Dover High SchoolLocally Funded Initiatives (LFI’s) Community
Discussion
Wednesday, May 4, 2011
Why Locally Funded Initiatives (LFI’s)??
• OSFC spaces and numbers defined by enrollment to meet minimum requirements
• DCS curriculum and programs surpass this• local graduation requirements exceed state minimum• 85% of seniors plan to attend 2 or 4-year college; need above
minimum requirements for college prep• DHS has a rich, diverse curriculum that includes fine arts,
advanced placement courses, and pre-engineering courses• community expectations are beyond state standards• district staff have compared co-funded plan to current
programming and have identified necessary additions to that co-funded plan
ACADEMIC CLASSROOMSSuggested LFI Square Footage
4 classrooms 3600
3 labs (2 science; 1 tech/ pre-engineering) 3500
2 special education classrooms 1800
1 art classroom and storage 1350
ACADEMIC CLASSROOMS
• full inclusion/co-teaching and resource class model for our 104 special education students (about 13% of students)
• 10 Advanced Placement (AP) courses, where students earn college credit (over 170 tests administered each year)
• Project Lead the Way/Pre-engineering courses for college credit (92 students)
• appx. 300 students in visual arts courses (about 37% of students)
MEDIA CENTER SPACES
Suggested LFI Square Footage
Technology equipment room 2000
MEDIA CENTER SPACES
• district technology staff works out of current high school and needs space to receive, configure, and repair all district technology
• coordination and service of district’s 857 computers; 116 SmartBoards; 125 projectors; 120 printers
• additional technology serviced includes scanners, document cameras, cameras, wireless access points, response systems, distance learning equipment
MUSIC SPACES
Suggested LFI Square Footage
Additional instrumental rehearsal space
1500
Storage 900
Percussion lab 1200
MUSIC SPACES
approximately … • 140 students in band• 55 students in orchestra• 80 students in vocal music• 35 in steel drum band • 285 students in music program … approx. 35%
of student population is in a performing music group/class at DHS
PHYSICAL EDUCATION SPACESSuggested LFI Square FootageAddtl. gym space to equal current seating
2500
Addtl. weight room space to equal current size
1000
Addtl. wrestling room space to equal current size
1300
Locker rooms and storage 2850
PHYSICAL EDUCATION SPACES
• proposed gym is same actual size, but seating would be reduced by 250 seats due to new building requirements/handicapped access
• weight room and wrestling room requirements just bring new facility to equal size of current space
• locker rooms and storage are some of the most common LFI's due to this space being built more for PE classes and less to meet the needs of competition gyms
AUDITORIUM ($280/sq ft/Re-use chairs)
Suggested LFI Square Footage
1000-seat auditorium w/ orchestra pit 7600
AUDITORIUM
• current auditorium is used approximately 60 times per year just for school functions – including concerts, elementary programs, student assemblies, and class meetings– this does not include any rehearsals, staff
development, or classroom use– this also does not include any community events
(i.e. dance recitals, FOP concerts, etc.)
BUILDING SERVICES SPACE(Due to the LFI’s)
Suggested LFI Square Footage
Restrooms 1089
Corridors 6220
Mechanical/Electrical 2146
Construction Factor 4867
BUILDING SERVICES SPACE
• costs incurred with the additional space – you would need more hallways, restrooms, etc., if you had more space in the facility
OTHERSuggested LFI Square Footage
Keep existing high school gym
N/A
OTHER : KEEP EXISTING GYM
• there is a minimum student threshold for co-funding of an auxiliary gym – we are just below that … however,– approx. 475 students participate in athletics –
many more than one sport– appx. 58% of students participate in athletics
… comparable figures to a much larger school• multiple practice sites impact academics as
students get home earlier for homework and family time
IN SUMMARY …
• proposed OSFC site = 150,000 square feet• current DHS = 200,000 square feet• district is showing increasing enrollment
projections• LFI’s presented here would “maintain” current
programming
Suggested LFI Square Footage
CLASSROOMS
4 classrooms 3600
3 labs (2 science; 1 tech/ pre-eng.) 3500
2 special education classrooms 1800
1 art classroom and storage 1350
MEDIA CENTER SPACESTechnology equipment room 2000
MUSIC SPACES
Addt’l instrumental rehearsal space 1500
Storage 900
Percussion lab 1200
AUDITORIUM1000-seat auditorium w/ orchestra pit 7600
Suggested LFI Square Footage
PHYSICAL EDUCATION SPACESAddtl. gym space to equal current seating 2500
Addtl. weight room space to equal current size 1000
Addtl. wrestling room space to equal current size 1300
Locker rooms and storage 2850
BUILDING SERVICES SPACERestrooms 1089
Corridors 6220
Mechanical/Electrical 2146Construction Factor 4867
OTHERKeep existing high school gym N/A
TOTAL SUGGESTED LFI SQUARE FOOTAGE 45,422