22
BIM JSV XLI XIVVM½IH E KYMHI JSV QERYJEGXYVIVW NYRI IHMXMSR “The construction team are told they will be using collaborative BIM on the next project”

E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

BIM

“The construction team are told they will be using

collaborative BIM on the next project”

Page 2: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

contents

1. Introduction

2. The Background to BIM

3. What Manufacturers Should Do 4

4

4

5

4. Open Standards 6

6

6

7

7

7

Example of COBie Template 8

5. BIM and Facilities Management 9

9

9

9

Case Studies

Glossary

Further Reading

Page 3: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

1. Introduction

What is BIM?

The consistent, conventional labelling or naming of documents and data

and ensures all those working on the project follow the same procedures. A suitable process is described in BS 1192, which is already used for numbering drawings on many projects and can form the basis of a system for use with BIM

A method for storing and manipulating information. On many projects this involves the use of a three-dimensional representation of the buildings in software. Essentially, a BIM is a shared representation and spatial database that records the location and attributes of every component

A method for exchanging or issuing information about the building, including its construction, operation, performance and maintenance. Traditionally, this has involved exchanging drawings, schedules and manuals, in paper or electronic format and this may continue. The difference is that when BIM is used, the information will be generated from the BIM, rather than by preparing the documents separately

Who is this guide for?

BIM

Page 4: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

Why should I invest in BIM?

2. The Background to BIM

Existing information systems

BIM

Page 5: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

The development of shared data

1 Collaboration across the industry.

2 Engagement through the entire life-cycle of the building.

3 Collation and exchange of information in common format.

4 Shared three-dimensional models.

5 Intelligent, structured databases.

BIM

The Government’s Requirements

Page 6: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

3. What Manufacturers Should Do

Developing a BIM strategy

Staff training needs

Software requirements

Restructuring product data to make it BIM compatible

The requirements of the supply chain

Data Drop 1 is related to the client’s requirements and spatial analysis. At this stage the model will be used for feasibility studies and will be generic in content and structure

Data Drop 2 is a technical solution that can be built. Information from the model can be used for costing. The information within the model is still

Data Drop 3 is also a technical solution that can be built. The information is far richer than in Data Drop 2 because it is fully coordinated and can be used for procurement of materials and products. At this stage product

of data about components, systems, locations, connections, documents and attributes

4BIM

Data Drop 1

Data Drop 2

Data Drop 3

Page 7: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

Manufacturers’ structured product information

The expense of purchasing software for a range of BIM platforms

Training staff to use the software to create BIM objects

5BIM

Data Drop 4

Product Code

Thickness (mm)

R-value (m2K/W)

Weight (kg/m2)

55

65

75

85

95

STOCK NO DESCRIPTION UNIT AREA

ea

ea

ea

Mineral insulation board

Page 8: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

4. Open Standards

The Need for Open Standards

Early adoption

6BIM

Page 9: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

Green Building XML

Construction Operations Building Information Exchange

7BIM

Page 10: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

Example of COBie Template

8BIM

Property sets

Page 11: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

5. BIM and Facilities Management

Record BIM

Operational BIM

Integration

9BIM

Page 12: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

Using the Record and Operational BIMs

at

BIM

Page 13: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

®

Bentley AECOsim

Graphisoft ArchiCAD

Nemetschek Vectorworks

Revit Architecture

Kingspan Kooltherm® K3 Floorboard

Kingspan Kooltherm® K8 Cavity Board

Kingspan Kooltherm®

Kingspan Kooltherm® K15 Rainscreen Board

Kingspan Thermaroof® TR27 LPC/FM

BIM

®

®

Page 14: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

Lower Roof - Slab Level3200

1a

Roof Over Main Beams4000

45-70-45/330 - Decking and paving pedestals

45-45-50/390 - Standard gypsum plasterboard - type A

45-70-30/370 - Stainless steel frames

45-45-95/410 - Cement-bonded particleboard

45-70-30/370 - Stainless steel frames

45-80-50/300 - Aggregate concrete blocks

45-45-65/420 - Phenolic foam boardKingspan Insulation Ltd - Kingspan Kooltherm® K15 Rainscreen Board

45-65-50/363 - Polymeric roofing membranes

45-20-64/395 - Precast concrete flags45-55-60/330 - Cementitious render

45-45-65/430 - Polyisocyanurate (PIR) foam board

25-80-72/160 - One coat render system

20-50-30/170 - Single layer warm roof covering system

45-80-40/320 - Metal tray infill units

45-75-45/380 - Metal furrings

25-85-45/140 - Gypsum board wall lining system

20-10-20/190C - Unit suspended ceiling system type C

25-80-70/120 - Drained and back-ventilated rainscreencladding system

45-45-65/430 - Polyisocyanurate (PIR) foam boardKingspan Insulation Ltd - Kingspan Thermaroof® TR26 LPC/FM

CONTENTS

®

®

BIM

Page 15: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

BIM

Page 16: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

BIM

Page 17: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

Increasing the organisation’s capability for involvement with design activity for major projects

Providing another marketing platform for the organisation’s products and systems by providing information in a range of formats hosted by third-parties such as the NBS National BIM Library

Kalzip has approached BIM in four stages:1 An initial BIM trial, for familiarisation

2 Provision of BIM objects via the Kalzip website and the NBS National BIM library

sites These models are free to download and contain basic information on various systems, as well as

standard Kalzip BIMs

4 Full BIM-based collaborative design and delivery, involving Kalzip’s design department as an integral part of the project team

Two-dimensional system build-up

Hygrothermal performance

Acoustic performance

Structural performance

Fire performance

COSHH documentation

BBA documentation

Product literature

BIM

Page 18: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

Architectural drawings, including plans, details and sections

Manufacturing assembly drawings including plans, details and sections

Bill of materials for procurement

Component fabrication drawings

BIM

Page 19: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

Glossary

Building Information Modelling

Building Information Model

BIM object

BIM platform

BIM Task Group

buildingSMART International

CAD

CADD

Construction BIM

Contract BIM

Construction Operations Building information exchange

Construction Products Association

COBie UK 2012

Data Drop

Design BIM

Green Building XML

BIM

Page 20: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

Industry Alliance for Interoperability

Industry Foundation Classes

Interoperability

Modelling Support Group

Multi-format BIM object

NBS

Operational BIM

Project BIM

Record BIM

Standard for Exchange of Products

BIM

Page 21: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

CONTENTS

Further reading

Web-links

BIM

Page 22: E KYMHI JSV QERYJEGXYVIVW - Pentagon Solutions · 2014. 11. 24. · Example of COBie Template 8 5. BIM and Facilities Management 9 6IGSVH &-1 9 3TIVEXMSREP &-1 9 -RXIKVEXMSR 9 9WMRK

t. f.