EInSite Engineering, LLC
1955 Route 34, Suite 1A • Wall, NJ 07719732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net
Licensed in NJ, PA, DE, NY, CT, MD, NC, DC, & CO
STORMWATER MANAGEMENT REPORT for
PROPOSED SELF-STORAGE FACILITY
Located at
BLOCK 1709; LOT 1
In
TOWNSHIP OF NEPTUNE MONMOUTH COUNTY, NJ
Has been prepared for
PSI ATLANTIC NEPTUNE NJ, LLC 530 OAK COURT DRIVE. SUITE 185
MEMPHIS, TN 38117
On
February 7, 2020
InSite Project No. 19-1255-01
________________________________________ Jason L. Fichter, PE, PP NJPE 43118– NJPP 5726
TABLE OF CONTENTS
INTRODUCTION......................................................................................................................... 2 PROJECT LOCATION ............................................................................................................... 2 FLOOD HAZARD AREA ............................................................................................................ 2 SOIL CHARACTERISTICS ....................................................................................................... 3 PRE-DEVELOPMENT CONDITIONS ..................................................................................... 4 POST-DEVELOPMENT CONDITIONS ................................................................................... 4 STORMWATER MANAGEMENT SUMMARY ...................................................................... 5 WATER QUALITY N.J.A.C. 7:8-5.5 .......................................................................................... 6 GROUNDWATER RECHARGE N.J.A.C. 7:8-5.4(a)2 ............................................................. 7 SOIL EROSION AND SEDIMENT CONTROL ....................................................................... 7 CONCLUSION ............................................................................................................................. 8 APPENDIX A
Exhibits: 1. Tax Map 2. USGS Map 3. Soils Map 4. FEMA Map
APPENDIX B Pre-Development Flow Calculations
APPENDIX C Post-Development Flow Calculations
APPENDIX D Basin Drain Down Time Scour Hole Design Emergency Spillway Design Soil Logs Offsite Stability (Failure Analysis)
APPENDIX E Pre-Development Drainage Map Post-Development Drainage Map
Stormwater Management Report Page 2 of 14 PSI Atlantic Neptune NJ, LLC February 7, 2020 Block 1709; Lot 1 Township of Neptune, Monmouth County, NJ
InSite Engineering, LLC 1955 Route 34; Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
INTRODUCTION
This stormwater management report is being submitted as part of the development application
for the Proposed Self-Storage Facility, located on Block 1709; Lot 1 as shown on Sheet 17 of the
Official Tax Map of Township of Neptune, Monmouth County, New Jersey. This report was
prepared in accordance with the Township of Neptune, Monmouth County, the State Soil
Conservation District (SCD) Standards, the New Jersey Department of Environmental Protection
(NJDEP) as well as current industry standards and practices for stormwater management.
The site is a single-family home, storage buildings, multiple greenhouses, and a cell tower with a
maintenance building. The project to demolish the home, storage buildings, and greenhouses
and construct a self-storage facility with leasable parking spaces for vehicles such as RVs,
trailers, or automobiles, as well as site improvements such as, paved parking lot, stormwater
management system, lighting and landscaping.
The project is considered a “major development” in terms of stormwater by disturbing more than
one acre and complies with stormwater quantity reductions, stormwater quality, and groundwater
recharge by means of the proposed infiltration basin.
PROJECT LOCATION
The property is zoned within the C-5 Route 33 Commercial Zone in the Hospital Support
Overlay where a self-storage facility is not a permitted use. The project site is located at the
intersection of Route 18 and Route 33, in between the entrance ramp from Route 33 Westbound
to Route 18 Southbound. The site has frontages on the ramp to Route 18 Southbound on the
south, west, and north sides, and Route 18 on the east. The area consists of highways and
commercial uses.
FLOOD HAZARD AREA
According to FEMA's current Effective FIRM entitled, "FIRM Flood Insurance Rate Map,
Monmouth County, New Jersey (All Jurisdictions) Panel 333 of 457", Map Number
Stormwater Management Report Page 3 of 14 PSI Atlantic Neptune NJ, LLC February 7, 2020 Block 1709; Lot 1 Township of Neptune, Monmouth County, NJ
InSite Engineering, LLC 1955 Route 34; Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
#34025C0333F, dated 01/30/15, the site is not within a flood hazard area and is located in Zone
AE and X, with a base flood elevation of 48.
According to FEMA's current Preliminary FIRM entitled, "Preliminary Flood Insurance Rate
Map (FIRM)", Community Panel #34025C0333G, dated 01/30/15, the site is within a flood
hazard area and is located in Zone AE, with base flood elevation of 48. Both FEMA maps and
the record survey reference the NAVD88 vertical datum.
A Flood Hazard Verification Report (Method 6) has been prepared SWM Consulting, entitled
"Hydrologic and Hydraulic Analysis Report" dated February 12, 2020 as part of this application.
The calculated flood hazard elevation is 41.93. The outlet of the proposed basin is above this
elevation to prevent any tailwater effects. An application has been prepared to NJDEP for the
approval of the flood hazard verification.
SOIL CHARACTERISTICS
Geotechnical information for this application is based on the report and plans prepared by
Ingram Engineering Services, Inc., entitled "Geotechnical Investigation Report", being dated
06/19/19. According to test pit #10, the seasonal high groundwater is at approximate elevation
40.0. The bottom of the infiltration basin is at 42.50 and the sand layer at 43.00, thus complying
with the two-foot separation requirement. The basin drains within 72 hours using a design
infiltration rate of 0.5 inches per hour. The soil boring logs are provided in Appendix D.
The existing soil classifications for the site are based on the USDA NRCS Web Soil Survey. The
survey is useful at the planning level to draw general conclusions about the suitability of a site
for certain land uses. Based on the NRCS data, the site consists of the following soil type:
Stormwater Management Report Page 4 of 14 PSI Atlantic Neptune NJ, LLC February 7, 2020 Block 1709; Lot 1 Township of Neptune, Monmouth County, NJ
InSite Engineering, LLC 1955 Route 34; Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
SOIL NAME HYDROLOGIC GROUP
EvuB – Evesboro-Urban land complex, 0 to 5 percent slopes
A
FrrC – Freehold-Urban land complex, 0 to 10 percent slopes
B
UdauB – Udorthents-Urban land complex, 0 to 8 percent slopes
D
The soils promote infiltration and will be classified as hydrologic group A. The majority of the
site belongs to hydrologic soil group “A” and will be analyzed as such.
PRE-DEVELOPMENT CONDITIONS
A summary of the previously discussed drainage areas for the pre-development condition follows
below. Refer to the Appendix B for accompanying maps and hydrograph calculations and
Appendix E for the Pre-Development Drainage Map.
Total Area = 3.745 acres
Area 1: Drainage area to Route 33 Area: 0.621 acres Runoff Curve Number: CN = 55 Time of concentration: Tc = 10 minutes
Area 2: Drainage area to wetlands
Area: 3.123 acres Runoff Curve Number: CN = 72 Time of concentration: Tc = 11.2 minutes
POST-DEVELOPMENT CONDITIONS
A summary of the previously discussed drainage areas for the post-development condition
follows below. Refer to the Appendix C for hydrograph calculations Appendix E for the Post-
Development Drainage Map.
Total Area = 3.745 acres
Area 1: Drainage area to Route 33 Area: 0.475 acres Runoff Curve Number: CN = 57 Time of concentration: Tc = 10 minutes
Stormwater Management Report Page 5 of 14 PSI Atlantic Neptune NJ, LLC February 7, 2020 Block 1709; Lot 1 Township of Neptune, Monmouth County, NJ
InSite Engineering, LLC 1955 Route 34; Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
Area 2: Project area to proposed infiltration basin Area: 2.956 acres Runoff Curve Number: CN = 80 Time of concentration: Tc = 10 minutes
Area 3: Project area to Musquash Brook bypassing the basin
Area: 0.406 acres Runoff Curve Number: CN = 30/39 Time of concentration: Tc = 10 minutes
Area 4: Offsite area captured by infiltration for basin sizing only, reductions not required for this area. Area: 0.199 acres Runoff Curve Number: CN = 39 Time of concentration: Tc = 16.2 minutes
STORMWATER MANAGEMENT SUMMARY
Methods of determining stormwater runoff and peak discharge follow the procedures as outlined
in “Urban Hydrology for Small Watersheds”, Soil Conservation Service Technical Release No.
55. Rainfall data for each storm event is taken from New Jersey 24-hour Rainfall Frequency
Data (NOAA Atlas 14 Volume 2). Stormwater hydrographs were performed using HydroCAD
Software Solutions’ “HydroCAD 10.00” computer program. The following 24-hour storm
events were studied using the SCS TR-20 runoff method, Type III storm distribution, and the
Delmarva Unit Hydrograph:
Monmouth County
Storm Frequency (Years)
Rainfall (Inches)
2 10 25 100
3.38 4.38 6.53 8.94
Pre- and Post-development computations for the resultant hydrographs, routing computations,
and runoff volumes are appended, respectively, to this report. For each drainage area, the
following summaries were generated:
Stormwater Management Report Page 6 of 14 PSI Atlantic Neptune NJ, LLC February 7, 2020 Block 1709; Lot 1 Township of Neptune, Monmouth County, NJ
InSite Engineering, LLC 1955 Route 34; Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
Pre- and Post-Development Flow Rates to Route 33
Storm (Year)
Pre-Development Peak Flow
(cfs)
Post-Development Peak Flow
(cfs)
Difference (cfs)
2 0.4 0.3 -0.1 10 0.6 0.5 -0.1 100 1.4 1.1 -0.3
Under pre-development conditions, a portion of the site drains towards Route 33. Under post-
development conditions, this drainage area is reduced. The table above demonstrates that the
post-development flows to this area meet existing flows or are reduced, and therefore complies
with stormwater quantity requirements for all storm events.
Pre- and Post-Development Flow Rates to Musquash Brook
Storm (Year)
Pre-Development Peak Flow (cfs)
Reduction Allowable Peak Flow (cfs)
Flow from Offsite Area (cfs)
Total Allowable Peak Flow (cfs)
Post-Development Peak Flow (cfs)
2 3.7 50% 1.9 0.0 1.9 1.8 10 5.8 75% 4.4 0.0 4.4 4.3 25 7.4 - - 0.0 - 5.9 100 10.9 80% 8.7 0.2 8.9 8.9
Under pre-development conditions, this drainage area reaches Musquash Brook. Under post-
development conditions, this drainage area contains the proposed development and is directed
into the proposed infiltration basin and ultimately discharging to the Musquash Brook. Offsite
areas also drain to the proposed infiltration basin which have been included for basin volume and
sizing, however, these areas are not required to receive peak flow rate reductions. Therefore,
under post-development conditions, the peak flow rates from the undisturbed drainage areas are
added to the reduced peak flows to calculate the actual allowable peak flow rate. The table
above demonstrates that the post-development flows to this area meet existing flows or are
reduced, and therefore complies with stormwater quantity requirements for all storm events.
WATER QUALITY N.J.A.C. 7:8-5.5
NJDEP regulations require that water quality treatment be provided for the proposed site runoff.
The water quality standards require that stormwater management measures be designed to reduce
the post-construction load of total suspended solids (TSS) in stormwater runoff generated from
Stormwater Management Report Page 7 of 14 PSI Atlantic Neptune NJ, LLC February 7, 2020 Block 1709; Lot 1 Township of Neptune, Monmouth County, NJ
InSite Engineering, LLC 1955 Route 34; Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
the water quality design storm for new asphalt areas by 80% of the anticipated load from the
developed site and 50% for the existing asphalt areas, expressed as an annual average.
Under existing conditions, 0.173 ac. of impervious area drains to Route 33. Under proposed
conditions, the amount of impervious area to Route 33 is reduced to 0.137 ac., which improves
stormwater quality to this outfall.
The remaining portion of the site drains 0.559 ac. of dirty impervious area to Musquash Brook.
Under proposed conditions, the dirty impervious area to Musquash Brook is increased to 1.13 ac.
All impervious surfaces within this drainage area are captured and directed into the proposed
infiltration basin which provides 80% TSS removal, therefore complying with stormwater
quality requirements. The first stage orifice is set to the water surface elevation for the NJDEP
water quality storm event to ensure infiltration.
GROUNDWATER RECHARGE N.J.A.C. 7:8-5.4(A)2
In accordance with N.J.A.C. 7:8-5.4(a).2.ii, groundwater recharge does not apply to projects
within the “urban redevelopment area”. An Urban Redevelopment Area is defined, per N.J.A.C.
7:8 1.2, as development portions of areas delineated on the State Plan Policy Map as the
Metropolitan Planning Area. The proposed development is located within Planning Area 1
(Metropolitan Planning Area) and is not required to meet groundwater recharge. However, the
infiltration basin provides groundwater recharge, which is inherently beneficial.
SOIL EROSION AND SEDIMENT CONTROL
In accordance with the Soil Erosion and Sediment Control Act, soil erosion measures will be
incorporated into the design and graphically depicted on the Soil Erosion and Sediment Control
Plans. These measures consist of, but are not limited to:
• Sediment Barriers and Silt Fences
• Stabilized Construction Access
• Topsoil Stockpiles
• Temporary and Permanent Stabilization
Stormwater Management Report Page 8 of 14 PSI Atlantic Neptune NJ, LLC February 7, 2020 Block 1709; Lot 1 Township of Neptune, Monmouth County, NJ
InSite Engineering, LLC 1955 Route 34; Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
Off-site stability is met by meeting or reducing the existing peak rate of runoff by for the 2- and
10- year storm events while discounting infiltration in the proposed basin while assuming the
basin is filled to the initial outfall device. The following summary table illustrates that off-site
stability reductions are met:
Off-site Stability Peak Flow Rates to Musquash Brook
Storm (Year)
Pre-Development Peak Flow (cfs)
Post-Development Peak Flow (cfs)
2 3.7 2.5 10 5.8 4.4
The An application will be filed to the Soil Conservation District for the plan to be certified. A
NJPDES 5G3 permit will also be obtained.
CONCLUSION
The project is considered a “major development” in terms of stormwater by disturbing more than
one acre and complies with stormwater quantity reductions, stormwater quality, and groundwater
recharge by means of the proposed infiltration basin.
InSite Engineering, LLC 1955 Route 34, Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
APPENDIX A
Exhibits: 1. Tax Map 2. USGS Map 3. Soils Map 4. FEMA Map
SITE
USGS QUAD MAP
1,000
PLAN
Scale 1"=1,000'
0 1,000
Revisions
InSite Project No.19-1255-01
Drawing No.19-1255-01
DateJanuary 10, 2020
Site Location:
BLOCK 1709, LOT 12419 HIGHWAY 33TOWNSHIP OF NEPTUNEMONMOUTH COUNTY, NJ
PlanningSurveyingEngineering
InSite Engineering, LLC
CERTIFICATE OF AUTHORIZATION:
24GA28083200
1955 ROUTE 34, SUITE 1A,
WALL, NJ 08736
732-531-7100 (Ph)
732-531-7344 (Fax)
[email protected] www.InSiteEng.net
Reference:
U.S. GEOLOGICAL SURVEYFARMINGDALE, NJ 2016
SITE
SOILS MAP
200
PLAN
Scale 1"=200'
0 200
Revisions
PlanningSurveyingEngineering
Reference:
USDA WEB SOIL SURVEY
InSite Project No.19-1255-01
Drawing No.19-1255-01
DateJanuary 10, 2020
Site Location:
BLOCK 1709, LOT 12419 HIGHWAY 33TOWNSHIP OF NEPTUNEMONMOUTH COUNTY, NJ
InSite Engineering, LLC
CERTIFICATE OF AUTHORIZATION:
24GA28083200
1955 ROUTE 34, SUITE 1A,
WALL, NJ 08736
732-531-7100 (Ph)
732-531-7344 (Fax)
[email protected] www.InSiteEng.net
SITE
FEMA FLOOD INSURANCE RATE MAP
500
PLAN
Scale 1"=500'
0 500
Revisions
PlanningSurveyingEngineering
Reference:
FEMA FLOOD INSURANCE RATE MAP (FIRM)MAP NUMBER 34025C0333FMAP REVISED SEPTEMBER 25, 2009ZONE AE AND X
InSite Project No.19-1255-01
Drawing No.19-1255-01
DateJanuary 10, 2020
Site Location:
BLOCK 1709, LOT 12419 HIGHWAY 33TOWNSHIP OF NEPTUNEMONMOUTH COUNTY, NJ
InSite Engineering, LLC
CERTIFICATE OF AUTHORIZATION:
24GA28083200
1955 ROUTE 34, SUITE 1A,
WALL, NJ 08736
732-531-7100 (Ph)
732-531-7344 (Fax)
[email protected] www.InSiteEng.net
SITE
TAX MAP
200
PLAN
Scale 1"=200'
0 200
Revisions
PlanningSurveyingEngineering
Reference:
TAX MAP OF TOWNSHIP OF NEPTUNEMONMOUTH COUNTY, NEW JERSEYTAX MAP SHEET #17DECEMBER 12/2013
InSite Project No.19-1255-01
Drawing No.19-1255-01
DateJanuary 10, 2020
Site Location:
BLOCK 1709, LOT 12419 HIGHWAY 33TOWNSHIP OF NEPTUNEMONMOUTH COUNTY, NJ
InSite Engineering, LLC
CERTIFICATE OF AUTHORIZATION:
24GA28083200
1955 ROUTE 34, SUITE 1A,
WALL, NJ 08736
732-531-7100 (Ph)
732-531-7344 (Fax)
[email protected] www.InSiteEng.net
C-5
R-2
C-5
R-5
R-3
R-3
HC
C
N
E
P
T
U
N
E
C
IT
Y
B
O
R
O
U
G
H
N
E
P
T
U
N
E
T
O
W
N
S
H
IP
SITE
LOCATION MAP
PLAN
Revisions
PlanningSurveyingEngineering
Reference:
GOOGLE MAPS
500
Scale 1"=500'
0 500
InSite Project No.19-1255-01
Drawing No.19-1255-01
DateJanuary 10, 2020
Site Location:
BLOCK 1709, LOT 12419 HIGHWAY 33TOWNSHIP OF NEPTUNEMONMOUTH COUNTY, NJ
InSite Engineering, LLC
CERTIFICATE OF AUTHORIZATION:
24GA28083200
1955 ROUTE 34, SUITE 1A,
WALL, NJ 08736
732-531-7100 (Ph)
732-531-7344 (Fax)
[email protected] www.InSiteEng.net
InSite Engineering, LLC 1955 Route 34, Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
APPENDIX B
Pre-Development Flow Calculations
1S
Ex Area A1
2S
Ex Area A2
3L
Route 33
4L
Musquash Brook
Routing Diagram for 200207 Premier Storage Monmouth CountyPrepared by InSite Engineering LLC, Printed 2/11/2020
HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 2HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 pointsRunoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv.
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.621 ac 27.86% Impervious Runoff Depth=0.88"Subcatchment 1S: Ex Area A1 Tc=10.0 min CN=39/98 Runoff=0.4 cfs 0.046 af
Runoff Area=3.123 ac 56.71% Impervious Runoff Depth=1.79"Subcatchment 2S: Ex Area A2 Flow Length=266' Tc=11.2 min CN=39/98 Runoff=3.7 cfs 0.465 af
Inflow=0.4 cfs 0.046 afLink 3L: Route 33 Primary=0.4 cfs 0.046 af
Inflow=3.7 cfs 0.465 afLink 4L: Musquash Brook Primary=3.7 cfs 0.465 af
Total Runoff Area = 3.744 ac Runoff Volume = 0.510 af Average Runoff Depth = 1.64"48.08% Pervious = 1.800 ac 51.92% Impervious = 1.944 ac
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 3HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Ex Area A1
Runoff = 0.4 cfs @ 12.16 hrs, Volume= 0.046 af, Depth= 0.88"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 3-2yr Rainfall=3.38"
Area (ac) CN Description0.173 98 Paved parking, HSG A0.448 39 >75% Grass cover, Good, HSG A0.621 55 Weighted Average0.448 39 72.14% Pervious Area0.173 98 27.86% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 1S: Ex Area A1
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.42
0.4
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Type III 24-hr3-2yr Rainfall=3.38"
Runoff Area=0.621 acRunoff Volume=0.046 af
Runoff Depth=0.88"Tc=10.0 min
CN=39/98
0.4 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 4HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Ex Area A2
Runoff = 3.7 cfs @ 12.17 hrs, Volume= 0.465 af, Depth= 1.79"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 3-2yr Rainfall=3.38"
Area (ac) CN Description1.771 98 Paved parking, HSG A1.352 39 >75% Grass cover, Good, HSG A3.123 72 Weighted Average1.352 39 43.29% Pervious Area1.771 98 56.71% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
8.2 100 0.0292 0.20 Sheet Flow, 1Grass: Short n= 0.150 P2= 3.40"
2.4 93 0.0086 0.65 Shallow Concentrated Flow, 2Short Grass Pasture Kv= 7.0 fps
0.6 73 0.0945 2.15 Shallow Concentrated Flow, 3Short Grass Pasture Kv= 7.0 fps
11.2 266 Total
Subcatchment 2S: Ex Area A2
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
4
3
2
1
0
Type III 24-hr3-2yr Rainfall=3.38"
Runoff Area=3.123 acRunoff Volume=0.465 af
Runoff Depth=1.79"Flow Length=266'
Tc=11.2 minCN=39/98
3.7 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 5HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 3L: Route 33
Inflow Area = 0.621 ac, 27.86% Impervious, Inflow Depth = 0.88" for 3-2yr eventInflow = 0.4 cfs @ 12.16 hrs, Volume= 0.046 afPrimary = 0.4 cfs @ 12.16 hrs, Volume= 0.046 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 3L: Route 33
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.42
0.4
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Inflow Area=0.621 ac
0.4 cfs0.4 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 6HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 4L: Musquash Brook
Inflow Area = 3.123 ac, 56.71% Impervious, Inflow Depth = 1.79" for 3-2yr eventInflow = 3.7 cfs @ 12.17 hrs, Volume= 0.465 afPrimary = 3.7 cfs @ 12.17 hrs, Volume= 0.465 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 4L: Musquash Brook
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
4
3
2
1
0
Inflow Area=3.123 ac
3.7 cfs3.7 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 7HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 pointsRunoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv.
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.621 ac 27.86% Impervious Runoff Depth=1.57"Subcatchment 1S: Ex Area A1 Tc=10.0 min CN=39/98 Runoff=0.6 cfs 0.081 af
Runoff Area=3.123 ac 56.71% Impervious Runoff Depth=2.94"Subcatchment 2S: Ex Area A2 Flow Length=266' Tc=11.2 min CN=39/98 Runoff=5.8 cfs 0.765 af
Inflow=0.6 cfs 0.081 afLink 3L: Route 33 Primary=0.6 cfs 0.081 af
Inflow=5.8 cfs 0.765 afLink 4L: Musquash Brook Primary=5.8 cfs 0.765 af
Total Runoff Area = 3.744 ac Runoff Volume = 0.846 af Average Runoff Depth = 2.71"48.08% Pervious = 1.800 ac 51.92% Impervious = 1.944 ac
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 8HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Ex Area A1
Runoff = 0.6 cfs @ 12.15 hrs, Volume= 0.081 af, Depth= 1.57"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 5-10yr Rainfall=5.23"
Area (ac) CN Description0.173 98 Paved parking, HSG A0.448 39 >75% Grass cover, Good, HSG A0.621 55 Weighted Average0.448 39 72.14% Pervious Area0.173 98 27.86% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 1S: Ex Area A1
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Type III 24-hr5-10yr Rainfall=5.23"
Runoff Area=0.621 acRunoff Volume=0.081 af
Runoff Depth=1.57"Tc=10.0 min
CN=39/98
0.6 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 9HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Ex Area A2
Runoff = 5.8 cfs @ 12.17 hrs, Volume= 0.765 af, Depth= 2.94"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 5-10yr Rainfall=5.23"
Area (ac) CN Description1.771 98 Paved parking, HSG A1.352 39 >75% Grass cover, Good, HSG A3.123 72 Weighted Average1.352 39 43.29% Pervious Area1.771 98 56.71% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
8.2 100 0.0292 0.20 Sheet Flow, 1Grass: Short n= 0.150 P2= 3.40"
2.4 93 0.0086 0.65 Shallow Concentrated Flow, 2Short Grass Pasture Kv= 7.0 fps
0.6 73 0.0945 2.15 Shallow Concentrated Flow, 3Short Grass Pasture Kv= 7.0 fps
11.2 266 Total
Subcatchment 2S: Ex Area A2
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
6
5
4
3
2
1
0
Type III 24-hr5-10yr Rainfall=5.23"
Runoff Area=3.123 acRunoff Volume=0.765 af
Runoff Depth=2.94"Flow Length=266'
Tc=11.2 minCN=39/98
5.8 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 10HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 3L: Route 33
Inflow Area = 0.621 ac, 27.86% Impervious, Inflow Depth = 1.57" for 5-10yr eventInflow = 0.6 cfs @ 12.15 hrs, Volume= 0.081 afPrimary = 0.6 cfs @ 12.15 hrs, Volume= 0.081 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 3L: Route 33
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=0.621 ac
0.6 cfs0.6 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 11HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 4L: Musquash Brook
Inflow Area = 3.123 ac, 56.71% Impervious, Inflow Depth = 2.94" for 5-10yr eventInflow = 5.8 cfs @ 12.17 hrs, Volume= 0.765 afPrimary = 5.8 cfs @ 12.17 hrs, Volume= 0.765 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 4L: Musquash Brook
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
6
5
4
3
2
1
0
Inflow Area=3.123 ac
5.8 cfs5.8 cfs
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 12HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 pointsRunoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv.
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.621 ac 27.86% Impervious Runoff Depth=3.56"Subcatchment 1S: Ex Area A1 Tc=10.0 min CN=39/98 Runoff=1.4 cfs 0.184 af
Runoff Area=3.123 ac 56.71% Impervious Runoff Depth=5.62"Subcatchment 2S: Ex Area A2 Flow Length=266' Tc=11.2 min CN=39/98 Runoff=10.9 cfs 1.461 af
Inflow=1.4 cfs 0.184 afLink 3L: Route 33 Primary=1.4 cfs 0.184 af
Inflow=10.9 cfs 1.461 afLink 4L: Musquash Brook Primary=10.9 cfs 1.461 af
Total Runoff Area = 3.744 ac Runoff Volume = 1.646 af Average Runoff Depth = 5.27"48.08% Pervious = 1.800 ac 51.92% Impervious = 1.944 ac
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 13HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Ex Area A1
Runoff = 1.4 cfs @ 12.17 hrs, Volume= 0.184 af, Depth= 3.56"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 7-100yr Rainfall=8.94"
Area (ac) CN Description0.173 98 Paved parking, HSG A0.448 39 >75% Grass cover, Good, HSG A0.621 55 Weighted Average0.448 39 72.14% Pervious Area0.173 98 27.86% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 1S: Ex Area A1
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
1
0
Type III 24-hr7-100yr Rainfall=8.94"Runoff Area=0.621 ac
Runoff Volume=0.184 afRunoff Depth=3.56"
Tc=10.0 minCN=39/98
1.4 cfs
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 14HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Ex Area A2
Runoff = 10.9 cfs @ 12.17 hrs, Volume= 1.461 af, Depth= 5.62"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 7-100yr Rainfall=8.94"
Area (ac) CN Description1.771 98 Paved parking, HSG A1.352 39 >75% Grass cover, Good, HSG A3.123 72 Weighted Average1.352 39 43.29% Pervious Area1.771 98 56.71% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
8.2 100 0.0292 0.20 Sheet Flow, 1Grass: Short n= 0.150 P2= 3.40"
2.4 93 0.0086 0.65 Shallow Concentrated Flow, 2Short Grass Pasture Kv= 7.0 fps
0.6 73 0.0945 2.15 Shallow Concentrated Flow, 3Short Grass Pasture Kv= 7.0 fps
11.2 266 Total
Subcatchment 2S: Ex Area A2
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
12
11
10
9
8
7
6
5
4
3
2
1
0
Type III 24-hr7-100yr Rainfall=8.94"Runoff Area=3.123 ac
Runoff Volume=1.461 afRunoff Depth=5.62"
Flow Length=266'Tc=11.2 min
CN=39/98
10.9 cfs
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 15HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 3L: Route 33
Inflow Area = 0.621 ac, 27.86% Impervious, Inflow Depth = 3.56" for 7-100yr eventInflow = 1.4 cfs @ 12.17 hrs, Volume= 0.184 afPrimary = 1.4 cfs @ 12.17 hrs, Volume= 0.184 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 3L: Route 33
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
1
0
Inflow Area=0.621 ac
1.4 cfs1.4 cfs
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 16HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 4L: Musquash Brook
Inflow Area = 3.123 ac, 56.71% Impervious, Inflow Depth = 5.62" for 7-100yr eventInflow = 10.9 cfs @ 12.17 hrs, Volume= 1.461 afPrimary = 10.9 cfs @ 12.17 hrs, Volume= 1.461 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 4L: Musquash Brook
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=3.123 ac
10.9 cfs10.9 cfs
InSite Engineering, LLC 1955 Route 34, Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
APPENDIX C
Post-Development Flow Calculations
7S
Pr Area 1
8S
Pr Area 2
10S
Pr Area 3
15S
Offsite Area
18P
Infiltration Basin
5L
Route 33
9L
Musquash Brook
Routing Diagram for 200207 Premier Storage Monmouth CountyPrepared by InSite Engineering LLC, Printed 2/11/2020
HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
NJ DEP 2-hr 1-WQ Rainfall=1.25"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 2HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 pointsRunoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv.
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.475 ac 28.84% Impervious Runoff Depth=0.30"Subcatchment 7S: Pr Area 1 Tc=10.0 min CN=39/98 Runoff=0.3 cfs 0.012 af
Runoff Area=2.958 ac 69.03% Impervious Runoff Depth=0.71"Subcatchment 8S: Pr Area 2 Tc=10.0 min CN=39/98 Runoff=3.8 cfs 0.176 af
Runoff Area=0.406 ac 0.00% Impervious Runoff Depth=0.00"Subcatchment 10S: Pr Area 3 Tc=10.0 min CN=36/0 Runoff=0.0 cfs 0.000 af
Runoff Area=0.199 ac 0.00% Impervious Runoff Depth=0.00"Subcatchment 15S: Offsite Area Flow Length=522' Tc=16.2 min CN=39/0 Runoff=0.0 cfs 0.000 af
Peak Elev=44.68' Storage=0.176 af Inflow=3.8 cfs 0.176 afPond 18P: Infiltration Basin Outflow=0.0 cfs 0.000 af
Inflow=0.3 cfs 0.012 afLink 5L: Route 33 Primary=0.3 cfs 0.012 af
Inflow=0.0 cfs 0.000 afLink 9L: Musquash Brook Primary=0.0 cfs 0.000 af
Total Runoff Area = 4.038 ac Runoff Volume = 0.188 af Average Runoff Depth = 0.56"46.04% Pervious = 1.859 ac 53.96% Impervious = 2.179 ac
NJ DEP 2-hr 1-WQ Rainfall=1.25"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 3HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: Pr Area 1
Runoff = 0.3 cfs @ 1.17 hrs, Volume= 0.012 af, Depth= 0.30"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsNJ DEP 2-hr 1-WQ Rainfall=1.25"
Area (ac) CN Description0.137 98 Paved parking, HSG A0.338 39 >75% Grass cover, Good, HSG A0.475 56 Weighted Average0.338 39 71.16% Pervious Area0.137 98 28.84% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 7S: Pr Area 1
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
NJ DEP 2-hr1-WQ Rainfall=1.25"
Runoff Area=0.475 acRunoff Volume=0.012 af
Runoff Depth=0.30"Tc=10.0 min
CN=39/98
0.3 cfs
NJ DEP 2-hr 1-WQ Rainfall=1.25"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 4HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: Pr Area 2
Runoff = 3.8 cfs @ 1.17 hrs, Volume= 0.176 af, Depth= 0.71"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsNJ DEP 2-hr 1-WQ Rainfall=1.25"
Area (ac) CN Description2.042 98 Paved parking, HSG A0.916 39 >75% Grass cover, Good, HSG A2.958 80 Weighted Average0.916 39 30.97% Pervious Area2.042 98 69.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 8S: Pr Area 2
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
4
3
2
1
0
NJ DEP 2-hr1-WQ Rainfall=1.25"
Runoff Area=2.958 acRunoff Volume=0.176 af
Runoff Depth=0.71"Tc=10.0 min
CN=39/98
3.8 cfs
NJ DEP 2-hr 1-WQ Rainfall=1.25"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 5HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pr Area 3
Runoff = 0.0 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsNJ DEP 2-hr 1-WQ Rainfall=1.25"
Area (ac) CN Description0.141 30 Woods, Good, HSG A0.265 39 >75% Grass cover, Good, HSG A0.406 36 Weighted Average0.406 36 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 10S: Pr Area 3
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
1
0
NJ DEP 2-hr1-WQ Rainfall=1.25"
Runoff Area=0.406 acRunoff Volume=0.000 af
Runoff Depth=0.00"Tc=10.0 min
CN=36/0
0.0 cfs
NJ DEP 2-hr 1-WQ Rainfall=1.25"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 6HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 15S: Offsite Area
Runoff = 0.0 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsNJ DEP 2-hr 1-WQ Rainfall=1.25"
Area (ac) CN Description0.199 39 >75% Grass cover, Good, HSG A0.199 39 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
9.8 100 0.0186 0.17 Sheet Flow, 1Grass: Short n= 0.150 P2= 3.40"
0.3 52 0.1260 2.48 Shallow Concentrated Flow, 2Short Grass Pasture Kv= 7.0 fps
5.7 314 0.0170 0.91 Shallow Concentrated Flow, 3Short Grass Pasture Kv= 7.0 fps
0.4 56 0.1250 2.47 Shallow Concentrated Flow, 4Short Grass Pasture Kv= 7.0 fps
16.2 522 Total
Subcatchment 15S: Offsite Area
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
1
0
NJ DEP 2-hr1-WQ Rainfall=1.25"
Runoff Area=0.199 acRunoff Volume=0.000 af
Runoff Depth=0.00"Flow Length=522'
Tc=16.2 minCN=39/0
0.0 cfs
NJ DEP 2-hr 1-WQ Rainfall=1.25"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 7HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 18P: Infiltration Basin
Inflow Area = 3.157 ac, 64.68% Impervious, Inflow Depth = 0.67" for 1-WQ eventInflow = 3.8 cfs @ 1.17 hrs, Volume= 0.176 afOutflow = 0.0 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 minPrimary = 0.0 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrsPeak Elev= 44.68' @ 3.10 hrs Surf.Area= 0.132 ac Storage= 0.176 af
Plug-Flow detention time= (not calculated: initial storage exceeds outflow)Center-of-Mass det. time= (not calculated: no outflow)
Volume Invert Avail.Storage Storage Description#1 43.00' 0.581 af Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (acres) (acre-feet) (acre-feet)43.00 0.079 0.000 0.00044.00 0.109 0.094 0.09445.00 0.143 0.126 0.22046.00 0.179 0.161 0.38147.00 0.220 0.200 0.581
Device Routing Invert Outlet Devices#1 Primary 43.00' 15.0" Round Culvert L= 30.0' Ke= 0.500
Inlet / Outlet Invert= 43.00' / 42.50' S= 0.0167 '/' Cc= 0.900 n= 0.013, Flow Area= 1.23 sf
#2 Device 1 44.70' 1.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #3 Device 1 45.45' 1.2' long Sharp-Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=0.0 cfs @ 0.00 hrs HW=43.00' (Free Discharge)1=Culvert ( Controls 0.0 cfs)
2=Sharp-Crested Rectangular Weir ( Controls 0.0 cfs)3=Sharp-Crested Rectangular Weir ( Controls 0.0 cfs)
NJ DEP 2-hr 1-WQ Rainfall=1.25"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 8HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Pond 18P: Infiltration Basin
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
4
3
2
1
0
Inflow Area=3.157 acPeak Elev=44.68'Storage=0.176 af
3.8 cfs
0.0 cfs
NJ DEP 2-hr 1-WQ Rainfall=1.25"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 9HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 5L: Route 33
Inflow Area = 0.475 ac, 28.84% Impervious, Inflow Depth = 0.30" for 1-WQ eventInflow = 0.3 cfs @ 1.17 hrs, Volume= 0.012 afPrimary = 0.3 cfs @ 1.17 hrs, Volume= 0.012 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 5L: Route 33
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Inflow Area=0.475 ac
0.3 cfs0.3 cfs
NJ DEP 2-hr 1-WQ Rainfall=1.25"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 10HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 9L: Musquash Brook
Inflow Area = 3.563 ac, 57.31% Impervious, Inflow Depth = 0.00" for 1-WQ eventInflow = 0.0 cfs @ 0.00 hrs, Volume= 0.000 afPrimary = 0.0 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 9L: Musquash Brook
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
1
0
Inflow Area=3.563 ac
0.0 cfs0.0 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 11HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 pointsRunoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv.
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.475 ac 28.84% Impervious Runoff Depth=0.91"Subcatchment 7S: Pr Area 1 Tc=10.0 min CN=39/98 Runoff=0.3 cfs 0.036 af
Runoff Area=2.958 ac 69.03% Impervious Runoff Depth=2.17"Subcatchment 8S: Pr Area 2 Tc=10.0 min CN=39/98 Runoff=4.5 cfs 0.536 af
Runoff Area=0.406 ac 0.00% Impervious Runoff Depth=0.00"Subcatchment 10S: Pr Area 3 Tc=10.0 min CN=36/0 Runoff=0.0 cfs 0.000 af
Runoff Area=0.199 ac 0.00% Impervious Runoff Depth=0.00"Subcatchment 15S: Offsite Area Flow Length=522' Tc=16.2 min CN=39/0 Runoff=0.0 cfs 0.000 af
Peak Elev=45.45' Storage=0.287 af Inflow=4.5 cfs 0.536 afPond 18P: Infiltration Basin Outflow=1.8 cfs 0.357 af
Inflow=0.3 cfs 0.036 afLink 5L: Route 33 Primary=0.3 cfs 0.036 af
Inflow=1.8 cfs 0.357 afLink 9L: Musquash Brook Primary=1.8 cfs 0.357 af
Total Runoff Area = 4.038 ac Runoff Volume = 0.572 af Average Runoff Depth = 1.70"46.04% Pervious = 1.859 ac 53.96% Impervious = 2.179 ac
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 12HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: Pr Area 1
Runoff = 0.3 cfs @ 12.16 hrs, Volume= 0.036 af, Depth= 0.91"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 3-2yr Rainfall=3.38"
Area (ac) CN Description0.137 98 Paved parking, HSG A0.338 39 >75% Grass cover, Good, HSG A0.475 56 Weighted Average0.338 39 71.16% Pervious Area0.137 98 28.84% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 7S: Pr Area 1
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Type III 24-hr3-2yr Rainfall=3.38"
Runoff Area=0.475 acRunoff Volume=0.036 af
Runoff Depth=0.91"Tc=10.0 min
CN=39/98
0.3 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 13HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: Pr Area 2
Runoff = 4.5 cfs @ 12.16 hrs, Volume= 0.536 af, Depth= 2.17"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 3-2yr Rainfall=3.38"
Area (ac) CN Description2.042 98 Paved parking, HSG A0.916 39 >75% Grass cover, Good, HSG A2.958 80 Weighted Average0.916 39 30.97% Pervious Area2.042 98 69.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 8S: Pr Area 2
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
5
4
3
2
1
0
Type III 24-hr3-2yr Rainfall=3.38"
Runoff Area=2.958 acRunoff Volume=0.536 af
Runoff Depth=2.17"Tc=10.0 min
CN=39/98
4.5 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 14HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pr Area 3
Runoff = 0.0 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 3-2yr Rainfall=3.38"
Area (ac) CN Description0.141 30 Woods, Good, HSG A0.265 39 >75% Grass cover, Good, HSG A0.406 36 Weighted Average0.406 36 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 10S: Pr Area 3
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
1
0
Type III 24-hr3-2yr Rainfall=3.38"
Runoff Area=0.406 acRunoff Volume=0.000 af
Runoff Depth=0.00"Tc=10.0 min
CN=36/0
0.0 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 15HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 15S: Offsite Area
Runoff = 0.0 cfs @ 23.97 hrs, Volume= 0.000 af, Depth= 0.00"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 3-2yr Rainfall=3.38"
Area (ac) CN Description0.199 39 >75% Grass cover, Good, HSG A0.199 39 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
9.8 100 0.0186 0.17 Sheet Flow, 1Grass: Short n= 0.150 P2= 3.40"
0.3 52 0.1260 2.48 Shallow Concentrated Flow, 2Short Grass Pasture Kv= 7.0 fps
5.7 314 0.0170 0.91 Shallow Concentrated Flow, 3Short Grass Pasture Kv= 7.0 fps
0.4 56 0.1250 2.47 Shallow Concentrated Flow, 4Short Grass Pasture Kv= 7.0 fps
16.2 522 Total
Subcatchment 15S: Offsite Area
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0
0
0
0
0
0
0
0
0
0
Type III 24-hr3-2yr Rainfall=3.38"
Runoff Area=0.199 acRunoff Volume=0.000 af
Runoff Depth=0.00"Flow Length=522'
Tc=16.2 minCN=39/0
0.0 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 16HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 18P: Infiltration Basin
Inflow Area = 3.157 ac, 64.68% Impervious, Inflow Depth = 2.04" for 3-2yr eventInflow = 4.5 cfs @ 12.16 hrs, Volume= 0.536 afOutflow = 1.8 cfs @ 12.61 hrs, Volume= 0.357 af, Atten= 60%, Lag= 27.5 minPrimary = 1.8 cfs @ 12.61 hrs, Volume= 0.357 af
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrsPeak Elev= 45.45' @ 12.61 hrs Surf.Area= 0.159 ac Storage= 0.287 af
Plug-Flow detention time= 248.8 min calculated for 0.357 af (67% of inflow)Center-of-Mass det. time= 149.6 min ( 915.1 - 765.4 )
Volume Invert Avail.Storage Storage Description#1 43.00' 0.581 af Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (acres) (acre-feet) (acre-feet)43.00 0.079 0.000 0.00044.00 0.109 0.094 0.09445.00 0.143 0.126 0.22046.00 0.179 0.161 0.38147.00 0.220 0.200 0.581
Device Routing Invert Outlet Devices#1 Primary 43.00' 15.0" Round Culvert L= 30.0' Ke= 0.500
Inlet / Outlet Invert= 43.00' / 42.50' S= 0.0167 '/' Cc= 0.900 n= 0.013, Flow Area= 1.23 sf
#2 Device 1 44.70' 1.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #3 Device 1 45.45' 1.2' long Sharp-Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=1.8 cfs @ 12.61 hrs HW=45.45' (Free Discharge)1=Culvert (Passes 1.8 cfs of 8.0 cfs potential flow)
2=Sharp-Crested Rectangular Weir (Weir Controls 1.8 cfs @ 2.83 fps)3=Sharp-Crested Rectangular Weir ( Controls 0.0 cfs)
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 17HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Pond 18P: Infiltration Basin
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
5
4
3
2
1
0
Inflow Area=3.157 acPeak Elev=45.45'Storage=0.287 af
4.5 cfs
1.8 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 18HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 5L: Route 33
Inflow Area = 0.475 ac, 28.84% Impervious, Inflow Depth = 0.91" for 3-2yr eventInflow = 0.3 cfs @ 12.16 hrs, Volume= 0.036 afPrimary = 0.3 cfs @ 12.16 hrs, Volume= 0.036 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 5L: Route 33
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Inflow Area=0.475 ac
0.3 cfs0.3 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 19HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 9L: Musquash Brook
Inflow Area = 3.563 ac, 57.31% Impervious, Inflow Depth = 1.20" for 3-2yr eventInflow = 1.8 cfs @ 12.61 hrs, Volume= 0.357 afPrimary = 1.8 cfs @ 12.61 hrs, Volume= 0.357 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 9L: Musquash Brook
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
2
1
0
Inflow Area=3.563 ac
1.8 cfs1.8 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 20HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 pointsRunoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv.
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.475 ac 28.84% Impervious Runoff Depth=1.62"Subcatchment 7S: Pr Area 1 Tc=10.0 min CN=39/98 Runoff=0.5 cfs 0.064 af
Runoff Area=2.958 ac 69.03% Impervious Runoff Depth=3.52"Subcatchment 8S: Pr Area 2 Tc=10.0 min CN=39/98 Runoff=7.0 cfs 0.869 af
Runoff Area=0.406 ac 0.00% Impervious Runoff Depth=0.14"Subcatchment 10S: Pr Area 3 Tc=10.0 min CN=36/0 Runoff=0.0 cfs 0.005 af
Runoff Area=0.199 ac 0.00% Impervious Runoff Depth=0.25"Subcatchment 15S: Offsite Area Flow Length=522' Tc=16.2 min CN=39/0 Runoff=0.0 cfs 0.004 af
Peak Elev=45.89' Storage=0.361 af Inflow=7.0 cfs 0.873 afPond 18P: Infiltration Basin Outflow=4.3 cfs 0.694 af
Inflow=0.5 cfs 0.064 afLink 5L: Route 33 Primary=0.5 cfs 0.064 af
Inflow=4.3 cfs 0.699 afLink 9L: Musquash Brook Primary=4.3 cfs 0.699 af
Total Runoff Area = 4.038 ac Runoff Volume = 0.942 af Average Runoff Depth = 2.80"46.04% Pervious = 1.859 ac 53.96% Impervious = 2.179 ac
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 21HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: Pr Area 1
Runoff = 0.5 cfs @ 12.15 hrs, Volume= 0.064 af, Depth= 1.62"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 5-10yr Rainfall=5.23"
Area (ac) CN Description0.137 98 Paved parking, HSG A0.338 39 >75% Grass cover, Good, HSG A0.475 56 Weighted Average0.338 39 71.16% Pervious Area0.137 98 28.84% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 7S: Pr Area 1
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.520.5
0.480.460.440.42
0.40.380.360.340.32
0.30.280.260.240.22
0.20.180.160.140.12
0.10.080.060.040.02
0
Type III 24-hr5-10yr Rainfall=5.23"
Runoff Area=0.475 acRunoff Volume=0.064 af
Runoff Depth=1.62"Tc=10.0 min
CN=39/98
0.5 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 22HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: Pr Area 2
Runoff = 7.0 cfs @ 12.15 hrs, Volume= 0.869 af, Depth= 3.52"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 5-10yr Rainfall=5.23"
Area (ac) CN Description2.042 98 Paved parking, HSG A0.916 39 >75% Grass cover, Good, HSG A2.958 80 Weighted Average0.916 39 30.97% Pervious Area2.042 98 69.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 8S: Pr Area 2
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
7
6
5
4
3
2
1
0
Type III 24-hr5-10yr Rainfall=5.23"
Runoff Area=2.958 acRunoff Volume=0.869 af
Runoff Depth=3.52"Tc=10.0 min
CN=39/98
7.0 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 23HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pr Area 3
Runoff = 0.0 cfs @ 14.73 hrs, Volume= 0.005 af, Depth= 0.14"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 5-10yr Rainfall=5.23"
Area (ac) CN Description0.141 30 Woods, Good, HSG A0.265 39 >75% Grass cover, Good, HSG A0.406 36 Weighted Average0.406 36 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 10S: Pr Area 3
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.009
0.008
0.007
0.007
0.006
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
Type III 24-hr5-10yr Rainfall=5.23"
Runoff Area=0.406 acRunoff Volume=0.005 af
Runoff Depth=0.14"Tc=10.0 min
CN=36/0
0.0 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 24HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 15S: Offsite Area
Runoff = 0.0 cfs @ 12.99 hrs, Volume= 0.004 af, Depth= 0.25"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 5-10yr Rainfall=5.23"
Area (ac) CN Description0.199 39 >75% Grass cover, Good, HSG A0.199 39 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
9.8 100 0.0186 0.17 Sheet Flow, 1Grass: Short n= 0.150 P2= 3.40"
0.3 52 0.1260 2.48 Shallow Concentrated Flow, 2Short Grass Pasture Kv= 7.0 fps
5.7 314 0.0170 0.91 Shallow Concentrated Flow, 3Short Grass Pasture Kv= 7.0 fps
0.4 56 0.1250 2.47 Shallow Concentrated Flow, 4Short Grass Pasture Kv= 7.0 fps
16.2 522 Total
Subcatchment 15S: Offsite Area
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.009
0.008
0.007
0.007
0.006
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
Type III 24-hr5-10yr Rainfall=5.23"
Runoff Area=0.199 acRunoff Volume=0.004 af
Runoff Depth=0.25"Flow Length=522'
Tc=16.2 minCN=39/0
0.0 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 25HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 18P: Infiltration Basin
Inflow Area = 3.157 ac, 64.68% Impervious, Inflow Depth = 3.32" for 5-10yr eventInflow = 7.0 cfs @ 12.15 hrs, Volume= 0.873 afOutflow = 4.3 cfs @ 12.46 hrs, Volume= 0.694 af, Atten= 39%, Lag= 18.2 minPrimary = 4.3 cfs @ 12.46 hrs, Volume= 0.694 af
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrsPeak Elev= 45.89' @ 12.46 hrs Surf.Area= 0.175 ac Storage= 0.361 af
Plug-Flow detention time= 199.8 min calculated for 0.694 af (80% of inflow)Center-of-Mass det. time= 118.8 min ( 882.6 - 763.7 )
Volume Invert Avail.Storage Storage Description#1 43.00' 0.581 af Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (acres) (acre-feet) (acre-feet)43.00 0.079 0.000 0.00044.00 0.109 0.094 0.09445.00 0.143 0.126 0.22046.00 0.179 0.161 0.38147.00 0.220 0.200 0.581
Device Routing Invert Outlet Devices#1 Primary 43.00' 15.0" Round Culvert L= 30.0' Ke= 0.500
Inlet / Outlet Invert= 43.00' / 42.50' S= 0.0167 '/' Cc= 0.900 n= 0.013, Flow Area= 1.23 sf
#2 Device 1 44.70' 1.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #3 Device 1 45.45' 1.2' long Sharp-Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=4.3 cfs @ 12.46 hrs HW=45.89' (Free Discharge)1=Culvert (Passes 4.3 cfs of 8.9 cfs potential flow)
2=Sharp-Crested Rectangular Weir (Weir Controls 3.2 cfs @ 3.57 fps)3=Sharp-Crested Rectangular Weir (Weir Controls 1.1 cfs @ 2.17 fps)
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 26HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Pond 18P: Infiltration Basin
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
7
6
5
4
3
2
1
0
Inflow Area=3.157 acPeak Elev=45.89'Storage=0.361 af
7.0 cfs
4.3 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 27HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 5L: Route 33
Inflow Area = 0.475 ac, 28.84% Impervious, Inflow Depth = 1.62" for 5-10yr eventInflow = 0.5 cfs @ 12.15 hrs, Volume= 0.064 afPrimary = 0.5 cfs @ 12.15 hrs, Volume= 0.064 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 5L: Route 33
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.520.5
0.480.460.440.42
0.40.380.360.340.32
0.30.280.260.240.22
0.20.180.160.140.12
0.10.080.060.040.02
0
Inflow Area=0.475 ac
0.5 cfs0.5 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 28HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 9L: Musquash Brook
Inflow Area = 3.563 ac, 57.31% Impervious, Inflow Depth = 2.35" for 5-10yr eventInflow = 4.3 cfs @ 12.46 hrs, Volume= 0.699 afPrimary = 4.3 cfs @ 12.46 hrs, Volume= 0.699 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 9L: Musquash Brook
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
4
3
2
1
0
Inflow Area=3.563 ac
4.3 cfs4.3 cfs
Type III 24-hr 6-25yr Rainfall=6.53"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 29HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 pointsRunoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv.
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.475 ac 28.84% Impervious Runoff Depth=2.25"Subcatchment 7S: Pr Area 1 Tc=10.0 min CN=39/98 Runoff=0.6 cfs 0.089 af
Runoff Area=2.958 ac 69.03% Impervious Runoff Depth=4.53"Subcatchment 8S: Pr Area 2 Tc=10.0 min CN=39/98 Runoff=8.8 cfs 1.117 af
Runoff Area=0.406 ac 0.00% Impervious Runoff Depth=0.43"Subcatchment 10S: Pr Area 3 Tc=10.0 min CN=36/0 Runoff=0.0 cfs 0.014 af
Runoff Area=0.199 ac 0.00% Impervious Runoff Depth=0.61"Subcatchment 15S: Offsite Area Flow Length=522' Tc=16.2 min CN=39/0 Runoff=0.0 cfs 0.010 af
Peak Elev=46.11' Storage=0.401 af Inflow=8.9 cfs 1.127 afPond 18P: Infiltration Basin Outflow=5.8 cfs 0.948 af
Inflow=0.6 cfs 0.089 afLink 5L: Route 33 Primary=0.6 cfs 0.089 af
Inflow=5.9 cfs 0.963 afLink 9L: Musquash Brook Primary=5.9 cfs 0.963 af
Total Runoff Area = 4.038 ac Runoff Volume = 1.230 af Average Runoff Depth = 3.66"46.04% Pervious = 1.859 ac 53.96% Impervious = 2.179 ac
Type III 24-hr 6-25yr Rainfall=6.53"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 30HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: Pr Area 1
Runoff = 0.6 cfs @ 12.16 hrs, Volume= 0.089 af, Depth= 2.25"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 6-25yr Rainfall=6.53"
Area (ac) CN Description0.137 98 Paved parking, HSG A0.338 39 >75% Grass cover, Good, HSG A0.475 56 Weighted Average0.338 39 71.16% Pervious Area0.137 98 28.84% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 7S: Pr Area 1
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Type III 24-hr6-25yr Rainfall=6.53"
Runoff Area=0.475 acRunoff Volume=0.089 af
Runoff Depth=2.25"Tc=10.0 min
CN=39/98
0.6 cfs
Type III 24-hr 6-25yr Rainfall=6.53"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 31HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: Pr Area 2
Runoff = 8.8 cfs @ 12.16 hrs, Volume= 1.117 af, Depth= 4.53"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 6-25yr Rainfall=6.53"
Area (ac) CN Description2.042 98 Paved parking, HSG A0.916 39 >75% Grass cover, Good, HSG A2.958 80 Weighted Average0.916 39 30.97% Pervious Area2.042 98 69.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 8S: Pr Area 2
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
9
8
7
6
5
4
3
2
1
0
Type III 24-hr6-25yr Rainfall=6.53"
Runoff Area=2.958 acRunoff Volume=1.117 af
Runoff Depth=4.53"Tc=10.0 min
CN=39/98
8.8 cfs
Type III 24-hr 6-25yr Rainfall=6.53"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 32HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pr Area 3
Runoff = 0.0 cfs @ 12.51 hrs, Volume= 0.014 af, Depth= 0.43"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 6-25yr Rainfall=6.53"
Area (ac) CN Description0.141 30 Woods, Good, HSG A0.265 39 >75% Grass cover, Good, HSG A0.406 36 Weighted Average0.406 36 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 10S: Pr Area 3
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.0520.05
0.0480.0460.0440.042
0.040.0380.0360.0340.032
0.030.0280.0260.0240.022
0.020.0180.0160.0140.012
0.010.0080.0060.0040.002
0
Type III 24-hr6-25yr Rainfall=6.53"
Runoff Area=0.406 acRunoff Volume=0.014 af
Runoff Depth=0.43"Tc=10.0 min
CN=36/0
0.0 cfs
Type III 24-hr 6-25yr Rainfall=6.53"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 33HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 15S: Offsite Area
Runoff = 0.0 cfs @ 12.53 hrs, Volume= 0.010 af, Depth= 0.61"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 6-25yr Rainfall=6.53"
Area (ac) CN Description0.199 39 >75% Grass cover, Good, HSG A0.199 39 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
9.8 100 0.0186 0.17 Sheet Flow, 1Grass: Short n= 0.150 P2= 3.40"
0.3 52 0.1260 2.48 Shallow Concentrated Flow, 2Short Grass Pasture Kv= 7.0 fps
5.7 314 0.0170 0.91 Shallow Concentrated Flow, 3Short Grass Pasture Kv= 7.0 fps
0.4 56 0.1250 2.47 Shallow Concentrated Flow, 4Short Grass Pasture Kv= 7.0 fps
16.2 522 Total
Subcatchment 15S: Offsite Area
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.042
0.04
0.038
0.036
0.034
0.032
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Type III 24-hr6-25yr Rainfall=6.53"
Runoff Area=0.199 acRunoff Volume=0.010 af
Runoff Depth=0.61"Flow Length=522'
Tc=16.2 minCN=39/0
0.0 cfs
Type III 24-hr 6-25yr Rainfall=6.53"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 34HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 18P: Infiltration Basin
Inflow Area = 3.157 ac, 64.68% Impervious, Inflow Depth = 4.28" for 6-25yr eventInflow = 8.9 cfs @ 12.16 hrs, Volume= 1.127 afOutflow = 5.8 cfs @ 12.44 hrs, Volume= 0.948 af, Atten= 34%, Lag= 16.9 minPrimary = 5.8 cfs @ 12.44 hrs, Volume= 0.948 af
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrsPeak Elev= 46.11' @ 12.44 hrs Surf.Area= 0.184 ac Storage= 0.401 af
Plug-Flow detention time= 176.3 min calculated for 0.948 af (84% of inflow)Center-of-Mass det. time= 106.2 min ( 869.9 - 763.8 )
Volume Invert Avail.Storage Storage Description#1 43.00' 0.581 af Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (acres) (acre-feet) (acre-feet)43.00 0.079 0.000 0.00044.00 0.109 0.094 0.09445.00 0.143 0.126 0.22046.00 0.179 0.161 0.38147.00 0.220 0.200 0.581
Device Routing Invert Outlet Devices#1 Primary 43.00' 15.0" Round Culvert L= 30.0' Ke= 0.500
Inlet / Outlet Invert= 43.00' / 42.50' S= 0.0167 '/' Cc= 0.900 n= 0.013, Flow Area= 1.23 sf
#2 Device 1 44.70' 1.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #3 Device 1 45.45' 1.2' long Sharp-Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=5.8 cfs @ 12.44 hrs HW=46.11' (Free Discharge)1=Culvert (Passes 5.8 cfs of 9.3 cfs potential flow)
2=Sharp-Crested Rectangular Weir (Weir Controls 3.9 cfs @ 3.89 fps)3=Sharp-Crested Rectangular Weir (Weir Controls 1.9 cfs @ 2.66 fps)
Type III 24-hr 6-25yr Rainfall=6.53"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 35HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Pond 18P: Infiltration Basin
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
9
8
7
6
5
4
3
2
1
0
Inflow Area=3.157 acPeak Elev=46.11'Storage=0.401 af
8.9 cfs
5.8 cfs
Type III 24-hr 6-25yr Rainfall=6.53"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 36HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 5L: Route 33
Inflow Area = 0.475 ac, 28.84% Impervious, Inflow Depth = 2.25" for 6-25yr eventInflow = 0.6 cfs @ 12.16 hrs, Volume= 0.089 afPrimary = 0.6 cfs @ 12.16 hrs, Volume= 0.089 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 5L: Route 33
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=0.475 ac
0.6 cfs0.6 cfs
Type III 24-hr 6-25yr Rainfall=6.53"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 37HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 9L: Musquash Brook
Inflow Area = 3.563 ac, 57.31% Impervious, Inflow Depth = 3.24" for 6-25yr eventInflow = 5.9 cfs @ 12.44 hrs, Volume= 0.963 afPrimary = 5.9 cfs @ 12.44 hrs, Volume= 0.963 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 9L: Musquash Brook
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
6
5
4
3
2
1
0
Inflow Area=3.563 ac
5.9 cfs5.9 cfs
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 38HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 pointsRunoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv.
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=0.475 ac 28.84% Impervious Runoff Depth=3.63"Subcatchment 7S: Pr Area 1 Tc=10.0 min CN=39/98 Runoff=1.1 cfs 0.144 af
Runoff Area=2.958 ac 69.03% Impervious Runoff Depth=6.49"Subcatchment 8S: Pr Area 2 Tc=10.0 min CN=39/98 Runoff=12.7 cfs 1.601 af
Runoff Area=0.406 ac 0.00% Impervious Runoff Depth=1.25"Subcatchment 10S: Pr Area 3 Tc=10.0 min CN=36/0 Runoff=0.2 cfs 0.042 af
Runoff Area=0.199 ac 0.00% Impervious Runoff Depth=1.57"Subcatchment 15S: Offsite Area Flow Length=522' Tc=16.2 min CN=39/0 Runoff=0.1 cfs 0.026 af
Peak Elev=46.51' Storage=0.477 af Inflow=12.8 cfs 1.627 afPond 18P: Infiltration Basin Outflow=8.6 cfs 1.448 af
Inflow=1.1 cfs 0.144 afLink 5L: Route 33 Primary=1.1 cfs 0.144 af
Inflow=8.8 cfs 1.490 afLink 9L: Musquash Brook Primary=8.8 cfs 1.490 af
Total Runoff Area = 4.038 ac Runoff Volume = 1.813 af Average Runoff Depth = 5.39"46.04% Pervious = 1.859 ac 53.96% Impervious = 2.179 ac
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 39HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: Pr Area 1
Runoff = 1.1 cfs @ 12.17 hrs, Volume= 0.144 af, Depth= 3.63"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 7-100yr Rainfall=8.94"
Area (ac) CN Description0.137 98 Paved parking, HSG A0.338 39 >75% Grass cover, Good, HSG A0.475 56 Weighted Average0.338 39 71.16% Pervious Area0.137 98 28.84% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 7S: Pr Area 1
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
1
0
Type III 24-hr7-100yr Rainfall=8.94"Runoff Area=0.475 ac
Runoff Volume=0.144 afRunoff Depth=3.63"
Tc=10.0 minCN=39/98
1.1 cfs
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 40HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: Pr Area 2
Runoff = 12.7 cfs @ 12.16 hrs, Volume= 1.601 af, Depth= 6.49"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 7-100yr Rainfall=8.94"
Area (ac) CN Description2.042 98 Paved parking, HSG A0.916 39 >75% Grass cover, Good, HSG A2.958 80 Weighted Average0.916 39 30.97% Pervious Area2.042 98 69.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 8S: Pr Area 2
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Type III 24-hr7-100yr Rainfall=8.94"Runoff Area=2.958 ac
Runoff Volume=1.601 afRunoff Depth=6.49"
Tc=10.0 minCN=39/98
12.7 cfs
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 41HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pr Area 3
Runoff = 0.2 cfs @ 12.36 hrs, Volume= 0.042 af, Depth= 1.25"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 7-100yr Rainfall=8.94"
Area (ac) CN Description0.141 30 Woods, Good, HSG A0.265 39 >75% Grass cover, Good, HSG A0.406 36 Weighted Average0.406 36 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 10S: Pr Area 3
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Type III 24-hr7-100yr Rainfall=8.94"Runoff Area=0.406 ac
Runoff Volume=0.042 afRunoff Depth=1.25"
Tc=10.0 minCN=36/0
0.2 cfs
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 42HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 15S: Offsite Area
Runoff = 0.1 cfs @ 12.43 hrs, Volume= 0.026 af, Depth= 1.57"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 7-100yr Rainfall=8.94"
Area (ac) CN Description0.199 39 >75% Grass cover, Good, HSG A0.199 39 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
9.8 100 0.0186 0.17 Sheet Flow, 1Grass: Short n= 0.150 P2= 3.40"
0.3 52 0.1260 2.48 Shallow Concentrated Flow, 2Short Grass Pasture Kv= 7.0 fps
5.7 314 0.0170 0.91 Shallow Concentrated Flow, 3Short Grass Pasture Kv= 7.0 fps
0.4 56 0.1250 2.47 Shallow Concentrated Flow, 4Short Grass Pasture Kv= 7.0 fps
16.2 522 Total
Subcatchment 15S: Offsite Area
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Type III 24-hr7-100yr Rainfall=8.94"Runoff Area=0.199 ac
Runoff Volume=0.026 afRunoff Depth=1.57"
Flow Length=522'Tc=16.2 min
CN=39/0
0.1 cfs
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 43HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 18P: Infiltration Basin
Inflow Area = 3.157 ac, 64.68% Impervious, Inflow Depth = 6.18" for 7-100yr eventInflow = 12.8 cfs @ 12.16 hrs, Volume= 1.627 afOutflow = 8.6 cfs @ 12.43 hrs, Volume= 1.448 af, Atten= 33%, Lag= 16.5 minPrimary = 8.6 cfs @ 12.43 hrs, Volume= 1.448 af
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrsPeak Elev= 46.51' @ 12.43 hrs Surf.Area= 0.200 ac Storage= 0.477 af
Plug-Flow detention time= 145.3 min calculated for 1.448 af (89% of inflow)Center-of-Mass det. time= 90.1 min ( 854.2 - 764.2 )
Volume Invert Avail.Storage Storage Description#1 43.00' 0.581 af Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (acres) (acre-feet) (acre-feet)43.00 0.079 0.000 0.00044.00 0.109 0.094 0.09445.00 0.143 0.126 0.22046.00 0.179 0.161 0.38147.00 0.220 0.200 0.581
Device Routing Invert Outlet Devices#1 Primary 43.00' 15.0" Round Culvert L= 30.0' Ke= 0.500
Inlet / Outlet Invert= 43.00' / 42.50' S= 0.0167 '/' Cc= 0.900 n= 0.013, Flow Area= 1.23 sf
#2 Device 1 44.70' 1.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #3 Device 1 45.45' 1.2' long Sharp-Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=8.6 cfs @ 12.43 hrs HW=46.51' (Free Discharge)1=Culvert (Passes 8.6 cfs of 10.0 cfs potential flow)
2=Sharp-Crested Rectangular Weir (Weir Controls 5.1 cfs @ 4.39 fps)3=Sharp-Crested Rectangular Weir (Weir Controls 3.5 cfs @ 3.36 fps)
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 44HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Pond 18P: Infiltration Basin
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=3.157 acPeak Elev=46.51'Storage=0.477 af
12.8 cfs
8.6 cfs
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 45HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 5L: Route 33
Inflow Area = 0.475 ac, 28.84% Impervious, Inflow Depth = 3.63" for 7-100yr eventInflow = 1.1 cfs @ 12.17 hrs, Volume= 0.144 afPrimary = 1.1 cfs @ 12.17 hrs, Volume= 0.144 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 5L: Route 33
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
1
0
Inflow Area=0.475 ac
1.1 cfs1.1 cfs
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by InSite Engineering LLC
Page 46HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 9L: Musquash Brook
Inflow Area = 3.563 ac, 57.31% Impervious, Inflow Depth = 5.02" for 7-100yr eventInflow = 8.8 cfs @ 12.43 hrs, Volume= 1.490 afPrimary = 8.8 cfs @ 12.43 hrs, Volume= 1.490 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 9L: Musquash Brook
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
9
8
7
6
5
4
3
2
1
0
Inflow Area=3.563 ac
8.8 cfs8.8 cfs
InSite Engineering, LLC 1955 Route 34, Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
APPENDIX D
Basin Drain Down Time Scour Hole Design
Emergency Spillway Design Soil Logs
Offsite Stability (Failure Analysis)
Type III 24-hr 7-100yr Rainfall=8.94"200207 Premier Storage Monmouth County Printed 2/11/2020Prepared by {enter your company name here}
HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Hydrograph for Pond 18P: Infiltration Basin
Time(hours)
Inflow(cfs)
Storage(acre-feet)
Elevation(feet)
Outflow(cfs)
Discarded(cfs)
Primary(cfs)
0.00 0.0 0.000 43.00 0.0 0.0 0.02.00 0.1 0.005 43.06 0.0 0.0 0.04.00 0.2 0.023 43.28 0.0 0.0 0.06.00 0.3 0.054 43.61 0.0 0.0 0.08.00 0.4 0.103 44.08 0.1 0.1 0.0
10.00 0.8 0.194 44.82 0.2 0.1 0.112.00 6.9 0.325 45.67 3.0 0.1 2.914.00 1.2 0.279 45.40 1.7 0.1 1.616.00 0.7 0.234 45.10 0.8 0.1 0.818.00 0.4 0.214 44.96 0.5 0.1 0.420.00 0.3 0.205 44.89 0.3 0.1 0.322.00 0.3 0.201 44.86 0.3 0.1 0.224.00 0.2 0.197 44.83 0.2 0.1 0.226.00 0.0 0.179 44.71 0.1 0.1 0.028.00 0.0 0.168 44.62 0.1 0.1 0.030.00 0.0 0.158 44.54 0.1 0.1 0.032.00 0.0 0.147 44.46 0.1 0.1 0.034.00 0.0 0.137 44.37 0.1 0.1 0.036.00 0.0 0.127 44.29 0.1 0.1 0.038.00 0.0 0.117 44.21 0.1 0.1 0.040.00 0.0 0.108 44.12 0.1 0.1 0.042.00 0.0 0.098 44.04 0.1 0.1 0.044.00 0.0 0.089 43.96 0.1 0.1 0.046.00 0.0 0.080 43.87 0.1 0.1 0.048.00 0.0 0.072 43.79 0.1 0.1 0.050.00 0.0 0.063 43.71 0.1 0.1 0.052.00 0.0 0.055 43.62 0.0 0.0 0.054.00 0.0 0.047 43.54 0.0 0.0 0.056.00 0.0 0.039 43.46 0.0 0.0 0.058.00 0.0 0.031 43.37 0.0 0.0 0.060.00 0.0 0.024 43.29 0.0 0.0 0.062.00 0.0 0.017 43.21 0.0 0.0 0.064.00 0.0 0.010 43.12 0.0 0.0 0.066.00 0.0 0.003 43.04 0.0 0.0 0.068.00 0.0 0.000 43.00 0.0 0.0 0.070.00 0.0 0.000 43.00 0.0 0.0 0.072.00 0.0 0.000 43.00 0.0 0.0 0.0
TOP OF BERM = 47.9 FT.
ELEV. = 46.8 FT.
Hmax = 0.3 FT.
ELEV. = 46.5 FT BOTTOM OF SPILLWAY
30 FT.
o Spillway Capacity:
Spillway calculation based on weir equation: Q = CLH**3/2
'C' = weir coefficient: Use 3.3
Qmax through spillway = 16.3
Spillway designed to pass 10 year flow
10 year flow = 7.00 CFS HEADWATER DEPTH = 0.17 FT.
ALLOWABLE HEADWATER DEPTH = 0.3 FT. WHICH IS GREATER THAN REQUIEREDTHEREFORE WEIR HAS CAPACITY
FREEBOARD 10-YR = 1.23 FT. SINCE GREATER THAN OR EQUALS
STABILITY:
Q=AV OR V=Q/A
Q (FLOW, CFS) 7.0A (AREA, SF) 9V (VELOCITY, FPS) 0.78 WHICH IS LESS THEN 2 FPS AS REQUIRED BY SCD
CHAPTER 18-1, TABLE 18-1 FOR LOAMY SAND
TOP OF SPILLWAY
SPILLWAY LENGTH =
EMERGENCY SPILLWAY CALCULATIONS
8S
Pr Area 2
10S
Pr Area 3
15S
Offsite Area
18P
Infiltration Basin
9L
Musquash Brook
Routing Diagram for 200207 Premier Storage Monmouth County - Offsite Stability
Prepared by InSite Engineering LLC, Printed 2/11/2020HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County - Offsite Sta Printed 2/11/2020Prepared by InSite Engineering LLC
Page 2HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 pointsRunoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv.
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=2.958 ac 69.03% Impervious Runoff Depth=2.17"Subcatchment 8S: Pr Area 2 Tc=10.0 min CN=39/98 Runoff=4.5 cfs 0.536 af
Runoff Area=0.406 ac 0.00% Impervious Runoff Depth=0.00"Subcatchment 10S: Pr Area 3 Tc=10.0 min CN=36/0 Runoff=0.0 cfs 0.000 af
Runoff Area=0.199 ac 0.00% Impervious Runoff Depth=0.00"Subcatchment 15S: Offsite Area Flow Length=522' Tc=16.2 min CN=39/0 Runoff=0.0 cfs 0.000 af
Peak Elev=45.61' Storage=0.313 af Inflow=4.5 cfs 0.536 afPond 18P: Infiltration Basin Outflow=2.5 cfs 0.536 af
Inflow=2.5 cfs 0.536 afLink 9L: Musquash Brook Primary=2.5 cfs 0.536 af
Total Runoff Area = 3.563 ac Runoff Volume = 0.536 af Average Runoff Depth = 1.80"42.69% Pervious = 1.521 ac 57.31% Impervious = 2.042 ac
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County - Offsite Sta Printed 2/11/2020Prepared by InSite Engineering LLC
Page 3HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: Pr Area 2
Runoff = 4.5 cfs @ 12.16 hrs, Volume= 0.536 af, Depth= 2.17"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 3-2yr Rainfall=3.38"
Area (ac) CN Description2.042 98 Paved parking, HSG A0.916 39 >75% Grass cover, Good, HSG A2.958 80 Weighted Average0.916 39 30.97% Pervious Area2.042 98 69.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 8S: Pr Area 2
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
5
4
3
2
1
0
Type III 24-hr3-2yr Rainfall=3.38"
Runoff Area=2.958 acRunoff Volume=0.536 af
Runoff Depth=2.17"Tc=10.0 min
CN=39/98
4.5 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County - Offsite Sta Printed 2/11/2020Prepared by InSite Engineering LLC
Page 4HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pr Area 3
Runoff = 0.0 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 3-2yr Rainfall=3.38"
Area (ac) CN Description0.141 30 Woods, Good, HSG A0.265 39 >75% Grass cover, Good, HSG A0.406 36 Weighted Average0.406 36 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 10S: Pr Area 3
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
1
0
Type III 24-hr3-2yr Rainfall=3.38"
Runoff Area=0.406 acRunoff Volume=0.000 af
Runoff Depth=0.00"Tc=10.0 min
CN=36/0
0.0 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County - Offsite Sta Printed 2/11/2020Prepared by InSite Engineering LLC
Page 5HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 15S: Offsite Area
Runoff = 0.0 cfs @ 23.97 hrs, Volume= 0.000 af, Depth= 0.00"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 3-2yr Rainfall=3.38"
Area (ac) CN Description0.199 39 >75% Grass cover, Good, HSG A0.199 39 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
9.8 100 0.0186 0.17 Sheet Flow, 1Grass: Short n= 0.150 P2= 3.40"
0.3 52 0.1260 2.48 Shallow Concentrated Flow, 2Short Grass Pasture Kv= 7.0 fps
5.7 314 0.0170 0.91 Shallow Concentrated Flow, 3Short Grass Pasture Kv= 7.0 fps
0.4 56 0.1250 2.47 Shallow Concentrated Flow, 4Short Grass Pasture Kv= 7.0 fps
16.2 522 Total
Subcatchment 15S: Offsite Area
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0
0
0
0
0
0
0
0
0
0
Type III 24-hr3-2yr Rainfall=3.38"
Runoff Area=0.199 acRunoff Volume=0.000 af
Runoff Depth=0.00"Flow Length=522'
Tc=16.2 minCN=39/0
0.0 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County - Offsite Sta Printed 2/11/2020Prepared by InSite Engineering LLC
Page 6HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 18P: Infiltration Basin
Inflow Area = 3.157 ac, 64.68% Impervious, Inflow Depth = 2.04" for 3-2yr eventInflow = 4.5 cfs @ 12.16 hrs, Volume= 0.536 afOutflow = 2.5 cfs @ 12.49 hrs, Volume= 0.536 af, Atten= 43%, Lag= 20.0 minPrimary = 2.5 cfs @ 12.49 hrs, Volume= 0.536 af
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrsStarting Elev= 44.70' Surf.Area= 0.133 ac Storage= 0.179 afPeak Elev= 45.61' @ 12.49 hrs Surf.Area= 0.165 ac Storage= 0.313 af (0.135 af above start)
Plug-Flow detention time= 252.5 min calculated for 0.357 af (67% of inflow)Center-of-Mass det. time= 62.5 min ( 827.9 - 765.4 )
Volume Invert Avail.Storage Storage Description#1 43.00' 0.581 af Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (acres) (acre-feet) (acre-feet)43.00 0.079 0.000 0.00044.00 0.109 0.094 0.09445.00 0.143 0.126 0.22046.00 0.179 0.161 0.38147.00 0.220 0.200 0.581
Device Routing Invert Outlet Devices#1 Primary 43.00' 15.0" Round Culvert L= 30.0' Ke= 0.500
Inlet / Outlet Invert= 43.00' / 42.50' S= 0.0167 '/' Cc= 0.900 n= 0.013, Flow Area= 1.23 sf
#2 Device 1 44.70' 1.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #3 Device 1 45.45' 1.2' long Sharp-Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=2.5 cfs @ 12.49 hrs HW=45.61' (Free Discharge)1=Culvert (Passes 2.5 cfs of 8.3 cfs potential flow)
2=Sharp-Crested Rectangular Weir (Weir Controls 2.3 cfs @ 3.11 fps)3=Sharp-Crested Rectangular Weir (Weir Controls 0.2 cfs @ 1.29 fps)
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County - Offsite Sta Printed 2/11/2020Prepared by InSite Engineering LLC
Page 7HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Pond 18P: Infiltration Basin
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
5
4
3
2
1
0
Inflow Area=3.157 acPeak Elev=45.61'Storage=0.313 af
4.5 cfs
2.5 cfs
Type III 24-hr 3-2yr Rainfall=3.38"200207 Premier Storage Monmouth County - Offsite Sta Printed 2/11/2020Prepared by InSite Engineering LLC
Page 8HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 9L: Musquash Brook
Inflow Area = 3.563 ac, 57.31% Impervious, Inflow Depth = 1.80" for 3-2yr eventInflow = 2.5 cfs @ 12.49 hrs, Volume= 0.536 afPrimary = 2.5 cfs @ 12.49 hrs, Volume= 0.536 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 9L: Musquash Brook
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
2
1
0
Inflow Area=3.563 ac
2.5 cfs2.5 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County - Offsite St Printed 2/11/2020Prepared by InSite Engineering LLC
Page 9HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 pointsRunoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv.
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=2.958 ac 69.03% Impervious Runoff Depth=3.52"Subcatchment 8S: Pr Area 2 Tc=10.0 min CN=39/98 Runoff=7.0 cfs 0.869 af
Runoff Area=0.406 ac 0.00% Impervious Runoff Depth=0.14"Subcatchment 10S: Pr Area 3 Tc=10.0 min CN=36/0 Runoff=0.0 cfs 0.005 af
Runoff Area=0.199 ac 0.00% Impervious Runoff Depth=0.25"Subcatchment 15S: Offsite Area Flow Length=522' Tc=16.2 min CN=39/0 Runoff=0.0 cfs 0.004 af
Peak Elev=45.91' Storage=0.366 af Inflow=7.0 cfs 0.873 afPond 18P: Infiltration Basin Outflow=4.4 cfs 0.873 af
Inflow=4.4 cfs 0.878 afLink 9L: Musquash Brook Primary=4.4 cfs 0.878 af
Total Runoff Area = 3.563 ac Runoff Volume = 0.878 af Average Runoff Depth = 2.96"42.69% Pervious = 1.521 ac 57.31% Impervious = 2.042 ac
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County - Offsite St Printed 2/11/2020Prepared by InSite Engineering LLC
Page 10HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: Pr Area 2
Runoff = 7.0 cfs @ 12.15 hrs, Volume= 0.869 af, Depth= 3.52"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 5-10yr Rainfall=5.23"
Area (ac) CN Description2.042 98 Paved parking, HSG A0.916 39 >75% Grass cover, Good, HSG A2.958 80 Weighted Average0.916 39 30.97% Pervious Area2.042 98 69.03% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 8S: Pr Area 2
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
7
6
5
4
3
2
1
0
Type III 24-hr5-10yr Rainfall=5.23"
Runoff Area=2.958 acRunoff Volume=0.869 af
Runoff Depth=3.52"Tc=10.0 min
CN=39/98
7.0 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County - Offsite St Printed 2/11/2020Prepared by InSite Engineering LLC
Page 11HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 10S: Pr Area 3
Runoff = 0.0 cfs @ 14.73 hrs, Volume= 0.005 af, Depth= 0.14"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 5-10yr Rainfall=5.23"
Area (ac) CN Description0.141 30 Woods, Good, HSG A0.265 39 >75% Grass cover, Good, HSG A0.406 36 Weighted Average0.406 36 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)10.0 Direct Entry,
Subcatchment 10S: Pr Area 3
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.009
0.008
0.007
0.007
0.006
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
Type III 24-hr5-10yr Rainfall=5.23"
Runoff Area=0.406 acRunoff Volume=0.005 af
Runoff Depth=0.14"Tc=10.0 min
CN=36/0
0.0 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County - Offsite St Printed 2/11/2020Prepared by InSite Engineering LLC
Page 12HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 15S: Offsite Area
Runoff = 0.0 cfs @ 12.99 hrs, Volume= 0.004 af, Depth= 0.25"
Runoff by SCS TR-20 method, UH=Delmarva, Split Pervious/Imperv., Time Span= 0.00-72.00 hrs, dt= 0.01 hrsType III 24-hr 5-10yr Rainfall=5.23"
Area (ac) CN Description0.199 39 >75% Grass cover, Good, HSG A0.199 39 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
9.8 100 0.0186 0.17 Sheet Flow, 1Grass: Short n= 0.150 P2= 3.40"
0.3 52 0.1260 2.48 Shallow Concentrated Flow, 2Short Grass Pasture Kv= 7.0 fps
5.7 314 0.0170 0.91 Shallow Concentrated Flow, 3Short Grass Pasture Kv= 7.0 fps
0.4 56 0.1250 2.47 Shallow Concentrated Flow, 4Short Grass Pasture Kv= 7.0 fps
16.2 522 Total
Subcatchment 15S: Offsite Area
Runoff
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
0.009
0.008
0.007
0.007
0.006
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
Type III 24-hr5-10yr Rainfall=5.23"
Runoff Area=0.199 acRunoff Volume=0.004 af
Runoff Depth=0.25"Flow Length=522'
Tc=16.2 minCN=39/0
0.0 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County - Offsite St Printed 2/11/2020Prepared by InSite Engineering LLC
Page 13HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 18P: Infiltration Basin
Inflow Area = 3.157 ac, 64.68% Impervious, Inflow Depth = 3.32" for 5-10yr eventInflow = 7.0 cfs @ 12.15 hrs, Volume= 0.873 afOutflow = 4.4 cfs @ 12.44 hrs, Volume= 0.873 af, Atten= 36%, Lag= 17.3 minPrimary = 4.4 cfs @ 12.44 hrs, Volume= 0.873 af
Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrsStarting Elev= 44.70' Surf.Area= 0.133 ac Storage= 0.179 afPeak Elev= 45.91' @ 12.44 hrs Surf.Area= 0.176 ac Storage= 0.366 af (0.187 af above start)
Plug-Flow detention time= 200.7 min calculated for 0.694 af (80% of inflow)Center-of-Mass det. time= 54.1 min ( 817.9 - 763.7 )
Volume Invert Avail.Storage Storage Description#1 43.00' 0.581 af Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store(feet) (acres) (acre-feet) (acre-feet)43.00 0.079 0.000 0.00044.00 0.109 0.094 0.09445.00 0.143 0.126 0.22046.00 0.179 0.161 0.38147.00 0.220 0.200 0.581
Device Routing Invert Outlet Devices#1 Primary 43.00' 15.0" Round Culvert L= 30.0' Ke= 0.500
Inlet / Outlet Invert= 43.00' / 42.50' S= 0.0167 '/' Cc= 0.900 n= 0.013, Flow Area= 1.23 sf
#2 Device 1 44.70' 1.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #3 Device 1 45.45' 1.2' long Sharp-Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=4.4 cfs @ 12.44 hrs HW=45.91' (Free Discharge)1=Culvert (Passes 4.4 cfs of 8.9 cfs potential flow)
2=Sharp-Crested Rectangular Weir (Weir Controls 3.3 cfs @ 3.60 fps)3=Sharp-Crested Rectangular Weir (Weir Controls 1.1 cfs @ 2.22 fps)
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County - Offsite St Printed 2/11/2020Prepared by InSite Engineering LLC
Page 14HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Pond 18P: Infiltration Basin
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
7
6
5
4
3
2
1
0
Inflow Area=3.157 acPeak Elev=45.91'Storage=0.366 af
7.0 cfs
4.4 cfs
Type III 24-hr 5-10yr Rainfall=5.23"200207 Premier Storage Monmouth County - Offsite St Printed 2/11/2020Prepared by InSite Engineering LLC
Page 15HydroCAD® 10.00-24 s/n 03018 © 2018 HydroCAD Software Solutions LLC
Summary for Link 9L: Musquash Brook
Inflow Area = 3.563 ac, 57.31% Impervious, Inflow Depth = 2.96" for 5-10yr eventInflow = 4.4 cfs @ 12.44 hrs, Volume= 0.878 afPrimary = 4.4 cfs @ 12.44 hrs, Volume= 0.878 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Link 9L: Musquash Brook
InflowPrimary
Hydrograph
Time (hours)727068666462605856545250484644424038363432302826242220181614121086420
Flo
w (
cfs)
4
3
2
1
0
Inflow Area=3.563 ac
4.4 cfs4.4 cfs
PROJECT- PREMIER STORAGE NENUMBER- 19-1255-01
BY- SGMDATE- 2/7/2020
rev
SCOUR HOLE CALCULATIONS18 " FES S-0 ADS HP PIPE
--------------------------------------------------- Do = 1.50
Wo = 1.50 (CIRCULAR SAME AS Do)TW = 2.40 (2 YR TW DEPTH)
Q(25) = 9.14 CFS MAX. FLOW BASED ON HWY = DEPTH OF SCOUR HOLE BELOW INVERTq= 6.09 CFS/FT (Q/Wo)
CASE 1 - RIPRAP SIZE FOR Y = 1/2 Do
0.0125D(50) = ---------- (q/Do) ^ 4/3 = 0.70 INCHES
TWUSE 1.0 INCHES
CASE 2 - RIPRAP SIZE FOR Y = Do
0.0082D(50) = ---------- (q/Do) ^ 4/3 = 0.46 INCHES
TWUSE 0.0 INCHES
USE CASE 1 RIPRAP SIZE = 1.0 INCHES Y = 0.75 FEET
APRON THICKNESS
T = 2 x D (50) = 2.00 InchesWith filter fabric
USE 0.17 FEET
WIDTH OF HOLE BOTTOM
W(H) = 2 x Wo = 3.00 FEET
LENGTH OF HOLE BOTTOM
L(H) = 3 x Do = 4.50 FEET
OVERALL WIDTH
W = W(H) + 2 (3 * Y) = 7.5 FEET
OVERALL LENGTH
L = L(H) + 2 (3 * Y) = 9.0 FEET
RIP RAP QUANTITY= WLT(1/27) = 0 CUBIC YARDS
Scour Hole Design
PROJECT- PREMIER STORAGE NENUMBER- 19-1255-01
BY- SGMDATE- 2/7/2020
rev
SCOUR HOLE CALCULATIONS18 " FES S-6 ADS HP PIPE
--------------------------------------------------- Do = 1.50
Wo = 1.50 (CIRCULAR SAME AS Do)TW = 2.40 (2 YR TW DEPTH)
Q(25) = 6.74 CFS MAX. FLOW BASED ON HWY = DEPTH OF SCOUR HOLE BELOW INVERTq= 4.49 CFS/FT (Q/Wo)
CASE 1 - RIPRAP SIZE FOR Y = 1/2 Do
0.0125D(50) = ---------- (q/Do) ^ 4/3 = 0.46 INCHES
TWUSE 0.0 INCHES
CASE 2 - RIPRAP SIZE FOR Y = Do
0.0082D(50) = ---------- (q/Do) ^ 4/3 = 0.30 INCHES
TWUSE 0.0 INCHES
USE CASE 1 RIPRAP SIZE = 0.0 INCHES Y = 0.75 FEET
APRON THICKNESS
T = 2 x D (50) = 0.00 InchesWith filter fabric
USE 0.00 FEET
WIDTH OF HOLE BOTTOM
W(H) = 2 x Wo = 3.00 FEET
LENGTH OF HOLE BOTTOM
L(H) = 3 x Do = 4.50 FEET
OVERALL WIDTH
W = W(H) + 2 (3 * Y) = 7.5 FEET
OVERALL LENGTH
L = L(H) + 2 (3 * Y) = 9.0 FEET
RIP RAP QUANTITY= WLT(1/27) = 0 CUBIC YARDS
Scour Hole Design
PROJECT- PREMIER STORAGE NENUMBER- 19-1255-01
BY- SGMDATE- 2/7/2020
rev
SCOUR HOLE CALCULATIONS15 " FES S-10 ADS HP PIPE
--------------------------------------------------- Do = 1.25
Wo = 1.25 (CIRCULAR SAME AS Do)TW = 0.25 (0.2 Do ASSUMED)
Q(25) = 5.80 CFS MAX. FLOW BASED ON HWY = DEPTH OF SCOUR HOLE BELOW INVERTq= 4.64 CFS/FT (Q/Wo)
CASE 1 - RIPRAP SIZE FOR Y = 1/2 Do
0.0125D(50) = ---------- (q/Do) ^ 4/3 = 4.64 INCHES
TWUSE 5.0 INCHES
CASE 2 - RIPRAP SIZE FOR Y = Do
0.0082D(50) = ---------- (q/Do) ^ 4/3 = 3.05 INCHES
TWUSE 3.0 INCHES
USE CASE 1 RIPRAP SIZE = 5.0 INCHES Y = 0.625 FEET
APRON THICKNESS
T = 2 x D (50) = 10.00 InchesWith filter fabric
USE 0.83 FEET
WIDTH OF HOLE BOTTOM
W(H) = 2 x Wo = 2.50 FEET
LENGTH OF HOLE BOTTOM
L(H) = 3 x Do = 3.75 FEET
OVERALL WIDTH
W = W(H) + 2 (3 * Y) = 6.3 FEET
OVERALL LENGTH
L = L(H) + 2 (3 * Y) = 7.5 FEET
RIP RAP QUANTITY= WLT(1/27) = 1 CUBIC YARDS
Scour Hole Design
PROJECT- PREMIER STORAGE NENUMBER- 19-1255-01
BY- SGMDATE- 2/7/2020
rev
SCOUR HOLE CALCULATIONS18 " FES S-0 ADS HP PIPE
--------------------------------------------------- Do = 1.50
Wo = 1.50 (CIRCULAR SAME AS Do)TW = 2.40 (2 YR TW DEPTH)
Q(25) = 9.14 CFS MAX. FLOW BASED ON HWY = DEPTH OF SCOUR HOLE BELOW INVERTq= 6.09 CFS/FT (Q/Wo)
CASE 1 - RIPRAP SIZE FOR Y = 1/2 Do
0.0125D(50) = ---------- (q/Do) ^ 4/3 = 0.70 INCHES
TWUSE 1.0 INCHES
CASE 2 - RIPRAP SIZE FOR Y = Do
0.0082D(50) = ---------- (q/Do) ^ 4/3 = 0.46 INCHES
TWUSE 0.0 INCHES
USE CASE 1 RIPRAP SIZE = 1.0 INCHES Y = 0.75 FEET
APRON THICKNESS
T = 2 x D (50) = 2.00 InchesWith filter fabric
USE 0.17 FEET
WIDTH OF HOLE BOTTOM
W(H) = 2 x Wo = 3.00 FEET
LENGTH OF HOLE BOTTOM
L(H) = 3 x Do = 4.50 FEET
OVERALL WIDTH
W = W(H) + 2 (3 * Y) = 7.5 FEET
OVERALL LENGTH
L = L(H) + 2 (3 * Y) = 9.0 FEET
RIP RAP QUANTITY= WLT(1/27) = 0 CUBIC YARDS
Scour Hole Design
PROJECT- PREMIER STORAGE NENUMBER- 19-1255-01
BY- SGMDATE- 2/7/2020
rev
SCOUR HOLE CALCULATIONS18 " FES S-6 ADS HP PIPE
--------------------------------------------------- Do = 1.50
Wo = 1.50 (CIRCULAR SAME AS Do)TW = 2.40 (2 YR TW DEPTH)
Q(25) = 6.74 CFS MAX. FLOW BASED ON HWY = DEPTH OF SCOUR HOLE BELOW INVERTq= 4.49 CFS/FT (Q/Wo)
CASE 1 - RIPRAP SIZE FOR Y = 1/2 Do
0.0125D(50) = ---------- (q/Do) ^ 4/3 = 0.46 INCHES
TWUSE 0.0 INCHES
CASE 2 - RIPRAP SIZE FOR Y = Do
0.0082D(50) = ---------- (q/Do) ^ 4/3 = 0.30 INCHES
TWUSE 0.0 INCHES
USE CASE 1 RIPRAP SIZE = 0.0 INCHES Y = 0.75 FEET
APRON THICKNESS
T = 2 x D (50) = 0.00 InchesWith filter fabric
USE 0.00 FEET
WIDTH OF HOLE BOTTOM
W(H) = 2 x Wo = 3.00 FEET
LENGTH OF HOLE BOTTOM
L(H) = 3 x Do = 4.50 FEET
OVERALL WIDTH
W = W(H) + 2 (3 * Y) = 7.5 FEET
OVERALL LENGTH
L = L(H) + 2 (3 * Y) = 9.0 FEET
RIP RAP QUANTITY= WLT(1/27) = 0 CUBIC YARDS
Scour Hole Design
PROJECT- PREMIER STORAGE NENUMBER- 19-1255-01
BY- SGMDATE- 2/7/2020
rev
SCOUR HOLE CALCULATIONS15 " FES S-10 ADS HP PIPE
--------------------------------------------------- Do = 1.25
Wo = 1.25 (CIRCULAR SAME AS Do)TW = 0.25 (0.2 Do ASSUMED)
Q(25) = 5.80 CFS MAX. FLOW BASED ON HWY = DEPTH OF SCOUR HOLE BELOW INVERTq= 4.64 CFS/FT (Q/Wo)
CASE 1 - RIPRAP SIZE FOR Y = 1/2 Do
0.0125D(50) = ---------- (q/Do) ^ 4/3 = 4.64 INCHES
TWUSE 5.0 INCHES
CASE 2 - RIPRAP SIZE FOR Y = Do
0.0082D(50) = ---------- (q/Do) ^ 4/3 = 3.05 INCHES
TWUSE 3.0 INCHES
USE CASE 1 RIPRAP SIZE = 5.0 INCHES Y = 0.625 FEET
APRON THICKNESS
T = 2 x D (50) = 10.00 InchesWith filter fabric
USE 0.83 FEET
WIDTH OF HOLE BOTTOM
W(H) = 2 x Wo = 2.50 FEET
LENGTH OF HOLE BOTTOM
L(H) = 3 x Do = 3.75 FEET
OVERALL WIDTH
W = W(H) + 2 (3 * Y) = 6.3 FEET
OVERALL LENGTH
L = L(H) + 2 (3 * Y) = 7.5 FEET
RIP RAP QUANTITY= WLT(1/27) = 1 CUBIC YARDS
Scour Hole Design
Ingram Engineering Services, Inc. 16 Hagerty Blvd., Suite 400
West Chester, PA 19382 Office 484-947-5549 Fax 610-431-7015
Premier Storage Investors, LLC – Neptune, NJ
18", 40" & 66" BGSSoil Description
0'' to 15" Topsoil and Little Root Mat, Sandy Loam Depth 1' 2' 3' 4'
15" to 40'' Light Brown Silty f. SAND, feint and few mottles, wet at 40" (episaturation) 18'' 9 15 12/6"
40'' to 115''Light Brown to Grey f. Sandy SILT with little to trace clay, many and prominent mottling, damp to moist
40'' 11 23 14/6"
115'' to 145''Grey to Light Brown f. Sandy SILT with some to little clay, moist, many and prominent mottling
66'' 14 28 15/6"
Perched water encountered at 40" BGS , Cave in at 40", Limiting Zone at 40" BGS (Episaturation and Mottling LZ)
16" BGSSoil Description
0'' to 8'' Topsoil and Little Root Mat, Sandy Loam Depth 1' 2' 3' 4'8'' to 33'' Light Brown to Tan Silty f-m SAND, dense 16'' 33 60
No GW or LZ Encountered within depths explored
36" & 72" BGSSoil Description
0'' to 12" Topsoil and Little Root Mat, Sandy Loam Depth 1' 2' 3' 4'
12" to 48''Light Brown to Tan SAND with some fine to medium gravel and little silt, wet at 48" (episaturation)
36'' 10 21 21
48'' to 85'' Light Brown to Grey f. Sandy SILT, dense, many and prominent mottling 72'' 13 38 25/6"
85'' to 102''Tan to Grey to Orange Silty CLAY with fine sand, damp to wet, many and prominent mottling
102'' to 126'' Dark Grey f. SAND and Micaceous SILT, platy to channers, damp to moist
126'' to 150''Grey to Orange to Tan Silty f. SAND with trace clay, wet, many and promiment mottling, dense
Perched water encountered at 48" BGS , Limiting Zone at 48" BGS (Episaturation and Mottling LZ)
11", 48" & 66" BGSSoil Description
0'' to 18'' Topsoil and Little Root Mat, Sandy Loam Depth 1' 2' 3' 4'
18'' to 63''Light Brown to Tan Silty f. SAND, feint and few mottling, dry to damp (moisture increased with depth)
11'' 8 19 10/6"
63'' to 144''Light Brown to Grey f. Sandy, Clayey SILT, moist to wet, many and prominent mottling
48'' 14 18 15/6"
66'' 16 28
LZ at 63" BGS (Mottling LZ)
24", 48" & 72" BGSSoil Description
0'' to 12" Topsoil and Little Root Mat, Sandy Loam Depth 1' 2' 3' 4'
12" to 49''Light Brown to Tan Silty f. SAND, feint and few mottling, dry to damp (moisture increased with depth)
24'' 7 10 7/6"
49'' to 78''Tan to Brown to Grey f. Sandy SILT with little clay, many and prominent mottling, moist
48'' 5 12 9/6"
78'' to 129'' Grey to Brown f. Sandy SILT, many and prominent mottling, moist to wet 72'' 12 17 12/6"129'' to 147'' Grey to Orange SILT with little f. sand, many and prominent mottling, wet
LZ at 49" BGS (Mottling LZ)
Test @Depth BGS Kneas Bar Testing Results (blows/foot)
Depth BGS Kneas Bar Testing Results (blows/foot)
TP #3
TP #1
Depth BGS Kneas Bar Testing Results (blows/foot)Test @
Test @Depth BGS Kneas Bar Testing Results (blows/foot)
TP #4Test @
TP #2
Depth BGS Kneas Bar Testing Results (blows/foot)
TP #5Test @
Ingram Engineering Services, Inc. 16 Hagerty Blvd., Suite 400
West Chester, PA 19382 Office 484-947-5549 Fax 610-431-7015
Premier Storage Investors, LLC – Neptune, NJ
17", 48" & 72" BGSSoil Description
0'' to 10'' Topsoil and Little Root Mat, Sandy Loam Depth 1' 2' 3' 4'
10'' to 33''Tan to Light Brown SAND with some f. gravel and little silt, few and feint mottling
17'' 16 27 16/6"
33'' to 46'' Tan to Grey SAND with little silt, few and prominent mottling 48'' 13 29 19/6"
46'' to 84''Light Brown to Tan to Grey Silty f. SAND, dry to damp, many and prominent mottling
72'' 9 19 6/6"
84'' to 133''Grey to Tan to Light Brown SILT and SAND with some pockets of clay, very wet
133'' to 147''Dark Grey to Black f. SAND and Micaceous SILT, damp, plates to channers, damp
147'' to 154'' Grey to Tan to Light Brown SILT and SAND with some pockets of clay, wet
LZ at 46" BGS (Mottling LZ)
12", 48" & 78" BGSSoil Description
0'' to 10'' Topsoil and Little Root Mat, Sandy Loam Depth 1' 2' 3' 4'
10'' to 71''Grey to Dark Brown f. Sandy SILT with brick, concrete, pottery, terracotta (FILL)
12'' 8 8 2/6"
71'' to 85''Brown to Grey f. Clayey SILT with little to trace sand, many and prominent mottling, damp
48'' 3 2 3/6"
85'' to 97'' Dark Grey to Black f. Sandy SILT, plates to channers 78'' 5 13 12/6"
97'' to 119''Grey to Tan to Light Brown Clayey SILT with little to trace SAND, many and prominent mottling, damp
119'' to 154'' Grey to Tan to White f. Sandy SILT with many and prominent mottling, damp
LZ at 71" BGS (Mottling LZ)
24", 42" & 64" BGSSoil Description
0'' to 34'' FILL - Silt & Sand, gravel, brick, concrete, piping, debris Depth 1' 2' 3' 4'
34'' to 105''Tan to Yellow to Grey f. SAND and SILT with clay pockets, many and prominent mottling, damp to wet, episaturation at 105"
24'' 17 14 5/6"
105'' to 144''Dark Grey f. SAND and Micaceous SILT, damp to wet, groundwater at 140" BGS, damp to wet
42'' 10 12 4/6"
64'' 9 8 5/6"
Perched water encountered at 105" BGS , Limiting Zone at 105" BGS (Episaturation and Mottling LZ)Groundwater encountered at 140" BGS
24", 42" & 64" BGSSoil Description
0'' to 53'' FILL - Topsoil and Little Root Mat, Sandy Loam, buried concrete and brick Depth 1' 2' 3' 4'
53'' to 99''Grey to Orange to Brown f. Sandy SILT to Clayey SILT with f. sand, many and prominent mottling, damp
24'' 26 19 8/6"
99'' to 110'' Dark Grey to Dark Brown f. Sandy Micaceous SILT, plates to channers, damp 42'' 7 11 7/6"
110'' to 129''Grey to Dark Grey to Orange f. Sandy SILT, damp to wet, common and prominent mottling
64'' 9 10 2/6"
LZ at 53" BGS (Mottling LZ)
Test @Depth BGS Kneas Bar Testing Results (blows/foot)
TP #9Test @
Depth BGS Kneas Bar Testing Results (blows/foot)
TP #10
Depth BGS Kneas Bar Testing Results (blows/foot)
Test @Depth BGS Kneas Bar Testing Results (blows/foot)
TP #8Test @
TP #7
InSite Engineering, LLC 1955 Route 34, Suite 1A • Wall, NJ 07719
732-531-7100 (ph) • 732-531-7344 (fx) • [email protected] • www.InSiteEng.net Licensed in NJ, PA, DE, NY, CT, NC, DC, & CO
APPENDIX E
Pre-Development Drainage Map Post-Development Drainage Map