ATFM Implementation Thailand and Southeast Asia 55 th DGCA Conference 22 – 26 October 2018 Nadi, Fiji

ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

ATFM ImplementationThailand and Southeast Asia

55th DGCA Conference22 – 26 October 2018Nadi, Fiji

Page 2: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

Thailand and Southeast Asia Air Traffic Growth

Page 3: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

Thailand Air Traffic Demand Growth

3

950,6

611,0

07,70

0

1,296

,314 1,734

,761 2,2

35,12

9

848,7

9989

9,700

1,178

,190

1,604

,814 2,1

06,63

0

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

Historical Forecast 1-5 Y Forecast 6-10 Y Forecast 11-15 Y

Num

ber o

f Flig

hts

Fiscal Year

Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2007-2017Forecast Annual Traffic Volume - Fiscal Year 2018-2032

OthersOverflyDomesticInternationalTotalRevenue Flight

%CAGR 2007-2017 = 8%

%CAGR (15Y) 2017-2032= 6%

Page 4: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

East/North East227,140 Flights/Year622 Flights DailyOverall GR: 6.0%

South266,498 Flights/Year730 Flights Daily

Overall GR: ‐0.1%

West141,344 Flights/Year387 Flights Daily

Overall GR: 7.7%Volume GR

Int’l 70% 6.6%Dom 0%

Overfly 30% 10.2%

Volume GR

Int’l 62% 8.6%

Dom 26% 1.2%

Overfly 12% 3.4%

Volume GR

Int’l 34% 3.8%

Dom 56% ‐2.6%

Overfly 10% 1.6%Note: Annual Growth Rate / Data up to  30 Sep 2018 4

Thailand Air Traffic DemandNorth 246,059 Flights/Year674 Flights Daily

Overall GR: 21.9 %Volume GR

Int’l 62% 24.7%Dom 33% 17.8%

Overfly 5% 16.4%

Overall1,027,690 Flights/Year2,816 Flights DailyOverall GR: 8.1%

Volume GR

Int’l 47.3% 11.7%

Dom 42.3% 4.6%

Overfly 10.4% 6.8%

Page 5: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

Why We Need ATFM in Southeast Asia

5

Source: Boeing Current Market Outlook 2017 - 2036

Page 6: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

The Challenge: Demand Growth

In 20 years…

▪ China as the world’s largest aviation market

▪ More than half of new passengers from Asia-Pacific

▪ 5 APAC markets among the top 10, with Thailand surpassing France and Italy

IATA 20-Year Passenger Forecast, October 2017

Page 7: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

IntroductionConcept & Project Phases

Page 8: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

Evolution of the Regional ATFM Concept

8

CANSO Whole of flight CDM Pilot Project between BKK-SIN2011-2012

Tripartite CDM Project between BKK-HKG-SIN2012-2013

Distributed Multi Nodal Regional ATFM Concept 2014 - ….

Research Collaboration on Regional ATFM Concept2013

Page 9: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

ATS Units

AeroMET

ARRIVAL ATFM NODE Flight Operations Centre

(FOC) Pilot

ATS Units

A-CDM

DEPARTURE ATFM NODE

Airport Operator

ATFM Information

Exchange

Flow Management Position

(FMP) FMP

Airport Operator

9

Multi-Nodal ATFM Network Concept

Page 10: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

Distributed GDP/CTOTto regulate traffic into constrained arrival airports

Phase 1 (2015-2016)

Distributed GDP/CTOTto regulate traffic into constrained airspace

Phase 2 (2017-20XX)

Globally-interconnectedATFM network, enabled by SWIM infrastructure

Phase X

Identification of Elements

Development of Relevant Provisions

ATFM System-to-System Information Linkage (SWIM-Enabled)

10

How We Approach The Project: Multi-Phase Work

Page 11: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

11

Who The Members Are: Tiered Participation

Level 3 ATFM NodesGenerate, Distribute, Comply to CTOT

Level 2 ATFM NodesReceive and Comply to CTOT

Level 1 ATFM NodesObservers(soon to upgrade)

▪ China▪ Hong Kong China▪ Singapore▪ Thailand▪ Cambodia

▪ Indonesia▪ Malaysia▪ Myanmar▪ Philippines

▪ Lao PDR**▪ Viet Nam**

Page 12: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

12

Key Achievements

Planned EventsAd-Hoc

WX-InducedEmergency

Validated procedures for distributed GDPProven benefits for constrained airportsIncreased awareness for cross-border ATFMContribution to APAC States’ ATFM readiness

11

Spectrum of ATFM Operations

Page 13: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

Technical Sub-GroupDistributed Multi-Nodal ATFM Network

Page 14: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

NowMET Info

Flight Info

ADP

ATFM Measure

AFTN

AFTN

AFTN E‐mail

AFTN

AFTN

E‐mail

E‐mailFax Phone

Operations Control Centre (OCC)

Page 15: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

TSG’s Objectives

For effective ATFM operation

Need for information 

sharing between ATFM systems

TSG established to achieve ATFM 

to ATFM systems 

interconnection

Allow  effective 

information sharing

Achieve synchronization between ATFM 

systems

Using standardized data format and interoperable 

infrastructure

TSG’s objectives

Page 16: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

Near Future

• Loose system coupling• Use of open standards• Use of interoperable services

• Improved availability of quality data and information

• Improved shared situational awareness• Improved decision making• More flexible and cost‐effective communications• Increased system performance

SWIM

Page 17: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

• Technical Sub‐Group of Distributed Multi‐Nodal ATFM Network ProjectSystem‐to‐system connection designed based on SOA with the use of XML‐based information exchange model

Operational Scenarios(Operational 

Requirements)

Required Data Elements

Mapping to FIXM

Develop FIXM Extension ATFM Sys‐Sys ICD

ATFM Sys‐Sys Connection

System Test

CTOT, CLDT, etc. not included in FIXM4.1 Core

What’ve been done so far

Successful System‐to‐System 

between AEROTHAI and 

CAAS

Page 18: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

ATFM‐on‐SWIM Forward Plan

Oct 2018 2018 June 2019 2020

ATFM‐related services 

development based on operational 

scenarios

SWIM in ASEAN Demonstration

Key milestones• Network connection: CRV• ICD amendment to include ADP service

Page 19: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

ASEAN ATFM Implementation Support Team

Page 20: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

ASEAN ATM Enhancement Guidance

ICAO Global Air Navigation Plan

(DOC 9750)ICAO

Asia PacificSeamless ATM

Plan ASEAN ATMMaster Plan

Adopted at the 23rd ASEAN Transport Ministers Meeting

in October 2017

5th Edition of the GANP, covering 15-year strategic plan, including the introduction of the

Aviation System Block Upgrades (ASBU)

Version 2.0, endorsed by APANPIRG/27

September 2016

Page 21: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

ATFM in ASEAN Master Plan Context

Required ASEAN-Wide Harmonized Implementation

21

InitiativesPerformance Based Navigation (PBN) RoutesAir Traffic Flow Management (ATFM)ATS Inter-facility Data Communication (AIDC)Aeronautical Information Management (AIM)Common Aeronautical Virtual Private Network (CRV)

Page 22: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

ATFM in ASEAN Master Plan Context

ATFM Implementation Expectations

Phases Target Completion Expectations

Phase I 31 Dec 2018

All Member States to achieve Level-2 capability in the Multi-Nodal ATFM Network

Established local procedure to comply with ATFM measures distributed by other States

Phase II 31 Dec 2020

All Member States with major aerodromes to achieve Level-3 capability in the Multi-Nodal ATFM Network

Established procedure balance demand-capacity with ATFM measures

22

Page 23: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

ASEAN ATFM Implementation Support TeamCore Idea:▪ ASEAN ATM Master Plan

→ ASEAN Members supporting ATFM as Level-2 by 2018▪ Support group to aid AMS in ATFM implementation

→ Workshop series→ Guided / specific operational trials

Proposed Strategy: ▪ Singapore (CAAS) & Thailand (AEROTHAI) to lead▪ Kick-off meeting: 24 August 2018, Bangkok

▪ Develop a roadmap for harmonized ATFMimplementation among ASEAN Members

Page 24: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

Where We Are Headed: Road Forward

➢ Appointed by ASEAN ATM SPG to lead the support for other Member States

Initiatives Lead / Co-leadsPBN Routes Cambodia & Lao PDR

ATFM Singapore & ThailandAIDC MalaysiaAIM Singapore & ThailandCRV Singapore & Thailand

24

ASEAN ATFM Implementation Leads

Page 25: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

Key Success Factors

25

Collaboration

ConsensusSynergy

Global and Regional Development

Page 26: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

If you want to go fast,

go alone.If you want to go far,

go together.

Page 27: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

27

Page 28: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

28

Phase 1 Key Objective & Work Plan

Phase 1 Stage 1 Phase 1 Stage 2 Phase 1 Stage 3

Communication Linkage and Information Exchange Protocol Design

Procedure Development and Demonstration Flights

Progressive implementation effort

ATFM System-to-System Information LinkageStakeholder Engagement

Distributed GDPfor

Constrained / Congested Arrival Airports

Page 29: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

29

Phase 2 Key Objective & Work Plan

Phase 2 Stage 1 Phase 2 Stage 2 Phase 2 Stage 3

Airspace Demand-Capacity Assessment Capability

Procedure Development for Single-Constraint DCB

Procedure Development for Multi-Constraint DCB

ATFM System-to-System Information LinkageStakeholder Engagement

Distributed GDP (+other measures)for

Constrained / Congested Airspace Volume

For recent ATFM programs, refer to http://tinyurl.com/multi-nodal-16

Page 30: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

SummaryASEAN ATFM Implementation Support Team Kick‐Off Meeting

Page 31: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

ASEAN ATFM Implementation Support

Updated AMS ATFM Implementation Status

24 August 2018 31

AMS

Phase 11 Jan 2018 to 31 Dec 2020

Phase II1 Jan 2018 to 31 Dec 2022

Expected Starting Date

Expected Completion 

Date

Progress(ASEAN ATFM/1)

Expected Starting Date

Expected Completion 

Date

Progress(ASEAN ATFM/1)

BRUNEI To be provided

To be provided

To be provided

To be provided

CAMBODIA Started 31‐Dec‐17 100% Started 31‐Dec‐20 Completed

INDONESIA 26‐Jun‐16 31‐Dec‐17 100% 26‐Jun‐16 31‐Dec‐18Expect 

completion 31 Dec 2019

LAO PDR 28‐Dec‐18 31‐Dec‐20 30% 31‐Dec‐20 30‐Dec‐22 None

MALAYSIA Started Completed 100% 01‐Dec‐19 3rd Quarter 2020

MYANMAR Started 31‐Dec‐19 Completed Started 31‐Dec‐20

PHILIPPINES 02‐Apr‐18 01‐Nov‐18 01‐Nov‐18 01‐Nov‐19

SINGAPORE Started 01‐Apr‐17 100% Started 01‐Sep‐18 Completed30 Sep 2017?

THAILAND Started 31‐May‐17 100% Started 30‐Sep‐17 100%

VIETNAM Started 31‐Dec‐18 80% Started 31‐Dec‐20Updated : As of Oct 2017 As of Jul 2018

+ (Informal) Update during ASEAN ATFM Support / 1

Page 32: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

ASEAN ATFM Implementation Support

ATFM Implementation Support Wish List• Prioritized Elements ‐ Phase I

1. ATFM operations training 2. Regulatory framework development

• Prioritizes Elements ‐ Phase II1. ATM resource capacity assessment

Prioritized Work Areas

24 August 2018 32

Input into EU ARISE Plus workshops

Page 33: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

ASEAN ATFM Implementation Support

Workshop # 1: ASEAN ATM Master Plan“Introduction to ATM Master Plan and Key Initiatives”

▪ Date 10 – 12 September 2018▪ Host Civil Aviation Authority of Thailand (CAAT)▪ Venue Pathumwan Princess Hotel, Bangkok

Workshop # 3: Implementation of ATFM“To assist implementation of ATFM in ASEAN”

▪ Date 24 – 26 September 2018▪ Host AirNav Indonesia▪ Venue AirNav Indonesia HQ, Tangerang City

EU ARISE Plus Workshops

24 August 2018 33

Page 34: ATFM Implementation Thailand and Southeast Asia · (2015-2016) Distributed GDP/CTOT to regulate traffic into constrained airspace Phase 2 ... Hong Kong China ... PBN Routes Cambodia

Thank You!