26
Future Trial Theme 1 – COBie to FM How do we efficiently integrate COBie outputs with FM inputs?

Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

  • Upload
    vandung

  • View
    225

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

Future Trial Theme 1 – COBie to FM

How do we efficiently integrate COBie outputs with FM inputs?

Page 2: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

Why is this important?

Page 3: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%~£16bn ~£14bn ~£8bn ~ £4.5bn ~£4bn

Renewables and Energy Efficiency Transport Energy Social Water & Waste

Smart metering £0.8bn (~20%)

OFTO £0.6bn (~20%)

Renewables and Energy Efficiency £14.5bn (~14%)

Ports £0.6bn (~5%)

Airports £1.2bn (~5%)

Rail £5.0bn (~14%)

Roads £6.9bn (~13%)

Nuclear £1.0bn

Onshore Transmission £3.0bn (~8%)

Gas £3.6bn (~20%)

Social £2.3bn

(Housing, education,

health, justice)

Local Authorities

£2.2bn (~20%)

Waste £0.3bn (~3%)

Water £3.4bn (~5%)

Source: KPMG analysis

2016 Public Sector Pipeline £45bn

Page 4: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET
Page 5: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

Client

Architect QS Design

Engineer

Project

Manager

Main Contractors

Sub-contractors

Building product manufacturer

Sub-contractors Sub-contractors Sub-contractors

Building product distributor

Global and local commodities

If construction grows at the expected rate,

we will be over capacity! How will you

manage us?

What is COBie?

What is COBie?

BS 1192? SHARED? No way!

Sorry it’s %15 more expensive

The EIR said we have to do it all!

THE CHALLENGE - SUPPLY CHAIN INTEGRATION & COLLABORATION

FM Provider

Data in a format we can

understand Please!

WHERE IS MY COBie?!

Page 6: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

WHAT DO OPERATORS REALLY NEED?

DESIGN

Data Drop 1-2 Data Drop 6

GRAPHICS

GRAPHICS GRAPHICS

DATA

DATA DATA

CONSTRUCT OPERATE

Data Drop 3-5

Page 7: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

BIM – FM INTEGRATION

FM Software integration according to maturity levels (BIM Task Group, 2011)

Page 8: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

What do we want the trial to address?

Page 9: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

• Joined up using the same interoperable format(s)

• Manufacturers to come to the table and produce their product data sheets to a consistent standard (data first geometry second)

• Enable consistency in how equipment and assets are classified

• More input from FM provider to support the Employers Information Requirements (EIR)

• Supply chain Integration for data capture - Drops 3 - 6 are critical

• Include Customers to enable greater understanding - better education for industry as a whole

• Review means for less contractual thinking and more robust channels of communication

AREAS OF FOCUS

Page 10: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

IFC is a gateway to the data – can’t ignore everything that happens around it

IFC Industry joined up

Manufacturers data sets /

CIBSE PDT’s

Classification system

FM Providers contribution

Clients and customers

understanding

Collaboration – less

contractual

CAFM – Computer Aided Facilities Management System

Page 11: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

CAFM

Planned Preventative Maintenance

Asset Condition

Fault rectification

& History

Asset Performance

Whole Life Cycle

Statutory Compliance

How do we use the data once transferred into CAFM system?

Page 12: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

• Use the Energy model pre and post construction to inform maintenance options

• Easier identification of assets and gain faster mobilisation underpinned by Statutory and Business compliance

• Obtain data and opportunities for different methods of maintaining and managing Assets

• Identify critical systems, plant & equipment together with critical spares very early on

• A fully developed maintenance strategy to handover to a client prior to the operational phase

• Be able to provide information on best in class assets and inform on whole life cycle costs

• Be more competitive with our bids based on knowledge and accurate data

BENEFITS OF BIM IN FM - LOWER COST / CARBON

Page 13: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

Designers

Contractors

FM Providers

O & M

Energy Performance

Critical Assets

Manufacturers

Supply Chain

To summarise all stakeholders have a key part to play

OPEN COLLABORATION

Page 14: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

CASE STUDY: UNIVERSITY OF EDINBURGH HOLYROOD STUDENT CAMPUS

Page 15: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

THE PROJECT DELIVERY TEAM

OWNER FM PROVIDER END USER

DESIGN & CONSTRUCTION

SUBCONTRACTOR

Page 16: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

North Site

South Site

Page 17: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

MODEL DEVELOPMENT

Page 18: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

CLASSIFICATION STANDARD

Page 19: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

DEFINED OBJECT TEMPLATES

Page 20: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

COMPONENT TRACKING

Page 21: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

Main Asset

Details

Attributes

Maintainable

Assets

Sub assets

Maintainable

Unit

MANUFACTURERS DATA

Page 22: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

DATA EXPORT TOOL TO COBie OUTPUT

DATA EXPORT COBie SPREADSHEET

Page 23: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

COBie SPREADSHEET FILE MAXIMO MAXIMO INPUT SCRIPTS

COBie SPREADSHEET TO MAXIMO RECONCILIATION PROCESS (THE LONG ROUTE)

Page 24: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

MAINTENANCE PLAN WORK ORDER REPORT PPM WORK ORDER

MAXIMO TO RAISED WORK ORDER

Page 25: Future Trial Theme 1 COBie to FM - bre.co.uk Events/BIM Conference... · Future Trial Theme 1 – COBie to FM ... Smart metering £0.8bn (~20%) OFTO £0.6bn ... COBie SPREADSHEET

EMPLOYERS INFORMATION

REQUIREMENTS (EIR)

BUILDING EXECUTION PLAN (BEP)

SCHEMA (e.g. COBie)

LEVEL OF DEVELOPMENT (LOD)

DATA REQUIREMENTS DATABASE SYSTEM

DELIVERABLES

INFORMATION MODEL

DATABASE

GRAPHICAL DATA

INFORMATION MODEL

NON-GRAPHICAL DATA

FACILITIES MAINTENANCE

FACILITIES MAINTENANCE SYSTEM

SYNCHRONIZE

INFORMATION & DATA FLOW

CLASSIFICATION (Uniclass 2)