    Department of Heavy Industry

    Indian Electrical Equipment Industry Mission Plan 2012-2022 Page 2

    Vision 2022 for

    Indian Electrical Equipment Industry

    To make India the country of choice for the

    production of electrical equipment and reach

    an output of US$ 100 billion by balancing

    exports and imports

  • 7/30/2019 Dhi Draft Mission Plan 2012-22

    2/3

    Department of Heavy Industry

    Indian Electrical Equipment Industry Mission Plan 2012-2022 Page 20

    2.0 Indian Power and Electrical Equipment Industry

    2.1 Indian Power Sector

    Power is a necessary fuel for a growing economy. The Indian economy is on a rising path

    targeting GDP growth rate of 8-9%. To achieve this growth, it is imperative that the properpower infrastructure is in place.

    India has the fifth-largest generation capacity in the world with an installed capacity of over

    199 GW, as on 31st March, 20126 and is also the sixth-largest electricity consumer,

    accounting for 3.4% of total global consumption. Indias total consumption in 2009 was

    estimated at 632 TWh. This is expected to increase to 2,465 TWh by 20357.

    The industrial sector, due to increasing capacity additions, has the highest demand for

    electricity across all sectors and is expected to remain high. The domestic and commercial

    sectors are likely to experience a steady demand for electricity, but the share of agriculture

    is expected to see a decline in the coming years8.

    2.1.1 Generation

    2.1.1.1 Thermal energy accounts for the major share of generation in India. Share of wind and

    other renewable forms of energy currently stands at around 12% of the total installed

    capacity. Government plans to increase the share of power generated from renewable

    sources in the coming Plans. India currently stands as the 5th largest and 3rd largest producer

    in the world of hydro and wind energy respectively.

    2.1.1.2 With envisioned capacity additions, India is expected to reach an installed capacity of 400

    GW by 2022. This increase will be in line with the countrys GDP growth plans of 89% per

    year.

    Figure 2.1: Installed Total Capacity (as on 31st March 2012)

    Total 199 GWSource: CEA

    *RES Renewable Energy Sources

    6Ministry of Power

    7International Energy Agencys World Energy Outlook 2011

    8Crisil

    Thermal -Coal56%

    Thermal -Others10%

    Hydro20%

    Nuclear2%

    RES*12%

  • 7/30/2019 Dhi Draft Mission Plan 2012-22

    3/3

    Department of Heavy Industry

    Indian Electrical Equipment Industry Mission Plan 2012-2022 Page 27

    Figure 2.9: Growth in Industry Size of Major T&D Equipment (` 000 crores)

    Source: IEEMA

    Figure 2.10: Market Size of T&D Equipment (201112)

    Source: IEEMA

    Domestic Capacity and Utilisation

    2.2.3.3 There is significant capacity in Indias T&D equipment segment, which is operating broadly

    at 70% capacity utilization. The domestic T&D segment is geared to cater to the expected

    growth in the demand for T&D equipment.

    Figure 2.11: Domestic T&D Capacity Utilization (2011-12)

    Source: IEEMA

    18

    3946 47

    5260 64

    2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

    Cables28%

    TransmissionLine and

    Conductors23%

    Transformers19%

    Switchgear &Controlgear

    15%

    RotatingMachines

    10%

    Energy Meters4%

    Capacitors1%

    85%

    56%

    79%72% 72%

    66% 68%61%

    81%

    HTSwitchgear

    Cables Capacit-ors

    Transfor-mers

    Transmiss-ion LineTowers

    Motors ACGenerators

    Conductors EnergyMeters