.KMA FLORIDA NEW JERSEY

Page 11: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

v

\ \ \

8

0 X)I o-U T3

§ i?O 70 in> O-H IM rnrn o o

o mZ om z

TJTJm

"3 j 0

zd o^j mn om o

i §m his

REMEDIAL DESIGN INTERIMACTION ON-SITE GROUNDWATER

NATIONAL PRESTO INDUSTRIES INC.EAU CLAIRE, WISCONSIN

eder associates consulting engineers, p.c.NEW YORK WISCONSIN MICHIGAN GEORGIA FLORIDA NEW JERSEY

m01oGO

0

Ftm

Page 12: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

Existing Manhole SeeModifications Dwg. No. 2 7

New 4'0 ManholeSee Dwg. No. 2

4'H ManholeSee Dwg. No. 2

NOTES1. BENCHMARK-TOP OF HYDRANT O RIVERVIEW & WCLSH

ELEVATlON=818.27 (CITY DATUM)

2. AREA ABOVE STORM PIPES IS COVERED WITH PINE TREES

3. DATE OF SURVEY 5-4-93

4. DELLS POND:HIGHEST WATER ELEVATION - LAST 5 YEARS=795.10 MARCH 23. 1990LOWEST WATER ELEVATION - LAST 5 YEARS=793.00 MARCH 17, 1993WATER SURFACE ELEV.-794.00 MAY 4. 1993

PLANScale 7 "=50'

Excavate, Install Pipe,And Backfill

8"# Pipe

CT1ON1-AScale: 1/2"= T-0"

SECT3QN.HScale: 1/2"=T-

Page 13: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

^I.vVoK <;k\v^\ * •

^9TOP OF PH

ELEVATIDN-796.911̂

•Ax^ \\NV\\V\^\\V^N\^N\ \ x\ 's

\V\\\\>\ \N\ \ \ \ x\\ v \ ^ k i \ \ \ \ V v ^

\

WATER SURFACE ELEV.=794.00

Excavate, Install Pipe,.And Backfill

RiverBottom ~\

Page 14: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

L^M

\

Excavate, Install Pipe,And Backfill

RiverBo t tom~\

V

815 i—

810 —

805

SECTIONScale: T/2'

fO"<f

800_A

795

790

785

5 Year Max W 3.£'. 735,^0 (3/23/90) \j

Page 15: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

3 DATE OF SURVEY 5-4-93

- = : OS S SSSSfi = 3: USWATER SURFACE ELEV. -794.00 MAY 4.

PLANScale 1"=50'

^

Excavate, Install Pipe, _And Backfill \\

Pipe

SECTION 1-BScale: 1/2"= T-0"

Existingf~ U.H.

Weir B. 799.7

793145

Inv. El. 798.0

/nv. O. 798.8 Ass7.96X Slope AndIn Th« Diversion B

PRNGPRQFLE

Page 16: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

Lj£@@££> DECIDUOUS TREE^ TREE LINEIP SET 1" IRON PIPE

__ _ WATER'S EDGERCp REINFORCED CONCRETE PIPE

CMP CORRUGATED METAL PIPE

•'/^> ''AA*/

: Stops And Iny. El. 803.04a Diversion Box

815

810

805

800

795

790

785

4971 4M061193

REM

EDIA

L D

ESIG

N IN

TERI

MAC

TIO

N O

N-S

ITE

GRO

UNDW

ATf

NAT

ION

AL P

REST

O IN

DUST

RIES

INC.

EAU

CLA

IRE,

WIS

CONS

IN

f* ^*-J

e

cj e

r as

soci

ates

co

nsul

ting

engi

neer

sNE

W Y

ORK

W

ISCO

NSIN

M

ICHI

GAN

G

EORG

IA

FLO

RID

A

NEW

PROJECT

REMEDIAL DESIGN INTERIMACTION ON-SITE GROUNDWATER

NATIONAL PRESTO INDUSTRIES INC.EAU CLAIRE. WISCONSIN

TITLE

OUTFALL LOCATION

w^ 1 eder associates consulting engineers, p.c.

LOCUST VALLEY, NEW YORK • MADISON, WISCONSINANN ARBOR, MICHIGAN • AUGUSTA. GEORGIA

JACKSONVILLE. FLORIDA • TRENTON. NEW JERSEYDRAWN BY SCALE

AJP As ShownDESIGNED BY PROJECT No.

SH 497-14APPROVED BY DWG. No.

SJO .DATE 1

JUNE, 1993

Page 17: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

8"<t PipeInv. El. 791.95

8$ Pipe _Inv. El. 795.45

4'-0" ID PrecastCone. Manhole With

Access Cover

o 8550?MANHOLE SECTIONAL PLAN

Page 18: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

2-B

1 _8"0 PipeInv. El. 798.0

4'-0" ID Precast. Manhole With-

Access Cover

_8"0 Pipe• Inv. El. 798.2 Install New Weir Plate

' 21 "x5'-0

Existing ManholeContractor To LocateAnd Verify Elevations

8"0 Pipe'Inv. El. 798.5Grout In Place

2-B

8"H Inlet F(See InletDetail This

EXISTING MANHOLE MODIFICATIONS

Grade 804.0±

Existing MContract otAnd Verify

"\ Weir El. 799.7±

Install21"x5'- 0'*l

Page 19: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

2-A_New ConcreteDividing Wall

2-A

48"0 Reinforced Cone.Storm Sewer (Typ.)

EXISTING JUNCTION BOX MODIFICATIONS

Rim El. 811.88

Inv. El. 803.04Inv. El. 802.53

_New ConcreteDividing Wall

Page 20: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

48"0 Reinforced Conc._Storm Sewer (Typ.)

EXISTING JUNCTION BOX MODIFICATIONS

Rim El. 811.88

' '••'.' Existing~

4Precas

El.\ 803.79

\_New ConcreteDividing Wall

//?/. El. 80J.O4 (VenInv. El. 802.53 (Ven

SECTION 2-A

8'0 Ductile Iron RestrainedJoint Pipe (7R Flex AsManufactured By U.S. Pipe)

^_8"f S.S. Long' Radius Elbow

3 1/2'V S.S.Discharge Nozzle Nozzle

12-2

11-2

PLAN ELEVATION

DISCHARGE NOZZLEDETAILNTS

Page 21: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

ManholeTo Locate

ify Elevations

gXISTING MANHOLE MODIFICATIONS

Weir El. 799.7±

Grade 8Q4.Q± (Verify)

Existing ManholeContractor To LocateAnd Verify Elevations

Prec-

Install New Weir Plate21"x5'-0"x1/4" Thk.

Cone. Pipe Support

SECTION 2-B

See Detail 1This Dwg.

ExistingManhole

8"0 Pipe

2 1/2"* Hole

8"# Pipe

J" 6

R gVATIONScale 1/2"=1'-0"

SECTION THRU INLETScale 1 1/2"= T-0"

DETAIL 1Scale 1 1/2"= T-0'

INLET PIPE DETAIL

Page 22: eder associates consulting engineers, p. c. · 2019-11-19 · eder associates consulting engineers, p.c. Mr. Dan Koich WDNR June 11, 1993-2-Eder and NPI's contractor for this project

Ci<

§3si

COrnO

/, LI

'>

:v/

\^: :".•-'

if

^Qo

'o'Q'

j

"• r1

ofriCOm3O

i

T>TJ

O

SO O

CDF3K

COOJ o

8o II

N)(O

Io

> y * £|ig3i^ O O

[o —!^siz oo

z >PS

REMEDIAL DESIGN INTERIMACTION OM-SITE GROUNDWATE

NATION/<L PRESTO INDUSTRIES INC.EAU CLAIRE, WISCONSIN

eder associates consulting engineers,NEW YORK WISCONSIN MICHIGAN GEORGIA FLORIDA NEW.