Distributed Multi-Nodal ATFM Operational Trial

Page 2: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

The Needs for Cross-Border ATFM in APAC

Distributed Multi-Nodal ATFM - Basic Concept

3

Domestic ATFM

Cross-Border ATFM

Regional Central ATFM

Unit

?

?April 2017 Multi-Nodal Briefing

Page 3: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Distributed Multi-Nodal ATFM - Basic Concept

5

Bases:• Common ATFM principles and guidance

with harmonized protocols supported by agreed Common Operating Procedures (COP)

• Effective information sharing and dissemination framework

Concept:Independent “virtual” ATFM nodes supported by interconnected information sharing framework

Supplement: A-CDM Process

Distributed Multi-Nodal ATFM Network

April 2017 Multi-Nodal Briefing

Page 4: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Distributed Multi-Nodal ATFM - Basic Concept

6

ATFM Information

ATS Units

MET Info

Flow Management Position (FMP)

ARRIVAL ATFM NODE

Flight Operations Centre (FOC)

Pilot

Flow Management Position (FMP)

ATS Units

A-CDM

DEPARTURE ATFM NODE

Airport Operator

April 2017 Multi-Nodal Briefing

Page 5: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Operational Trial Project Overview

7

• Ground Delay Program supporting Airport Congestions

Phase 1 2015 - 2016

• Ground Delay Program supporting Airspace Congestion

• Interconnectivity among ATFM systems

Phase 22017 - TBD

• Fully interconnected Global ATFM Service

• Integration with SWIM and 4D-Trajectory Management

Phase X Vision

Phased Approach to the Operational Trial

April 2017 Multi-Nodal Briefing

Page 6: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Tiered Participation Model

Operational Trial Project Overview

8

Level 3 ATFM NodesGenerate, Distribute, Comply to CTOT China, Hong Kong China,

Singapore, Thailand

Level 2 ATFM NodesReceive and Comply to CTOT Cambodia, Indonesia,

Malaysia

Level 1 ATFM NodesObservers Lao PDR, Myanmar,

Philippines, Viet Nam

Advisory ATFM Node Australia

April 2017 Multi-Nodal Briefing

Page 7: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Phase 1: Concept and Overview

10

• Ground Delay Program supporting Airport Congestions

Phase 1 2015 - 2016

April 2017 Multi-Nodal Briefing

Phase 1 Overview Stage Plan

Page 8: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Phase 1 – DCB for Constrained Airports

Stage 1 Stage 2 Stage 3

CommunicationLinkage and Protocols

Dissemination of Information

Demand Prediction Validation

Local Table-Top Exercises

Cross-Border ATFM Procedures Development and Validation (through demo flights)

Limited-ScopeOperationalService

Phase 2 – DCB for Constrained Airspace

TBD

Phase 1: Concept and Overview

11

Phase 1 Overview Stage Plan

April 2017 Multi-Nodal Briefing

Page 9: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Operational Concept and Objective

Phase 1 – Stage 3: Limited-Scope Ops Service

16

Key Objective: Effectiveness of ATFM in Live SituationsTo test ATFM Service under real environment; and

To implement cross-border ATFM focusing on airport constraints progressively, ensuring readiness of stakeholders

Harmonized and Validated ATFM Processes(Stage 2 work)

ATFM System Infrastructure and Internal Procedures

(Readiness Checklist)

Communication Infrastructure and Demand

Prediction Capability(Stage 1 work)

Associated Documents and Stakeholder Awareness

(COP, AIP Supplement / AIC, Awareness Campaign)

April 2017 Multi-Nodal Briefing

Page 10: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Stage 3 Activities in 2016

Phase 1 – Stage 3: Limited-Scope Ops Service

17April 2017 Multi-Nodal Briefing

Aug Sep Oct Nov - Dec

Singapore’s National Day

Royal Thai Air Force Air Show

Five Power Defence Arrangement Exercise

Northeast Monsoon Season

Planned Events

Semi-Ad Hoc Events

Page 11: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Singapore National Day Parade 2016 (WSSS)

Event Detail

Closure of WSSS for NDP’16 aerial flypast between 1035 – 1105 UTC

16, 23, 30 July and 9 August 2016

ATFM Measure Implemented

GDP / CTOT for flights destination WSSS between 0930 – 1230 UTC on all dates

Phase 1 – Stage 3: Limited-Scope Ops Service

18April 2017 Multi-Nodal Briefing

Aug Sep Oct Nov - Dec

Singapore’s National Day

Royal Thai Air Force Air Show

Five Power Defence Arrangement Exercise

Northeast Monsoon Season

Page 12: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Singapore National Day Parade 2016 (WSSS)

CTOT Compliance Result

Average CTOT compliance = 70%

Program Result

• Average airborne delay reduction 6 minutes

• Shorter time required for recovery

Phase 1 – Stage 3: Limited-Scope Ops Service

19April 2017 Multi-Nodal Briefing

Aug Sep Oct Nov - Dec

Singapore’s National Day

Royal Thai Air Force Air Show

Five Power Defence Arrangement Exercise

Northeast Monsoon Season

Page 13: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Stage 3 Activities in 2017

Phase 1 – Stage 3: Limited-Scope Ops Service

26April 2017 Multi-Nodal Briefing

Jan Mar Multi-Nodal/13 Apr

Thailand’s Children Day Air Display

VTBS Runway 19L Maintenance

Bangkok, Thailand Continuation of Implementation

Semi-Ad Hoc Events

Ad-Hoc Implementation

Page 14: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Summary of Contributions in Phase 1

• Validated cross-border ATFM procedure for airport constraints

• Demonstration of ATFM programs in live operations

• Increasing readiness level of stakeholders, with some able to support ad-hoc ATFM measures

• Incorporation of Multi-Nodal concept into ICAO Doc 9971 (3rd edition, in print)

• Representation in CANSO Best Practice Guide on ATFM Implementation (in development)

Phase 1 – Stage 3: Limited-Scope Ops Service

30April 2017 Multi-Nodal Briefing

Page 15: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Forward Plan

• Level 3 ATFM Nodes moving toward Operationally-Ready ATFM Service

– Singapore: 1 Apr 2017

– Thailand: 1 Apr 2017

– Combined ATFM measure deployed as needed

• Strengthened Post-Ops Analysis Framework

– Increased involvement of Level 2 ATFM Nodes

– Analysis process closer to actual operations time

• Strengthened Tiered Participation Model

• Parallel development of Phase 2

Phase 1 - Forward to Implementation

31April 2017 Multi-Nodal Briefing

Page 16: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Post-Ops Analysis Framework (1/5)

• Objective: To harmonize Post-Ops Analysis for GDP/CTOT programs

• Possibility: inclusion in Regional Framework document

• Focus: 2-sided Post-Ops Analysis

Phase 1 Forward Plan

3224 Mar 2017 Multi-Nodal/13

Arrival ANSP• GDP Impact• Departure and Arrival

Compliance• GDP Effectiveness

Departure ANSP• GDP Impact• Departure Compliance• Departure Situation• Feedback on Process

Phase 1 - Forward to Implementation

Page 17: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Post-Ops Analysis Framework (2/5)

Proposed KPI: Arrival ANSP

Phase 1 Forward Plan

3324 Mar 2017 Multi-Nodal/13

GDP Impact

Data Data Source

ATFM Delay Statistics• Total, Average, Maximum

ATFM System,FPL

Flight Breakdown• By type (Int’l vs Dom)• By ADEP, airlines• By project participation

ATFM System

Phase 1 - Forward to Implementation

Page 18: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Post-Ops Analysis Framework (3/5)

Proposed KPI: Arrival ANSP

Phase 1 Forward Plan

3424 Mar 2017 Multi-Nodal/13

Compliance

Data Data Source

CTOT Compliance Statistics• Compliance ratio• Distribution of diff(ATOT, CTOT)

ATFM System,DEP Messages

CTO / CLDT Compliance Statistics• Compliance ratio• Distribution of diff(ATO/ALDT, CTO/CLDT)

ATFM System,DEP Messages

Compliance Breakdown• By type (Int’l vs Dom)• By ADEP, airlines• By project participation

ATFM System,DEP Messages

Phase 1 - Forward to Implementation

Page 19: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Post-Ops Analysis Framework (4/5)

Proposed KPI: Arrival ANSP

Phase 1 Forward Plan

3524 Mar 2017 Multi-Nodal/13

GDP Effectiveness

Data Data Source

Delay Attribution• Overall system (ground + airborne) delay• Ratio – ground delay : airborne delay• Difference in delay between compliant and

non-compliant flights

ATFM SystemARR Messages / Radar track

Operational Effectiveness• Expected flow vs achieved flow

Phase 1 - Forward to Implementation

Page 20: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Post-Ops Analysis Framework (5/5)

Proposed KPI: Departure ANSP

Phase 1 Forward Plan

3624 Mar 2017 Multi-Nodal/13

Departure Compliance

Data Data Source

CTOT Compliance Statistics• Compliance ratio

ATFM System,DEP Messages

Departure Time Distribution• Statistics on diff(ATOT, CTOT)• Distribution of diff(ATOT, CTOT)

ATFM System,DEP Messages

Compliance Breakdown• By airlines

ATFM System,DEP Messages

Commentary on departure facilitationFeedback on process and information distribution

Phase 1 - Forward to Implementation

Page 21: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Project Participation

24 Mar 2017 Multi-Nodal/13 37

Multi-Nodal ATFM Network Tiered Participation

Phase 1 - Forward to Implementation

Page 22: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Building the Momentum to further enhance Multi-Nodal ATFM in Phase 1

• Level 2 ANSPs

• Level 3 ANSPs

• Total Airports in the Multi-Nodal ATFM Network

Phase 1 - Forward to Implementation

April 2017 Multi-Nodal Briefing 39

16 Airports

16 Airports

32

Current

Participation

Rate

35-50%

Target : 70%

Page 23: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Phase 2: Concept and Overview

40

• Distributed Ground Delay Program

• Airport Arrival Constraints (short-term & medium-term) e.g. weather, runway outage

Phase 1 2015 - 2016

• Ground Delay Program supporting Airspace Congestion & Capacity Planning

• Explore interconnectivity among ATFM systemsPhase 2

• Fully interconnected Global ATFM Service

• Integration with SWIM and 4D-Trajectory Management

Phase X Vision

Beyond Phase 1 of the Operational Trial

April 2017 Multi-Nodal Briefing

Page 24: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Phase 2 Key Objective

Phase 2: Concept and Overview

41

Key Objective: Distributed ATFM Programs to Support Airspace Constraints

To develop ATFM procedure for constrained airspaceTo validate the procedure and pave way for implementation

Harmonized and Validated ATFM Processes

ATFM System Infrastructure and Internal Procedures

Local procedure to support ATFM programs

ATFM System-to-System Information Sharing

Associated Documents and Stakeholder Awareness

(COP, AIP Supplement / AIC, Awareness Campaign)

April 2017 Multi-Nodal Briefing

Page 25: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Initial Activities

Part 7 – Phase 2: Concept and Overview

42April 2017 Multi-Nodal Briefing

Jan Feb Mar Multi-Nodal /13

Thailand’s Children Day Air Display

Cobra Gold 2017Joint Military Exercise

Cope Tiger 2017Joint Military Exercise

Bangkok, Thailand

Planned Events

Activity Review

Page 26: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Cope Tiger 2017 Joint Military Exercise (BKK FIR)

Event DetailAnnual large-scale joint military exercise taking up part of BKK FIR; congestion increase on alternate routings20 – 31 March 2017

ATFM Measure PlannedGDP / CTOT for flights destination VTBS, VTBD via TL, RAMEI, PAKRI

Phase 2: Concept and Overview

45April 2017 Multi-Nodal Briefing

Jan Feb Mar Multi-Nodal /13

Thailand’s Children Day Air Display

Cobra Gold 2017Joint Military Exercise

Cope Tiger 2017Joint Military Exercise

Bangkok, Thailand

Page 27: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Cope Tiger 2017 Joint Military Exercise (BKK FIR)

CTOT Compliance ResultHigh compliance ratio, 90+%

Program Result• Smoothened inbound traffic into BKK TMA• Reduced congestion around route converging waypoints

Phase 2: Concept and Overview

46April 2017 Multi-Nodal Briefing

Jan Feb Mar Multi-Nodal /13

Thailand’s Children Day Air Display

Cobra Gold 2017Joint Military Exercise

Cope Tiger 2017Joint Military Exercise

Bangkok, Thailand

Page 28: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Phase 2 Key Items

Phase 2: Concept and Overview

48April 2017 Multi-Nodal Briefing

Airspace (dynamic)

Capacity

Assessment

ATFM System

Information Linkage

GDP/CTOT for

Airspace

ConstraintsMulti-Constraints

ATFM Measure(s)

Page 29: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Phase 2 Stage Plan

Phase 2: Concept and Overview

49April 2017 Multi-Nodal Briefing

Phase 1 Continued Implementation

Phase 2 – DCB for Airspace Constraints

Stage 1 Stage 2 Stage 3

• Airspace Capacity Assessment

• Demand Monitoring and Prediction

• Demand and Flight Trajectory Accuracy Assessment

• Single-ConstraintDCB

• Combined ATFM Measures

• Multi-ConstraintDCB(Layered ATFM

Measures)

• ATFM System-to-System Information Linkage

• Stakeholder Engagement

Page 30: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Technical Subgroup

50April 2017 Multi-Nodal Briefing

For effective ATFM Operation

Need for information

sharing between ATFM Systems

TSG established to achieve ATFM to

ATFM systems interconnection

TSG’s objective

Allow information sharing

Achieve certain degree of

synchronization between ATFM

SystemsHarmonizing data

format and infrastructure

(possibly FIXM & SWIM Technology)

Progress of TSG

- Identified Basic Ops Use Cases

- Identified Requires Data Fields

- Mapped Data Fields to Existing Standards, ie FIXM

Next Steps

- Testing of sharing of CTOTs information between two ATFM system

- Drafting of ICD

Page 31: Distributed Multi-Nodal ATFM Operational Trial · Distributed Multi-Nodal ATFM - Basic Concept 6 ATFM Information ATS Units MET Info Flow Management Position (FMP) ARRIVAL ATFM NODE

Q ue st ions & D i s cuss ions