17
1 Defense Waste Processing Facility Melter Bubblers Presentation to: Citizens Advisory Board, Waste Management Committee 8/24/10 Karthik Subramanian Chief Technology Officer Savannah River Remediation SRR-MS-2010-00155

DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

Embed Size (px)

Citation preview

Page 1: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

1

Defense Waste Processing Facility Melter Bubblers

Presentation to:Citizens Advisory Board, Waste Management Committee

8/24/10Karthik SubramanianChief Technology OfficerSavannah River Remediation

SRR-MS-2010-00155

Page 2: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

2

Acknowledgements

• DOE-SR

• DWPF Facility Engineering

• DWPF Operations

• EnergySolutions/Vitreous State Laboratory

• SRNL

Page 3: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

3

Outline

• Liquid Waste System

• DWPF Overview

• Bubblers Implementation– Controlled, systematic approach

– Reliably install and operate bubblers

– Maintain glass quality requirements

– Enhance sludge disposition rate

• Specific Questions– Melter impacts

– Cold-cap coverage: volatiles carryover

Page 4: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

4

SRS Liquid Waste System

DWPF

Saltstone

H Tank Farm

F Tank Farm

GWSBs

Vaults

Savannah River & other Spent Fuel

H Canyon

DOE Complex Legacy Materials

DWPF - Defense Waste Processing FacilityGWSB - Glass Waste Storage BuildingARP – Actinide Removal ProcessMCU – Modular Caustic Side Solvent Extraction UnitSWPF – Salt Waste Processing FacilityDSS – Decontaminated Salt Solution

recycle

Cs, Sr & Actinidessalt solution

sludge

Empty Tanks -> Closure

Sludge Preparation

ARP/MCU SWPF

Disposal

canisters

*Average of 215 canisters/year for last 10 years

Page 5: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

5

Waste Acceptance Activities

Nitric Acid, Formic Acid, and Antifoam Additions

Antifoam Additions, Decon Frit Water Additions, and Frit Additions

512-S (Actinide Removal Product (ARP))

SRAT

221-S

SME

221-S

MFT

221-S

Melter

221-S

SAMPLE ANALYSIS HOLD POINT-GLASS ACCEPTABLE?

SRAT Sample

Analyses

Modular Caustic Side Solvent Extraction Unit (Strip Effluent, Cs-137 stream)

Washed Sludge Slurry

Melter Off Gas

Sand Filter/ Stack

DWPF Process

• Glass quality requirements met

• REDOX control through formic acid/nitric acid

• One sample per macro-batch

Page 6: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

6

Melter

Riser

Pour Spout

Dome Heaters

Electrodes

Melter Shell

*Currently rate-limiting step at DWPF

Page 7: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

7

Current Glass Pump

• Glass Pump Provides ~6% Increase In Canister Productivity

Page 8: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

8

Melter Bubblers Implementation

• Implement bubblers in existing Glass Melter to increase melt rate/waste throughput– Maximize number

– Symmetry

– Location with respect to feed point

– Ease of remote access

– Minimize impact on remote jumpers

Un

ag

ita

ted

Me

lte

r (n

atu

ral

co

nv

ec

tio

n)

Bu

bb

led

Me

lte

r (f

orc

ed

co

nv

ec

tio

n)

Page 9: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

9

Melter Configuration

Page 10: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

10

Bubbler Assemblies

Page 11: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

11

Top View of Melter From South Wall

Page 12: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

12

Bubblers Implementation

• Installation and operation of the bubbler systems following a safe, systematic, and controlled approach

• Testing program is being completed to determine any safety and operational impacts to the system

• Bubbler installation on track to September 2010– Detailed controlled startup – Learning process as with all

enhancements/modifications to existing facilities

• Same glass quality requirements met • Enhanced the production capacity to accelerate

the sludge disposition rate

Page 13: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

13

Knowledge of Bubblers

• Knowledge of test programs, and previous melters operated under similar conditions, were used to develop the strategy for implementation at DWPF

7,762,0002,175,0002,963,000*Total glass produced, lb

22>2Closest distance from the bubbler injection point to floor refractory, in

~2~4~5Closest distance from bubbler injection point to refractory wall, in

8 assemblies10 assemblies4 assembliesNumber of bubblers

121012Glass contact refractory thickness, in

K3K3K3Glass contact refractory type

3.35.02.6Melt surface area, m2

RectangularRectangularCylinderGeometry

LAW Pilot MelterM-Area MelterDWPFParameter

Page 14: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

14

Key Parameters in DWPF Bubblers

• Cold cap is critical to the operation of the DWPF melter and will be maintained with bubbler operations– Minimize carryover of volatile species (e.g. halides)– Off-gas system life not significantly impacted– Minimal changes in radionuclide carryover (e.g. Tc)

COLD-CAP BUILD-UP DURING NORMAL OPERATIONS

DM1200 Experimental Melter at VSL-CUA

95% COLD CAP COVERAGE

Page 15: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

15

Summary

• Bubbler implementation strategy is a comprehensive plan to address specific technical issues and integration within the plant– Sludge batch planning

– Transfer control

– Safety analyses

– Melter impacts

– Glass quality

• Controlled strategy will be used to install and operate bubblers at the DWPF facility

• It is recognized that, as with any modification, there is a start-up phase and continuous improvement that will take place as the bubblers are operated and more knowledge is gained

Page 16: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

16

Backup

Page 17: DWPF Melter Bubblers - Savannah River Site · • Installation and operation of the bubbler systems following a safe, systematic, and controlled approach ... Microsoft PowerPoint

17

Off-Gas System