20
DWPF Melter 1 Removal From Service John E. Owen Closure Business Unit Westinghouse Savannah River Company SRS ALARA Workshop – Augusta, GA May 3, 2005

DWPF Melter 1 Removal From Service - Savannah …DWPF Melter 1 Removal From Service John E. Owen Closure Business Unit Westinghouse Savannah River Company SRS ALARA Workshop – Augusta,

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

DWPF Melter 1 Removal From Service

John E. OwenClosure Business Unit

Westinghouse Savannah River CompanySRS ALARA Workshop – Augusta, GA

May 3, 2005

Melter Cross Section

Melter 1 Installed in Melt Cell

Melter Storage Box on Rail Car

Melter Storage Box in RRW

Initial Alignment of Melter

Final Alignment of Melter

Lowering Melter into MSB

Melter Fully Lowered into MSB

Removing Lifting Yoke

Removing Alignment Guides

Placing SS Drum Inside MSB

Installing MSB Lid

MSB Leaving 221S Airlock

MSB and Rail Car

Lifting MSB with Gantry Crane

Placing Concrete Shield Covers

DWPF Melt Cell Crawler

26” 17”

42”

Crawler Using Broom Tool

Crawler Using Vacuum