    Eastern Power Networks plc

    Use of System Charging Statement

    FINAL NOTICEEffective from 1 Apr il 2014Version 2.1 

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    2/43

    Version Control  

    Version Publication

    Date

    Description of version and any changes made

    1.0 24/12/2013 Indicative Charges Effective 1 April 2014 (form to be approvedby Ofgem)

    2.0 19/02/2014 Final Charges Effective 1 April 2014 (form still awaiting Ofgemapproval)

    Please note changes have been made to the following charges:-

     Annex 1:HV HH MeteredNHH UMS Category CLV UMS (Pseudo HH Metered)HV Generation Intermittent

     Annex 4: All charges beginning with:LDNO LV

    LDNO HV2.1 20/02/2014 Form Approval received from Ofgem

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    3/43

    Contents

    1.  Introduction ........................................................................................................................................... 2 

    2.  Charge Application and Definitions ...................................................................................................... 3 

    Supercustomer Billing and Payment .................................................................................................... 3 Supercustomer Charges ...................................................................................................................... 3 Site-Specific Billing and Payment......................................................................................................... 4 

    Site-Specific Billed Charges ................................................................................................................. 4 

    Time Periods for Half-Hourly Metered Properties ................................................................................ 5 

    Time Periods for Half-Hourly Unmetered Properties............................................................................ 6  Application of Capacity Charges .......................................................................................................... 6 Chargeable Capacity ............................................................................................................................ 6 Exceeded Capacity .............................................................................................................................. 6 Demand Exceeded Capacity ................................................................................................................ 7 Generation Exceeded Capacity ............................................................................................................ 7 Standby Capacity for Additional Security on Site ................................................................................. 7 

    Minimum Capacity Levels .................................................................................................................... 8 

     Application of Charges for Excess Reactive Power ............................................................................. 8 

    Demand Chargeable Reactive Power .................................................................................................. 8 Generation Chargeable Reactive Power .............................................................................................. 9 Generation Charges for pre-2005 Designated EHV Properties ........................................................... 9 Provision of Billing Data ..................................................................................................................... 10 Out of Area Use of System Charges .................................................................................................. 10 Licensed Distribution Network Operator Charges .............................................................................. 10 Third Party Access from Exempt Distribution Networks .................................................................... 11 

    3 Schedule of Charges for Use of the Distribution System 13

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    4/43

    1. Introduction

    1.1. This statement has been prepared in order to discharge the obligation of Eastern

    Power Networks plc, hereafter referred to as “UK Power Networks”, under

    standard licence condition 14 of its Electricity Distribution Licence. It contains

    information about our charges1 and charging principles for use of our distribution

    system. It also contains information about our Line Loss Factors (LLFs).

    1.2. The charges in this statement are calculated using the Common DistributionCharging Methodology (CDCM) for Low Voltage and High Voltage (LV and HV)

    Designated Properties and the Extra-high Voltage Distribution Charging

    Methodology (EDCM) for Designated Extra-high Voltage (EHV) properties. The

    application of charges to premises can usually be referenced using the Line Loss

    Factor Class (LLFC) contained in the charge tables.

    1.3. All charges in this statement are shown exclusive of VAT. Invoices will include VAT

    at the current applicable rate.

    1.4. The annexes that form part of this statement are also provided for additional

    convenience in spreadsheet format. This spreadsheet also contains

    supplementary information used for charging purposes but which is not required to

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    5/43

    2. Charge Application and Defin itions

    Supercustomer Bill ing and Payment

    2.1. Supercustomer billing and payment applies to metering points registered as Non-

    Half-Hourly (NHH) metered or NHH unmetered. The Supercustomer approach

    makes use of aggregated data obtained from the ‘Non Half Hourly DUoS Report’.

    2.2. Invoices are calculated on a periodic basis and sent to each user for whom UK

    Power Networks is transporting electricity through its distribution system. Invoicesare reconciled, over a period of approximately 14 months, to ensure the cash

    positions of Users and UK Power Networks are adjusted to reflect later and more

    accurate consumption figures.

    2.3. The charges are applied on the basis of the LLFC assigned to a Meter Point

     Administration Number (MPAN), and the units consumed within the time periods

    specified in this statement. These time periods may not necessarily be the same

    as those indicated by the Time Pattern Regimes (TPRs) assigned to the Standard

    Settlement Configuration (SSC) – specific to Distribution Network Operators

    (DNOs). All LLFCs are assigned at the sole discretion of UK Power Networks.

    Supercustomer Charges

    2 4 S t h ll bill d th h th f ll i t

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    6/43

    2.8. Valid Settlement combinations 4  for these LLFCs are detailed in Market Domain

    Data (MDD).

    2.9. Where an MPAN has an invalid settlement combination, the ‘Domestic

    Unrestricted’ fixed and unit charge will be applied as default until the invalid

    combination is corrected. Where there are multiple SSC/TPR combinations, the

    default ‘Domestic Unrestricted’ fixed and unit charge will be applied for each

    invalid TPR combination.

    2.10. The time periods for the charge rates are as specified by the SSC. To determine

    the appropriate charge rate for each SSC/TPR a lookup table is provided in the

    spread sheet that accompanies this statement.

    2.11. The ‘Domestic Off-Peak’ and ‘Small Non-Domestic Off-Peak’ charges are

    supplementary to either an Unrestricted or a Two Rate charge.

    Site-Specific Billing and Payment

    2.12. Site-specific billing and payment applies to metering points settled as Half Hourly

    (HH) metered. The site-specific billing and payment approach makes use of HH

    metering data received through settlement.

    2.13. Invoices are calculated on a periodic basis and sent to each user for whom UK

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    7/43

    •  a capacity charge, pence/kVA/day, for Maximum Import Capacity (MIC) and/or

    Maximum Export Capacity (MEC);

    •  an excess capacity charge, pence/kVA/day, if a site exceeds its MIC and/or

    MEC;

    •  unit charges, pence/kWh; more than one unit charge may apply;

    and

      an excess reactive power charge, pence/kVArh, for each unit in excess of thereactive charge threshold.

    2.17. Users who wish to supply electricity to Customers whose Metering System is

    Measurement Class C, D, E within SVA or Users who trade their own electricity

    within CVA will be allocated the relevant charge structure dependent upon the

    voltage and location of the Metering Point.

    2.18. Measurement Class C, E or CVA charges apply to Exit/Entry Points where HH

    metering, or an equivalent meter, is used for Settlement purposes.

    2.19. Measurement Class D charges apply to Exit Points deemed to be suitable as

    Unmetered Supplies as permitted in the Electricity (Unmetered Supply)

    Regulations 2001 and where operated in accordance with BSCP520.

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    8/43

    2.25. The time periods for the application of unit charges to Designated EHV Properties

    are detailed in Annex 2.

    UK Power Networks has not issued a notice to change the time bands.

    Time Periods for Half-Hourly Unmetered Properties

    2.26. The time periods for the application of unit charges to connections that are Pseudo

    HH metered are detailed in Annex 1.

    UK Power Networks has not issued a notice to change the time bands.

     Appl ication of Capaci ty Charges

    2.27. The following sections explain the application of Capacity Charges and Exceeded

    Capacity charges.

    Chargeable Capacity

    2.28. The chargeable capacity is, for each billing period, the MIC/MEC, as detailed

    below.

    2.29. The MIC/MEC will be agreed with UK Power Networks at the time of connection or

    pursuant to a later change in requirements. Following such an agreement (be it at

    the time of connection or later) no reduction in MIC/MEC will be allowed for a

    i d f 12 th I th b f t th h bl it

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    9/43

    Demand Exceeded Capacity

    )0,),max(max(2capacityexceededDemand

    22

    MICRERI AI   −+×=  

    Where:

     AI = Active Import (kWh)

    RI = Reactive Import (kVArh)

    RE = Reactive Export (kVArh)

    MIC = Maximum Import Capacity (kVA)

    2.32. Only reactive import and reactive export values occurring at times of active import

    are used in the calculation. Where data for two or more MPANs is aggregated for

    billing purposes the HH consumption values are summated prior to the calculation

    above.

    2.33. This calculation is completed for every half hour and the maximum value from the

    billing period is applied.

    Generation Exceeded Capacity

    )0,),max(max(2capacityexceededGeneration 22 MECRERI AE   −+×=

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    10/43

    Minimum Capacity Levels

    2.37. There is no minimum capacity threshold.

     Appl ication of Charges for Excess Reacti ve Power

    2.38. When an individual HH metered MPAN’s reactive power (measured in kVArh) at

    LV and HV Designated Properties exceeds 33% of total active power (measured in

    kWh), excess reactive power charges will apply. This threshold is equivalent to an

    average power factor of 0.95 during the period. Any reactive units in excess of the

    33% threshold are charged at the rate appropriate to the particular charge.

    2.39. Power Factor is calculated as follows:

    Cos θ = Power Factor

    2.40. The chargeable reactive power is calculated as follows:

    kWh

    kVArh

    θ 

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    11/43

    Generation Chargeable Reacti ve Power

    ( )  

     

     

     

     

     

     

     ×

      

       −−= ,010.95

    1maxmaxkVArhchargeableGeneration 2   AERI,RE  

    Where:

     AE = Active Export (kWh)

    RI = Reactive Import (kVArh)

    RE = Reactive Export (kVArh)

    2.44. Only reactive import and reactive export values occurring at times of active export

    are used in the calculation. Where data for two or more MPANs is aggregated for

    billing purposes the HH consumption values are summated prior to the calculation

    above.

    2.45. The square root calculation will be to two decimal places.

    2.46. This calculation is completed for every half hour and the values summated over

    the billing period.

    Generation Charges for pre-2005 Designated EHV Properties

    2 47 D i t d EHV P ti th t t d t th di t ib ti t d

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    12/43

    increases its export capacity, the incremental increase in export capacity will

    attract UoS charges as other non-exempt generators.

    Provision of Billing Data

    2.49. Where HH metering data is required for UoS charging and this is not provided

    through settlement processes, such metering data shall be provided by the User of

    the system to UK Power Networks in respect of each calendar month within five

    working days of the end of that calendar month. The metering data shall identify

    the amount consumed and/or produced in each half hour of each day and shall

    separately identify active and reactive import and export. Metering data provided

    to UK Power Networks shall be consistent with that received through the metering

    equipment installed. Metering data shall be provided in an electronic format

    specified by UK Power Networks from time to time and, in the absence of such

    specification, metering data shall be provided in a comma-separated text file in theformat of D0036 MRA data flow (as agreed with UK Power Networks). The data

    shall be emailed to [email protected].

    2.50. UK Power Networks requires details of reactive power consumed or produced to

    be provided for all Measurement Class C (mandatory HH metered) sites and for

    Measurement Class E (elective HH metered) sites. It is also required for CVA sites

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    13/43

    2.54. Where an MPAN has an Invalid Settlement Combination, the ‘LDNO HV: Domestic

    Unrestricted’ fixed and unit charges will be applied as default until the invalid

    combination is corrected. Where there are multiple SSC/TPR combinations, the

    default ‘LDNO HV: Domestic Unrestricted’ fixed and unit charges will be applied for

    each invalid TPR combination.

    2.55. The charge structure for Designated EHV Properties embedded in networks

    operated by LDNOs will be calculated individually using the EDCM. The relevant

    charge structures are set out in Annex 2.

    2.56. For nested networks the relevant charging principles set out in DCUSA Schedule

    21 will apply.

    Third Party Access from Exempt Distribution Networks

    2.57. Where one of our MPANs is embedded within an Exempt Distribution Network

    connected to one of UK Power Networks’ distribution systems, and a Difference

    Metering scheme is in place for settlement purposes, we will continue to charge

    the Supplier of the boundary MPAN of the connection, based on gross

    measurement for distribution use of system. No charges will be levied directly to

    the Customer or Supplier of the embedded MPAN(s) connected within the Exempt

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    14/43

    •  the text filename shall be formed of the metering reference specified by UK

    Power Networks followed by a hyphen and followed by a timestamp in the

    format YYYYMMDDHHMMSS and followed by “.txt”; and

    •  the title of the email should contain the phrase “gross data for Difference

    Metered private network”.

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    15/43

    3. Schedule of Charges for Use of the Distr ibut ion System

    3.1. Tables listing the distribution use of system charges are published in the annexesto this document.

    3.2. These charges are also listed in a spreadsheet which is published with this

    statement and can be downloaded from www.ukpowernetworks.co.uk. 

    3.3. Annex 1 contains charges to LV and HV Designated Properties.

    3.4. Annex 2 contains the charges to Designated EHV Properties and charges applied

    to LDNOs with Designated EHV Properties embedded in networks within UK

    Power Networks’ area.

    3.5. Annex 3 contains details of any preserved and additional charges that are valid at

    this time. Preserved charges are mapped to an appropriate charge and are closed

    to new customers.

    3.6. Annex 4 contains the charges applied to LDNOs in respect of LV and HV

    Designated Properties embedded in networks within UK Power Networks’

    distribution services area.

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    16/43

    4. Schedule of Line Loss Factors

    Role of Line Loss Factors in the Supply of Electricity4.1. Electricity entering or exiting the DNOs’ networks is adjusted to take account of

    energy that is lost5 as it is distributed through the network.

    4.2. This adjustment is made to ensure that energy bought or sold by a User, from/to a

    Customer, accounts for energy lost as part of distributing energy to and from the

    Customer’s premises.

    4.3. DNOs are responsible for calculating the LLFs and providing these factors to

    Elexon. Elexon manage the Balancing and Settlement Code (BSC). The code

    covers the governance and rules for the balancing and settlement arrangements.

    4.4. Annex 5 provides the LLFs which must be used to adjust the metering system

    volumes to take account of losses on the distribution network.

    Calculation of Line Loss Factors

    4.5. LLFs are calculated in accordance with BSC Procedure (BSCP) 128, which

    determines the principles that DNOs must comply with when calculating LLFs.

    4.6. LLFs are calculated using either a generic method or a site-specific method. The

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    17/43

    4.10. The Elexon portal website, www.elexonportal.co.uk, contains the LLFs in standard

    industry data format (D0265). A user guide with details on registering and using

    the portal can be downloaded from www.elexonportal.co.uk/userguide .

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    18/43

    5. Notes for Designated EHV Properties

    EDCM Nodal/Network Group Costs5.1. A table is provided in the accompanying spreadsheet which shows the unscaled

    LRIC nodal costs used to calculate the current EDCM charges. These charges are

    published on our website www.ukpowernetworks.co.uk .

    5.2. These are illustrative of the modelled costs at the time that this statement was

    published. A new connection will result in changes to current network utilisations,

    which will then form the basis of future prices: the charge determined in this

    statement will not necessarily be the charge in subsequent years because of the

    interaction between new and existing network connections and any other changes

    made to UK Power Networks’ distribution system which may affect charges.

    Charges for New Designated EHV Properties

    5.3. Charges for any new Designated EHV Properties calculated after publication of

    the current statement will be published in an addendum to that statement as and

    when necessary.

    5.4. The form of the addendum is detailed in Annex 6 to this statement.

    5.5. The addendum will be sent to relevant DCUSA parties and published as a revised

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    19/43

    other than normal planned or unplanned outages) in order to benefit from any

    reduced Use of System charges calculated using the EDCM.

    5.9. Several options exist in which UK Power Networks may agree for some or the

    entire MIC to be interruptible. Under the EDCM the applicable demand capacity

    costs would be based on the MIC minus the capacity subject to interruption.

    5.10. An EDCM customer interested in making part or all of its MIC interruptible as an

    integral irrevocable feature of a new connection or modification to their existing

    connection should in the first instance contact UK Power Networks’ connections

    function;

    •  By emailing [email protected] 

    •  By telephone to 08701 964 599

    •  By writing to UK Power Networks, Projects Gateway, Metropolitan House,

    Darkes Lane, Potters Bar, EN6 1AG

    The customer must make an express statement in their application that they have

    an interest in some or all of the import capacity being interruptible for active

    network management purposes.

    5.11. An EDCM customer who is proactively interested in voluntarily but revocably

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    20/43

    6. Electrici ty Distribution Rebates

    6.1. UK Power Networks has neither given nor formally announced any Use of System

    rebates to Users in the 12 months preceding the date of publication of this revision

    of the statement.

    7. Accounting and Administ ration Services

    7.1. UK Power Networks reserves the right to impose payment default remedies. The

    remedies are as set out in DCUSA where applicable or else as detailed in the

    following paragraph.

    7.2. If any invoices that are not subject to a valid dispute remain unpaid on the due

    date, late payment interest (calculated at base rate plus 8%) and administration

    charges will be imposed.

    7.3. Our administration charges will be set at a level which is in line with the Late

    Payment of Commercial Debts Regulations 2002;

    Size of Unpaid Debt Late Payment Fee

    Up to £999.99 £40.00

    £1,000 to £9,999.99 £70.00

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    21/43

    9. Glossary of Terms

    9.1. The following definitions, which can extend to grammatical variations and cognateexpressions, are included to aid understanding:

    Term Definition

     All-the-way Charge A tariff applicable to an end User rather than an LDNO.

    Balancing and Settlement Code(BSC)

    The BSC contains the governance arrangements forelectricity balancing and settlement in Great Britain. Anoverview document is available at:

    www.elexon.co.uk/ELEXONDocuments/trading_arrangements.pdf .

    CDCM

    The common distribution charging methodology used forcalculating charges to Designated Properties as required bystandard licence condition 13A of the electricity distribution

    licence.

    Central Volume Allocation (CVA) As defined in the BSC.

     A person to whom a User proposers to supply, or for thetime being supplies, electricity through an exit point, or fromwho, a User or any relevant exempt supplier, is entitled torecover charges, compensation or an account of profits inrespect of electricity supplied though an Exit Point.

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    22/43

    Term Definition

    Distribution Connection and Useof System Agreement (DCUSA)

    The DCUSA is a multi-party contract between the licensedelectricity distributors, suppliers, generators and OffshoreTransmission Owners (OFTOs) of Great Britain.

    It is a requirement that all licensed electricity distributorsand suppliers become parties to the DCUSA.

    Distribution Network Operator(DNO)

     An electricity distributor who operates one of the 14distribution services areas and in whose electricitydistribution licence the requirements of section B of the

    standard conditions of that licence have effect.

    Distribution Services AreaThe area specified by the authority within which each DNOmust provide specified distribution services.

    Distribution System

    The system consisting (wholly or mainly) of:

    •  electric lines owned or operated by an authoriseddistributor that is used for the distribution ofelectricity from grid supply points or generation sets

    or other entry points to the points of delivery tocustomers or users; or

    •  any transmission licensee in its capacity asoperator of that licensee’s transmission system orthe Great Britain (GB) transmission system

    and includes any remote transmission assets (owned by atransmission licensee within England and Wales) that areoperated by that authorised distributor and any electricalplant, electricity meters, and metering equipment owned or

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    23/43

    Term Definition

    Entry Point

     A boundary point at which electricity is exported onto adistribution system from a connected installation or fromanother distribution system, not forming part of the totalsystem (boundary point and total system having themeaning given to those terms in the BSC).

    Exempt Distributor

     A person who is an operator of an electricity distributionsystem intended for the conveyance of electricity to or fromusers connected to that electricity distribution system for

    which a specific exemption to hold a distribution licencepursuant to the Electricity Act has been granted to thatoperator or the operator is entitled to not hold a distributionlicence consequent to a class exemption from the holding ofa distribution licence also issued pursuant to section 5 ofthe Electricity Act as amended.

    Exempt Distribution Network

     Any structures, equipment, lines, appliances or devicesused, or to be used, at a Premises, that constitutes an

    electricity distribution system under the control if not theownership of the Exempt Distributor.

    Exit Point

     A Point of Connection at which a supply of electricity mayflow from the Distribution System to the Customer’sinstallation or User’s installation or the Distribution Systemof another person.

    Extra-High Voltage (EHV) Nominal voltages of 22kV and above.

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    24/43

    Term Definition

    kVArh Kilovolt Ampere reactive hour.

    kW Kilowatt.

    kWh Kilowatt hour (equivalent to one “unit” of electricity).

    Licensed Distribution NetworkOperator (LDNO)

    The holder of a licence in respect of distribution activities inGreat Britain.

    Line Loss Factor (LLF)The factor used in Settlement to adjust the metering systemvolumes to take account of losses on the DistributionSystem.

    Line Loss Factor Class (LLFC) An identifier assigned to an SVA metering system which isused to assign the LLF and Use of System charges.

    Low Voltage (LV) Nominal voltages below 1kV.

    Market Domain Data (MDD)Market domain data is a central repository of reference dataused by all users involved in settlement. It is essential tothe operation of SVA trading arrangements.

    Maximum Export Capacity(MEC)

    The Maximum Export Capacity of apparent powerexpressed in kVA that has been agreed can flow throughthe Entry Point to the Distribution System from theCustomer’s installation as specified in the Connection Agreement.

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    25/43

    Term Definition

    Metering System Particular commissioned metering equipment installed forthe purposes of measuring the quantities of exports and/orimports at the Exit or Entry point.

    Metering Point AdministrationNumber (MPAN)

     A number relating to a metering point under the MRA.

    Meter Timeswitch Code (MTC)

    MTCs are three digit codes allowing Suppliers to identifythe metering installed in Customers’ premises. They

    indicate whether the meter is single or multi-rate, pre-payment or credit, or whether it is ‘related’ to another meter.

    MRA The Master Registration Agreement.

    Nested LDNO A Distribution System Operator that is responsible for aNested Network.

    Nested Networks

    This refers to a situation where there is more than one level

    of Embedded Network and therefore Nested DistributionSystems between LDNOs (e.g. host DNOintermediateLDNONested LDNOCustomer).

    OfgemOffice of Gas and Electricity Markets – Ofgem is governedby GEMA and is responsible for the regulation of thedistribution companies.

    Point of Common Coupling  As defined in the Common Connection Charging

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    26/43

    Term Definition

    Time Pattern Regime (TPR) The pattern of switching behaviour through time that one ormore meter registers follow.

    Use of System ChargesCharges applicable to Demand and Generation connectionswhich are connected to and utilise the Distribution Network.

    UserSomeone that has a Use of System agreement with theDNO e.g. a Supplier, Generator or other DNO.

    Unmetered Supplies Exit points deemed to be suitable as unmetered supplies aspermitted in the Electricity (Unmetered Supply) Regulations2001 and where operated in accordance with BSCP520.

    10. Annexes 1 to 6

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    27/43

     Annex 1 - Schedule of Charges for use of the Distribution System by LV and HV Designated Properties

    Time periods Red Time Band Green Time Band Black Time Band Yellow Time Band Green Time Band

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    16.00 - 19.00 16.00 - 19.00  07:00 - 16.00

    19.00 - 23.00

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    07.00 - 23.00

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    00.00 - 07.00

    23.00 - 24.00

    00.00 - 07.00

    23.00 - 24.00

    Saturday and Sunday

     All Year   00.00 - 24.00 00.00 - 24.00

    Notes

    Open LLFCs PCs

    Unit rate 1

    p/kWh

    (red/black)

    Unit rate 2

    p/kWh

    (amber/yellow)

    Unit rate 3

    p/kWh

    (green)

    Fixed charge

    p/MPAN/day

    Capacity charge

    p/kVA/day

    Reactive power

    charge

    p/kVArh

    Excess capacity

    charge

    p/kVA/day

    Closed LLFCs

    Domestic Unrestricted 3, 40 1 2.053 4.31

    Domestic Two Rate7, 11, 25, 43,

    46, 582 2.443 0.087 4.31

    Domestic Off Peak (related MPAN) 22, 29, 55, 61 2 0.129

    Small Non Domestic Unrestricted 201, 237, 238, 239 3 1.472 4.61

    Small Non Domestic Two Rate15, 49, 205,

    242, 247, 2484 1.832 0.069 4.61

    Small Non Domestic Off Peak (related MPAN) 33, 64 4 0.207

    LV Medium Non-Domestic 250, 254 5-8 1.669 0.073 29.95

    LV Sub Medium Non-Domestic

    HV Medium Non-Domestic

    LV HH Metered 86 0 10.268 0.161 0.043 12.63 3.11 0.311 3.11

    LV Sub HH Metered 80 0 8 578 0 105 0 024 8 66 4 90 0 238 4 90

    Eastern Power Networks - Effective from 1st April 2014 - Final LV and HV charges

     Amber Tim e Band

    07.00 - 16.00

    19.00 - 23.00

    Monday to Friday

    (Including Bank Holidays)

    November to February

    Inclusive

    Monday to Friday

    (Including Bank Holidays)

    March to October Inclusive

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    Notes

    Time Bands for Half Hourly Unmetered PropertiesTime Bands for Half Hourly Metered Properties

     All tim es are in UK Clock time

    Saturday and Sunday

     All Year 

     All tim es are in UK Clock time

     Annex 2 - Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users).

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    28/43

    Note: The list of MPANs / MSIDs provided may be incomplete; the DNO reserves the right to apply the listed charges to any other MPANs / MSIDs associated with the site. 1 of 6

    ImportUnique Identifier 

    LLFC/MSID

    ImportMPANs/MSIDs

    Export

    Unique

    Identifier 

    LLFC/MSID

    ExportMPANs/MSIDs

    Name

    Import

    Super Redunit rate

    (p/kWh)

    Import

    fixed charge

    (p/day)

    Import

    capacity rate

    (p/kVA/day)

    Import

    exceededcapacity rate

    (p/kVA/day)

    Export

    Super Redunit rate

    (p/kWh)

     Export

    fixed charge

    (p/day)

    Export

    capacity rate

    (p/kVA/day)

    Export

    exceededcapacity rate

    (p/kVA/day)

    3VALSW 771 1014569699836 THREE VALLEYS WATER PLC 0.466 166.03 2.76 2.76

     ADBRKS 771 1023529546480 ADDENBROOKES NHS TRUST 0.970 5,745.65 3.94 3.94

     AIAMAN 771 1014569292506 AIAMAN 792 1030054607984 A I A MANAGEMENT LTD 1.334 7.91 14.30 14.30   -1.281   158.12 0.09 0.09

     ARAMAN 800  1023483097981,

    1023492591231  BAE SYSTEMS PROPERTIES LTD 0.010 6,186.18 0.82 0.82

     ARLAFD 771  1030081553176,

    1030081553404  ARLAFD 792

      1030085114723,

    1030085114955  ARLA FOODS 3.857 3,057.43 1.37 1.37 1,019.14 0.09 0.09

     AW_GRA 771  1023477037942,

    1014571445536  ANGLIAN WATER SERVICES LTD 2.041 166.03 6.35 6.35

     AWOUSE 771  1023475403798,

    1014571965793  ANGLIAN WATER SERVICES LTD 2.570 166.03 2.17 2.17

    BDWLWF 796  1030082700187,

    1030082700415  BDWLWF 797 1030082700647 RWE NPOWER RENEWABLES LTD 1.483 35.77 1.86 1.86 3,666.58 0.09 0.09

    BGWDWF 796 1030083931374 BGWDWF 797 1030083931142 BIGGLESWADE WIND FARM LIMITED 0.655 1.27 1.96 1.96 260.96 0.09 0.09

    BERMAT 771 1014571751895 BERNARD MATTHEWS LIMITED 0.370 83.01 6.95 6.95

    BOCTHA 803 1014572608412 BOC LTD 2.184 899.11 6.07 6.07

    BPA_CO 804 1014572578282 BRITISH PIPELINE AGENCY LTD 0.928 476.31 2.32 2.32

    BPTLTD 771  1023475256360,

    1014572502380  BREAKSPEAR PARK TRUSTEE LTD C/O KING STURGE 1.407 166.03 1.88 1.88

    BROGB_ 821

    1030041592510,

    1030041592742,

    1030041592974,

    1030041593203

    BROGB_ 701

    1030041591828,

    1030041592050,

    1030041592282,

    1030041591590,

    1050000011309,

    1050000140440

    INFINIS LIMITED 0.002 212.71 1.37 1.37

    BROXSF 796 1050000521610 BROXSF 797 1030085039971 LARK ENERGY LTD 5.217 10.42 3.72 3.72 2,397.18 0.09 0.09

    BRTHSS 796 1030083941266 BRTHSS 797 1030083941034 TURVES SOLAR LIMITED 0.252 2.63 1.31 1.31 235.52 0.09 0.09

    BRTHSW 796 1030083918035 BRTHSW 797 1030083917802 REG BURNTHOUSE FARM LIMITED 0.252 3.71 1.31 1.31 234.44 0.09 0.09

    BS_BUR 805 1023485782314 BS_BUR 700 1023485782546 BRITISH SUGAR PLC 2.099 58.38 1.40 1.40   -2.189   417.93 0.09 0.09

    BS_WIS 806 1014568635628 BS_WIS 719 1023470427970 BRITISH SUGAR PLC 0.405 23.82 1.34 1.34   -0.405   214.34 0.09 0.09

    BTLCOM 771  1050000169030,

    1014572546086  BRITISH TELECOM 5.973 166.03 6.35 6.35

    CANTSF 796 1030082355419 CANTSF 797 1030081926920 HASLINGFIELD SOLAR PARK LTD 0.081 21.61 2.38 2.38 1,080.64 0.09 0.09

    CEMEX UK 771  1014571132500,

    1023474247588  CEMEX UK OPERATIONS LIMITED 4.046 166.03 3.65 3.65

    CHEDISF 796 1030083806488 CHEDISF 797 1030083806256 ADALINDA SOLAR SPV1 LTD 0.501 7.92 1.78 1.78 949.89 0.09 0.09

    COLDHA 808 1030017556367 COLDHA 715 1030017556135 SCOTTISHPOWER STRATEGIC TRANSACTIONS 0.290 23.29 1.92 1.92

    Time Periods for Designated EHV Properties

    Super Red Time Band

    Eastern Power Networks - Effective from 1st April 2014 - Final EDCM charges

    16:00 - 19:00

     All t imes are in UK Cl ock ti me

    Time periods

    Monday to Friday

    (Including Bank Holidays)

    November to February Inclusive

    Notes

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    29/43

    Note: The list of MPANs / MSIDs provided may be incomplete; the DNO reserves the right to apply the listed charges to any other MPANs / MSIDs associated with the site. 2 of 6

    ImportUnique Identifier 

    LLFC/MSID

    ImportMPANs/MSIDs

    Export

    Unique

    Identifier 

    LLFC/MSID

    ExportMPANs/MSIDs

    Name

    Import

    Super Redunit rate

    (p/kWh)

    Import

    fixed charge

    (p/day)

    Import

    capacity rate

    (p/kVA/day)

    Import

    exceededcapacity rate

    (p/kVA/day)

    Export

    Super Redunit rate

    (p/kWh)

     Export

    fixed charge

    (p/day)

    Export

    capacity rate

    (p/kVA/day)

    Export

    exceededcapacity rate

    (p/kVA/day)

    Time Periods for Designated EHV Properties

    Super Red Time Band

    Eastern Power Networks - Effective from 1st April 2014 - Final EDCM charges

    16:00 - 19:00

     All t imes are in UK Cl ock ti me

    Time periods

    Monday to Friday

    (Including Bank Holidays)

    November to February Inclusive

    Notes

    CTWDFM 796 1030079565056 CTWDFM 797 1030079564823 GEM WIND FARM 3 LIMITED 0.109 10.70 2.01 2.01 877.48 0.09 0.09

    DGRLTY 771  1030050289278,

    1030050289506  DIGITAL REALTY (WELWYN) SARL 1.348 6,061.12 1.37 1.37

    DRABED 809 1014572509517 CARLISLE GROUP PLC 0.009 7,173.97 1.19 1.19

    E_GYAR-1 7111 MSID: 7111 E_GYAR-1 7111 MSID: 7111 GREAT YARMOUTH POWER STATION 10.49 1.23 1.23

    E_KLYN-A-1 7044 MSID: 7044 E_KLYN-A-1 7044 MSID: 7044 KING'S LYNN POWER STATION 5.58 1.32 1.32

    E_PETEM1 7006 MSID: 7006 E_PETEM1 7006 MSID: 7006 PETERBOROUGH POWER STATION 0.99 1.31 1.31

    EARLHF 796 1030081316739 EARLHF 797 1030081316960 GEM WIND FARM 2 LIMITED 4.002 3.31 2.65 2.65 331.14 0.09 0.09

    EDLMUC 810

    1023497822125,

    1023497822357,

    1023514863056,

    1030010107819

    EDLMUC 702

    1023497821896,

    1023514686185,

    1030010107580,

    1023497821664

    NON FOSSIL PURCHASING AGENCY 0.090 6.81 1.36 1.36

    EDLPIT 811 1030020271288 EDLPIT 713 1030020271056 NON FOSSIL PURCHASING AGENCY 1.238 21.31 2.17 2.17

    EMR_TI 813  1023475632649,

    1014572805060  EUROPEAN METAL RECYCLING LTD 0.061 476.31 2.09 2.09

    EPRSUT 812 1023494988750 EPRSUT 705 1023503165023 ELEAN POWER STATION 1.587 77.14 1.30 1.30   -1.594   1,954.09 0.09 0.09

    ESWMID 771  1014572640842,

    1014572641075  ESWMID 792

      1023518907371,

    1023518908064  NORTHUMBRIAN WATER PLC 5.148 166.03 4.24 4.24   -5.007   0.09 0.09

    ESWWIX 771 1014572713989 NORTHUMBRIAN WATER 5.689 2,048.28 5.49 5.49

    EYEWFM 796 1030085019966 EYEWFM 7 97 1030085020190 EYE WIND FARM 2.774 8.51 1.71 1.71 578.73 0.09 0.09

    FBWTHE 817 1023507304338 FBWTHE 718 1023507304560 CEMG EXPORT PORTFOLIO 4.093 67.27 2.55 2.55   -5.868   647.18 0.09 0.09

    FIBEYE 816 1023479132092 FIBEYE 707 1023479132320 EPR EYE POWER STATION 2.774 16.45 1.73 1.73   -3.447   279.68 0.09 0.09

    FORD_D 818 1015684515819 FORD MOTOR COMPANY LTD 22,053.77 1.79 1.79

    FORD_DHVS 771 1014572810813 FORD MOTOR COMPANY LTD 166.03 4.30 4.30

    FUJISL 771

    1023526590750,

    1023526590982,

    1023526591211

    FUJITSU SERVICES LIMITED 1.091 249.04 2.93 2.93

    FXDFAG 771  1014572633250,

    1023479907422HUTCHISON PORTS (UK) LTD 6.565 166.03 4.63 4.63

    FXDOYS 771  1023482441566,

    1023492579962  HUTCHISON PORTS (UK) LTD 6.590 166.03 4.56 4.56

    GLASM2 796 1030083962424 GLASM2 797 1030083962656 GLASS MOOR 2 WIND FARM LTD 0.190 41.14 1.38 1.38 2,024.11 0.09 0.09

    GLASSM 814 1030024800679 GLASSM 709 1030024800447 FENLAND WINDFARMS LIMITED 0.189 10.60 1.46 1.46

    GLXOST 771  1014569657748,

    1014569657970  GLAXOSMITHKLINE SERVICES UNLIMITED 1.235 166.03 4.52 4.52

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    30/43

    Note: The list of MPANs / MSIDs provided may be incomplete; the DNO reserves the right to apply the listed charges to any other MPANs / MSIDs associated with the site. 3 of 6

    ImportUnique Identifier 

    LLFC/MSID

    ImportMPANs/MSIDs

    Export

    Unique

    Identifier 

    LLFC/MSID

    ExportMPANs/MSIDs

    Name

    Import

    Super Redunit rate

    (p/kWh)

    Import

    fixed charge

    (p/day)

    Import

    capacity rate

    (p/kVA/day)

    Import

    exceededcapacity rate

    (p/kVA/day)

    Export

    Super Redunit rate

    (p/kWh)

     Export

    fixed charge

    (p/day)

    Export

    capacity rate

    (p/kVA/day)

    Export

    exceededcapacity rate

    (p/kVA/day)

    Time Periods for Designated EHV Properties

    Super Red Time Band

    Eastern Power Networks - Effective from 1st April 2014 - Final EDCM charges

    16:00 - 19:00

     All t imes are in UK Cl ock ti me

    Time periods

    Monday to Friday

    (Including Bank Holidays)

    November to February Inclusive

    Notes

    GLXOWR 771

    1023475634256,

    1023475635409,

    1023475634948,

    1023475634488,

    1014570677103,

    1023484819994,

    1023475633563

    GLXOW R 792  1030074763340,

    1030074763118  GLAXOSMITHKLINE SERVICES UNLIMITED 1.618 581.10 2.36 2.36   -1.561   0.09 0.09

    GUNFL3 7277 MSID: 7277 GUNFL3 7277 MSID: 7277 GUNFLEET SANDS 33kV 4.009 284.09 3.21 3.21 914.46 0.09 0.09

    GUNFLT 7211 MSID: 7211, 7213 GUNFLT 7211 MSID: 7211, 7213 DONG ENERGY 0.017 224.45 3.82 3.82

    HEINZF 771 1014573127752 H J HEINZ COMPANY 5.593 83.01 5.63 5.63

    HTFD_L 820 1014569896484 HAYWARD TYLER LTD 0.065 1,201.15 1.50 1.50

    ICGLTD 796 1030075706342 INDUSTRIAL CHEMICALS GROUP LIMITED 874.80 1.38 1.38

    INFSSE ENET   1099000001162,1099000001171

      SOUTHERN ELECTRIC POWER DISTRIBUTION PLC 3.115 4,686.14 1.54 1.54

    KODAKH 822 1023478871040 KODAKH 710 1023466193217 KODAK LIMITED 0.697 1,105.16 1.48 1.48

    LBARPS 8 24 1014572529986 NPOWER LIMITED 0.234 238.15 1.18 1.18

    LBCO_ L 771  1023479820941,

    1014568411606  HANSON BUILDING PRODUCTS LTD 0.021 166.03 1.25 1.25

    LDAHSF 796 1030083806024 LDAHSF 797 1030083805795 HURSIT SPV1 LTD 0.564 4.29 1.59 1.59 515.35 0.09 0.09

    LEXHSF 796 1030083805563 LEXHSF 797 1030083805331 CLARAMOND SOLAR SPV1 LTD 0.689 4.97 1.60 1.60 596.52 0.09 0.09

    LONWST 826 1023497360519 LONWST 704 1023479109093 LONDON WASTE LTD 0.001 150.14 0.83 0.83

    LS&E_N 823  1023477604661,

    1014568599280  A T B LAURENCE SCOTT LTD 0.073 1,439.31 1.11 1.11

    LU_FIN 825  1023478728447,

    1023478728907  LONDON UNDERGROUND LTD 0.752 476.31 2.14 2.14

    LU_MHO 864

    1030059686387,

    1030060990025,

    1030060990257,1030060990489

    LONDON UNDERGROUND LIMITED 42,960.17 1.52 1.52

    MDLWCK 796 1050000543223 MDLWCK 797 1050000543241 MIDDLEWICK WIND FARM 1.595 34.13 2.80 2.80 4,778.27 0.09 0.09

    MLVLCM 771 1030062915127 MIDDLE LEVEL COMMISSIONERS 0.439 83.01 4.36 4.36

    MNBRNZ 771  1014572268249,

    1023498487971  BOLTON AEROSPACE LIMITED 0.376 166.03 2.24 2.24

    MSDHOD 828  1023533706269,

    1023533706490  MERCK SHARP AND DOHME LTD 0.002 3,076.40 2.74 2.74

    NEWHOL 807 1014569560220 CNH UK LIMITED 0.722 4,328.30 2.60 2.60

    NEWSIL 771

    ,

    1030022814856, NEWS INTERNATIONAL SUPPLY COMPANY LTD 332.06 2.84 2.84

    NR_BAS 840 1023478020044 NR_BAS 722 1023545945010 NETWORK RAIL INFRASTRUCTURE LTD 6,395.04 3.52 3.52 0.01 0.09 0.09

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    31/43

    Note: The list of MPANs / MSIDs provided may be incomplete; the DNO reserves the right to apply the listed charges to any other MPANs / MSIDs associated with the site. 4 of 6

    ImportUnique Identifier 

    LLFC/MSID

    ImportMPANs/MSIDs

    Export

    Unique

    Identifier 

    LLFC/MSID

    ExportMPANs/MSIDs

    Name

    Import

    Super Redunit rate

    (p/kWh)

    Import

    fixed charge

    (p/day)

    Import

    capacity rate

    (p/kVA/day)

    Import

    exceededcapacity rate

    (p/kVA/day)

    Export

    Super Redunit rate

    (p/kWh)

     Export

    fixed charge

    (p/day)

    Export

    capacity rate

    (p/kVA/day)

    Export

    exceededcapacity rate

    (p/kVA/day)

    Time Periods for Designated EHV Properties

    Super Red Time Band

    Eastern Power Networks - Effective from 1st April 2014 - Final EDCM charges

    16:00 - 19:00

     All t imes are in UK Cl ock ti me

    Time periods

    Monday to Friday

    (Including Bank Holidays)

    November to February Inclusive

    Notes

    NR_COL 842  1014572898446,

    1030076303426NR_COL 720

      1023545945047,

    1030077668707NETWORK RAIL INFRASTRUCTURE LTD 0.013 6,395.05 5.77 5.77

    NR_CRW 843 1014572578742 NR_CRW 721 1023545945029 NETWORK RAIL INFRASTRUCTURE LTD 0.001 6,395.04 4.31 4.31 0.09 0.09

    NR_GRA 844 1014573096936 NETWORK RAIL INFRASTRUCTURE LTD 3,197.52 2.69 2.69

    NR_HOR 845 1014572986535 NETWORK RAIL INFRASTRUCTURE LTD 6,395.05 3.69 3.69

    NR_KNG 846 1014572901666 NETWORK RAIL INFRASTRUCTURE LTD 3,197.52 1.50 1.50

    NR_LBR 847 1014572780683 NETWORK RAIL INFRASTRUCTURE LTD 8,840.86 2.20 2.20

    NR_MAN 848 1014572821160 NR_MAN 723 1023545947499 NETWORK RAIL INFRASTRUCTURE LTD 0.007 3,197.52 3.19 3.19 0.09 0.09

    NR_MIL 849 1014573017580 NETWORK RAIL INFRASTRUCTURE LTD 0.004 7,352.49 2.20 2.20

    NR_NRW 850 1014572876363 NR_NRW 724 1023545944902 NETWORK RAIL INFRASTRUCTURE LTD 3,197.51 3.16 3.16 0.01 0.09 0.09

    NR_PET 851 1014573170075 NETWORK RAIL INFRASTRUCTURE LTD 3,197.52 3.69 3.69

    NR_RAY 852 1014573010682 NR_RAY 725 1023545944911 NETWORK RAIL INFRASTRUCTURE LTD 6,395.04 3.19 3.19 0.01 0.09 0.09

    NR_RYE 853 1014572632104 NETWORK RAIL INFRASTRUCTURE LTD 6,395.05 2.35 2.35

    NR_SED 855 1014572682017 NR_SED 727 1023545944920 NETWORK RAIL INFRASTRUCTURE LTD 6,395.04 4.81 4.81 0.09 0.09

    NR_SHN 854 1023478597119 NR_SHN 726 1023545945056 NETWORK RAIL INFRASTRUCTURE LTD 0.002 6,395.04 2.96 2.96 0.09 0.09

    NR_SPR 856 1014572602660 NR_SPR 728 1023545944930 NETWORK RAIL INFRASTRUCTURE LTD 6,395.04 3.15 3.15 0.09 0.09

    NR_STW 857 1014572719730 NR_STW 729 1023545947968 NETWORK RAIL INFRASTRUCTURE LTD 0.002 6,395.04 3.49 3.49 0.01 0.09 0.09

    NR_SUN 858 1014572853366 NETWORK RAIL INFRASTRUCTURE LTD 7,560.84 1.70 1.70

    NR_TOT 859 1014573142245 NETWORK RAIL INFRASTRUCTURE LTD 6,395.05 2.19 2.19

    NR_UGL 860 1014573113954 NETWORK RAIL INFRASTRUCTURE LTD 3,197.52 4.00 4.00

    NR_WEL 861 1014572501466 NETWORK RAIL INFRASTRUCTURE LTD 0.039 6,395.05 4.56 4.56

    NRAUTH 771  1014572907871,

    1023484600573  NATIONAL RIVERS AUTHORITY 6.343 166.03 1.21 1.21

    NYSEIB 771  1030062357839,

    1030062357607  IMPERIUM CENTRE LIMITED 0.722 4,361.80 1.84 1.84

    PICKEN 830 1030030431071 PICKEN 706 1030030430849 ENERTRAG U K LTD 0.753 6.24 1.06 1.06

    PLMPPR 831  1030062872341,

    1030062872573  PALM PAPER LTD 2,191.47 2.75 2.75

    PP_COR 832 1014569523654 PETROPLUS REFINING & MARKETING LTD 0.749 952.61 3.93 3.93

    PRECIS 771  1014572632790,

    1015685836242

    PRECIS (1730) LTD & CARISBROOKE SWAVESEY GENERAL

    PARTNER LTD  0.518 166.03 6.67 6.67

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    32/43

    Note: The list of MPANs / MSIDs provided may be incomplete; the DNO reserves the right to apply the listed charges to any other MPANs / MSIDs associated with the site. 5 of 6

    ImportUnique Identifier 

    LLFC/MSID

    ImportMPANs/MSIDs

    Export

    Unique

    Identifier 

    LLFC/MSID

    ExportMPANs/MSIDs

    Name

    Import

    Super Redunit rate

    (p/kWh)

    Import

    fixed charge

    (p/day)

    Import

    capacity rate

    (p/kVA/day)

    Import

    exceededcapacity rate

    (p/kVA/day)

    Export

    Super Redunit rate

    (p/kWh)

     Export

    fixed charge

    (p/day)

    Export

    capacity rate

    (p/kVA/day)

    Export

    exceededcapacity rate

    (p/kVA/day)

    Time Periods for Designated EHV Properties

    Super Red Time Band

    Eastern Power Networks - Effective from 1st April 2014 - Final EDCM charges

    16:00 - 19:00

     All t imes are in UK Cl ock ti me

    Time periods

    Monday to Friday

    (Including Bank Holidays)

    November to February Inclusive

    Notes

    PRHMSF 796 1030085099084 PRHMSF 797 1030085040202 AG RENEWABLES 0.583 2.54 6.58 6.58 1,728.26 0.09 0.09

    PRMFDS 771  1014572860726,

    1023479474560  PREMIER INTERNATIONAL FOODS UK LIMITED 1.558 166.03 4.71 4.71

    QNETIC 771 1014572722956 QINETIQ LTD 1.595 3,996.15 5.60 5.60

    RAF_AL 771 1014572929954 MINISTRY OF DEFENCE 4.959 83.01 6.37 6.37

    RAINHM 862  1023487353212,

    1023487352751  RAINHM 703

      1023487353444,

    1023525149808  NON FOSSIL PURCHASING AGENCY 1.772 21.46 1.43 1.43

    RANJAC 771  1014712345991,

    1014712346008  RANSOMES JACOBSEN LTD 0.734 83.01 3.75 3.75

    RANSON 834 1030034117745 RANSON 714 1030034117513 RANSON MOOR WINDFARM 0.258 2.31 1.73 1.73

    REDTI1 815 1030037720697 REDTI1 708  1030037258397,

    1030037258625  FENLAND WINDFARMS LIMITED 1.155 143.21 2.96 2.96 7,462.18 0.09 0.09

    RIDEON 771 1014570337858 RIDGEONS LIMITED 0.929 83.01 5.10 5.10

    RNDMHS 771 1014571768453 THE RANDOM HOUSE GROUP LTD 2.321 83.01 3.09 3.09

    RPRLTD 771 1014569969627 RHONE POULENC RORER LTD 0.368 166.03 2.69 2.69

    SCROBY 836 1023545564889 SCROBY 716 1023545564903 SCROBY SANDS GENERATION 0.096 19.03 1.88 1.88

    SEN1&2 ENET  1099000000372,

    1099000000381  SEN1&2 ENET

      1099000000372,

    1099000000381  SOUTHERN ELECTRIC POWER DISTRIBUTION PLC 0.072 2,835.28 1.62 1.62

    SHELL_ 837 1014573023334 LONDON GATEWAY PORT LIMITED 0.840 1,190.77 1.31 1.31

    SHERSH 7234 MSID: 7234 SHERSH 7234 MSID: 7234 STATKRAFT 0.133 27.98 1.16 1.16 1,548.09 0.09 0.09

    STAGSH 838 1030037478730 STAGSH 717 1030037478509 EON RENEWABLES 0.249 171.72 0.96 0.96 3,434.34 0.09 0.09

    STAMFORD DNET MSID: 2035 STAMFORD DNET MSID: 2035 WPD 1,165.80 7.19 7.19

    STANS2 802  1030047519845,

    1030047520070  STANSTED AIRPORT LIMITED 13,476.80 2.05 2.05

    STANS3 801 1015685338293 BAA PLC 166.03 3.08 3.08

    TILBUR 833

    1023478133661,

    1023525729172,

    1023525728718

    TILBUR 733

    1030084129409,

    1030084129630,

    1030084129862

    FORTH PORTS PLC 0.061 2,030.93 2.49 2.49 667.31 0.09 0.09

    UB_EYE 771  1014573052317,

    1023470683505  BIRDS EYE LIMITED 1.263 166.03 6.31 6.31

    UBS_UK 771  1030065428330,

    1030065428562  MATTERHORN CAPITAL DC CHESHAM S.A.R.L 0.169 5,098.12 1.46 1.46

    VXHALL 771

    1014571158953,

    1014571159186,

    1014571159414,

    1014571158721

    VAUXHALL MOTORS 0.065 332.06 2.62 2.62

    WARNER 771  1030076325049,

    1030076325270  WARNER BROTHERS 0.391 4,590.05 2.25 2.25

    WAIRWF 796 1050000529637 WAIRWF 797 1050000529664 WESTON AIRFIELD WIND FARM 4.413 19.49 1.26 1.26 820.54 0.09 0.09

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    33/43

    Note: The list of MPANs / MSIDs provided may be incomplete; the DNO reserves the right to apply the listed charges to any other MPANs / MSIDs associated with the site. 6 of 6

    ImportUnique Identifier 

    LLFC/MSID

    ImportMPANs/MSIDs

    Export

    Unique

    Identifier 

    LLFC/MSID

    ExportMPANs/MSIDs

    Name

    Import

    Super Redunit rate

    (p/kWh)

    Import

    fixed charge

    (p/day)

    Import

    capacity rate

    (p/kVA/day)

    Import

    exceededcapacity rate

    (p/kVA/day)

    Export

    Super Redunit rate

    (p/kWh)

     Export

    fixed charge

    (p/day)

    Export

    capacity rate

    (p/kVA/day)

    Export

    exceededcapacity rate

    (p/kVA/day)

    Time Periods for Designated EHV Properties

    Super Red Time Band

    Eastern Power Networks - Effective from 1st April 2014 - Final EDCM charges

    16:00 - 19:00

     All t imes are in UK Cl ock ti me

    Time periods

    Monday to Friday

    (Including Bank Holidays)

    November to February Inclusive

    Notes

    WDLWWF 796  1030078016464,

    1030078016696  W DLW WF 797

      1030078016924,

    1030078017157  WADLOW ENERGY LIMITED 0.695 8.05 3.04 3.04 1,238.65 0.09 0.09

    WHMLWF 796 1030079196591 WHMLWF 797 1030079196820 CO-OPERATIVE GROUP LIMITED 0.277 73.67 1.78 1.78 2,716.44 0.09 0.09

    WILLIA 819 1030027859903 METAL & WASTE RECYCLING LTD 0.682 1,099.66 3.21 3.21

    WRGSTE 839 1023479303448 WRGSTE 712 1023477563953 NON FOSSIL PURCHASING AGENCY 0.018 89.09 0.83 0.83

    WWYNDC 771  1030059750786,

    1030059751015  MOU NTC ITY I NV EST ME NTS LT D 0. 03 9 18 ,5 09. 96 3 .5 9 3. 59

     Annex 3 - Schedule of Chargesfor use of the Distribution System to Preserved/Additional LLFC Classes

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    34/43

    1 of 1

    Closed

    LLFCsPCs

    Unit rate 1

    p/kWh

    Unit rate 2

    p/kWh

    Unit rate 3

    p/kWh

    Fixed charge

    p/MPAN/day

    Closed

    LLFCsPCs

    Unit rate 1

    p/kWh

    (red/black)

    Unit rate 2

    p/kWh

    (amber /yellow)

    Unit rate 3

    p/kWh

    (green)

    Fixed charge

    p/MPAN/day

    Capacity charge

    p/kVA/day

    Reactive power

    charge

    p/kVArh

    Excess Capacity

    charge

    p/kVA

    .

    Eastern Power Networks has n o Preserved NHH Tariffs/Additional LLFC classes

    Eastern Power Networks has no Preserved HH Tariffs/Additional LLFC classes

    Eastern Power Networks - Effective fr om 1st April 2014 - Final LV and HV tariffs

    NHH preserved charges/additional L LFCs

    Notes:

    HH preserved charges/additional L LFCs

    Notes:

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    35/43

     Annex 4 - Charges applied to LDNOs with HV/LV end users

    Time periods Red Time Band  Amber Time Ban d Green Time Band Black Time Band Yellow Time Band Green Time Band

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    16.00 - 19.00 16.00 - 19.00  07:00 - 16.00

    19.00 - 23.00

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    07.00 - 16.0019.00 - 23.00

      07.00 - 23.00

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    00.00 - 07.00

    23.00 - 24.00

    00.00 - 07.00

    23.00 - 24.00

    Saturday and Sunday

     All Year   00.00 - 24.00 00.00 - 24.00

    Notes

    Unique billing

    identifier  PCs

    Unit rate 1

    p/kWh(red/black)

    Unit rate 2

    p/kWh(amber/yellow)

    Unit rate 3

    p/kWh(green)

    Fixed charge

    p/MPAN/day

    Capacity charge

    p/kVA/day

    Reactive power

    chargep/kVArh

    Excess capacity

    chargep/kVA

    LDNO LV: Domestic Unrestricted 1 1.448 3.04

    LDNO LV: Domestic Two Rate 2 1.723 0.061 3.04

    LDNO LV: Domestic Off Peak (related MPAN) 2 0.091

    LDNO LV: Small Non Domestic Unrestricted 3 1.038 3.25

    LDNO LV: Small Non Domestic Two Rate 4 1.292 0.049 3.25

    LDNO LV: Small Non Domes tic Off Peak (related MPAN) 4 0.146

    LDNO LV: LV Medium Non-Domestic 5-8 1.177 0.051 21.13

    LDNO LV: LV HH Metered 0 7.243 0.114 0.030 8.91 2.19 0.219 2.19

    LDNO LV: NHH UMS category A 8 0.947

    LDNO LV: NHH UMS category B 1 1.354

    LDNO LV: NHH UMS category C 1 2.248

    LDNO LV: NHH UMS category D 1 0.677

    LDNO LV: LV UMS (Pseudo HH Metered) 0 19.334 0.433 0.351

    LDNO LV: LV Generation NHH 8 -0.916

    LDNO LV: LV Generation Intermittent 0 -0.916 0.289

    LDNO LV: LV Generation Non-Intermittent 0 -9.260 -0.164 -0.047 0.289

    LDNO HV: Domestic Unrestricted 1 1.007 2.11

    LDNO HV: Domestic Two Rate 2 1.199 0.043 2.11

    Eastern Power Networks - Effecti ve from 1st April 2014 - Final LDNO tariffs

    Time Bands for Half Hourly Unmetered Properties

     All tim es are i n UK Clo ck ti me

    Time Bands for Half Hourly Metered Properties

    Monday to Friday

    (Including Bank Holidays)

    November to February Inclusive

    Notes All times are in UK Clock time

    Monday to Friday

    (Including Bank Holidays)

    March to October Inclusive

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    Saturday and Sunday

     All Year 

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    36/43

    Time periods Red Time Band  Amber Time Ban d Green Time Band Black Time Band Yellow Time Band Green Time Band

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    16.00 - 19.00 16.00 - 19.00  07:00 - 16.00

    19.00 - 23.00

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    07.00 - 16.0019.00 - 23.00

      07.00 - 23.00

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    00.00 - 07.00

    23.00 - 24.00

    00.00 - 07.00

    23.00 - 24.00

    Saturday and Sunday

     All Year   00.00 - 24.00 00.00 - 24.00

    Notes

    Unique billing

    identifier  PCs

    Unit rate 1

    p/kWh(red/black)

    Unit rate 2

    p/kWh(amber/yellow)

    Unit rate 3

    p/kWh(green)

    Fixed charge

    p/MPAN/day

    Capacity charge

    p/kVA/day

    Reactive power

    chargep/kVArh

    Excess capacity

    chargep/kVA

    Eastern Power Networks - Effecti ve from 1st April 2014 - Final LDNO tariffs

    Time Bands for Half Hourly Unmetered Properties

     All tim es are i n UK Clo ck ti me

    Time Bands for Half Hourly Metered Properties

    Monday to Friday

    (Including Bank Holidays)

    November to February Inclusive

    Notes All times are in UK Clock time

    Monday to Friday

    (Including Bank Holidays)

    March to October Inclusive

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    Saturday and Sunday

     All Year 

    LDNO HVplus: NHH UMS category C 1 1.454

    LDNO HVplus: NHH UMS category D 1 0.438

    LDNO HVplus: LV UMS (Pseudo HH Metered) 0 12.510 0.280 0.227

    LDNO HVplus: LV Generation NHH 8 -0.606

    LDNO HVplus: LV Sub Generation NHH

    LDNO HVplus: LV Generation Intermittent 0 -0.606 0.191

    LDNO HVplus: LV Generation Non-Intermittent 0 -6.125 -0.108 -0.031 0.191

    LDNO HVplus: LV Sub Generation Intermittent 0 -0.608 0.195

    LDNO HVplus: LV Sub Generation Non-Intermittent 0 -6.182 -0.102 -0.029 0.195

    LDNO HVplus: HV Generation Intermittent 0 -0.593 41.57 0.217

    LDNO HVplus: HV Generation Non-Intermittent 0 -6.213 -0.075 -0.017 41.57 0.217

    LDNO EHV: Domestic Unrestricted 1 0.723 1.52

    LDNO EHV: Domestic Two Rate 2 0.860 0.031 1.52

    LDNO EHV: Domestic Off Peak (related MPAN) 2 0.045

    LDNO EHV: Small Non Domestic Unrestricted 3 0.518 1.62

    LDNO EHV: Small Non Domestic Two Rate 4 0.645 0.024 1.62

    LDNO EHV: Small Non Domestic Off Peak (related MPAN) 4 0.073

    LDNO EHV: LV Medium Non Domestic 5 8 0 588 0 026 10 54

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    37/43

    Time periods Red Time Band  Amber Time Ban d Green Time Band Black Time Band Yellow Time Band Green Time Band

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    16.00 - 19.00 16.00 - 19.00  07:00 - 16.00

    19.00 - 23.00

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    07.00 - 16.0019.00 - 23.00

      07.00 - 23.00

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    00.00 - 07.00

    23.00 - 24.00

    00.00 - 07.00

    23.00 - 24.00

    Saturday and Sunday

     All Year   00.00 - 24.00 00.00 - 24.00

    Notes

    Unique billing

    identifier  PCs

    Unit rate 1

    p/kWh(red/black)

    Unit rate 2

    p/kWh(amber/yellow)

    Unit rate 3

    p/kWh(green)

    Fixed charge

    p/MPAN/day

    Capacity charge

    p/kVA/day

    Reactive power

    chargep/kVArh

    Excess capacity

    chargep/kVA

    Eastern Power Networks - Effecti ve from 1st April 2014 - Final LDNO tariffs

    Time Bands for Half Hourly Unmetered Properties

     All tim es are i n UK Clo ck ti me

    Time Bands for Half Hourly Metered Properties

    Monday to Friday

    (Including Bank Holidays)

    November to February Inclusive

    Notes All times are in UK Clock time

    Monday to Friday

    (Including Bank Holidays)

    March to October Inclusive

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    Saturday and Sunday

     All Year 

    LDNO 132kV/EHV: LV Generation NHH 8 -0.351

    LDNO 132kV/EHV: LV Sub Generation NHH

    LDNO 132kV/EHV: LV Generation Intermittent 0 -0.351 0.111

    LDNO 132kV/EHV: LV Generation Non-Intermittent 0 -3.546 -0.063 -0.018 0.111

    LDNO 132kV/EHV: LV Sub Generation Intermi ttent 0 -0.352 0.113

    LDNO 132kV/EHV: LV Sub Generation Non -Intermittent 0 -3.579 -0.059 -0.017 0.113

    LDNO 132kV/EHV: HV Generation Intermittent 0 -0.343 24.06 0.126

    LDNO 132kV/EHV: HV Generation Non-Intermittent 0 -3.597 -0.043 -0.010 24.06 0.126

    LDNO 132kV: Domestic Unrestricted 1 0.375 0.79

    LDNO 132kV: Domestic Two Rate 2 0.447 0.016 0.79

    LDNO 132kV: Domestic Off Peak (r elated MPAN) 2 0.024

    LDNO 132kV: Small Non Domestic Unrestricted 3 0.269 0.84

    LDNO 132kV: Small Non Domestic Two Rate 4 0.335 0.013 0.84

    LDNO 132kV: Small Non Domestic Off Peak (related MPAN) 4 0.038

    LDNO 132kV: LV Medium Non-Domestic 5-8 0.305 0.013 5.48

    LDNO 132kV: LV Sub Medium Non-Domestic

    LDNO 132kV: HV Medium Non-Domestic

    LDNO 132kV: LV HH Metered 0 1 878 0 029 0 008 2 31 0 57 0 057 0 57

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    38/43

    Time periods Red Time Band  Amber Time Ban d Green Time Band Black Time Band Yellow Time Band Green Time Band

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    16.00 - 19.00 16.00 - 19.00  07:00 - 16.00

    19.00 - 23.00

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    07.00 - 16.0019.00 - 23.00

      07.00 - 23.00

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    00.00 - 07.00

    23.00 - 24.00

    00.00 - 07.00

    23.00 - 24.00

    Saturday and Sunday

     All Year   00.00 - 24.00 00.00 - 24.00

    Notes

    Unique billing

    identifier  PCs

    Unit rate 1

    p/kWh(red/black)

    Unit rate 2

    p/kWh(amber/yellow)

    Unit rate 3

    p/kWh(green)

    Fixed charge

    p/MPAN/day

    Capacity charge

    p/kVA/day

    Reactive power

    chargep/kVArh

    Excess capacity

    chargep/kVA

    Eastern Power Networks - Effecti ve from 1st April 2014 - Final LDNO tariffs

    Time Bands for Half Hourly Unmetered Properties

     All tim es are i n UK Clo ck ti me

    Time Bands for Half Hourly Metered Properties

    Monday to Friday

    (Including Bank Holidays)

    November to February Inclusive

    Notes All times are in UK Clock time

    Monday to Friday

    (Including Bank Holidays)

    March to October Inclusive

    Monday to Friday

    (Including Bank Holidays)

     All Year 

    Saturday and Sunday

     All Year 

    LDNO 0000: LV Generation Non-Intermittent 0 -0.619 -0.011 -0.003 0.019

    LDNO 0000: LV Sub Generation Intermittent 0 -0.061 0.020

    LDNO 0000: LV Sub Generation Non-Intermittent 0 -0.625 -0.010 -0.003 0.020

    LDNO 0000: HV Generation Intermittent 0 -0.060 4.20 0.022

    LDNO 0000: HV Generation Non-Intermittent 0 -0.628 -0.008 -0.002 4.20 0.022

     Annex 5 – Schedule of Line Loss Factors

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    39/43

    Period 1 Period 2 Period 3 Period 4 Period 5

    Winter Peak Summer Peak Winter Shoulder Night Other  

    Monday to Friday

    November to February  16:00 - 19:59 07:00 - 15:59

    Monday to Friday

    June to August  07:00 - 19:59

    Monday to Friday

    March  07:00 - 19:59

     All Year    00:00 - 06:59 Al l Other Times

    Notes

    Metered Voltage Period 1 Period 2 Period 3 Period 4 Period 5 Associated LLFC

    Low Voltage Network 1.094 1.073 1.082 1.065 1.074

    3, 7, 11, 15, 22, 25, 29,

    33, 40, 43, 46, 49, 55,

    58, 61, 64, 86, 88,

    100, 101, 102, 103,

    110, 111, 112, 113,

    150, 151, 152, 153,

    160, 161, 162, 163,

    201, 205, 237, 238, 239,

    242, 247, 248, 250, 254,

    901, 905, 912, 913, 915

    Low Voltage Substation 1.078 1.062 1.069 1.055 1.062 80, 902, 916

    High Voltage Network 1.061 1.047 1.054 1.039 1.047 84, 903, 918

    High Voltage Substation 1.059 1.045 1.052 1.037 1.045 771, 791, 792

    33kV Generic 1.009 1.008 1.009 1.008 1.008 796, 797

    132kV Generic 1.001 1.001 1.001 1.001 1.001 798, 799

    Demand

    Eastern Power Networks - Effective fr om 1st Apri l 2014 - Final LLF Time Periods

     All tim es are i n UK Clock tim e

    Generic Demand and Generation LLFs

    Metered Voltage, Respective Periods and Associated LLFCs

    EHV Site Specific LLFs

    Time periods

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    40/43

    Site Period 1 Period 2 Period 3 Period 4 Period 5 Associated LLFC/MSID

    EARLHF 1.009 1.008 1.009 1.008 1.008 796

    EDLMUC 1.112 1.109 1.111 1.109 1.110 810

    EDLPIT 1.100 1.014 1.031 1.018 1.030 811

    EMR_TI 1.012 1.015 1.013 1.013 1.016 813

    EPRSUT 1.038 1.032 1.034 1.029 1.038 812

    ESWMID 1.059 1.045 1.052 1.037 1.045 771

    ESWWIX 1.059 1.045 1.052 1.037 1.045 771

    EYEWFM 1.009 1.008 1.009 1.008 1.008 796

    FBWTHE 1.074 1.045 1.012 1.036 1.054 817

    FIBEYE 1.074 1.068 1.067 1.064 1.073 816

    FORD_D 1.001 1.001 1.001 1.001 1.001 818

    FORD_DHVS 1.059 1.045 1.052 1.037 1.045 771

    FUJISL 1.059 1.045 1.052 1.037 1.045 771

    FXDFAG 1.059 1.045 1.052 1.037 1.045 771

    FXDOYS 1.059 1.045 1.052 1.037 1.045 771

    GLASM2 1.009 1.008 1.009 1.008 1.008 796

    GLASSM 1.067 1.048 1.058 1.041 1.055 814

    GLXOST 1.059 1.045 1.052 1.037 1.045 771

    GLXOWR 1.059 1.045 1.052 1.037 1.045 771

    GUNFL3 1.009 1.008 1.009 1.008 1.008 MSID: 7277

    GUNFLT 1.000 1.000 1.000 1.000 1.000 MSID: 7211

    HEINZF 1.059 1.045 1.052 1.037 1.045 771

    HTFD_L 1.010 1.009 1.007 1.006 1.008 820

    ICGLTD 1.009 1.008 1.009 1.008 1.008 796

    INFSSE 1.000 1.000 1.000 1.000 1.000 ENET

    KODAKH 1.009 1.008 1.008 1.007 1.009 822

    LBARPS 1.017 1.006 1.015 1.011 1.014 824

    LBCO_ L 1.059 1.045 1.052 1.037 1.045 771

    LDAHSF 1.009 1.008 1.009 1.008 1.008 796

    LEXHSF 1.009 1.008 1.009 1.008 1.008 796

    LONWST 1 004 1 004 1 004 1 004 1 001 826

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    41/43

    Site Period 1 Period 2 Period 3 Period 4 Period 5 Associated LLFC/MSID

    NYSEIB 1.059 1.045 1.052 1.037 1.045 771

    PICKEN 1.019 1.008 1.015 1.007 1.010 830

    PLMPPR 1.002 1.000 1.000 1.001 1.001 831

    PP_COR 1.009 1.009 1.009 1.007 1.009 832

    PRECIS 1.059 1.045 1.052 1.037 1.045 771

    PRHMSF 1.009 1.008 1.009 1.008 1.008 796

    PRMFDS 1.059 1.045 1.052 1.037 1.045 771

    QNETIC 1.059 1.045 1.052 1.037 1.045 771

    RAF_AL 1.059 1.045 1.052 1.037 1.045 771

    RAINHM 1.020 1.005 1.009 1.004 1.010 862

    RMWFII 1.009 1.008 1.009 1.008 1.008 796

    RANJAC 1.059 1.045 1.052 1.037 1.045 771

    RANSON 1.069 1.055 1.063 1.049 1.062 834

    REDTI1 1.110 1.092 1.106 1.081 1.098 815

    RIDEON 1.059 1.045 1.052 1.037 1.045 771

    RNDMHS 1.059 1.045 1.052 1.037 1.045 771

    RPRLTD 1.059 1.045 1.052 1.037 1.045 771

    SCROBY 1.088 1.080 1.084 1.079 1.083 836

    SEN1&2 1.000 1.000 1.000 1.000 1.000 ENET

    SHELL_ 1.060 1.058 1.058 1.056 1.058 837

    SHERSH 1.000 1.000 1.000 1.000 1.000 MSID: 7234

    STAGSH 1.094 1.084 1.092 1.081 1.088 838

    STAMFORD 1.000 1.000 1.000 1.000 1.000 DNET

    STANS2 1.009 1.009 1.011 1.007 1.011 802

    STANS3 1.022 1.010 1.019 1.011 1.018 801

    TILBUR 1.008 1.007 1.009 1.007 1.008 833

    UB_EYE 1.059 1.045 1.052 1.037 1.045 771

    UBS_UK 1.059 1.045 1.052 1.037 1.045 771

    VXHALL 1.059 1.045 1.052 1.037 1.045 771

    WARNER 1.059 1.045 1.052 1.037 1.045 771

    WDLWWF 1 009 1 008 1 009 1 008 1 008 796

    Si P i d 1 P i d 2 P i d 3 P i d 4 P i d 5 A i d LLFC/MSID

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    42/43

    Site Period 1 Period 2 Period 3 Period 4 Period 5 Associated LLFC/MSID

    ESWMID   1.059 1.045 1.052 1.037 1.045 792

    EYEWFM   1.009 1.008 1.009 1.008 1.008 797

    FBWTHE   1.039 1.016 1.031 1.004 1.026 718

    FIBEYE   1.037 1.015 1.029 1.011 1.023 707

    GLASM2 1.009 1.008 1.009 1.008 1.008 797

    GLASSM   1.010 1.000 1.004 0.996 1.007 709

    GLXOWR   1.059 1.045 1.052 1.037 1.045 792

    GUNFL3   1.009 1.008 1.009 1.008 1.008 7277

    GUNFLT   1.000 1.000 1.000 1.000 1.000 7211

    KODAKH 1.005 0.995 1.004 1.002 1.003 710

    LDAHSF   1.009 1.008 1.009 1.008 1.008 797

    LEXHSF   1.009 1.008 1.009 1.008 1.008 797

    LONWST   1.001 1.000 1.000 0.999 1.001 704

    MDLWCK   1.009 1.008 1.009 1.008 1.008 797

    NR_BAS 1.003 1.002 1.002 1.001 1.002 722

    NR_COL   1.010 1.006 1.014 1.005 1.001 720

    NR_CRW   1.002 1.001 1.000 1.001 1.001 721

    NR_MAN   1.009 1.005 1.011 1.004 0.997 723

    NR_NRW   0.990 0.990 0.945 0.970 1.000 724

    NR_RAY 1.008 1.003 1.006 1.002 1.003 725

    NR_SED   1.015 1.007 1.010 1.004 1.008 727

    NR_SHN 1.003 1.002 1.002 1.001 1.001 726

    NR_SPR   1.008 1.003 1.005 1.003 1.004 728

    NR_STW   1.002 1.002 1.002 1.003 0.998 729

    PICKEN 1.016 1.006 1.009 1.005 1.012 706

    PRHMSF   1.009 1.008 1.009 1.008 1.008 797

    RAINHM 1.010 1.005 1.008 1.002 1.007 703

    RMWFII 1.009 1.008 1.009 1.008 1.008 797

     Annex 6 - New Designated EHV Properties. Addendum to Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with

    Designated EHV Properties/end-users).

  • 8/9/2019 Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges

    43/43

    Note: The list of MPANs / MSIDs provided may be incomplete; the DNO reserves the right to apply the listed charges to any other MPANs / MSIDs associated with the site.   1 of 1

    Import

    Unique Identifier 

    Import

    MPANs/MSIDs

    Import

    LLFC

    Export

    Unique Identifier 

    Export

    LLFC

    Export

    MPANs/MSIDsName

    Import

    super-red

    unit rate

    p/kWh

    Import fixed

    charge

    p/day

    Import

    capacity rate

    p/kVA/day

    Import

    exceeded

    capacity rate

    p/kVA/day

    Export

    super-red

    unit rate

    p/kWh

    Export fixed

    charge

    p/day

    Export

    capacity rate

    p/kVA/day

    Export

    exceeded

    capacity rate

    p/kVA/day

    EDCM import 1 EDCM export 1

    EDCM import 2 EDCM export 2

    EDCM import 3 EDCM export 3

    EDCM import 4 EDCM export 4

    EDCM import 5 EDCM export 5

    EDCM import 6 EDCM export 6

    EDCM import 7 EDCM export 7

    EDCM import 8 EDCM export 8

    EDCM import 9 EDCM export 9

    EDCM import 10 EDCM export 10

    Import

    Unique Identifier 

    Import

    MPANs/MSIDs

    Import

    LLFC

    Export

    Unique Identifier 

    Export

    LLFC

    Export

    MPANs/MSIDsName

    Import LLF

    period 1

    Import LLF

    period 2

    Import LLF

    period 3

    Import LLF

    period 4

    Import LLF

    period 5

    Export LLF

    period 1

    Export LLF

    period 2

    Export LLF

    period 3

    Export LLF

    period 4

    Export LLF

    period 5

    EDCM Import 1 EDCM Export 1

    EDCM Import 2 EDCM Export 2

    EDCM Import 3 EDCM Export 3

    EDCM Import 4 EDCM Export 4

    EDCM Import 5 EDCM Export 5

    EDCM Import 6 EDCM Export 6

    EDCM Import 7 EDCM Export 7

    EDCM Import 8 EDCM Export 8

    EDCM Import 9 EDCM Export 9

    EDCM Import 10 EDCM Export 10

    Eastern Power Networks - Effective from 1st April 2014 - Final new designated EHV charges

     Annex 6 - Adden dum t o Ann ex 2 EHV char ges

    Eastern Power Networks - Effective from 1st April 2014 - Final new designated EHV line loss factors