IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-1]
DETAILED PROJECT REPORT
IWMP-V-Theog, Shimla, Himachal Pradesh
2009-10
Department of Rural Development Government of Himachal Pradesh
Prepared by
Dr YS Parmar University of Horticulture and Forestry Regional Centre, National Afforestation and Eco-development Board
(Ministry of Environment and Forests, Govt. of India)
Nauni, Solan (HP) 173 230
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-2]
DETAILED PROJECT REPORT
IWMP-V-Theog, Shimla, Himachal Pradesh
2009-10
Submitted to
Department of Rural Development Government of Himachal Pradesh
Submitted by
Dr YS Parmar University of Horticulture and Forestry Regional Centre, National Afforestation and Eco-development Board
(Ministry of Environment and Forests, Govt. of India)
Nauni, Solan (HP) 173 230
Prepared by P Kaushal Team Leader
JL Hudden and Bhupinder Sharma
Mohinder Thakur, Sanjay Chauhan, Ashish Mehta, Rakesh Verma, Om Prakash, Rajender Thakur and Sangeeta
Chauhan
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-3]
ABBREVIATION USED
BPL : Below Poverty Line DPR : Detailed Project Report DRDA : District Rural Development Agency GIS : Geographical Information System ha : hectare IPH : Irrigation and Public Health IRDP : Integrated Rural Development Programme IWMP : Integrated Watershed Management Programme lt : liter m : meter MNREGA : Mahatma Gandhi Rural Employment Guarantee Act. NABARD : National Bank of Agriculture and Rural Development NDRI : National Diary Research Institute OBC : Other Backward Classes PIA : Project Implementing Agency PMGS Y : Pradhan Mantry Gramin Sadak Yojna PWD : Public Work Department SC : Scheduled Caste ST : Scheduled Tribe EPA : Entry Point Activity SHG : Self Help Group WDF : Watershed Development Fund
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-4]
Gist of Draft DPRs IWMP-V
Project Integrated Watershed Management Programme (IWMP-V)
Panchayat/Micro watersheds Ghoond,Parghiya,Ghorna,Deothi
Block Theog
Project Area 5741 ha.
Cost Rs. 8,61,15,000
Area Proposed For treatment 5741 ha.
Panchayats Covered under the project 4 (Four)
Total Micro Watershed 3 (Three)
Financial Projection in the DPR as :
9 (i) Project fund Rs. 8,61,15,000
9 (ii) Convergence Rs. 2,81,336
Total (9 i+9 ii) Rs. 8,63,96,336
Whether the year- wise annual action plan prepared or not
Yes. Scheme identified for convergence will have to be considered in annual action plan
Whether activity – wise project fund and convergence funds indicated separately or not.
Yes
Whether Khasra No. of civil structure indicated or not.
GPS Code indicated activity wise
Physical & financial target of the project period mentioned in the AAP or not
Yes
MW-wise code mentioned on not Yes - MicroShed
Proposed Activities Kachha talab/pond
Rain water harvesting structure/ roof water
Water storage tank(WST)
Kuhal
Agriculture Provision of crop seed Demonstration unit
Horticulture Plants Vegetable seeds Collection centre Demonstration unit/MIS
Animal husbandry Soil Conservation Drinking water Livelihood activity Production system and Micro Enterprises
Provision of funds for water Conservation/Harvesting activities.
Rs.3,74,18,200
Area proposed to be brought under Supplemental Irrigation
3296 ha.
Whether the Draft DPR has been approved by:
18.(i) the Gram Sabha/ Gram panchayat Yes (resolution of gram panchayat in each micro watershed)
18.(ii) The District level Resource Group. Yes. recommendation/ approval /letter all ready submitted to SLNA by the respected DLRG
Expected Outcome Increase in availability of water,Production of Agriculture, horticulture and fodder Improvement in soil and economic status of BPL and Antoyadaya families
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-5]
Dr. YS Parmar University of Horticulture and Forestry Nauni -Solan IWMP-V – Shimla (Theog Block)
i) Status Quo Analysis.
Total Geographical Area under the project. 5741 ha.
Area under cultivation. 1000 ha.
Fallow land and barren land 338 ha.
Pasture land 247 ha.
Ghasani 678 ha.
Forest Area. 3386 ha.
Community. land -
Other land. 92 ha.
Current cropping pattern. Agri (maize+pulses/wheat/barley/pulses) Horti (fruit crops +vegetable)
ii) Water Harvesting
Current Status of Water Harvesting activities.
Kachha talab, WST and kuhal etc.
Water Harvesting potential in term of Cubic meters.
30583 m3
Proposed Activities. Kachha talab/pond
Rain water harvesting structure/ roof water
Water storage tank(WST)
Kuhal
Water potential to be created in cubic liters. 30583000 lt
iii) Farm based interventions:
Agriculture based proposed in the DPR. Maize, pluses, veg. crop, fruit crops.
Agriculture allied activities proposed in the DPRs.
Polyhouse, seed village, dairy
iv) Non Farm Based interventions:
Skill Development. Carpentry, masonry, Basket making, weaver, cutting and tailoring, black smith, cobbler etc.
Proposed Micro Enterprises. Carpentry, masonry, Basket making, weaver, cutting and tailoring, black smith, cobbler,Goatry, Dairy,Nursery,Vermi Compost etc.
v) Financial Envelop:
Watershed Project. Rs. 8,61,15,000
Convergence. Rs. 2,81,336
vi) Outcome:
Quantifiable indicators. Improvement in Agriculture & horticulture, milk production .
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-6]
Part 4.01
P 4.01 INTRODUCTION AND BUDGET P4.01a Introduction
Watershed : IWMP- V Theog Gram panchayat : Deothi Ward : Deothi, Janahan and Dhar Panchayat Area : 2365 ha
Wards Area to be treated : 1544 ha Amount : 231.60 lacs
The Deothi is located at 45 km distance from the Block headquarter, Theog. The total geographical area of the panchayat is 2365 hectare and area of Deothi,Janahan and Dhar ward of Deothi Panchayat to be treated is 1544 hectare. The Gram Panchayat/ward at 310.01.537 latitude and 770.29.303 longitude. The height of Gram Panchayat of Deothi is 9375 feet from above mean sea level. The Panchayat is covered with GP Parghiya,Ghorna, Ghoond and Gorli Maraog. The catchment area watershed is Kohlu, Badro, Kandu, Hulla and Deli nalahs. The total population of the Panchayat is 2439 covering seven wards.
P4.01b BUDGET
Sr. No. Budget Component % of the budget Amount (lacs)
1 Administrative cost Monitoring Evaluation
10 01 01
23.160 2.316 2.316
2 Preparatory Phase Entry point activities Institution & capacity building Detailed Project Report (DPR)
04 05 01
9.264
11.580 2.316
3 Watershed Works Phase Watershed Development Works Livelihood activities for the asset less persons Production system & micro enterprises
50 10 13
115.800 23.160 30.108
4 Consolidation phase 05 11.580
Total 100 231.600
P4.01c Methodology 4. District level a. Collection of data at district level
i. DRDA and Line department b. Meeting with CEO (DRDA), Project Officer, Heads of Line Departments
B. Block level a. Data collection b. One day orientation with pradhan secretaries and panchayat sahayak at block level c. Meeting with line department officials of agriculture, horticulture and animal
husbandry department C. Panchayat Level
a. General meeting at Panchayat level with members of Panchayat Samiti, Pradhan and Ward members
b. Collection of revenue data from Patwari c. Collection of socio economic data from Panchayat Secretary d. Village level meeting organized, PRA exercises and transect walks e. Identification of beneficiary group for different activities
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-7]
Part 4.02
P 4.02 GENERAL DESCRIPTION OF PROJECT AREA P4.021 Socio economic profile of panchayat
Total families of the Panchayat : 569 Total families of the ward (Dhar,Deothi and Janahan) : 304 Total population of the Panchayat : 2439 Total population of the ward (Dhar,Deothi and Janahan) : 1342 Total families (General) of panchayat : 416(population =1772) Total General Families of ward (Dhar, Deothi and Janahan) : 199 (population = 906) Total families (Schedule caste) panchayat : 153(Population = 667) Total Schedule Caste families of : 105 (population = 436) ward (Dhar, Deothi and Janahan)
P 4.021a Population in different categories (ward wise) Name of ward General Families SC Families
No of families
Male Female Total No of families
Male Female Total
Deothi 46 164 173 337 8 24 22 46
Janahan 77 139 141 280 81 155 165 320
Dhar 76 152 137 289 16 36 34 70
Sub Total 199 455 451 906 105 215 221 436
Neri 45 80 77 157 7 13 14 27
Dhar Tarpunu 59 120 115 235 2 8 3 11
Tali 71 144 154 298 36 89 90 179
Meha 42 89 87 176 3 8 6 14
Total 416 888 884 1772 153 333 334 667 Source: Gram Panchayat, 2010
P 4.022 BPL Families
Total BPL Families : 161 Total Antoyodaya Families : 106
P 4.022a Population of BPL and Antoyodaya families (ward wise)- N.A
P 4.023 Land use pattern The total land of Deothi panchayat taken under the watershed project IWMP-V is 1544 hectare and whole area is rainfed. The cultivated land is 229 hectare under different farming system i.e. agriculture, horticulture and vegetables. The rest of area is under pasture, ghasni and forests etc. The barren is 34 hectare.
P4.023a Areas (ha) of panchayat (village wise) under different land use systems
Sr. No.
Name of village Total land
Un irrigated
Agri. Horti. Veg. Barren Pasture Ghasni Forest Other
1 Jangle Chdrian 148 148 - - - - - 5 141 2
2. Jangle Chambi 184 184 - 1 - 1 1 4 175 2
3 Jangle Kolu Nala 45 45 - 5 1 - - 1 37 1
4 Dhar 213 213 - 46 11 20 11 49 69 7
5 Deothi 107 107 8 35 8 5 - 21 30 -
6 Chila 116 116 1 30 1 3 - 45 32 4
7 Jangle kalana 17 17 - 1 - - - - 15 1
8 Jangle sujna 145 145 - 3 - - - 2 140 -
9 Kalana 41 41 - 26 - 1 1 7 3 3
10 Janahan 211 211 1 54 1 3 2 43 103 4
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-8]
11 Jangle Chila 21 21 - 1 - - - 1 19 -
12 Jangle lakhoti 216 216 - 5 - 1 - 15 195 -
13 Jangle Majehlya 80 80 - - - - - 6 72 2
Total 1544 1544 10 207 22 34 15 199 1031 26
Source: Revenue Patwari P 4.024 Status of Livestock The animal rearing is the integrated part of farming system in the watershed area. The major animals are cows (local and improved), buffaloes, sheep, goats etc. The people face acute problem of fodder and drinking water for these animals during the stress period. The details of livestock reared by the people in Deothi panchayat are given below:
P4.024a Number of milch and dry cows (Local and improved) and Buffaloes
Name of Ward
Local cow Improved cow Buffaloes
Milch Dry Total Milch Dry Total Milch Dry Total
Deothi 35 65 100 200 0 200 - - -
Janahan 55 25 80 115 5 120 - - -
Dhar 10 10 20 50 20 70 4 - 4
Sub Total 100 100 200 365 25 390 4 4
Neri 3 3 6 12 0 12 1 - 1
Dhar Tarpunu
5 15 20 75 5 80 - - -
Talli 25 25 50 200 0 200 - - -
Meha 10 15 25 120 5 125
Total 143 158 301 772 35 807 5 - 5 Source: NAEB, UHF, 2010
P 4.024b Livestock population (ward wise)
Name of Ward Bullock Calf Goat Sheep Poultry Mule Total
Deothi 100 150 20 - - - 570
Janahan 10 80 15 8 8 - 321
Dhar 10 40 - - - 6 150
Sub Total 120 270 35 8 8 6 1041
Neri 4 10 4 - - - 37
Dhar Tarpuna 20 40 100 20 20 3 303
Talli 6 40 4 50 45 - 395
Meha 20 80 - - - - 250
Total 170 440 139 78 73 9 2026 Source: NAEB, UHF, 2010
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-9]
Part 4.03
P4.03 SWOT ANALYSIS A critical analysis of strengths, weaknesses, opportunities and threats (SWOT) of any region is a good analysis for developing strategies /programmes as it provides valuable insights on potentials, constraints, opportunities and threats based on the primary, secondary and technical data a detailed analysis of SWOT is carried out.
P4.031 Strengths of the watershed area Road infrastructure is available.
Area is suitable for seasonal and offseason vegetable crops.
Area is suited to quality seed production of Vegetable crops
Area is also suitable for fruit crop production.
Unemployed educated youth.
Nearest market is available.
People are well versed with animal husbandry.
Farmers are innovative and ready to adopt new technologies.
P4.032 Weaknesses Area is rainfed.
Soil erosion in the cropped area.
Unconsolidated land holding
Scarcity of fodder.
Hailstorm prone area.
The pasture land/ grazing land are shrinking.
Unequal distribution of available water for irrigation.
Big farmers are getting more water for irrigation on the traditional right basis which needs to be reconsidered.
P4.033 Opportunities Introduction of organic farming
Roof water harvesting
Training to the farmers on horticulture management, floriculture, poultry and mushroom production etc.
Revival of Mahila Mandals and SHGs which are dysfunctional presently
Installation of vegetable collection centre at ward/panchayat level
Introduction of crossbred animals
P4.034 Threats Available land for agriculture is declining if S.M.C practices are not adopted.
Soil erosion in the sloppy lands.
Unscientific farming practices.
Deforestation.
Declining of the traditional artisans.
Social distress.
Declining of fodder sources.
Lack of interest and motivation.
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-10]
Part 4.04
P 4.04 ENTRY POINT ACTIVITIES
Entry point activities are necessary part to orient the community members towards thrift and credit activities of the project. Success of government initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and this amount plays vital role to involve more people in different project development activities. Different entry point activities suggested by farmers during PRA exercise as given below. P 4.041 Entry point activities suggested at different locations of watershed Ward Activity
Location Size Beneficiaries Cost Purpose /use
Deothi Vegetable collection centre
Beteowari 6x5 46 258800 To collect Farm produce
Tank with pipe
Nerwa khad to Ninkara
25 150000 Drinking
Janahan Vegetable collection centre
Janahan (Near middle school)
6x5 80 258800 To collect Farm produce
Dhar Vegetable collection centre
Dhar 6x5 50 258800 To collect Farm produce
Total 201 926400
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-11]
Part 4.05
P 4.05 WATER HARVESTING The main sources of irrigation in the gram Panchayat are Tallab , Dam, tanks and water schemes. The most of the cultivated area is rainfed. The existing water resources are drying due to climatic change. The people face acute problem of water during stress period, specifically for the irrigation of vegetable crops etc.
P 4.051 Existing and proposed water harvesting structures with storage capacity Name of structure
Number of structure
Capacity ( cu.lt) Project intervention No. of beneficiaries
Old New Old New Old New Old New
Kachha talab 4 15 560 2400 560 2400 - All
Roof water harvesting
- 6 - 130 - 130 - 30
Tanks 2 88 36 3520 36 3520 All 279
Kuhal 1 0 4-6 0 4-6 0 All -
Total 7 109 596 6050 596 6050 304 304
P 4.051a WATER BODIES /WATER HARVESTING STRUCTURES Work Name of
the Ward Proposed
No Location No of
Beneficiaries Dimension (m)
Estimated budget (Rs.)
Kachha Talab
Deothi 1 Banot All 10x8x2 62500
1 Lakhoti All 10x8x2 62500
1 Lohala All 10x8x2 62500
1 Drahal All 10x8x2 62500
Janahan 1 Chadrain All 10x8x2 62500
1 Chilla All 10x8x2 62500
1 Bedi 5 10x8x2 62500
Dhar 1 Jubbar All 10x8x2 62500
1 Thutna All 10x8x2 62500
1 Karana All 10x8x2 62500
1 Sujana All 10x8x2 62500
1 Upper Jubber All 10x8x2 62500
1 Barot All 10x8x2 62500
1 Manawan All 10x8x2 62500
1 Mashalta All 10x8x2 62500
Total 15 937500
Roof Water
Deothi 1 Sheel Dhar(|Banoti) All 3x3x2 57000
Janahan 1 Janahan-I 2 3x3x2 57000 1 Janahan-II 7 5x4x2 92000 1 Janahan-III 3 3x3x2 57000 Dhar 1 Dhar(Dilip Singh) 3 3x3x2 57000 1 Dhar(Kewal Ram) 1 3x3x2 57000 Total 6 377000
Tank Deothi 1 Lakhoti-I 5 5x4x2 82000 1 Lakhoti-II 5 5x4x2 82000
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-12]
1 Lakhoti-III 5 5x4x2 82000 1 Batara-I 7 5x4x2 82000 1 Batara-II 6 5x4x2 82000 1 Lohala 4 5x4x2 82000 1 Deothi-I 7 8x6x2 82000 1 Deothi-II 6 5x4x2 82000 1 Deothi-III 6 5x4x2 82000 1 Deothi-III 6 5x4x2 82000 1 Harda-I 4 5x4x2 82000 1 Harda-II 4 5x4x2 82000 1 Lakhoti Barasali-I 5 5x4x2 82000 1 Lakhoti Barasali-II 4 5x4x2 82000 1 Drahal-I 5 5x4x2 82000 1 Drahal-II 5 5x4x2 82000 1 Panchan-I (Land Laiq Ram) 6 5x4x2 82000 1 Panchan-II (Land JainSingh) 5 5x4x2 82000 1 Bahar Pajna (land Dhalu) 6 5x4x2 82000 1 Joli (Land Keshaw Ram) 5 5x4x2 82000 1 Ghareya(Land Mohan Singh) 6 5x4x2 82000 1 Lower Batera(Land Kewal
Ram) 5 5x4x2 82000
1 Bateowari-I (Mathu Ram) 6 5x4x2 82000 1 Bateowari-II(Anant Ram) 6 5x4x2 82000 Janahan 1 Chadrain khud-I 7 5x4x2 82000 1 Chadrain khud-II 7 5x4x2 82000 1 Chadrain khud-III 7 5x4x2 82000 1 Chadrain khud-IV 7 5x4x2 82000 1 Shikal-I 4 5x4x2 82000 1 Shikal-II 4 5x4x2 82000 1 Khala-I 7 5x4x2 82000 1 Khala-II 7 5x4x2 82000 1 Khala-III 7 5x4x2 82000 1 Khala-IV 7 5x4x2 82000 1 Bhaskar-I (Devender) 5 5x4x2 82000 1 Bhaskar-II 5 5x4x2 82000 1 Salana (Doulat Ram) 7 5x4x2 82000 1 Salana -II 6 5x4x2 82000 1 Jorna 5 5x4x2 82000 1 Jorna 5 5x4x2 82000 1 Jhal 4 5x4x2 82000 1 Jhal 4 5x4x2 82000 1 Chadrain (Land Daulat Ram) 5 5x4x2 82000 1 Chadrain 4 5x4x2 82000 1 Upper Bhaskar-Kufta(Atma
Ram) 5 5x4x2 82000
1 Upper Bhaskar-Kufta-I 5 5x4x2 82000 1 Upper Bhaskar-Kufta-II 5 5x4x2 82000 1 Panji (Suriender) 4 5x4x2 82000 1 Panji 4 5x4x2 82000 1 Janahan(Land Bahagat ram) 5 5x4x2 82000 1 Janahan-I 5 5x4x2 82000 1 Janahan-II 4 5x4x2 82000
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-13]
1 Janahan (Jiya Lal) 4 5x4x2 82000 1 Janahan 4 5x4x2 82000 1 Upper Hari Nagar(Land
Balbir) 5 5x4x2 82000
1 Dabbar(Land Ranjit Singh) 5 5x4x2 82000 1 Lashot(Land Naryan Singh) 5 5x4x2 82000 1 Deli (Liaq Ram) 7 5x4x2 82000 1 Sadhog (Sukh Lal) 5 5x4x2 82000 1 Sadhog (Satya-I) 6 5x4x2 82000 1 Saruwa (Daulat Ram) 5 5x4x2 82000 1 Bedi (Mushu Ram) 5 5x4x2 82000 1 New Deli (Surinder Kumar) 6 5x4x2 82000 Dhar 1 Banot (Ramesh Chand ) 4 5x4x2 82000 1 Banot 3 5x4x2 82000 1 Manawan ( Land Rajender) 5 5x4x2 82000 1 Dashari (land Hari Ram) 6 5x4x2 82000 1 Lower Jubber(Rajender) 5 5x4x2 82000 1 Upper jubber (Mohan lan) 4 5x4x2 82000 1 Upper jubber 3 5x4x2 82000 1 Thutna (land Ramesh chand) 5 5x4x2 82000 1 Dhar (Mohan Chauhan) 5 5x4x2 82000 1 Dhar 5 5x4x2 82000 1 Sujna (Land Paras Ram) 6 5x4x2 82000 1 Upper Kalana (Mehar Singh) 4 5x4x2 82000 1 Upper Kalana 5 5x4x2 82000 1 Lagana(Daulat ram) 3 5x4x2 82000 1 Lagana 4 5x4x2 82000 1 Bhagri(Land Ramesh) 5 5x4x2 82000 1 Lower Dhar-I 4 5x4x2 82000 1 Lower Dhar-II 5 5x4x2 82000 1 Lower Dhar-III 4 5x4x2 82000 1 Kothi Dhar(land Keshaw
Ram) 5 5x4x2 82000
1 Mandlia (Land Prakash Chauhan)
6 5x4x2 82000
1 Lower Dhar(Land Adhi Ram) 5 5x4x2 82000 1 Dhar(Land Dilip Singh) 3 5x4x2 82000 1 Lower Kalna (Rajinder
Thakur) 7 5x4x2 82000
1 Dhar (Liaq Ram) 4 5x4x2 82000 Total 88 452 7216000 Kuhal Deothi 1(Repair) Kolu Nala to Deothi All 5 km 1500000 Total 1500000
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-14]
P4.051b Storage capacity and cost of new water harvesting structures under watershed programme and convergence.
Structure Watershed Convergence
No. Capacity (cu.lt) Cost (Rs) No. Capacity (cu. lt) Cost (Rs)
Kaccha Pond 15 2400 937500 - - -
Roof water harvesting
6 130 377000 - - -
Irrigation tank 88 3520 7216000 - - -
Total 109 6050 8530500 - - -
Note: Details as in annexure
P 4.051c Storage capacity and cost of existing water harvesting structures under watershed programme and convergence.
Structure Watershed Convergence
No. Capacity (cu.lt) Cost (Rs) No. Capacity ( cu.lt) Cost (Rs)
Kaccha Pond 4 560 - - - -
Roof water harvesting
- - - - - -
Irrigation tank 2 36 - - - -
Kuhal (repair) 1 4 - 6” 1500000 - - -
P4.051d Total Storage Capacity of Existing and New structures
Scheme Existing structures(lt) New structures (lt) Total capacity (lt)
Watershed 596 6050 6646
Convergence - - -
Total Capacity 596 6050 6646
P4.052 Budget
Scheme Existing structures (Rs) New structures (Rs) Total (Rs)
Watershed 1500000 8530500 10030500
Convergence - - -
Total 1500000 8530500 10030500
P4.053 Total storage capacity and cost through watershed and convergence programme
Particulars Capacity (lt) Cost (Rs)
Watershed 7518 10030500
Convergence - -
Total 7518 10030500
Presently, if all the existing watershed structures are renovated, this will enhance storage capacity to 7518 cu lt with cost estimate of Rs. 10030500 (Total water harvesting potential Storage capacity (watershed) + storage capacity (convergence) =7518 cubic liter Area to be irrigated under watershed programme = 37.60 ha.
Note : Total area is calculated by dividing total water available under watershed with depth of irrigation i.e.
0.02 cm
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-15]
Part 4.06
P4.06 AGRICULTURE
The main agricultural crops grown in the Panchayat are wheat, Barley, maize, among cereal crops rajmash and Mash among pulses. The productivity of crop was observed very low due to rainfed condition. This can be increased through increase in irrigation facilities and latest technology. Part 4.061 Prevalent Farming System under Agriculture
1. Agriculture (Maize/ pulses + Wheat/Barley/ Pluses) 2. Agriculture + Animal Rearing 3. Agriculture + Horticulture (fruit crops+ Vegetables) + Animal Rearing 4. Agriculture + Labour + Rural Artisans
P 4.062 Present status of Agriculture Crops and Proposed interventions:
P 4.062a Cereals Crops
Crops grown: Maize, Wheat and Barley Total Productions : 34+ 12 + 19= 65 qt (based on PRA exercise)
Status Particulars Maize Wheat Barley
Existing Area under cultivation 27 Bigha 12 Bigha 12 Bigha
Production 34Q 12 Q 19Q
Productivity 1.25Q/ bigha 1Q/ bigha 1.6Q/ bigha
Variety Local Local Local
Technology Indigenous Indigenous Indigenous
Proposed Increase in area 6Bigha 6Bigha 6Bigha
Variety Kanchan Sonalika Dolma
Seed Quantity required by beneficiary group
99Kg 270Kg 216Kg
Source: Household survey, Regional Centre, NAEB, UHF, 2010
P4.062b Pulses
Crops grown : Rajmash and Mash Total Productions: 14.7+3.2=12.5 qt( based on PRA exercise)
Source: Household survey, Regional Centre, NAEB, UHF, 2010
Status Particulars Rajmash Mash
Existing Area under cultivation 21 Bigha 8 Bigha
Production 14.70qt 3.2 qt
Productivity 70 kg/ bigha 40 kg/ bigha
Variety Red capsule Local
Technology Indigenous Indigenous
Proposed Increase in area 9 Bigha 7Bigha
Variety Jawala Local
Seed Quantity required by beneficiary group 300 Kg 60 Kg
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-16]
P 4.062c Requirement of improved seed under different crops
Particulars Quantity Project contribution with 10% Seed replacement rate (Kg)
Estimated Budget (Rs.)
Cereals
Maize 99 10.0 200
Wheat 270 27.0 675
Barley 216 22.0 550
Pulses
Mash 60 6.0 540
Rajmash 300 30.0 2250
Total 4215 Note : Target for 3
rd and 4
th year
The quantity of seed for each crop has been determined by multiplying the seed rate per bighas with the total area cultivated under different crops i.e. Maize (33x 3), Wheat (18 x 15), Barley (18 x 12), Pulses mash(15x4) and Rajmash (30x10) by number of beneficiaries (list annexure). The project intervention would be replacement of local varieties by improved varieties at 10 percent replacement rate each year for two years. This seed may be given as demonstration units among the beneficiaries.
P 4.063 Critical Gaps in Agriculture Production
Lack of irrigation facilities.
Lack of scientific agricultural practices.
Timely unavailability of seeds, fertilizers and chemicals for insect-pest management.
Improved seed varieties not adequately used.
P4.064 Marketing
Not sold used only for self consumption
P4.065 Project Interventions
a) Introduction of improved seed Improved seed of maize, wheat and pulses will be introduced as demonstration units
b) Introduction of vermin-composting: Twenty units will be developed as
demonstration, in each village of the panchayat.
For better and productive utilization of FYM Vermicomopst is being recommended.
Ward Name No. Of Units Budget
Deothi 10 70000
Janahan 10 70000
Dhar 10 70000
Total 30 210000 Note : Target for 3
rd and 4
th year
Unit Dimension= 3mx1.85mx0.45m
Vermicomopst rate - 7000 /unit
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-17]
Item Budget estimate cost (Rs) Contribution Total
Project Beneficiaries
Seed 4215 4215 421
Vermi Composting 210000 210000 21000
Total 214215 214215 21421
c) Human Resource Development (HRD)/ Capacity Building and training in Agriculture
Training on cultivation practices of various agriculture crops.
Training on insects & pests management.
Training on post harvest management.
Training on Vermicomopst
Exposure visits and experience sharing.
d) Numbers of trainings / Exposure visits Number of Trainings =3
Number of Trainees=30-35
Duration = 3 days
e) Exposure visit One exposure visit of 30 -40 farmers
P 4.066 Project Impact a)
Crops Existing families
Addition in families
Total families after project interventions
Seed requirement after project intervention (kg)
Maize 35 20 55 99
Wheat 25 16 41 270
Barley 15 12 27 216
Mash 15 8 23 60
Rajmash 25 15 40 300
Total 115 71 186 945
Presently 115 families are involved in agriculture production. After project intervention 71 additional families will be involved in agriculture (i.e 20 families in maize, 16 in wheat, 12 in Barley and Pluses 23 families). In total 186 families will be benefited after project intervention and the seed requirement for all these families will be 945 kg i.e. 99 kg seeds for maize, 270 kg for wheat, 216 kg for Barley and 360 kg seed of Pulses.
b) Skill development and capacity building of about 25 to 30 farmers from the Panchayat c) Encouragement towards organic farming and improving fertility of soils through
Vermicomopst
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-18]
Part 4.07
P 4.07 HORTICULTURE
The chapter deals with the fruit and vegetable crops. Among fruits apple, pear, and walnut etc. are grown .Apple is the major cash crop. The watershed area is also cultivated with different types of vegetables. These includes cabbage, beans, capsicum, potato, peas, cauliflower, red chilli etc. the vegetable production is the main farm activity and a good source of employment and income.
P4.071 Prevalent Farming Practices under Horticulture
Horticulture + vegetables
Vegetable + Animal rearing
Vegetable crops(Cabbage + Beans) (Peas + Potato)(Cauliflower +Capsicum)
Fruit crop (Apple + Pear)
Agriculture + Horticulture + Animal rearing. P4.072 Present status of horticulture crops and proposed interventions:
P4.072a Fruits
Total production = 600 Q (Based on PRA Exercise)
Status Particular Apple Pear
Existing Area under cultivation 30Bigha -
Present Production 600Qt -
Productivity 20 Qt/Bigha -
Variety Red royal, Golden Redbartlet
Technology Indigenous indigenous
Proposed Increase in area 174 Bigha 114Bigha
Varieties Red chief, top red Bartlet, Red bartlet
Plants requirement 6090 4560
P 4.072b Vegetables crops Total Production = 10554 Q (based on PRA exercise)
Status Vegetable crops
Cabbage Bean Peas Cauliflower Potato Capsicum Tomato
Existing Area under cultivation
37 Bighas 30 Bighas 40 Bighas 7 Bighas 12 Bighas 9 Bighas 7 Bighas
Present Production
592 Quintal 210 Quintal
320Quintal 70 Quintal 60 Quintal 27 Quintal 35Quintal
Productivity 16Q/Bighas 7Q/Bighas 8Q/Bighas 10Q/Bighas 5 Q/Bighas 3Q/Bighas 5Q/Bighas
Variety Hybrid Falguni Azad, P-1, Linken
Shaweta Kufri,Jyoti Bharat Himsona
Technology Indigenous Indigenous Indigenous Indigenous Indigenous Indigenous Indigenous
Proposed Increase in area
15 Bighas 10 Bighas 18 Bighas 6 Bighas 5 Bighas 4 Bighas 4 Bighas
Variety Improved hybrid
Falguni Azad, P-1,Linken
Shaweta Kufri,Jyoti Bharat Himsona
Total seed requirement
2600 gm 240 Kg 464 kg 650 gm 25.5 Q 390 gm 220 gm
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-19]
P 4.073 Critical Gaps in Horticulture Production
Lack of vegetable collection centre
Lack of sufficient irrigation facilities
Quality seedling of fruit crop.
Lack of technical knowledge for cultural operation
Knowledge about PHT.
Lack of value addition.
Availability of fertilizers
P 4.074 Marketing
a) Vegetable are sold at Theog, Dhalli, Shimla market and Apple are sold at Dhalli, Solan, Chandigarh and Delhi.
P4.075 Project Interventions
a) Supply of improved verities of fruit crops seedlings. b) Vegetable collection centre. c) Training on cultural operations and on value addition. d) Farm based enterprises e) Irrigation through moisture conservation measures f) Drip irrigation Sprinkler g) Vegetable seed production area
P 4.075a Proposed fruit crop intervention in the Project Area Apple
Sr. No.
Name of ward No. of household
No. of Plants
Area (Bigha)
Amount(RS)
1 Deothi 54 1080 31 27000
2 Janahan 158 3160 90 79000
3 Dhar 92 1840 53 46000
Total 304 6080 174 152000 Note : Target for 3
rd and 4
th year
Pear:
Sr. No.
Name of ward No. of household
No. of Plants
Area (Bigha)
Amount(RS)
1 Deothi 54 810 20 9720
2 Janahan 158 2370 59 28440
3 Dhar 92 1380 35 16560
Total 304 4560 114 54720 Note : Target for 3
rd and 4
th year
The quantity of plant for each crop has been determined by the total number of plants x Bigha i. e apple 35 plant /bigha and pear 40/bigha.
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-20]
P 4.075b Requirement of Improved Vegetable Seed in Project Area Crops Seed requirement
Quantity (Kg)
Project contribution with 10% seed replacement
Estimated Budget(Rs)
Cabbage 2.600 0.260 5200
Beans 240.0 25.0 12000
Peas 464.0 50.0 4500
Cauliflower 0.650 0.070 2800
Potato 2550.0 255.0 30600
Capsicum 0.390 0.050 2750
Tomato 0.220 0.030 1500
Total 59350 Note : Target for 3
rd and 4
th year
The quantity of seed for each vegetable crop has been determined by multiplying the seed rate per bigha with the total area cultivated under different crops i.e. Cabbage (50 gm), Beans (6 kg), Peas (10 kg), Potato (150 kg), Capsicum (30 gm), Cauliflower(30 gm) and Tomato(20 gm) by number of beneficiaries (list annexure). The project intervention would be replacement of local varieties by improved varieties at 10 per cent replacement rate each year for 2 years. This seed may be given as samples among the beneficiaries for development and demonstration units P 4.076 Impact/Project Outcome
1. Skill development /capacity building of 76 farmers 2. Cropping pattern changed. Area under vegetable increased (62 bighas) 3. Farming systems changed. Areas under fruit crops increased (284 bighas) 4. Production of fruit and vegetable from the areas enhanced 5. Livelihood of 43 more farming families linked with horticulture
Species Existing families Addition in families
Total families after project intervention
Fruits
Apple 45 304 304
Pear - 304 304
Vegetables
Cabbage 35 15 50
Beans 28 18 46
Peas 30 20 50
Potato 15 8 23
Capsicum 12 8 20
Tomato 15 8 23
P 4.077 Vegetable Collection Centre
Ward Location No. Size Beneficiaries Cost (Rs.)
Deothi Deothi and Pajna 2 6x5 54 5,20,000
Janahan Panji 1 6x5 78 2,60,000
Dhar Sujna- Kalna 1 6x5 56 2,60,000
Total 4 188 10,40,000 Note : Target for 3
rd and 4
th year
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-21]
Poly house Demonstration unit for low volume high value crops of vegetable, floriculture and MIS
Ward Location No. Size Cost
Deothi Deothi & Bateowari 2 100m2 2,50,000
Janahan Janahan 1 100m2 1,25,000
Dhar Dhar 1 100m2 1,25,000
Total 4 5,00,000 Note : Target for 3
rd and 4
th year
Before introducing the Poly House Demonstration unit at ward level PIA will be authorized to decide the location and beneficiaries.
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-22]
Part 4.08
P 4.08 ANIMAL HUSBANDRY
Animal rearing is the second important activity for livelihood along with Agriculture. Animals are reared by farmers mainly for milk, FYM, Milch animals are local as well as improved. Hence milk production is low.
P 4.081 Milk Production and fodder requirement
Total numbers of milching cattle in the panchayat are 469 and average production of milk per day is 2.5 lt from local cows, 5.0 lt from jersey cows and 4.0 lt from buffaloes per day. The total milk production/day is 2091 lt for different species.
P 4.081a Average and Total milk production
Milch cattle Number Average milk production lt./day
Total production (lt.)
Buffaloes 4 4.0 16
Cow(Local) 100 2.5 250
Cow (improved) 365 5.0 1825
Total 469 2091
P 4.082 Fodder availability, requirement and Deficit (tons)
Green fodder available in project area is 4649 tons whereas dry fodder available is 2789 ton. Total 7438 ton fodder is available in project area. But requirement of green fodder is 11156 ton whereas requirement of dry fodder is 3719 ton. Total fodder required is 14875 ton. Deficit of green fodder in project area is 6507 ton and that of dry fodder is 930 tons.
P 4.082a Fodder availability, requirement and Deficit (tons)
Available Required Deficit
Green Dry Total Green Dry Total Green Dry Total
4649 2789 7438 11156 3719 14875 6507 930 7437
Note - Available Fodder Green - 25kg/day x 30 days x 6months x Total live stock Dry -15 kg/day x 30days x 6months x Total live stock
Required Fodder: Green -30kg/day x 30days x 12months x Total live stock
Dry -10kg/day x 30days x 12months x Total live stock
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-23]
P 4.082b Gap between Demand and supply of total Fodder
Particulars Fodder (tons)
Supply 7438
Demand 14875
Deficit 7437
P 4.083 Project interventions Plantation and cultivation of fodder trees and grasses Construction of talabs , Johars in grass land and community lands Training/Capacity building
a) Plantation and cultivation of fodder trees and grasses
Species: Tree: Buel, Ban, Robinia Grasses: Berseem, Orchard grass, Napier etc.
P 4.083a Requirement of fodder trees and grasses in wards
Name of Ward
Fodder Trees Estimated Budget(Rs.)
Grasses Estimated Budget(Rs.)
Area (ha.)
No. of Plants
Area (ha.)
Quantity of seeds (kg)
Deothi 4 4400 80000 4 140 16800
Janahan 6 6600 120000 4 140 16800
Dhar 4 4400 80000 4 140 16800
Total 14 15400 280000 12 420 50400 Note: target for 4
th year
b) Construction of talabs , Johars in grass land and community lands c) Training and Capacity Building
Live stock management
Animal Health
Artificial insemination
Improved grasses / Fodder trees
Exposure visits
Number of Training
Four trainings with 5-7 farmers in each trainings
Exposure visits for 5-7 farmers P 4.084 Project outcome/impact
P 4.084a Estimated production of milk after project intervention
Milk production after project intervention will increase to 6 lt. /day and total production of milk after project intervention will be 2879 liters.
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-24]
P 4.084b Milk production from cows and buffaloes
Milch cattle No. Milk production lt./day
Total production (lt.)
Buffaloes 4 6.0 24
Cow(Local) 100 3 300
Cow (improved) 365 7 2555
Total 469 2879
P 4.084c Total milk production before and after project intervention. Increase in milk production is 788 lt. with total production of 2879 lt.
Milch cattle Before project (lt.) After project (lt.) Increase after project
Buffaloes 16 24 8
Local cows 250 300 50
Improved cows 1825 2555 730
Total 2091 2879 788
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-25]
Part 4.09
P 4.09 FISHERY Fisheries can be one of the additional source of income to the farmers of the watershed area, but due to the lack of fresh water, the people enable to take up this activity as a source of income. Secondly the people of the watershed area is practicing agriculture, horticulture and vegetable cultivation which is giving good returns to the farmers. Hence fish cultivation cannot suggest for the watershed areas of the theog block.
P 4.09a Existing and Proposed water bodies for fish culture
Existing water bodies Proposed water bodies Owner ship private /common No Size (ft) location No Size (ft) Location
1 Nil Nil Nil Nil Nil Nil
2 Nil Nil Nil Nil Nil Nil
P 4.09ab Availability and requirement of fish seed /fingerlings
Ward Existing families
Proposed families
Present quantity of fish
Requirement of fish seed
Breeds
1 Nil Nil Nil Nil Nil
2 Nil Nil Nil Nil Nil
P 4.091 Project Interventions
Introducing of fisheries among more families
Requirement of improved seed (fingerlings)
Training on fish culture
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-26]
Part 4.10
P4.10 DRINKING WATER
The panchayat area falls in the rain fed area. Water resources are very limited which has been taped fully by the local people for drinking and irrigation purposes. In earlier days there were water bodies (Bawaries) from which the people used to take water for drinking purpose. During the field visit and interaction with the local people and transect- walk of the water shed area source some of fact regarding drinking water come up.
Dried up of the water bawaries due to the climate change.
Heavy pressure on the existing water bodies due to increase in population.
Less care of maintenance of water bodies, which is due to the habit of tap water provided at door step provided by the IPH department, lifted from Giri River.
Less percolation for the existing Bawaries due to less range and drying up of Johar at the watershed area
Presently people take the water through taps, which is provided in alternative days. P4.101 Availability of water in the panchayat P 4.101a Availability of water before and project interventions
Sr. No
Particulars Capacity (lt)
Present After Project intervention
1 Total supply of water per day 61750 586750
2 Total House holds 304 304
3 Total population 1342 1342
4 Water Available per house hold per day 203 1930
5 Per capita Availability 46 437
P 4.102 Status of Drinking water in different wards of Panchayat
P 4.102a Structure, water availability on daily and monthly basis Ward/ Village
Name of Structure Availability of water /day from the source
No. of months water available during the year
Tap/ WST Handpump Well Bawaries
No Capacity No Capacity No Capacity No Capacity
Deothi 3 34000 - - - 11 5500 22000 6-8 months/year
Janahan 2 20000 - - 1 150 1 500 17150 12-12 months/year
Dhar 2 24000 - -- 1 100 10 2500 22600
Total 7 78000 - - 2 250 20 8500 61750
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-27]
P 4.102b Structure with number of beneficiaries and dimensions. Work Name of the
Ward Existing number
Proposed number
Location No. of Beneficiarie
Dimension (m)
Estimated Budget
(Rs.)
Bawari Deothi 10 2(Repair) Bateowari All 4x4 ft and 3x3 ft
40000
2(Repair) Deothi All 8x8 and 6x6 ft
40000
1(Repair) Batara All 6x6 ft 20000
1(Repair) Lohala (Near Temple)
All 8x8ft 20000
1(Repair) Ghareya All 8x8ft 20000
Dhar 10 2(repair ) Dhar All 12x12 ft 40000
1(repair ) Thutna All 6x8 ft 20000
1(repair ) Kalana All 8x10 ft 20000
1(repair ) Lagana All 6x8 ft 20000
1(repair ) Lower Dhar All 6x8 ft 20000
1(repair ) Sujana All 10x10 ft 20000
1(repair ) Banot All 6x6 ft 20000
1(repair ) Ghaneshra All 4x6 ft 20000
1(repair ) Dashari All 4x6 ft 20000
Janahan 2 2(repair ) Solna All 4x6 ft 40000
Total 19 380000
Tank Deothi 3 1 Kolu Nala All 5x4x2 92000 1 Deothi All 5x4x2 92000
Tank with pipe
1 Maghareya to lakhto
All 3x3x2 and 5 km pipe line
150000
Tank Janahan 2 1 Janahan All 5x4x2 92000
1 Janahan (Near School)
All 5x4x2 92000
1 Khala 25 5x4x2 92000 1 Jhal All 5x4x2 92000 Dhar 2 1 Upper Thutna All 5x4x2 92000 1 Lower thutna All 5x4x2 92000
1 Kalana All 5x4x2 92000 1 Sujana All 5x4x2 92000 1 Mandlia All 5x4x2 92000 1 Jagroth All 5x4x2 92000 Total 13 1254000
P 4.103 Storage capacity and availability of water from existing structures
Sr. No.
Collecting structures
Storage capacity(lt)
Availability of water/ day from the source (lt)
No. of months water available during the year
1 Well 250 250 6 Months
2 WST/Tap 78000 58000 4-5 Months After the Interval of three days
3 Bawaries 8500 3500 6-7 Months
Total 86750 61750
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-28]
P 4.104 Proposed activities for increase in the water capacity/ availability through renovation/new construction of structure
P 4.104a Size, location, capacity of structures with beneficiaries
Structure Size (m) Location Capacity (lt) Benefited families
Old New Old New Old After intervention (lt)
Old New
Bawaries
As per list
3500 8500 All All
WST/Taps 58000 578000 All All
Well 250 250 All All
Total 61750 586750
P 4.105 Critical Gaps to be covered (item/activity)
Irregular supply of drinking water
Improper drainage of the catchment area to the ponds
P 4.106 Outcome
Source Present storage capacity(lt)
Proposed storage capacity(lt)
Total Families benefitted
Present Requirement/ day(lt)
Quantity after intervention (new + repair lt)
Bawaries 3500 8500
304 46 437 WST/Taps 58000 578000
Well 250 250
Total 61750 586750
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-29]
Part 4.11
P4.11 SOIL CONSERVATION
The watershed area comprises of hill steep slopes having mixed layers of soil, facing problems of major soil erosion during rainy season. During the field visit and interaction with the local people and farmers, it was observed that soil erosion is increasing at a faster rate, due to the following reasons:
Heavy and uncontrolled grazing
Deforestation in the watershed areas
Construction of roads and dumping of debris along Nala side
Cutting of bushes and hedges by local people for fuel and fodder purpose
Lake of physical and bio logical structures, which facilitate water conservation
Excessive use of cultivated land for Veg. purpose.
P4.110 To check soil erosion, following interventions are recommendation
Construction of check dams from top to bottom to minimize the flow of water.
Construction of crate walls to sloppy land sliding area.
Construction of Contour and trenches to check soil erosion.
Proper bunding on the cultivated lands by planting grasses
Biological/vegetative engineering measures along the slope land
P 4.111 Various structure are required to be constructed at different location for checking soil erosion
P 4.111a Structure with number of beneficiaries
Activity Ward Name
Location Proposed (No)
Families Benefited
Size(m) Estimated Budget(Rs.)
Dry check Dam
Dhar Dhar ka nala 30 All ward 4x2x1 108000
Kolu Nala 12 All ward 4x2x1 43200
Sujna Khad 15 All ward 4x2x1 54000
Total 57 205200
Soil conservation work includes formation of crate walls and gully plugging, drainage and contour trenching. In this panchayat total 57 gully plugging/dry check dam will be constructed which will benefit all ward. Vegetative Measure: Various types of trees (Robinia,kenth), Shrubs (|Berbris, Ruses) and grasses (Chrysopogon falues, Cynodon dactylon, Napier etc.) can be grown in the areas prone to soil erosion. Fodder grasses like Napier grass can be used on farm bunds. For demonstration in each panchayat about 10,000 cuttings could be planted/ distributed to farmers. Outcome
To minimize the impact of rainfall
To reduce soil erosion
To improve moisture conditions of the area
To improve soil properties, etc.
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-30]
Part 4.12
P4.12 CONVERGENCE
The linkage of the IWMP-V, Deothi with the other development programme is also one of the important components. The possibilities of identifying different activities under the IWMP and their association with other activities of different line departments can be assured through convergence. This is the best tool to derive support from different line departments.
The following activities can be converged from one head to another:
Developmental activities like roads and irrigation facilities can be converged with PMGSY, PWD, IPH and MNREGA programmes
Employment Generation with MNREGA programme run by Rural Development Department
To improve productivity, distribution of improved seeds, fertilizers, insecticides and pesticides can be converged with State Agriculture Department under Pandit Dindayal Krishi Yojna
Construction of poly houses and vegetable Collection Centres at watershed level can be constructed under the Horticulture Technology Mission run by Department of Horticulture
Income generating activities and micro-enterprises with rural employment programme, Prime Minster Employment Generation Programme. Self –Employment Schemes etc.
Diary development and sheep-goats rearing for the resource less people under Dudh Ganga Pariyojana run by the Animal Husbandry Department
Table: Activity/ work to be taken other programme/scheme Sr. No.
Activity /work
Programme /scheme for convergence
Agency/ Deptt.
Budget contribution (Rs)
Watershed Convergence Beneficiaries Total
1 Dry check dam
MNREGA RD 86330 118820 - 205300
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-31]
Part 4.13
P4.13 MICRO ENTERPRISES
Income generating activity reported in the watershed areas are carpentry, masonry, shoe making and weavers, diary, poultry, sheep and goats rearing, pattal and basket making etc,. These income generating activities can transform the rural poor, if they have given more opportunities in the form of trainings, equipments and machine etc., cutting and tailoring, achar making, jam, jelly, candy and juices making can be other options for rural women to improve their socio-economic conditions.
The skills of local artisans can be improved by providing more opportunities at their door steps. Keeping in view the above mentioned facts, the following activities will be taken up under watershed program for farmers.
P4.131 Income enhancement and employment generation through different income generating activities
P4.131a Number of households with activities and income
Sr. No
Activity Existing No. of household
Proposed No. of household
Present income/ mandays (Rs/day)
After intervention income/ mandays
1 Carpentry 1 6 12000/60 18000/90
2 Masonry 1 1 12000/60 18000/90
3 Black smith 1 1 4500/30 9000/60
4 Dairy farming 3 21 Self use 25200/210
5 Cutting & Tailoring
2 2 6000/60 9000/90
6 Goatry/sheep 2 4 Self use 4000/annual work
7 Vermicomopst - 10 - 6000/60
8 Horti. nursery - 7 - New concept
9 Seed village concept
- 7 - New concept
Note : Target for 3rd
and 4th
year The above mention activities are considered for the farmer/rural artisan land holding less than 3 bighas which will be verified during the implementation by the PIA.
P 4.132 Activity Wise Projects 1. Carpentry
a. Purpose : Livelihood/ Enhancement of income b. Category : SC/ IRDP c. No. of families involved : 6 d. Project intervention
i. Training ii. Tools and equipments
Outcomes of Projects
Present income/mandays
After intervention income
Requirement for intervention Approximate cost
12000/60 18000/90 Machine plainer and training. 60000
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-32]
2. Masonry a. Purpose : Livelihood/ Enhancement of income b. Category : SC/ IRDP c. No. of families involved : 1 d. Project intervention
i. Training ii. Tools and equipments
Outcomes of Projects
Present income/mandays
After intervention income
Requirement for intervention Approximate cost
12000/60 18000/90 Machine plainer and training. 10000
3. Black Smith a. Purpose : Livelihood/Enhancement of income b. Category : NSC c. No. of families involved : 1 d. Project Intervention
i. Training ii. Tools /equipment
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
4500/30 9000/60 Tools and Training 10000
4. Dairy Farm a. Purpose : Livelihood/Enhancement of income b. Category : NSC c. No. of families involved : 20 d. Project Intervention
I. Training II. Cows
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
Self use 25200/210 Cows 400000
5. Cutting & Tailoring
a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 2 d. Project Intervention
i. Training ii. Sewing Machine
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
6000/60 9000/90 Sewing Machine 20000
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-33]
6. Goatry a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 4 d. Project Intervention
i. Training ii. Improved Pair of Goats
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
Self use 4000/routine work Pair of improved breeds 40000
7. Vermicomopst a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 10 d. Project Intervention
i. Training ii. Worms and Pits
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
Nil 6000/60 Worms and pits 70000
8. Horticulture Nursery a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 7 d. Project Intervention
i. Training ii. Tools /equipment
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
Nil New Concept Infrastructure 1050000
9 Seed village concept a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 7 d. Project Intervention
i. Training ii. Tools /equipment
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
Nil New Concept Infrastructure 875000
Nursery and Seed village concept will be raised at the all ward level of the Gram Panchayat. Before introducing the Nursery and Seed village concept at ward level PIA will be authorized to decide the location and beneficiaries.
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-34]
Part 4.14
P4.14 LIVELIHOOD CONCERNS The land resource is the primary and major source of livelihood activities in the watershed area. These natural resources can be used properly by adopting integrated farming system to get more return per unit space per unit time. Area is suitable for the cultivation of apple, pear, pomegranate and walnut. These fruits plants can be integrated with agriculture and animal‟s husbandry to increase the productivity of land. The shortage of fodder leads farmers to rear only local breeds of animals that are too for self consumption of milk and farm yard manure. This shortage of fodder can be overcome by introducing multipurpose tree species. Other option of livelihood is the revival of rural artisans and for this best options with the rural artisans are carpenter, masonry, weaving, crafting and shoe making. The rural poor can earn good amount of money from these professions. These are some of important income generating activities need to be introduced in the watershed area. There is a dire need to aware, motivate and trained the local poor artisans. These artisans should be provided with equipments to earn their livelihood and to improve their socio economic conditions.
P4.141 Existing nature of livelihood in the watershed
Sr. No.
Category wise Total No. of household
Livelihood linked in the project
1 General 199 Agriculture +horticulture +animal husbandry + micro enterprises
2 SC 105 Agriculture
4 BPL N.A Agriculture and labourers
P4.142 AGRICULTURE
Sr. No. Particulars Before project Afterproject intervention
1 No. of days/year food grain sufficiently at home per family
4months 6 months
2 Average production from agriculture
5 qt/family 6 Q
3 Income from agriculture Self consumption Self consumption
4 No. of families who want to increase areas (all crops in agriculture combined)
115 71
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-35]
P4.143 HORTICULTURE
P4.143a Fruits production
Sr. No. Particulars Before project Afterproject intervention
1 No. of households with orchards 45 304
2 Area per household under horticulture (fruit trees)
4 bigha 6 bigha
3 Total production 600 Q 10650 Q
P4.143b Vegetable Productions
Sr. No. Particulars Before project After project intervention
1 No. of households having commercial vegetable production
30-35 45-50
2 Average area per household under vegetable
2.5 bighas per household
4 bighas per household
3 Total production 10554 Q 15096 Q
P4.143c Handling and Processing
Crops Particulars Before project
After project Intervention
Fruits Number of persons involved with no of day per year
1 persons 2persons/3months/year
Vegetable Number of persons involved with No of day per year
1persons 2 persons/3months/year
P4.143d Value Addition
Sr. No. Particulars Before project After project Intervention
1 Number of persons involved with no of day per year
1 1
P4.143e Marketing
Sr. No. Particulars Before project After project Intervention
1 Number of persons involved with no of day per year
1 1-2
P4.144 ANIMAL HUSBANDRY P4.144a Production: (Milk/Egg/Meat/Wool/Fodder)
Product Particulars Before project After project Intervention
Milk No of families involved 304 304
Quantity of milk produced 2091 2879
No of milch cattle 469 469
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-36]
P4.144b Milk
Sr. No.
Particulars Products Before project
After project Intervention Curd ,Cheese, Ghee
1 Number of families involved 304 Self use Self use
2 Total No of days per year 210 Self use Self use
P4.145 MICRO ENTERPRISES
P4.145a Activity Wise
Activity Particulars Before project After project Intervention
Carpentry No of households 1 6
No of mandays/year/household 60 90
Income per household 12000 18000
Masonry No of households 1 1
No of mandays/year/household 60 90
Income per household 12000 18000
Black Smith No of households 1 1
No of mandays/year/household 30 60
Income per household 4500 9000
Dairy No of households 3 21
No of mandays/year/household 210 210
Income per household Self use 25200
Cutting & Tailoring No of households 2 2
No of mandays/year/household 60 90
Income per household 6000 9000
Goatry No of households 2 4
No of mandays/year/household 365 365
Income per household Routine work 4000/ routine work
Vermicomopst No of households - 10
No of mandays/year/household - 60
Income per household - 6000
Horti. nursery No of households - 7
No of mandays/year/household - 150
Income per household - New concept
Seed village concept No of households - 7
No of mandays/year/household - 150
Income per household - New concept
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-37]
Part 4.15
P 4.15 CAPACITY BUILDING
To implement watershed activities more effectively skill development and capacity building at Panchayat level is very important. The activities proposed are given below : P4.151 Modules
P4.151a Awareness Camps
Will be organized at Panchayat level P4.151b Training:
Training will be organized at
Block level
DRDA level
Institutional level
P4.151c Exposure Visits:
Exposure visits will be conducted at University/ Institutions /Field P4.151d Special Trainings will be organized in the professional institutes
P4.152 Activities with number of participants P4.152a Target groups and location of programme Target group No. of
participants Activity Location
Member of Gram Shabha
All Awareness camps Panchayat level
PRI, VLI Members 10 Watershed Implementation and management Block level
Self Help Groups, User Groups and Beneficiary groups
3 to 5/panchayat
Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.
Block level (One trainings for such activities)
Self Help Groups, User Groups and Beneficiary groups
1 to 2/ ward/ panchayat
Exposure visits (university/professional institute/field visits)
State/Outside State
Self Help Groups, User Groups and Beneficiary groups
1 to 2 / ward/ panchayat
Kissan Melas/ Pradashanis State/Outside State
Self Help Groups, User Groups and Beneficiary groups
2 to 3/ activity/ panchayat
Specialized trainings (Mushroom production, floriculture, fruit crops, nursery raising techniques, dairy development, poultry farming, goat breeding, cereals crops, agriculture and insect-pest management etc.
Professional Institutes / University
PIAs, WDTs members
10 Project implementation and management trainings, report writing and accounts maintenance
DRDA level
The capacity building of farmers and youth in the watershed areas can also be done under
the micro enterprises and livelihood through Industrial Training Institute (ITI) occupation\trades as well as other entrepreneurs programmes which provide self-employment or wage employment within the watershed areas.
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-38]
Part 4.16
P 4.16 ACTIVITY AND BUDGET
P 4.161 Agriculture (For 2 years)
Activity /item Variety Quantity (kg)
Cost for 3rd year
Cost for 4th year Improved Seeds
Maize Kanchan/Pioneer 10.0 200 200
Wheat Madurai and S-308 27.0 675 675
Barley Dolma 22.0 550 550
Pulses (urad) Improved(T-9) 6.0 540 540
Rajmash Local 30.0 2250 2250
Total 4215 4215
P 4.162 Vermicomopst
Activity /item No. Rate (Rs/unit) Dimensions (m) Total Cost (Rs)
Vermicomopst units one in each village
30 7000 3x1.85x0.45 210000
Note : As per agriculture department norms
P 4.163 Horticulture (For 2 years)
Activity /Item
Variety No. of Plants required
Rate (Rs/plant)
Cost for 3rd year
Cost for 4th year
Apple Red royal, Golden
6080 25 152000 152000
Pear Red bartlet 4560 12 54720 54720
Total 10640 206720 206720
P 4.164 Vegetable (For 2 years)
Activity /Item
Variety Quantity (kg)
Cost for3rd year
Cost for 4th year
Cabbage Hybrid 0.26 5200 5200
Bean Falguni 25.00 12000 12000
Peas Hybrid, P-1, Linken & Azad
50.00 4500 4500
Potato Kufri jyoti 255.00 30600 30600
Capsicum Bharat 0.05 2750 2750
Cauliflower Shweta 0.07 2800 2800
Tomato Himsona 0.03 1500 1500
Total 59350 59350
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-39]
P 4.165 Vegetable collection Centers
Activity /item No. Rate (Rs/centre) Dimensions (m) Total Cost (Rs)
Vegetable collection centre(EPA)
3 258800 6x5 776400
Vegetable collection centre
4 260000 6x5 1040000
Total 6 1816400 Note : As per agriculture department norms
P 4.166 Poly house unit and MIS
Activity /item No. Rate (Rs/centre) Dimensions (m) Total Cost (Rs)
Poly house unit &MIS 4 125000 100m2 500000
Total 4 500000
P 4.167 Animal Husbandry
Activity /Item
Breed Area Rate (Rs)
Total cost (Rs)
Project share
Beneficiaries share
Convergence
Fodder 14 20000 280000 280000 - -
Grasses Napeir, Steria and Barseem
12 4200/ha Or 120/kg
50400 50400 - -
Total 330400 330400 - -
P 4.168 Soli Conservation
Activity /item No. Rate Dimensions (m) Total Cost (Rs)
Dry Check Dam 57 3600 4x2x1 205200
Total 57 205200
P 4.169 Micro Enterprises
Activity /Item Total No. of families Requirement Cost (Rs)
Carpentry 6 Tools and training. 60000
Masonry 1 Tools and training. 10000
Black Smith 1 Tools and training. 10000
Vermin 10 Pits and verms 70000
Dairy farming 21 Cows 420000
Cutting & Tailoring 2 Sewing Machine 20000
Goatry 4 Pair of improved breeds 20000
Hotri. Nursery 7 Installation of infrastructure
1050000
Seed village concept 7 875000
Total 2535000
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-40]
Action Plan for IWMP-V Theog Name of the State:- Himachal Pradesh Name of the District:- Shimla Name of Block:- Theog Name of Panchayat:- Deothi Total Area in Hectare:- 1544 hectare Total Sanctioned Amount:- Rs.2,31,60000 Total Village- 13
Sr. No.
Work Component
Total Proposed Work including Convergence
Fund s Allocated
1st year Plan 2
nd year Plan 3
rd year Plan 4
th year 5
th year
IWMP IWMP IWMP IWMP IWMP
Physical
Financial Physical Financial Physical Financial Physical Financial Physical Financial
A) General
1 Administrative cost
2316000 - 463200 - 463200 - 463200 - 463200 - 463200
2 Monitoring 231600 - - - 77200 - 77200 - 77200 - -
3 Evaluation 231600 - - - - 77200 - 77200 - 77200
Total 2779200 - 463200 - 540400 - 617600 - 617600 - 540400
B Institution & capacity building
a Awareness 6 90000 - 90000 - - - - - - - -
b Block level 6 120000 - 120000 - - - - - - - -
c District level 6 300000 - 300000 - - - - - - - -
d Institutional training
3 315000 - - 315000 - - - - - -
e Exposure visit 3-4 250000 - - - 250000 - - - - - -
f Expert visits/services and Misc.
83000 - - - - - 83000 - - - -
Total 1158000 - 510000 - 565000 - 83000 - - - -
C Detailed Project Report (DPR)
1 231600 - 231600 - - - - - - - -
Total 231600 - 231600
D ) Consolidation phase
1158000 - - - - - - - - - 1158000
Total-D 1158000 - - - - - - - - - 1158000 E) Entry point activities
a Vegetable collection centre
3 776400 69 776400 - - - - - - - -
b Tank with pipe 1 150000 13 150000 - - - - - - - -
Total 4 926400 82 926400 - - - - - - - -
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-41]
Sr. No.
Work Component Total Proposed Work including Convergence
Fund s Allocated
3rd
year Plan 4th
year Plan
IWMP Convergence IWMP Convergence
Physical Financial Physical Financial Physical Financial Physical Financial
C ) Watershed Development Phase
1 Watershed Development Works
a Kachha talab 15 937500 83 937500 - - - - - -
b Roof water 6 377000 34 377000 - - - - - -
c Tank 88 7216000 641 7216000 - - - - - -
d Kuhal 1 1500000 133 1500000 - - - - - -
Total 110 10030500 891 10030500 - - - - - -
2 Agriculture
a Provision for crop seed 8430 4215 - - - 4215 - -
b Vermicompost 15 210000 9 105000 - - 9 105000 - -
Total 218430 9 109215 - - 9 109215 - -
3 Horticulture
a a) Apple 12160 Plants 304000 14 152000 - - 14 152000 - -
b b) Pear 9120 Plants 109440 9 54720 - - 9 54720 - -
c Vegetable seed 118700 5 59350 - - 5 59350 - -
d Vegetable collection center
4 1040000 46 520000 - - 46 520000 - -
e Poly house & MIS 4 500000 22 250000 - - 22 250000 - -
Total 2072140 96 1036070 - - 96 1036070 - -
4 Animal Husbandry
a Fodder 15400 280000 - - - - 14 280000 - -
b Grasses 420 kg 50400 - - - - 12 50400 - -
Total 330400 - - - - 26 330400 - -
5 Soil Conservation
a Dry Check Dam 57 205200 8 86330 - 118820 - - - -
Total 57 205200 8 86330 - 118820 - - - -
6 Drinking water
a Bawari 19 380000 34 380000 - - - - - -
b Tank 13 1254000 111 1254000 - - - - - -
Total 1634000 145 1634000 - - - - - -
7 Livelihood activities for the asset less persons
a Carpentry 6 60000 - 60000 - - - - - -
b Black smith 1 10000 - 10000 - - - - - -
c Masonry 1 10000 - - - - - 10000 - -
Total 80000 - 70000 - - - 10000 - -
7 Production system & micro enterprises
a Vermicomopst 10 70000 6 70000
b Goatry 4 20000 - 20000
c Horti. Nursery 7 1050000 93 1050000
d Dairy 21 420000 - - - - - 420000 - -
e Cutting & tailoring 2 20000 - - - - - 20000 - -
f Seed village concept 7 875000 - - - - 78 875000 - -
Total 2455000 99 1140000 78 1315000 - -
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-42]
SUMMARY Located at an altitude of 9375 feet above mean sea level Gram Panchayat Deothi comprises the total area of 1544 hac. The total amount sanctioned for watershed development works, production systems, micro- enterprises, livelihood activities including preparation of DPR and other phases is 231.60 lacs. Data regarding socio-economic profile, land use pattern, livestock position and cropping pattern, etc was collected from panchayat secretaries, patwaries and through household surveys and PRA exercises. Total population of the panchayat is 1342 out of which 199 families are of general, 105 of scheduled caste. In total 110 new water harvesting structures will be constructed including convergence existing structures in which repair work will be done. Construction and repair of these structures will enhance the storage capacity to 6050 m3 with total cost of Rs 1,00,30,500 with convergence which will irrigate 30 hac area of the panchayat.
The main agricultural crops grown in the panchayat are maize, wheet and barley with total area of 114 bigha. In total 945 Kg seeds of agricultural crops will be provided in the panchayat which will cost Rs 8430 and 15 vermicomposting units will be developed as demonstration unit in the panchayat which will cost Rs 2,10,000 In agriculture there will be skill development and capacity building of about 30-35 farmers from the panchayat.
Horticulture is the major source of income to the farmers. The farmers are growing apple and vegetable crops in the watershed area. The total 21280 Plants of apple and pear will be distributed to the farmers costing Rs 4,13,440. Improved verities seeds of different vegetable crops will be distributed to the farmers which will be cost Rs 1,18,700 The technique of low volume high value crops will be demonstration by installing pollyhouses (MIS) and seed village concept for the BPL and SHGs. The total 4 pollyhouse and 7 seed village concept will be demonstrated the Rs. 13,75,000 has been earmarked for the purpose.
Total number of animals in the panchayat are 1949 for which fodder trees and grasses will be provided in each ward. In total 15400 plants of fodder and 420 Kg of grass seeds will be provided in the ward, which will cost Rs 2,80,000. and Rs 50,400 respectively. Drinking water is a pre requisite for the well- being of the area. 32 new drinking water structures like bawaries and wells will be constructed in different locations of the panchayat. Construction of new structures and repair of old structures will enhance the storage capacity to 586750 lt with cost estimate of Rs 1634000 Per capita availability of drinking water will increase from 46 lt to 437 lt after project. Soil conservation is the main objective of watershed programme. So to check soil erosion construction of crate wall will be done. Only River Banks will be constructed to prevent soil erosion, which will cost a total of Rs 2,05,200 The overall objective of watershed development programme is poverty elevation by investing in micro- enterprises and enhancing rural livelihoods. Income generating activities reported in the panchayat are Carpentry, masonry , Vermincomposting, cutting & tailoring , Black Smith, and dairy farming. A total of Rs 16,60,000 will be given to the beneficiaries of these groups with necessary trainings and tools.
Amount spent on different activities like entry point activities (9,26,400 lac), water harvesting structures (1,00,30,500), agriculture development (2,18,430), horticulture development (20,72,140), animal husbandry (3,30,400), drinking water (Rs 16,34,000), soil conservation (Rs 20,52,000), micro- enterprises and livelihood (Rs 16,60,000) and capacity building (Rs 11,58,000)
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-43]
Annexure –I
Water harvesting Structure of Gram Panchayat Deothi Target for 3rd year Existing and Proposed water harvesting structures in Deothi Panchayats of IWMP V Theog are presented as under Activity
Ward Name
Proposed No. Location GIS coordinates Benefited Families
Size (mt)
Estimated Cost (Rs.) Latitude Longitude Altitude
Kachha Talab Deothi 1 Banot 31002.04 77
030.10 2107 All 10x8x2 62500
1 Lakhoti 31002.04 77
030.15 2129 All 10x8x2 62500
1 Lohala 31002.05 77
030.21 2140 All 10x8x2 62500
1 Drahal 310020.6 77
030.25 2132 All 10x8x2 62500
Janahan 1 Chadrain 31003.39 77
030.50 2194 All 10x8x2 62500
1 Chilla 31003.40 77
030.08 1020 All 10x8x2 62500
1 Bedi 31003.45 77
030.15 1590 all 10x8x2 62500
Dhar 1 Jubbar 31002.04 77
030.08 2110 All 10x8x2 62500
1 Thutna 31001.10 77
030.09 2110 All 10x8x2 62500
1 Karana 31002.53 77
030.12 2115 All 10x8x2 62500
1 Sujana 31002.84 77
029.40 2162 All 10x8x2 62500
1 Upper Jubber 31002.41 77
029.15 1590 All 10x8x2 62500
1 Barot 31002.51 77
029.41 1596 All 10x8x2 62500
1 Manawan 31002.53 77
029.46 1593 All 10x8x2 62500
1 Mashalta 31002.55 77
029.47 1595 All 10x8x2 62500
15 937500
Roof Water Deothi 1 Sheel Dhar(|Banoti) 31002.02 77
030.12 2109 All 3x3x2 57000
Janahan 1 Janahan-I 31002.51 77
030.36 2050 2 3x3x2 57000
1 Janahan-II 31002.52 77
030.44 2073 7 5x4x2 92000
1 Janahan-III 31002.54 77
030.40 2070 3 3x3x2 57000
Dhar 1 Dhar (Dilip Singh) 31002.10 77
030.95 2112 3 3x3x2 57000
1 Dhar (Kewal Ram) 31002.13 77
030.08 2127 3x3x2 57000
6 377000 Tank Deothi 1 Lakhoti-I 31
002.05 77
030.13 2129 5 5x4x2 82000
1 Lakhoti-II 31002.11 77
030.17 2121 5 5x4x2 82000
1 Lakhoti-III 31002.14 77
030.22 2130 5 5x4x2 82000
1 Batara-I 31002.01 77
030.17 2121 7 5x4x2 82000
1 Batara-II 31002.04 77
030.21 2126 6 5x4x2 82000
1 Lohala 31002.06 77
030.22 2142 4 5x4x2 82000
1 Deothi-I 31002.04 77
030.07 2104 7 8x6x2 82000
1 Deothi-II 31002.07 77
030.12 2110 6 5x4x2 82000
1 Deothi-III 31002.10 77
030.19 2125 6 5x4x2 82000
1 Deothi-III 31002.17 77
030.23 2132 6 5x4x2 82000
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-44]
1 Harda-I 31002.03 77
030.16 2122 4 5x4x2 82000
1 Harda-II 31002.13 77
030.11 2127 4 5x4x2 82000
1 Lakhoti Barasali-I 31002.04 77
030.13 2128 5 5x4x2 82000
1 Lakhoti Barasali-II 31002.07 77
030.17 2130 4 5x4x2 82000
1 Drahal-I 31002.01 77
030.09 2124 5 5x4x2 82000
1 Drahal-II 31002.02 77
030.20 2127 5 5x4x2 82000
1 Panchan-I (Land Laiq Ram) 31002.14 77
030.27 2130 6 5x4x2 82000
1 Panchan-II (Land JainSingh) 31002.27 77
030.23 2133 5 5x4x2 82000
1 Bahar Pajna (land Dhalu) 31002.30 77
030.30 2125 6 5x4x2 82000
1 Joli (Land Keshaw Ram) 31002.32 77
030.35 2121 5 5x4x2 82000
1 Ghareya(Land Mohan Singh) 31002.35 77
030.40 2127 6 5x4x2 82000
1 Lower Batera(Land Kewal Ram)
31002.39 77
030.45 2135 5 5x4x2 82000
1 Bateowari-I (Mathu Ram) 31002.42 77
030.49 2140 6 5x4x2 82000
1 Bateowari-II(Anant Ram) 31002.47 77
030.49 2130 6 5x4x2 82000
Janahan 1 Chadrain khud-I 31002.59 77
030.43 2190 7 5x4x2 82000
1 Chadrain khud-II 31002.58 77
030.46 2193 7 5x4x2 82000
1 Chadrain khud-III 31002.55 77
030.47 2190 7 5x4x2 82000
1 Chadrain khud-IV 31002.53 77
030.43 2191 7 5x4x2 82000
1 Shikal-I 31002.40 77
030.31 2195 4 5x4x2 82000
1 Shikal-II 31002.42 77
030.33 2191 4 5x4x2 82000
1 Khala-I 31002.49 77
030.40 2197 7 5x4x2 82000
1 Khala-II 31002.47 77
030.41 2198 7 5x4x2 82000
1 Khala-III 31002.42 77
030.44 2196 7 5x4x2 82000
1 Khala-IV 31002.47 77
030.49 2192 7 5x4x2 82000
1 Bhaskar-I (Devender) 31002.03 77
030.32 2177 5 5x4x2 82000
1 Bhaskar-II 31002.02 77
030.30 2174 5 5x4x2 82000
1 Salana (Doulat Ram) 31002.07 77
030.40 2178 7 5x4x2 82000
1 Salana -II 31002.09 77
030.34 2170 6 5x4x2 82000
1 Jorna 31002.58 77
030.39 2160 5 5x4x2 82000
1 Jorna 31002.55 77
030.35 2165 5 5x4x2 82000
1 Jhal 31002.53 77
030.33 2161 4 5x4x2 82000
1 Jhal 31002.50 77
030.31 2163 4 5x4x2 82000
1 Chadrain (Land Daulat Ram) 31002.53 77
030.29 2169 5 5x4x2 82000
1 Chadrain 31002.43 77
030.25 2161 4 5x4x2 82000
1 Upper Bhaskar-Kufta(Atma Ram)
31002.05 77
030.35 2178 5 5x4x2 82000
1 Upper Bhaskar-Kufta-I 31002.06 77
030.38 2180 5 5x4x2 82000
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-45]
1 Upper Bhaskar-Kufta-II 31002.07 77
030.24 2180 5 5x4x2 82000
1 Panji (Suriender) 31002.15 77
030.28 2175 4 5x4x2 82000
1 Panji 31002.15 77
030.30 2171 4 5x4x2 82000
1 Janahan(Land Bahagat ram) 31002.19 77
030.35 2160 5 5x4x2 82000
1 Janahan-I 31002.11 77
030.40 2165 5 5x4x2 82000
1 Janahan-II 31002.29 77
030.37 2160 4 5x4x2 82000
1 Janahan (Jiya Lal) 31002.32 77
030.40 2154 4 5x4x2 82000
1 Janahan 31002.36 77
030.19 2157 4 5x4x2 82000
1 Upper Hari Nagar(Land Balbir)
31002.19 77
030.22 2155 5 5x4x2 82000
1 Dabbar(Land Ranjit Singh) 31002.30 77
030.27 2157 5 5x4x2 82000
1 Lashot(Land Naryan Singh) 31002.25 77
030.23 2158 5 5x4x2 82000
1 Deli (Liaq Ram) 31002.21 77
030.27 2168 7 5x4x2 82000
1 Sadhog (Sukh Lal) 31002.31 77
030.31 2161 5 5x4x2 82000
1 Sadhog (Satya-I) 31002.35 77
030.35 2163 6 5x4x2 82000
1 Saruwa (Daulat Ram) 31002.39 77
030.29 2165 5 5x4x2 82000
1 Bedi (Mushu Ram) 31002.33 77
030.30 2161 5 5x4x2 82000
1 New Deli (Surinder Kumar) 31002.36 77
030.42 2162 6 5x4x2 82000
Dhar 1 Banot ( land Ramesh Chand )
31002.57 77
030.45 2192 4 5x4x2 82000
1 Banot 31002.99 77
030.34 2195 3 5x4x2 82000
1 Manawan ( Land Rajender) 31002.55 77
030.36 2170 5 5x4x2 82000
1 Dashari (land Hari Ram) 31002.57 77
030.38 2177 6 5x4x2 82000
1 Lower Jubber( Land Rajender)
31002.51 77
030.33 2171 5 5x4x2 82000
1 Upper jubber ( land Mohan lan)
31002.53 77
030.36 2170 4 5x4x2 82000
1 Upper jubber 31002.54 77
030.09 2173 3 5x4x2 82000
1 Thutna (land Ramesh chand) 31002.10 77
030.14 2107 5 5x4x2 82000
1 Dhar (land Mohan Chauhan) 31002.59 77
030.44 2130 5 5x4x2 82000
1 Dhar 31002.58 77
030. 46 2135 5 5x4x2 82000
1 Sujna (Land Paras Ram) 31002.54 77
030. 40 2170 6 5x4x2 82000
1 Upper Kalana(Land Mehar Singh)
31002.56 77
030. 47 2169 4 5x4x2 82000
1 Upper Kalana 31002.54 77
030. 43 2167 5 5x4x2 82000
1 Lagana(Land Daulat ram) 31002.49 77
030. 45 2151 3 5x4x2 82000
1 Lagana 31002.50 77
030. 01 2150 4 5x4x2 82000
1 Bhagri(Land Ramesh) 31002.50 77
030. 59 2121 5 5x4x2 82000
1 Lower Dhar-I 31002.41 77
030. 05 2130 4 5x4x2 82000
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-46]
1 Lower Dhar-II 31002.45 77
030. 10 2133 5 5x4x2 82000
1 Lower Dhar-III 31002.40 77
030. 14 2137 4 5x4x2 82000
1 Kothi Dhar(land Keshaw Ram)
31002.43 77
030. 17 2138 5 5x4x2 82000
1 Mandlia (Land Prakash Chauhan)
31002.50 77
030. 19 2135 6 5x4x2 82000
1 Lower Dhar(Land Adhi Ram) 31002.51 77
030. 21 2140 5 5x4x2 82000
1 Dhar(Land Dilip Singh) 31002.40 77
030.17 2135 3 5x4x2 82000
1 Lower Kalna (Rajinder Thakur)
31002.43 77
030. .22 2139 7 5x4x2 82000
1 Dhar (Liaq Ram) 31002.47 77
030. 27 2140 4 5x4x2 82000
88 7216000 Kuhal Deothi 1 Kolu Nala to Deothi 31
002.51 77
030.08 1892 All 5 km 1500000
1 1500000
Annexure -III
Drinking Water Gram Panchayat Deothi Targer for 3rd year
Activity
Ward Name
Proposed No. Location GIS coordinates Benefitied Families
Size (mt)
Estimated Cost (Rs.) Latitude Longitude Altitude
Bawari Deothi 2(Repair) Bateowari 31001.53 77
030.14 1920 All 4x4 ft and 3x3 ft 40000
2(Repair) Deothi 31002.04 77
030.10 2103 All 8x8 and 6x6 ft 40000
1(Repair) Batara 31002.01 77
030.07 2107 All 6x6 ft 20000
1(Repair) Lohala (Near Temple) 31002.06 77
030.19 2139 All 8x8ft 20000
1(Repair) Ghareya 31002.07 77
030.22 2126 All 8x8ft 20000
Dhar 2(repair ) Dhar 31002.04 77
030.05 2107 All 12x12 ft 40000
1(repair ) Thutna 31002.10 77
030.09 2110 All 6x8 ft 20000
1(repair ) Kalana 31001.59 77
030.12 2115 All 8x10 ft 20000
1(repair ) Lagana 31002.50 77
029.37 2052 All 6x8 ft 20000
1(repair ) Lower Dhar 31002.57 77
029.42 2059 25 6x8 ft 20000
1(repair ) Sujana 31002.54 77
029.40 2162 All 10x10 ft 20000
1(repair ) Banot 31002.51 77
030.41 2160 All 6x6 ft 20000
1(repair ) Ghaneshra 31002.49 77
030.49 2165 All 4x6 ft 20000
1(repair ) Dashari 31002.45 77
030.45 2150 All 4x6 ft 20000
janahan 2(repair ) Solna 31002.08 77
030.40 2178 All 4x6 ft 40000
Total 19 380000 Tank Deothi 1 Kolu Nala 31
001.51 77
030.17 1922 5x4x2 92000
1 Deothi 31002.04 77
030.17 2103 5x4x2 92000
1 Maghareya to lakhto 31002.19 77
030.24 2163 3x3x2 and 5 km
pipe line 150000
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-47]
Janahan 1 Janahan 31002.49 77
030.42 2192 5x4x2 92000
1 Janahan (Near School) 31002.51 77
030.45 2187 5x4x2 92000
1 Khala 31002.07 77
030.40 2178 5x4x2 92000
1 Jhal 31002.53 77
030.35 2161 5x4x2 92000
Dhar 1 Upper Thutna 31002.11 77
030.10 2110 5x4x2 92000
1 Lower thutna 31002.15 77
030.17 2117 5x4x2 92000
1 Kalana 31001.58 77
030.14 2117 5x4x2 92000
1 Sujana 31002.56 77
030.42 2120 5x4x2 92000
1 Manadlia 31002.54 77
030.50 2130 5x4x2 92000
1 jagroth 31002.57 77
030.57 2135 5x4x2 92000
13 1254000
Annexure -III
Soil conservation Measures Gram panchayat Deothi Target for 3rd year Activity Ward Name Location GIS coordinates Proposed
(No) Families Benefited
Size(m) Estimated Budget(Rs.) Latitude Longitude Altitude
Dry check Dam Dhar Dhar ka nala 31002.10 77
030.09 2110 30 All ward 4x2x1 108000
kolu nala 31002.13 77
030.10 2121 12 All ward 4x2x1 43200
Sujna khad 31002.18 77
030.02 2125 15 All ward 4x2x1 54000
Total 57 205200
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-48]
Annexure-IV
List of Beneficiaries Name Roof water
Ward Village Name List of Beneficiaries Categories
Deothi Sheel Dhar (Banot) Mohan Lal
Janahan Janahan –I Sant Ram SC (BPL)
Narayan Singh SC (BPL)
Janahan –II Hari Ram SC
Sahi Ram SC
Parma Nand SC
Kewal Ram SC
Aatma Ram SC
Banu Lal SC
Asha Devi SC
Janahan –III Mansa Ram
Ranjeet Singh
Padam Singh
Dhar Dhar (Dlip Singh) Dalip Singh Tanta Gen Surinder Gen Mangat Ram Gen Dhar (Kewal Ram) Kewal Ram Gen
Tank
Ward Village Name List of Beneficiaries Categories
Janahn Chandrain Khud Sant Ram SC (BPL)
Narayan Singh SC (BPL)
Hari Ram SC
Sahi Ram SC
Parma Nand SC
Kewal Ram SC
Aatma Ram SC
Chandrain Khud Banu Lal SC
Asha Devi SC
Jiya Lal Gen (BPL)
Mansa Ram SC
Mahi Ram-I SC
Ghaiya Ram SC
Keshav Ram SC
Chandrain Khud Loku Ram SC
Ranjeet Singh SC
Padam Singh SC
Dhani Ram SC
Sahi Ram-II SC
Jai Ram SC
Prakash SC
Chandrain Khud Mahi Ram-II SC
Tonka Ram SC
Geru Ram SC
Narayan Singh SC
Partap Singh SC
Raju SC
Mohan Lal SC
Chandrain Daulat Ram
Moti Ram
Beli Ram
Bhagat Ram
Pradeep
Laiq Ram-I
Laiq Ram –II
Bansi Lal
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-49]
Mast Ram
Upper Bhaskar (kufta) Aatma Ram
Mohi Ram
Naresh
Inder
Beli Ram
Upper Bhaskar (kufta) Rangeet
Prem Lal
Shyam Singh
Parmanand
Joginder
Upper Bhaskar (kufta) Kali Ram
Balbahadur
Sohan lal
Padam Singh
Brij Lal
Panji Partap Sing
Surender
Ranjet
Prakash
Panji Laiq Ram
Bantu
Raju
Mohan Lal
Upper Hari Nagar Balbeer Singh
Surender Singh
Devinder
Aatma Ram
Sanjeev
Janahan –I Bhagat Ram
Madu Ram
Budhi Ram
Tunka Ram
Narayan Singh
Janahan -II Balbeer
Raju Ram
Dalip
Pratap Singh
Janahan Prakash
Jai Ram
Mohi Ram
Padam Singh
Janahan-II Jiya lal
Hari Ram
Sahi Ram
Parmanand
Janahan Bhanu Ram
Kewal Ram
Sant Ram
Narayan Singh
Dabbar Ranjeet Singh
Prakash Chand
Pratap Signh
Mohan Lal
Raju
Lashot Narayan Singh
Rajesh
Vijesh
Nirmala
Jhanta Ram
Shikal-1 Keshav Ram SC
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-50]
Mahi Ram SC
Jiya Lal Gen
Balbeer Gen
Shikal-II Pratap Gen
Mohan Lal SC
Naresh Gen
Anant Ram SC
Baskar Lachhi Ram Gen
Aatma Ram Gen BPL
Lachhi Dvi SC
Narayan Singh Gen
Naresh Kumar Gen
Ram Lal SC
Rajinder Singh SC
Devinder Singh Gen
Sanjeev Gen
Padam Singh Gen
Solna Anant Ram SC
Heera Sing SC
Mohan Lal SC
Sunil SC
Balak Ram SC
Roshan lal SC
Mohi Ram SC
Badri Nath SC
Daulat Ram SC
Jiya Lal SC
Parma Nand SC
Raksha Devi SC
Jodna Janahn Devu
Rati Ram
Tara Chand
Hari Singh
Balbeer Singh
Ramesh Singh
Bheem Singh
Padam Singh
Dharam Singh
Sadhog (Sukh Lal) Sukh lal
Devinder
Balbir
Surender
Satya –I
Sadhog (Satya) Satya
Vidya
Hemlata
Dixit
Gulshan
Dharya
Deli (Laiq Ram) Partap Singh
Laiq Ram
Rajinder Singh
Mohan Lal
Ranjet Singh
Narayan Singh
Prakash
Saruwa(Daulat Ram) Daulat Ram
Prem Lal
Mohan Lal
Anant Ram
Sushma
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-51]
Bedi (munshu Ram) Munshu Ram
Chaiyan Ram
Mohan Lal
Tula Ram
Gaiyan Ram
New Delhi (Surender) Surender
Laiq Ram
Narayan Singh
Ram Lal
Baldev
Hari Ram
Deothi Lakhoti Jai Singh Bharti
Dayal Singh
Prakash Chand-I
Kewal Ram-I
Narayan Singh
Deep Ram
Jeevan Singh
Prakash Chand-II
Kasha Ram
Aatma Ram
Kewal Ram-II
Rajkumar
Such Lal
Prakash Chand-III
Prakash Chand-IV
Batara Sita Ram
Keshav Ram
Charanjee Lal
Narayan Singh
Balbeer
Ramesh
Kewal
Narender
Rajender
Parmanand
Mathu Ram
Prem Lal
Lahola Mohan Singh
Dila Ram
Surat Ram
Prakash
Deothi Narayan Singh
Prakash Chand
Kapil Dev
Jai Ram
Satpal
Bali Ram
Aatma Ram
Rajesh
Kanshi Ram
Amer Jeet
Keshav Ram
Nardas
Rajesh
Manmohan Singh
Peli Ram
Mast Ram
Padam Singh
Dhani Ram
Surat Ram SC
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-52]
Dayal Singh
Prakash Chand
Gamla Ram SC
Rajkumar
Daulat Ram SC
Kanshiya Ram SC
Harda Dhani Ram
Hari Ram
Kewal Ram
Prakash Chand
Gyan Singh
Jai Ram
Prem lal
Mathu Ram
Brasli Jai Singh-I
Prakash Chand-I
Jai Singh-II
Jai Ram
Kewal Ram
Banri Bragta
Prakash Chand –II
Chet Ram
Dyal Singh
Daral Kewal Ram-I
Hari Ram
Kewal Ram-II
Prakash Chand
Gyan Singh
Jai Ram
Ranjeet Singh
Panjna -I Laiq Ram
Kashmir Singh
Trilok
Ranjeet
Prem Chopra
Narayan Chauhan
Panjna -II Pratap Singh
Jai Ram
Hiru Devi
Chet Ram
Kewal Ram
Bhahar(pajhna ) Dalu
Deep Ram
Surat Singh
Gamla Ram
Raj kumar
Kanshi Ram
Joli Keshav
Rajinder
Padam Singh
Rajkumar
Bansi Lal
Gharya Mohan Singh
Amer Jeet
Parkash –I
Paraksah-II(Mathu)
Dayal
Prem Chopra
Lower Batera Kewal Ram
Parmanand
Narender
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-53]
Rajinder
Mathu Ram
Bateowari-I(Mathu Ram) Mathu Ram
Aatma Ram
Mohi Ram
Daulat Ram
Rajinder
Mathi Devi
Bateowari -II (Anant Ram) Anant Ram
Balak Ram
Sant Ram
Malku Ram
Prakash
Chunnu Sharma
Dhar Banot Ramesh Chand (BPL)
Padam Singh
Mathu Ram
Prakash Sharma
Mahinder Singh
Bali Ram (BPL)
Laiq Ram
Manvorn Rajinder singh
Pratap Singh
Keshav Ram
Balveer Chauhan
Dalip Tanta
Dashari Hari Ram
K. R. Chauhan
Mohan Singh
Ramesh Chand
Surinder Tanta
Ved Prakash
Upper Jubber Mohan Lal
Keshav Chauhan
Mangat Ram
Kewal Ram
Durga Nand
Surender Tanta
Daulat Ram Tanta
Lower jubber Rajinder Singh
Dalip Tanta
Balveer Chauhan
Dhaniram
Keahav Chauhan
Thutna Ramesh Chand
Balak Ram
Devinder
Vija Ram
Narayan Singh
Dhar Mohan Chauhan
Rajinder Singh-I
Ramesh Lathek
Mohan lathek
Devinder Singh
Surinder tanta
Keshav Chauhan-I
Balbeer Singh
Kesahv Chauhan-II
Rajinder Singh –II
Upper Kalana Meher Singh
Sant Ram
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-54]
Kewal Ram
Padam Singh
Upper Kalana Santoshi Devi
Lachhi Ram
Daulat Ram
Mahinder Singh
Sita Ram
Sujna Paras Ram
Dalip Singh
Balveer Singh
Ranjeet Singh
Deep Ram
Virender Singh
Langana Bansi Chauhan
Daulat Ram
Laiq Ram
Mast Ram
Rati Ram
Vija Ram
Balak Ram
Bhangari Bali Ram
Ramesh Chand
Ranjeet Singh –I
Ranjeet Singh-II
Chet Ram
Lower Dhar Kewal Ram
Ranjot Singh
Mohan Singh
Mohan Chauhan
Dhani Ram
Pratap Singh
Keshav Ram
Devindr Singh
Ramesh Chauhan
Dinesh Chauhan
Aadi Ram
Daulat Ram
Jai Ram
Kothi Dhar Keshav Ram
Balveer
Laiq Ram (BPL)
Narender Tanta
Devinder
Mandlia Paras Ram
Daleep Singh
Balbeer Singh
Padam Singh
Prakash
Lower Dhar Adi Ram
Daulat Ram
Jai Ram
Kirpa Ram
Banku Ram
Heera Singh
Dhar (Tanta Niwas) Dalip Tanta
Surender
Mangat Ram
Daulat Ram
Rajinder Singh
Lower Kalana Rajinder Thakur
Manmohanu
IWMP-V (2009-10) Deothi (2c6c2G2b) Theog Shimla [page-55]
Ramesh-I
Ramesh-II
Bali Ram
Ranjeet
Chet Ram
Dhar (laiq Ram) Laiq Ram
Hira Singh
kewal Ram
Durga Singh
Annexure-V List of Micro Enterprises GP- Deothi
Vermicomopst
Sr. No. Name Village Ward
1 Mohan Lal Sharma (BPL) Sheel Ghat (Banot) Deothi
2 Laiq Ram Deli Janahan
3 Moti Ram (SC) BPL Charail Janahan
4 Jhariya Ram Chanana Janahan
5 Jiya Lal (Gen) BPL Janahan Janahan
6 Sant Ram (SC) BPL Janahan Janahan
7 Surender (BPL) Deli Janahan
8 Mohan Singh Deothi Deothi
Carpentry
Sr. No. Name Village Ward
1 Aatma Ram SC (BPL) Janahan Janahan
2 Mohan Lal , SC, BPL Janahan Janahan
3 Hari Ram SC, BPL Janahan Janahan
4 Sahi Ram (SC BPL) Janahan Janahan
5 Jai Ram SC, BPL Dhar Dhar
6 Deep Ram (General BPL) kalna Dhar
Masonry
Sr. No. Name Village Ward
1 Dalu SC (BPL) Deothi Deothi
Dairy
Sr. No. Name Village Ward
1 Asha Devi (SC BPL) Janahan Janahan
2 Santoshi (SC BPL) Salana Janahan
3 Kewal Ram (Gen BPL) Harda Deothi
4 Bansi Lal (SC BPL) Joh Deothi
5 Surat Singh (SC BPL) Deothi Deothi
6 Sita Ram (Gen BPL) Tipru Deothi
7 Narain singh (Gen BPL) Batura Deothi
8 Keshav Ram (Gen BPL) Batara Deothi
9 Mohi Ram Sharma (Gen BPL) Batewari Deothi
10 Pradeep (SC BPL) Chadrain Janahan
11 Daulat Ram (SC BPL) Chadrain Janahan
12 Sohan Lal (SC BPL) Bhaskar Janahan
13 Jai Ram (SC BPL) Janahan Janahan
14 Prago devi (Gen BPL) Kalna Dhar
15 Narita Devi (Gen BPL) Thutna Dhar
16 Ruma Devi (Gen BPL) Dhar Dhar
17 Dasi Devi w/o Rati Ram (Gen BPL) Lagani Dhar
18 Kesri Devi w/o Mast Ram (Gen BPL) Lagani Dhar
19 Uma Devi w/o Bija Ram (Gen BPL) Lagani Dhar
20 Mohan Lal Sharma (General BPL) Shilla Ghat Deothi
Cutting and Tailoring
Sr. No. Name Village Ward
1 Deep Ram SC (BPL) Pajna Deothi
2 Kanta devi Gen BPL Panji Janahan
Goatry
Sr. No. Name Village Ward
1 Chaina Ram (SC) BPL Janahan Janahan
2 Dhani Ram (SC) BPL Salana Janahan
3 Bhalku Ram (SC) BPL Chadrain Janahan
Note: addition and deletion of the beneficiaries under vermicompost, Dairy and Goatry can be considered during the
execution of the programme.
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-56]
Part 1.01
P 1.01 INTRODUCTION AND BUDGET P1.01a Introduction
Watershed : IWMP- Theog –V Gram panchayat : Ghoond Area : 1509 ha Amount : 226.35 lacs
Gram Panchayat Ghoond is located at 38 km distance from the Block headquarters, Theog. The total Geographical area of the panchayat is 1509 hectare. The Gram Panchayat is situated at 31004.620 latitude and 77025.810 longitudes. The height of Gram Panchayat of Ghoond is 7410 feet from above mean sea level. The Panchayat is covered with GP Bagain, Balghar, Sainj, Kamaha and Parghiya. The catchment area watershed is Kufta, kahar, jubber, jarol, Riudri, kharaina, Narainty Jhal, Ron Palu, Dhar, Jhalta and Khilna nallahs. The total population of the Panchayat is 2993 covering seven wards. P1.01b BUDGET
Sr. No. Budget Component % of the budget Amount (lacs)
1 Administrative cost Monitoring Evaluation
10 01 01
22.6350 2.2635 2.2635
2 Preparatory Phase Entry point activities Institution & capacity building Detailed Project Report (DPR)
04 05 01
9.0540
11.3175 2.2635
3 Watershed Works Phase Watershed Development Works Livelihood activities for the asset less persons Production system & micro enterprises
50 10 13
113.1750 22.6350 29.4255
4 Consolidation phase 05 11.3175
Total 100 226.3500
P1.01c Methodology A. District level
c. Collection of data at district level ii. DRDA and Line department
d. Meeting with CEO (DRDA), Project Officer, Heads of Line Departments B. Block level
d. Data collection e. One day orientation with pradhan secretaries and panchayat sahayak at block level f. Meeting with line department officials of agriculture, horticulture and animal
husbandry department C. Panchayat Level
f. General meeting at Panchayat level with members of Panchayat Samiti, Pradhan and Ward members
g. Collection of revenue data from Patwari h. Collection of socio economic data from Panchayat Secretary i. Village level meeting organized, PRA exercises and transect walks j. Identification of beneficiary group for different activities
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-57]
Part 1.02
P 1.02 GENERAL DESCRIPTION OF PROJECT AREA P1.021 Socio economic profile of panchayat
Total families : 526 Total population of the Panchayat : 2993 General families : 399 (population =2243) Schedule caste families : 125 (population = 740) Schedule tribe/OBC families : 2 (population = 10)
P 1.021a Population in different categories (ward wise) Name of ward
General Families SC Families Schedule tribe/OBC
No of families
Male Female Total No of families
Male Female Total No of families
Male Female Total
Gadheri 52 101 99 200 20 72 73 145 - - - -
Ghoond-I
50 205 200 405 9 24 10 34 - - - -
Ghoond-II
- - - - 49 147 149 296 2 6 4 10
Palu 83 230 232 462 13 32 30 62 - - - -
Shaloha 79 191 170 361 7 18 18 36 - - - -
Charain 60 156 148 304 14 50 52 102 - - - -
Tikker 75 252 259 511 13 35 30 65 - - - -
Total 399 1135 1108 2243 125 378 362 740 2 6 4 10
Source: Gram Panchayat, 2010
P 1.022 BPL Families
Total BPL Families : 118 Total Antoyodaya Families : 78
P 1.022a Population of BPL and Antoyodaya families (ward wise)
Name of Ward General Families SC Families Schedule tribe/OBC
BPL Antoyodaya BPL Antoyodaya BPL Antoyodaya
Gadheri 6 4 7 7 - -
Ghoond-I 12 6 4 4 - -
Ghoond-II - - 19 13 1 1
Palu 21 9 4 4 - -
Shaloha 11 5 5 5 - -
Charain 7 6 5 4 - -
Tikker 11 6 5 4 - -
Total 68 36 49 41 1 1 Source: Gram Panchayat, 2010
P 1.023 Land use pattern
The total land of Ghoond panchayat is 1509 hectare and whole area is rainfed. The cultivated land is 377 hectare under different farming system i.e. agriculture, horticulture and vegetables. The rest of area is under pasture, ghasni and forests etc. The barren is 78 hectare.
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-58]
P1.023a Areas (ha) of panchayat (village wise) under different land use systems
Sr. No.
Name of village
Total land
Irrigated Un irrigated
Agri. Horti. Veg. Fellow & Barren
Pasture Ghasni Forest Other
1 Jangal Ghoond
293 - 293 1 5 5 4 1 0 280 2
2. Chhaihala 97 - 97 9 19 19 2 6 35 19 7
3 Ghoond 250 - 250 28 50 50 15 71 54 19 13
4 Palvi 191 - 191 14 53 53 4 19 31 61 9
5 Madog 94 - 94 18 6 6 5 7 34 17 7
6 Charain 142 02 140 25 8 8 10 8 45 37 9
7 Ghadari 114 - 114 6 34 34 7 15 27 21 4
8 Shaloha 136 - 136 13 47 47 1 5 29 37 4
9 Tikker 192 - 192 28 17 17 19 43 64 12 9
Total 1509 02 1507 142 239 239 67 175 319 503 64
Source: Revenue Patwari P 1.024 Status of Livestock The animal rearing is the integrated part of farming system in the watershed area. The major animals are cows (local and improved), buffaloes, sheep, goats etc. The people face acute problem of fodder and drinking water for these animals during the stress period. The details of livestock reared by the people in Ghoond panchayat are given below: P1.024a Number of milch and dry cows (Local and improved) and Buffaloes
Name of Ward Local cow Improved cow Buffaloes
Milch Dry Total Milch Dry Total Milch Dry Total
Gadheri 30 10 40 78 2 80 0 0 0
Ghoond-I 20 10 30 70 10 80 0 0 0
Ghoond-II 61 9 70 9 1 10 2 0 2
Palu 30 20 50 170 30 200 1 0 1
Shaloha 53 7 60 100 0 100 0 0 0
Charain 100 20 120 75 5 80 0 0 0
Tikker 35 5 40 30 0 30 1 0 1
Total 329 81 410 532 48 580 4 0 4 Source: NAEB, UHF, 2010
P 1.024b Livestock population (ward wise) Name of Ward Bullock Calf Goat Sheep Poultry Mules Total
Gadheri 12 80 10 0 2 5 229
Ghoond-I 10 50 6 4 0 10 190
Ghoond-II 20 40 12 4 0 10 168
Palu 30 90 50 20 2 6 449
Shaloha 50 40 25 4 0 5 284
Charain 30 90 50 10 0 5 385
Tikker 100 40 50 10 0 0 271
Total 252 430 203 52 4 41 1976
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-59]
Part 1.03 P1.03 SWOT ANALYSIS A critical analysis of strengths, weaknesses, opportunities and threats (SWOT) of any region is a good analysis for developing strategies /programmes as it provides valuable insights on potentials, constraints, opportunities and threats based on the primary, secondary and technical data a detailed analysis of SWOT is carried out.
P1.031 Strengths of the watershed area
Road infrastructure is available.
Area is suitable for seasonal and offseason vegetable crops.
Area is suited to quality seed production of Vegetable crops
Area is also suitable for fruit crop production.
Unemployed educated youth.
Nearest market is available.
People are well versed with animal husbandry.
Farmers are innovative and ready to adopt new technologies.
P1.032 Weaknesses
Area is rainfed.
Soil erosion in the cropped area.
Unconsolidated land holding
Scarcity of fodder.
Hailstorm prone area.
The pasture land/ grazing land are shrinking.
Unequal distribution of available water for irrigation.
Big farmers are getting more water for irrigation on the traditional right basis which needs to
be reconsidered.
P1.033 Opportunities
Introduction of organic farming
Roof water harvesting
Training to the farmers on horticulture management, floriculture, poultry and mushroom production etc.
Revival of Mahila Mandals and SHGs which are dysfunctional presently
Installation of vegetable collection centre at ward/panchayat level
Introduction of crossbred animals
P1.034Threats
Available land for agriculture is declining if S.M.C practices are not adopted.
Soil erosion in the sloppy lands.
Unscientific farming practices.
Deforestation.
Declining of the traditional artisans.
Social distress.
Declining of fodder sources.
Lack of interest and motivation.
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-60]
Part 1.04
P 1.04 ENTRY POINT ACTIVITIES
Entry point activities are necessary part to orient the community members towards thrift and credit activities of the project. Success of government initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and this amount plays vital role to involve more people in different project development activities. Different entry point activities suggested by farmers during PRA exercise as given below. P 1.041 Entry point activities suggested at different locations of watershed
Ward Activity
Location Size Beneficiaries
Cost Purpose /use
Ghadheri Vegetable collection centre
Ghadhari 6x5 All 226350 To collect Farm produce
Ghoond-I Vegetable collection centre
Chadail 6x5 All 226350 To collect Farm produce
Palu Vegetable collection centre
Palu (Jai Ram)
6x5 All 226350 To collect Farm produce
Shaloha Vegetable collection centre
Shaloha 6x5 All 226350 To collect Farm produce
905400
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-61]
Part 1.05
P 1.05 WATER HARVESTING
The main sources of irrigation in the gram Panchayat are Tallab, Dam, tanks and water schemes. The most of the cultivated area is rainfed. The existing water resources are drying due to climatic change. The people face acute problem of water during stress period, specifically for the irrigation of vegetable crops etc. P 1.051 Existing and proposed water harvesting structures with storage capacity Name of structure
Number of structure
Capacity ( m3) Project intervention No. of beneficiaries
Old New Old New Old New Old New
Kachha talab 8 31 160 3712 160 3712 All 250
Roof water harvesting
- 5 - 232 - 232 - 19
Tanks 8 74 80 3440 80 3440 All
Dam - 1 - 150 - 150 - 60
Total 16 111 240 7714 240 7714
P 1.051a WATER BODIES /WATER HARVESTING STRUCTURES
Work Name of the Ward
Proposed No
Location No of Beneficiaries
Dimension (m)
Estimated budget (Rs.)
Kachha talab Godhari 1 Baghar All 10x8x2 62500
1 Lohala –I All 10x8x2 62500
1 Tir All 8x8x2 39200
1 Lohala-II All 8x6x2 36700
1 Magholi All 5x4x2 22500
1 Bharot All 8x6x2 36700
Ghoond-I 1 Randri All 8x8x2 39200
1 Jarawal All 10x8x2 62500
1 Panthaghati Kufta All 10x8x2 62500
Ghoond-II 1 Kharari All 8x8x2 39200
1 Naranti All 8x8x2 39200
1 Kufta All 8x8x2 39200
1 Ghoond All 5x4x2 22500
Palu 1 Darewara All 5x4x2 22500
1 Bagail All 5x4x2 22500
1 Palu All 8x8x2 39200
1 Namana All 8x6x2 36700
Shaloha 1 Bagra All 10x8x2 62500
1 Majheth All 10x8x2 62500
1 Khaloth All 10x8x2 62500
1 Shakreth All 10x8x2 62500
Charain 1 Bagin All 10x8x2 62500
1 Natu ka Nala All 8x6x2 36700
Tikkar 1 Rachhain All 10x8x2 62500
1 Tikkar Juber All 10x8x2 62500
1 Jarash All 8x6x2 36700
1 Tilu All 10x8x2 62500
1 Pagara All 8x6x2 36700
1 Madog All 8x6x2 36700
1 Ghasigoan All 8x6x2 36700
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-62]
1 Khayna All 8x6x2 36700
Total 31 1405500
Roof Water Gadhari 1 Lohala 3 5x4x2 92000
1 Gadhari 8 5x4x2 92000
Palu 2 Jhaltu 4 5x4x2 184000
Shaloha 1 Kair Shaloha 4 5x4x2 92000
Total 5 461000
Tank Gadhari 1 Bharot-I 6 5x4x2 82000
1 Bharot-II 5 5x4x2 82000
1 Lohala 6 5x4x2 82000
1 Kufta 7 5x4x2 82000
1 Nagar 9 5x4x2 82000
1 Jubber 5 5x4x2 82000
1 Galan 10 8x6x2 164000
1 Chalawanti 7 5x4x2 82000
1 Ghadhari 8 5x4x2 82000
1 Chalan Nala(Near Kharyan)
5 5x4x2 82000
Ghoond-I 1 Chadail 10 8x6x2 164000
1 Khadla 8 5x4x2 82000
1 Shillaghat 9 5x4x2 82000
1 Kufta-I 7 5x4x2 82000
1 Kufta-II 8 5x4x2 82000
1 Baloth 5 5x4x2 82000
1 Pargail 5 5x4x2 82000
1 Baroth-II 8 5x4x2 82000
Ghoond –II 1 Ghoond-I 7 5x4x2 82000
1 Ghoond-II 13 8x6x2 164000
1 Thumu 8 5x4x2 82000
1 Ghoond-III 6 5x4x2 82000
1 Narainty-I 7 5x4x2 82000
1 Narainty-II 9 5x4x2 82000
1 Kufta (Narainty ) 9 5x4x2 82000
Palu 1 Jhatlu 6 5x4x2 82000
1 Palu upper 3 5x4x2 82000
1 Thanadhar 3 5x4x2 82000
1 Polu lower 5 5x4x2 82000
1 Derewara 8 5x4x2 82000
1 Palu 9 5x4x2 82000
1 Mandal 6 5x4x2 82000
1 Nayabag 3 5x4x2 82000
1 Kanthri 8 5x4x2 82000
1 Lower Bagail 7 5x4x2 82000
1 Upper Bagail 8 5x4x2 82000
1 Namana 14 8x6x2 164000
1 Gohan 5 5x4x2 82000
1 Matahvan 3 5x4x2 82000
Shaloha 1 Bhamphi 8 5x4x2 82000
1 Painalati 11 5x4x2 82000
1 Rachah/Shaloh 12 8x6x2 164000
1 Kayar 10 5x4x2 82000
1 Shaloha(Majhoth) 16 8x6x2 164000
1 Shakroha 12 8x6x2 164000
1 Khaloth 13 8x6x2 164000
1 Dhunkhar-I 5 5x4x2 82000
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-63]
1 Dhunkhar-II 6 5x4x2 82000
1 Kathlog 15 8x6x2 164000
1 Shaloha (IPH Tank repair)
1 5x4x2 82000
1 Dhunkar (repair) 1 5x4x2 82000
Charain 1 Charain-I 6 5x4x2 82000
1 Karau 6 5x4x2 82000
1 Kun 8 5x4x2 82000
1 Darog 7 5x4x2 82000
1 Jaroth 9 5x4x2 82000
1 Kundharata 9 5x4x2 82000
1 Charain (SC) 10 8x6x2 164000
1 Kaunti 7 5x4x2 82000
1 Charain Kanchi 5 5x4x2 82000
1 Upper-I Chaila 6 5x4x2 82000
Tikkar 1 Tikkar-I 10 5x4x2 82000
1 Tikkar-II 12 8x6x2 164000
1 Rachain 6 5x4x2 82000
1 Tillu 5 5x4x2 82000
1 Nahi 11 5x4x2 82000
1 Kamolta 7 5x4x2 82000
1 Pani Nala 10 8x6x2 164000
1 Janahar Pagara 7 5x4x2 82000
1 Ghassi gaun 7 5x4x2 82000
1 Madog 8 5x4x2 82000
1 Ghassigaun-II 5 5x4x2 82000
1 Khagna 6 5x4x2 82000
1 Tikkar-III (SC) 6 5x4x2 82000
Total 74 7052000
Dam 1 Narainty Nallah (Dhalli Jubbar)
All 10x3 mtr 330000
Total 1 330000
P1.051b Storage capacity and cost of new water harvesting structures under watershed programme and convergence.
Structure Watershed Convergence
No. Capacity (m3) Cost (Rs) No. Capacity(m3) Cost (Rs)
Kaccha Pond
31 3712 1405500 - - -
Roof water harvesting
5 232 461000 - - -
Irrigation tank
74 3440 7052000 - - -
Dam 1 150 330000 - - -
Total 111 7534 9248500 - - - Note: Details as in annexure
P 1.051c Storage capacity and cost of existing water harvesting structures under watershed programme and convergence.
Structure Watershed Convergence
No. Capacity (m3) Cost (Rs) No. Capacity(m3) Cost (Rs)
Kaccha Pond
8 160 - - - -
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-64]
Roof water harvesting
- - - - - -
Irrigation tank
8 80 - - - -
Dam - - - - - -
Total 16 240 - - - -
P1.051d Total Storage Capacity of Existing and New structures
Scheme Existing structures(lt) New structures (lt) Total capacity (lt)
Watershed 240 7534 7774
Convergence - - -
Total Capacity 240 7534 7774
P1.052 Budget
Scheme Existing structures (Rs) New structures (Rs) Total (Rs)
Watershed - 9248500 9248500
Convergence - - -
Total - 9248500 9248500
P1.053 Total storage capacity and cost through watershed and convergence
programme
Particulars Capacity (lt) Cost (Rs)
Watershed 7774 9248500
Convergence - -
Total 7774 9248500
Presently, if all the existing watershed structures are renovated, this will enhance storage capacity to 7774 m
3
with cost estimate of Rs.9248500
(Total water harvesting potential Storage capacity (watershed) + storage capacity (convergence) =7774 m3
Area to be irrigated under watershed programme =39.77 ha. Note : Total area is calculated by dividing total water available under watershed with depth of irrigation i.e.
0.02 cm
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-65]
Part 1.06
P1.06 AGRICULTURE The main agricultural crops grown in the Panchayat are wheat, Barley, maize, among cereal crops rajmash and mash among pulses. The productivity of crop was observed very low due to rainfed condition. This can be increased through increase in irrigation facilities and latest technology. Part 1.061 Prevalent Farming System under Agriculture
1. Agriculture (Maize/ pulses + Wheat/Barley/ Pluses) 2. Agriculture + Animal Rearing 3. Agriculture + Horticulture (fruit crops+ Vegetables) + Animal Rearing 4. Agriculture + Labour + Rural Artisans
P 1.062 Present statuses of Agriculture Crops and Proposed interventions:
P 1.062a Cereals Crops
Crops grown : Maize, Wheat and Barley Total Productions : 113+36+40=189qt (based on PRA exercise)
Status Particulars Maize Wheat Barley
Existing Area under cultivation 90 Bigha 30 Bigha 25 Bigha
Production 113 Q 36 Q 40 Q
Productivity 1.25 Q/ bigha 1.20 Q/ bigha 1.6Q/ bigha
Variety Local Local Local
Technology Indigenous Indigenous Indigenous
Proposed Increase in area 20 Bigha 15 Bigha 10 Bigha
Variety Kanchan Sonalika Dolma
Seed Quantity required by beneficiary group
330 Kg 675 Kg 420 Kg
Source: Household survey, Regional Centre, NAEB, UHF, 2010
P1.062b Pulses Crops grown : Rajmash and Mash Total Productions: 8+ 30= 38qt ( based on PRA exercise)
Source: Household survey, Regionla Centre,NAEB, UHF, 2010
Status Particulars Rajmesh Mash
Existing Area under cultivation 50Bigha 20 Bigha
Production 30 qt 8 qt
Productivity 60 kg/ bigha 40 kg/ bigha
Variety Red capsule Local
Technology Indigenous Indigenous
Proposed Increase in area 10 Bigha 5 Bigha
Variety Jawala Local
Seed Quantity required by beneficiary group 600 Kg 100 Kg
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-66]
P 1.062c Requirement of improved seed under different crops
Particulars Quantity Project contribution with 10% Seed replacement rate (Kg)
Estimated Budget (Rs.)
Cereals
Maize 330 33 660
Wheat 675 67.5 16875
Barley 420 42 1050
Pulses
Mash 100 10 900
Rajmash 600 60 4500
Total 23985 Note : Target for 3
rd and 4
th year
The quantity of seed for each crop has been determined by multiplying the seed rate per bighas with the total area cultivated under different crops i.e. Maize (110 x 3), Wheat (45 x 15), Barley (35 x 12), Pulses mash(25x4) and Rajmash (60x10) by number of beneficiaries (list annexure). The project intervention would be replacement of local varieties by improved varieties at 10 percent replacement rate each year for two years. This seed may be given as demonstration units among the beneficiaries. P 1.063 Critical Gaps in Agriculture Production
Lack of irrigation facilities.
Lack of scientific agricultural practices.
Timely unavailability of seeds, fertilizers and chemicals for insect-pest management.
Improved seed varieties not adequately used.
P1.064 Marketing
Not sold used only for self consumption
P1.065 Project Interventions f) Introduction of improved seed
Improved seed of maize, wheat and pulses will be introduced as demonstration units
g) Introduction of vermin-composting: Twenty units will be developed as
demonstration, in each village of the panchayat.
For better and productive utilization of FYM Vermicompost is being recommended. Ward Name No. Of Units Budget
Ghadhri 3 21000
Ghoond-I 2 14000
Ghoond –II 2 14000
Palu 4 28000
Shaloha 4 28000
Charain 3 21000
Tikkar 4 28000
Total 22 154000 Note : Target for 3
rd and 4
th year
Unit Dimension= 3mx1.8mx.45m
Vermi compost rate - 7000 /unit
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-67]
Item Budget estimate cost (Rs) Contribution Total
Project Beneficiaries
Seed 23985 23985 2398
Vermi Composting 154000 154000 15400
Total 177985 177985 17798
h) Human Resource Development (HRD)/ Capacity Building and training in Agriculture
Training on cultivation practices of various agriculture crops.
Training on insects & pests management.
Training on post harvest management.
Training on Vermicomposting
Exposure visits and experience sharing.
i) Numbers of trainings / Exposure visits
Number of Trainings =3
Number of Trainees=30-35
Duration = 3 days
j) Exposure visit One exposure visit of 30 -40 farmers
P 1.066 Project Impact a)
Crops Existing families
Addition in families
Total families after project interventions
Seed requirement after project intervention (kg)
Maize 80 20 100 33.0
Wheat 30 15 45 67.5
Barley 25 12 37 42.0
Mash 20 8 28 10.0
Rajmash 40 10 50 60.0
Total 195 65 260 212.5
Presently 195 families are involved in agriculture production. After project intervention 65 additional families will be involved in agriculture (i.e 20 families in maize, 15 in wheat, 12 in Barley and Pluses 18 families). In total 260 families will be benefited after project intervention and the seed requirement for all these families will be 2125 kg i.e. 330 kg seeds for maize, 675 kg for wheat, 420 kg for Barley and 700 kg seed of Pulses.
b) Skill development and capacity building of about 25 to 30 farmers from the Panchayat c) Encouragement towards organic farming and improving fertility of soils through
vermincompost
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-68]
Part 1.07
P 1.07 HORTICULTURE
The chapter deals with the fruit and vegetable crops. Among fruits apple, pear, and walnut etc. are grown .Apple is the major cash crop. The watershed area is also cultivated with different types of vegetables. These includes cabbage, beans, capsicum, potato, peas, cauliflower, red chilli etc. the vegetable production is the main farm activity and a good source of employment and income. P1.071 Prevalent Farming Practices under Horticulture
Horticulture + vegetables
Vegetable + Animal rearing
Vegetable crops(Cabbage + Beans) (Peas + Potato)(Cauliflower +Capsicum)
Fruit crop (Apple + Pear)
Agriculture + Horticulture + Animal rearing. P1.072 Present status of horticulture crops and proposed interventions: P1.072a Fruits
Total production=1980Q (Based on PRA Exercise)
Status Particular Apple Pear
Existing Area under cultivation 90 Bigha 4 Bigha
Present Production 1980 Qt -
Productivity 22 Qt -
Variety Red royal, Golden Redbartlet
Technology Indigenous indigenous
Proposed Increase in area 298 Bigha 197Bigha
Varieties Red chief, top red Bartlet, Red bartlet
Plants requirement 10430 7880
P 1.072b Vegetables crops Total Production= 3609 Q (based on PRA exercise)
Status Vegetable crops
Cabbage Bean Peas Cauliflower Potato Capsicum Tomato
Existing Area under cultivation
65 Bighas 70 Bighas 80 Bighas 20 Bighas 60 Bighas 45 Bighas 40 Bighas
Present Production
910 Quintal
490 Quintal
640 Quintal
200Quintal 300 Quintal 135 Quintal
200 Quintal
Productivity 14 Q/Bighas
7 Q/Bighas
8Q/Bighas 10 Q/Bighas 5 Q/Bighas 3 Q/Bighas
5 Q/Bighas
Variety Hybrid Falguni Azad, P-1, Linken
Shaweta Kufri,Jayoti Bharat Himsona
Technology Indigenous Indigenous Indigenous Indigenous Indigenous Indigenous Indigenous
Proposed Increase in area
25 Bighas 20 Bighas 30 Bighas 5 Bighas 10 Bighas 10 Bighas 12 Bighas
Variety Improved hybrid
Falguni Azad, P-1,Linken
Shaweta Kugri,Jayoti Bharat Himsona
Total seed requirement
4500 gm 540 Kg 880kg 1250 gm 105 Q 1650 gm 1040 gm
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-69]
P 1.073 Critical Gaps in Horticulture Production
Lack of vegetable collection centre
Lack of sufficient irrigation facilities
Quality seedling of fruit crop.
Lack of technical knowledge for cultural operation
Knowledge about PHT.
Lack of value addition.
Availability of fertilizers
P 1.074 Marketing
b) Vegetable are sold at Theog, Dhalli, Shimla market and Apple are sold at Dhalli, Solan, Chandigarh and Delhi.
P1.075 Project Interventions
h) Supply of improved verities of fruit crops seedlings. i) Vegetable collection centre. j) Training on cultural operations and on value addition. k) Farm based enterprises l) Irrigation through moisture conservation measures m) Drip irrigation Sprinkler n) Vegetable seed production area
P 1.075a Proposed fruit crop intervention in the Project Area
Apple
Sr. No.
Name of ward No. of household
No. of Plants
Area (Bigha)
Amount(Rs.)
1 Gadheri 72 1440 41 36000
2 Ghoond-I 59 1180 33 29500
3 Ghoond-II 51 1020 29 25500
4 Palu 96 1920 54 48000
5 Shaloha 86 1720 49 43000
6 Charain 74 1480 42 37000
7 Tikker 88 1760 50 44000
Total 526 10520 298 263000 Note : Target for 3
rd and 4
th year
Pear:
Sr. No.
Name of ward No. of household
No. of Plants
Area (Bigha)
Amount(RS)
1 Gadheri 72 1080 27 12960
2 Ghoond-I 59 885 22 10620
3 Ghoond-II 51 765 19 9180
4 Palu 96 1440 36 17280
5 Shaloha 86 1290 32 15480
6 Charain 74 1110 28 13320
7 Tikker 88 1320 33 15840
Total 526 7890 197 94680 Note : Target for 3
rd and 4
th year
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-70]
The quantity of plant for each crop has been determined by the total number of plants x Bigha i. e apple 35 plant /bigha and pear 40/bigha. P 1.075b Requirement of Improved Vegetable Seed in Project Area
Crops Seed requirement (kg) Quantity (Kg)
Project contribution with 10% seed replacement
Estimated Budget(Rs.)
Cabbage 4.500 0.450 9000
Beans 540.0 54.0 25920
Peas 880.0 88.0 7920
Cauliflower 1.250 0.125 5000
Potato 10500.0 1050.0 126000
Capsicum 1.650 0.165 9075
Tomato 1.040 0.104 2600
Total 185515 Note : Target for 3
rd and 4
th year
The quantity of seed for each vegetable crop has been determined by multiplying the seed rate per bigha with the total area cultivated under different crops i.e. Cabbage (50 gm), Beans (6 kg), Peas (10 kg), Cauliflower(50 gm),Potato (150 kg), Capsicum (30 gm), and Tomato(30gm) by number of beneficiaries (list annexure). The project intervention would be replacement of local varieties by improved varieties at 10 per cent replacement rate each year for 2 years. This seed may be given as samples among the beneficiaries for development and demonstration units P 1.076 Impact/Project Outcome
6. Skill development /capacity building of 76 farmers 7. Cropping pattern changed. Area under vegetable increased (112 bighas) 8. Farming systems changed. Areas under fruit crops increased (495 bighas) 9. Production of fruit and vegetable from the areas enhanced 10. Livelihood of 43 more farming families linked with horticulture
Species Existing families Addition in families Total families after project
intervention
Fruits
Apple 80 446 526
Pear - 526 526
Vegetables
Cabbage 60 30 90
Beans 80 25 105
Peas 80 25 105
Cauliflower 25 15 40
Potato 60 10 70
Capsicum 45 15 60
Tomato 40 20 60
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-71]
P 1.077 Vegetable Collection Centre
Ward Location No. Size Beneficiaries Cost
Gadheri Lohala 1 6x5 72 260000
Ghoond-II Pantha ghati (Naranty village) 1 6x5 51 260000
Shaloha Khaloth 1 6x5 86 260000
Charain Charain (Near School) 1 6x5 74 260000
Tikker Tikker 1 6x5 88 260000
Total 5 371 1300000 Note : Target for 3
rd and 4
th year
Poly house Demonstration unit for low volume high value crops of vegetable, floriculture and MIS
Ward Location No. Size Cost
Gadheri Gadheri 1 100m2 125000
Ghoond-I Baroth 1 100m2 125000 Palu Bagail 1 100m2 125000 Shaloha Shaloha 1 100m2 125000 Charain Charain 1 100m2 125000 Tikker Tikker 1 100m2 125000 Total 6 750000
Note : Target for 3rd
and 4th
year Before introducing the Poly House at ward level PIA will be authorized to decide the location and beneficiaries.
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-72]
Part 1.08
P 1.08 ANIMAL HUSBANDRY
Animal rearing is the second important activity for livelihood along with Agriculture. Animals are reared by farmers mainly for milk, FYM, Milch animals are local as well as improved. Hence milk production is low.
P 1.081 Milk Production and fodder requirement
Total numbers of milching cattle in the panchayat are 865 and average production of milk per day is 2.5 lt. from local cows, 5.0 lt. from jersey cows and 3.0 lt. from buffaloes per day. The total milk production/day is 3494.5 lt. for different species.
P 1.081a Average and Total milk production
Milch cattle Number Average milk production lt./day
Total production (lt.)
Buffaloes 4 3.0 12.0
Cow(Local) 329 2.5 822.5
Cow (improved) 532 5.0 2660
Total 865 3494.5
P 1.082 Fodder availability, requirement and Deficit (tons) Green fodder available in project area is 7542 tons whereas dry fodder available is 4525 ton. Total 12067 ton. Fodder is available in project area. But requirement of green fodder is 18101 ton whereas requirement of dry fodder is 6034 ton. Total fodder required is 24135 ton. Deficit of green fodder in project area is 10559 ton. and that of dry fodder is 1509 tons.
P 1.082a Fodder availability, requirement and Deficit (tons)
Available Required Deficit
Green Dry Total Green Dry Total Green Dry Total 7542 4525 12067 18101 6034 24135 10559 1509 12068
Note - Available Fodder
Green - 25kg/day x 30 days x 6months x Total live stock Dry -15 kg/day x 30days x 6months x Total live stock
Required Fodder: Green -30kg/day x 30days x 12months x Total live stock
Dry -10kg/day x 30days x 12months x Total live stock
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-73]
P 1.082b Gap between Demand and supply of total Fodder
Particulars Fodder (tons)
Supply 12067
Demand 24135
Deficit 12068
P 1.083 Project interventions Plantation and cultivation of fodder trees and grasses Construction of talabs , Johars in grass land and community lands Training/Capacity building
d) Plantation and cultivation of fodder trees and grasses Species:
Tree: Buel, Ban, Robinia Grasses: Berseem, Orchard grass, Napier etc.
P 1.083a Requirement of fodder trees and grasses in wards
Name of Ward
Fodder Trees Estimated Budget(Rs)
Grasses Estimated Budget(Rs)
Area (ha.)
No. of Plants
Area (ha.)
Quantity of seeds (kg)
Gadheri 3 3300 60000 2 70 8400 Ghoond-I 2 2200 40000 2 70 8400 Ghoond-II 1 1100 20000 2 70 8400 Palu 1 1100 20000 2 70 8400 Shaloha 2 2200 40000 2 70 8400 Charain 2 2200 40000 2 70 8400 Tikker 1 1100 20000 2 70 8400
Total 12 13200 240000 14 490 58800 Note : Target for 4
th year
e) Construction of talabs , Johars in grass land and community lands f) Training and Capacity Building
Live stock management
Animal Health
Artificial insemination
Improved grasses / Fodder trees
Exposure visits
Number of Training
Four trainings with 5-7 farmers in each trainings
Exposure visits for 5-7 farmers P 1.084 Project outcome/impact P 1.084a Estimated production of milk after project intervention
Milk production after project intervention will increase to 6.1 lt. /day and total production of milk after project intervention will be 5326 liters.
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-74]
P 1.084b Milk production from cows and buffaloes
Milch cattle No. Milk production lt./day
Total production (lt.)
Buffaloes 4 5.0 20.0
Cow(Local) 329 4.0 1316.0
Cow (improved) 532 7.5 3990.0
Total 865 5326.0
P 1.084c Total milk production before and after project intervention. Increase in milk production is 1831.5 lt. with total production of 5326 lt.
Milch cattle Before project (lt.) After project (lt.) Increase after project
Buffaloes 12.0 20.0 8.0
Improved cows 822.5 1316.0 493.5
Local cows 2660 3990.0 1330.0
Total 3494.5 5326.0 1831.5
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-75]
Part 1.09
P 1.09 FISHERY Fisheries can be one of the additional source of income to the farmers of the watershed area, but due to the lack of fresh water, the people enable to take up this activity as a source of income. Secondly the people of the watershed area is practicing agriculture, horticulture and vegetable cultivation which is giving good returns to the farmers. Hence fish cultivation cannot suggest for the watershed areas of the theog block. P 1.09a Existing and Proposed water bodies for fish culture
Existing water bodies Proposed water bodies Owner ship private /common No Size (ft) location No Size (ft) Location
1 Nil Nil Nil Nil Nil Nil
2 Nil Nil Nil Nil Nil Nil
P 1.09ab Availability and requirement of fish seed /fingerlings
Ward Existing families
Proposed families
Present quantity of fish
Requirement of fish seed
Breeds
1 Nil Nil Nil Nil Nil
2 Nil Nil Nil Nil Nil
P 1.091 Project Interventions
Introducing of fisheries among more families
Requirement of improved seed (fingerlings)
Training on fish culture
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-76]
Part 1.10
P1.10 DRINKING WATER
The panchayat area falls in the rain fed area. Water resources are very limited which has been taped fully by the local people for drinking and irrigation purposes. In earlier days there were water bodies (Bawaries) from which the people used to take water for drinking purpose. During the field visit and interaction with the local people and transect- walk of the water shed area source some of fact regarding drinking water come up.
* Dried up of the water bawaries due to the climate change. * Heavy pressure on the existing water bodies due to increase in population. * Less care of maintenance of water bodies, which is due to the habit of tap water
provided at door step provided by the IPH department, lifted from Giri River. * Less percolation for the existing Bawaries due to less range and drying up of Johar at
the watershed area * Presently people take the water through taps, which is provided in alternative days.
P1.101 Availability of water in the panchayat P 1.101a Availability of water before and project interventions
Sr. No
Particulars Capacity (lt)
Present After Project intervention
1 Total supply of water per day 146700 316900
2 Total House holds 526 526
3 Total population 2993 2993
4 Water Available per house hold per day 279 602
5 Per capita Availability 49 106
P 1.102 Status of Drinking water in different wards of Panchayat
P 1.102a Structure, water availability on daily and monthly basis Ward/Village Name of Structure Availability
of water /day from the source
No. of months water available during the year
Tap/ WST Handpump Well Bawaries
No Capacity No Capacity No Capacity No Capacity
Ghadhri 4 16000 1 1000 4 1200 9 13500 30500 6-8 months/year
Ghoond-I 2 8000 1 1000 - 0 7 8750 17750 12-12 months/year
Ghoond –II 1 4000 - 0 - 0 4 4450 8450 6 months
Palu 5 20000 1 1000 5 2000 10 12500 34500 6 months
Shaloha 2 8000 1 1000 15 6000 3 3000 12000 6 months
Charain 2 8000 0 0 1 1000 1 1500 10500 6 months
Tikkar 6 24000 1 1000 0 0 7 8000 33000 6 months
Total 22 88000 5 5000 25 10200 41 51700 146700
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-77]
P 1.102b Structure with number of beneficiaries and dimensions. Work Name of
the Ward Existing number
Proposed number
Location No. of Beneficiaries
Dimension (m)
Estimated Budget (Rs.)
Bawari Ghadhari 3 1(repair) Lohala All 20000
1 1(repair) Ghadhari All 20000
1 1(repair) Tir All 20000
1 Galana All 0
1 1(repair) Nagain All 20000
1 1(repair) Shakarani All 20000
1 Nera Nal All 0
Ghoond-I 3 2(repair) Kholla All 40000
1 1(repair) Bharot All 20000
1 Kufta –II All 0
1 1(repair) Raiyudari All 20000
1 1(repair) Chadail All 20000
Ghoond-II 4 4(repair) Thumu All 80000
Palu 2 1(repair) Palu All 20000
1 1(repair) Darewala All 20000
1 Upper Palu All 0
1 Khalalu All 0
1 1(repair) Konthali All 20000
2 1(repair) Namala All 20000
2 1(repair) Baigail All 20000
Shaloha 2 2(repair) Shaloha All 40000
1 1(repair) Kalthog All 20000
Charain 1 1(repair) Charain (Devta ki Bawari
All 20000
Tikkar 1 Tikkar All 0
1 1(repair) Jarash All 20000
1 Rachhan All 0
1 Pagoda All 0
1 Nohra All 0
1 Madog All 0
1 1(repair) Khagna All 20000
Total 25 500000
Tank Gadheri 1 Bramu Nala
All 3x3x2 57000
1 Jujar Nala All 3x3x2 57000
Ghoond-I 1 Lohala All 3x3x2 57000
1 kharaina All 3x3x2 57000
Ghoond-II 1 Ind All 3x3x2 57000
1 Lohala All 3x3x2 57000
Palu 1 Jhaltu Nala All 3x3x2 57000
Shaloha 1 Indtek Mandeper Nala
All 3x3x2 57000
Charain 1 Madawan All 3x3x2 57000
Total 9 513000
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-78]
Well Charain 1 1(repair) Kun 40000
Total 40000
Khurli (animal drinking)
Gadheri 4 4 (repair) Different places in village
All 20000 (5000 each)
Ghoond-I 4 4 (repair) Different places in village
All 20000 (5000 each)
Ghoond-II 7 7 (repair) Different places in village
All 35000 (5000 each)
Palu 4 4 (repair) Different places in village
All 20000 (5000 each)
Shaloha 5 5 (repair) Different places in village
25000 (5000 each)
1 (New) Shaloha 1x3x1 10000
Tikkar 6 6 (repair) Different places in village
30000 (5000 each)
1 (New) Madog 1x3x1 10000
1 Jarash 1x3x1 10000
1 Tikkar 1x3x1 10000
Charain 5 5 (repair) Different places in village
25000 (5000 each)
1 (New) Koon 1x3x1 10000
1 (new ) Darag 1x3x1 10000
Total 235000
P 1.103 Storage capacity and availability of water from existing structures
Sr. No.
Collecting structures
Storage capacity(lt)
Availability of water/ day from the source(lt)
No. of months water available during the year
1 Well 10200 2000 6 Months
2 WST/Tap 88000 88000 4-5 Months After the Interval of three days
3 Bawaries 51700 51700 6-7 Months
4 Hand pump 5000 5000 12 Months
5 Khurli 26250 17500
Total 181150 164200
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-79]
P 1.104 Proposed activities for increase in the water capacity/ availability through
renovation/new construction of structure P 1.104a Size, location, capacity of structures with beneficiaries
Structure Size (m) Location Capacity (lt) Benefited families
Old New Old New Old After intervention (lt)
Old New
Well
As per annexure
2000 10200 All All
WST/Tap 88000 250000 All All
Bawaries 51700 51700 All All
Hand pump
5000 5000 All All
Khurli 17500 44250
Total 164200 361150
P 1.105 Critical Gaps to be covered (item/activity)
Irregular supply of drinking water
Improper drainage of the catchment area to the ponds
P 1.106 Outcome
Source Present storage capacity(lt)
Proposed storage capacity(lt)
Total Families benefitted
Present Requirement/ day(lt)
Quantity after intervention (new + repair lt)
Well 2000 10200
526 49 106
WST/Tap 88000 250000
Bawaries 51700 51700
Hand pump
5000 5000
Khurli 17500 44250
Total 164200 361150
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-80]
Part 1.11
P1.11 SOIL CONSERVATION The watershed area comprises of hill steep slopes having mixed layers of soil, facing problems of major soil erosion during rainy season. During the field visit and interaction with the local people and farmers, it was observed that soil erosion is increasing at a faster rate, due to the following reasons:
Heavy and uncontrolled grazing
Deforestation in the watershed areas
Construction of roads and dumping of debris along Nala side
Cutting of bushes and hedges by local people for fuel and fodder purpose
Lake of physical and bio logical structures, which facilitate water conservation
Excessive use of cultivated land for Veg. purpose. P1.110 To check soil erosion, following interventions are recommendation
Construction of check dams from top to bottom to minimize the flow of water.
Construction of crate walls to sloppy land sliding area.
Construction of Contour and trenches to check soil erosion.
Proper bunding on the cultivated lands by planting grasses
Biological/vegetative engineering measures along the slope land
P 1.111 Various structure are required to be constructed at different location for checking soil erosion
P 1.111a Structure with number of beneficiaries
Activity Ward Name Location Proposed (No)
Families Benefited
Size(m) Estimated Budget(Rs.)
Dry Check Dam
Gadhari Kufta nala 10 All 4x2x1 36000
Lohala Nala 15 All 4x2x1 54000
Kahar Nala 10 All 4x2x1 36000
Gadhari Nala 15 All 4x2x1 54000
Jubber Nala 15 All 4x2x1 54000
Ghoond-I Jarewal Nala 5 All 4x2x1 18000
Baroth 5 All 4x2x1 18000
Riundri 2 All 4x2x1 7200
Kufta-II 5 All 4x2x1 18000
Kharain Nala 4 All 4x2x1 14400
Ghoond-II Narainty Nala 10 All 4x2x1 36000
Jhal Nala 15 All 4x2x1 54000
Palu Roani Nala 10 All 4x2x1 36000
Palu Nala 5 All 4x2x1 18000
Dereware Nala 10 All 4x2x1 36000
Sholoha Padeper Nala 10 All 4x2x1 36000
Sholoha nala 8 All 4x2x1 28800
Panalalti nala 8 All 4x2x1 28800
Kayar Nala 12 All 4x2x1 43200
Charain Charain Nala 3 All 4x2x1 10800
Darag Nala 5 All 4x2x1 18000
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-81]
Tikkar Khilna Nala 5 All 4x2x1 18000
Dhar Nala 4 All 4x2x1 14400
Jarash Nala 4 All 4x2x1 14400
Madog Nala 4 All 4x2x1 14400
Gashi Nala 4 All 4x2x1 14400
Total 203 730800
Crate Wall Ghoond-II Narainty 4 All 4x2x1 22000
Soil conservation work includes formation of crate walls and gully plugging, drainage and contour trenching. In this panchayat total 203 Dry check dams and 4 crate walls will be constructed which will benefit all families of the area. Vegetative Measure: Various types of trees (Robinia,kenth), Shrubs (|Berbris, Ruses) and grasses (Chrysopogon falues, Cynodon dactylon, Napier etc.) can be grown in the areas prone to soil erosion. Fodder grasses like Napier grass can be used on farm bunds. For demonstration in each panchayat about 10,000 cuttings could be planted/ distributed to farmers.
Outcome
To minimize the impact of rainfall
To reduce soil erosion
To improve moisture conditions of the area
To improve soil properties, etc.
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-82]
Part 1.12
P1.12 CONVERGENCE
The linkage of the IWMP-V, Ghoond with the other development programme is also one of the important components. The possibilities of identifying different activities under the IWMP and their association with other activities of different line departments can be assured through convergence. This is the best tool to derive support from different line departments.
The following activities can be converged from one head to another:
Developmental activities like roads and irrigation facilities can be converged with PMGSY, PWD, IPH and MNREGA programmes
Employment Generation with MNREGA programme run by Rural Development Department
To improve productivity, distribution of improved seeds, fertilizers, insecticides and pesticides can be converged with State Agriculture Department under Pandit Dindayal Krishi Yojna
Construction of poly houses and vegetable Collection Centres at watershed level can be constructed under the Horticulture Technology Mission run by Department of Horticulture
Income generating activities and micro-enterprises with rural employment programme, Prime Minster Employment Generation Programme. Self –Employment Schemes etc.
Diary development and sheep-goats rearing for the resource less people under Dudh Ganga Pariyojana run by the Animal Husbandry Department
Table: Activity/ work to be taken other programme/scheme Sr.No. Activity
/work Programme /scheme for convergence
Agency/ Deptt
Budget contribution
Watershed convergence Beneficiaries Total
1 Dry check Dam
MNREGA RD 605890 124910 - 730800
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-83]
Part 1.13
P1.13 MICRO ENTERPRISES
Income generating activity reported in the watershed areas are carpentry, masonry, shoe making and weavers, diary, poultry, sheep and goats rearing, pattal and basket making etc,. These income generating activities can transform the rural poor, if they have given more opportunities in the form of trainings, equipments and machine etc., cutting and tailoring, achar making, jam, jelly, candy and juices making can be other options for rural women to improve their socio-economic conditions.
The skills of local artisans can be improved by providing more opportunities at their door steps. Keeping in view the above mentioned facts, the following activities will be taken up under watershed programme for farmers.
P1.131 Income enhancement and employment generation through different income generating activities
P1.131a Number of households with activities and income
Sr. No
Activity Existing No. of household
Proposed No of household
Present income/ mandays (Rs/day)
After intervention income/ mandays
1 Carpentry 17 25 204000/1020 450000/2250
2 Weaver 02 02 9000/60 18000/120
3 Basket making 05 07 22500/150 63000/420
4 Masonry 05 05 60000/300 90000/450
5 Vermin - 36 - 216000/7560
6 Dairy farming 03 03 75600/630 90720/630
7 Bee keeping - 10 - 60000/Seasonal work
8 Shoe maker 02 02 3000/60 6000/90
9 Sheep/Goat 02 03 Seasonal work 4000/Routine work
9 Seed village concept
- 5 - Introducing the concept
10 Horti. nursery - 2 - Introducing the concept
The above mention activities are considered for the farmer/rural artisan land holding less than 3 bighas which will be verified during the implementation by the PIA.
Note: Target for 3rd
and 4th
year
P 1.132 Activity Wise Projects 1. Carpentry
e. Purpose : Livelihood/ Enhancement of income f. Category : SC/ IRDP g. No. of families involved : 25 h. Project intervention
iii. Training iv. Tools and equipments
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-84]
Outcomes of Projects
Present income/mandays
After intervention income
Requirement for intervention Approximate cost
204000/1020 450000/2250 Machine plainer and training. 250000
2. Weaver
a. Purpose : Livelihood/Enhancement of income b. Category : SC/IRDP c. No. of families involved : 2 d. Project Intervention
i. Training ii. Khaddi
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
9000/60 18000/120 Khaddi 20000
3. Basket Making
a. Purpose : Livelihood/Enhancement of income b. Category : SC/IRDP c. No. of families involved : 7 d. Project Intervention
i. Training ii. Tools /equipment
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
22500/150 63000/420 Training and tools 70000
4. Masonry
a. Purpose : Livelihood/Enhancement of income b. Category : NSC c. No. of families involved : 5 d. Project Intervention
i. Training ii. Tools /equipment
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
60000/300 90000/450 Training and tools 50000
5. Vermin Compost
a. Purpose : Livelihood/Enhancement of income b. Category : SC/IRDP c. No. of families involved : 36 d. Project Intervention
i. Training
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-85]
ii. Pits & worms Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
- 145800/7560 Pits & worms 252000
6. Dairy Farm
e. Purpose : Livelihood/Enhancement of income f. Category : NSC g. No. of families involved : 3 h. Project Intervention
iii. Training iv. Tools /equipment
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
75600/630 90720/630 Cows 60000
7. Bee keeping e. Purpose : Livelihood/Enhancement of income f. Category : SC g. No. of families involved : 10 h. Project Intervention
iii. Training iv. Bee hives
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
- 60000/Seasonal work Bee hives 60000
8. Sheep /Goat e. Purpose : Livelihood/Enhancement of income f. Category : SC g. No. of families involved : 3 h. Project Intervention
iii. Training iv. Improved pair of goats
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
Seasonal work Seasonal work Improved pair of goats 15000
9. Seed village concept a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 5 d. Project Intervention
i. Training ii. Seedlings
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-86]
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
- New concept Seedling 625000
10. Horticulture Nursery
a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 2 d. Project Intervention
i. Training ii. Seed and technology
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
- New concept Seed and technology 300000
Before introducing the Seed village concept and Nursery at ward level PIA will be authorized to decide the location and beneficiaries.
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-87]
Part 1.14
P1.14 LIVELIHOOD CONCERNS The land resource is the primary and major source of livelihood activities in the watershed area. These natural resources can be used properly by adopting integrated farming system to get more return per unit space per unit time. Area is suitable for the cultivation of apple, pear, pomegranate and walnut. These fruits plants can be integrated with agriculture and animal‟s husbandry to increase the productivity of land. The shortage of fodder leads farmers to rear only local breeds of animals that are too for self consumption of milk and farm yard manure. This shortage of fodder can be overcome by introducing multipurpose tree species. Other option of livelihood is the revival of rural artisans and for this best options with the rural artisans are carpenter, masonry, weaving, crafting and shoe making. The rural poor can earn good amount of money from these professions. These are some of important income generating activities need to be introduced in the watershed area. There is a dire need to aware, motivate and trained the local poor artisans. These artisans should be provided with equipments to earn their livelihood and to improve their socio economic conditions. P1.141 Existing nature of livelihood in the watershed
Sr. No.
Category wise Total No. of household
Livelihood linked in the project
1 General 399 Agriculture +horticulture +animal husbandry + micro enterprises
2 SC 125 Agriculture
3 ST and OBC 2 Agriculture
4 BPL 118 Agriculture and labourers
P1.142 AGRICULTURE
Sr. No.
Particulars Before project
After project intervention
1 No. of days/year food grain sufficiently at home per family
4 months 6 months
2 Average production from agriculture 5 qt/family 6 Q
3 Income from agriculture Self consumption
Self consumption
4 No. of families who want to increase areas (all crops in agriculture combined)
195 65
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-88]
P1.143 HORTICULTURE
P1.143a Fruits production
Sr. No.
Particulars Before project
After project intervention
1 No. of households with orchards 480 526
2 Area per household under horticulture (fruit trees)
4 bigha 6 bigha
3 Total production 1980 q 4200 q
P1.143b Vegetable Productions
Sr. No.
Particulars Before project
After project intervention
1 No. of households having commercial vegetable production
390 480
2 Average area per household under vegetable
2 bighas per household
3 bighas per household
3 Total production 2875 Q 3780 Q
P1.143c Handling and Processing
Crops Particulars Before project
After project Intervention
Fruits Number of persons involved with no of day per year
1 persons 2 persons/3months/year
Vegetable Number of persons involved with No of day per year
2 persons 2 persons/3months/year
P1.143d Marketing
Sr. No.
Particulars Before project
After project Intervention
1 Number of persons involved with no of day per year
1 1
P1.144 ANIMAL HUSBANDRY P1.144a Production: (Milk/Egg/Meat/Wool/Fodder)
Product Particulars Before project
After project Intervention
Milk No of families involved 526 526
Quantity of milk produced 3494.5 5326.0
No of milch cattle 865 865
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-89]
P1.144b Milk
Sr. No.
Particulars Products Before project
After project Intervention
Curd ,Cheese, Ghee Self use Self use
1 Number of families involved 526 Self use Self use
2 Total No of days per year 240 Self use Self use
P1.145 MICRO ENTERPRISES P1.145a Activity Wise
Activity Particulars Before project
After project Intervention
Carpentry No of households 17 25
No of mandays/year/household 60 90
Income per household 12000 18000
Weaver No of households 2 2
No of mandays/year/household 45 60
Income per household 9000 12000
Basket making No of households 5 7
No of mandays/year/household 80 120
Income per household 6000 9000
Masonry No of households 5 5
No of mandays/year/household 270 360
Income per household 18000 24000
Vermin Compost No of households - 36
No of mandays/year/household - 60
Income per household - 6000
Dairy No of households 3 3
No of mandays/year/household 210 210
Income per household 25200 25200
Bee keeping No of households - 10
No of mandays/year/household - Seasonal work
Income per household 6000
Cobbler No of households 2 2
No of mandays/year/household 90 150
Income per household 4500 10000
Goatry/sheep No of households 2 3
No of mandays/year/household Self use Routine work
Income per household - 1500
Seed village concept No of households 5
No of mandays/year/household -
Income per household New concept
Horti. nursery No of households 2
No of mandays/year/household -
Income per household New concept
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-90]
Part 1.15
P 1.15 CAPACITY BUILDING
To implement watershed activities more effectively skill development and capacity building at Panchayat level is very important. The activities proposed are given below:
P1.151 Modules
P1.151a Awareness Camps
Will be organized at Panchayat level
P1.151b Training: Training will be organized at
Block level
DRDA level
Institutional level
P1.151c Exposure Visits: Exposure visits will be conducted at University/ Institutions /Field
P1.151d Special Trainings will be organized in the professional institutes
P1.152 Activities with number of participants
P1.152a Target groups and location of programme Target group No. of
participants Activity Location
Member of Gram Shabha
All Awareness camps Panchayat level
PRI, VLI Members 10 Watershed Implementation and management Block level
Self Help Groups, User Groups and Beneficiary groups
3 to 5/panchayat
Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.
Block level (One trainings for such activities)
Self Help Groups, User Groups and Beneficiary groups
1 to 2/ ward/ panchayat
Exposure visits (university/professional institute/field visits)
State/Outside State
Self Help Groups, User Groups and Beneficiary groups
1 to 2 / ward/ panchayat
Kissan Melas/ Pradashanis State/Outside State
Self Help Groups, User Groups and Beneficiary groups
2 to 3/ activity/ panchayat
Specialized trainings (Mushroom production, floriculture, fruit crops, nursery raising techniques, dairy development, poultry farming, goat breeding, cereals crops, agriculture and insect-pest management etc.
Professional Institutes / University
PIAs, WDTs members
10 Project implementation and management trainings, report writing and accounts maintenance
DRDA level
The capacity building of farmers and youth in the watershed areas can also be done under
the micro enterprises and livelihood through Industrial Training Institute (ITI) occupation\trades as well as other entrepreneurs programmes which provide self-employment or wage employment within the watershed areas.
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-91]
Part 1.16
P 1.16 ACTIVITY AND BUDGET
P 1.161 Agriculture (For 2 years)
Activity /item Variety Quantity (kg)
Cost for 3rd year
Cost for 4th year Improved Seeds
Maize Kanchan/Pioneer 33 660 660
Wheat Madurai and S-308 67.5 16875 16875
Barley Dolma 42 1050 1050
Pulses (urad) Improved(T-9) 10 900 900
Rajmash Local 60 4500 4500
Total 212.5 23985 23985
P 1.162 Vermi Composting
Activity /item No. Rate (Rs/unit) Dimensions (m) Total Cost (Rs)
Vermi composting units one in each village
22 7000 3x1.85x0.45 154000
Note : As per agriculture department norms
P 1.163 Horticulture (For 2 years)
Activity /Item
Variety No. of Plants required
Rate (Rs/plant)
Cost for 3rd year
Cost for 4th year
Apple Red royal, Golden
10520 25 263000 263000
Pear Red bartlet 7890 12 94680 94680
Total 18410 357680 357680
P 1.164 Vegetable (For 2 years)
Activity /Item Variety Quantity (kg) Cost for 3rd year
Cost for 4th year
Cabbage Vigro 0.450 9000 9000
Beans Falguni 54.0 25920 25920
Peas Hybrid, P-1, Linken & Azad
88.0 7920 7920
Cauliflower Shweta 0.125 5000 5000
Potato Kufri jyoti 1050.0 126000 126000
Capsicum Bharat 0.165 9075 9075
Tomato Himsona 0.104 2600 2600
Total 185515 185515
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-92]
P 1.165 Vegetable collection Centers
Activity /item No. Rate (Rs/centre) Dimensions (m) Total Cost (Rs)
Vegetable collection centre
5 260000 6x5 1300000
Total 5 1300000
Note : As per agriculture department norms P 1.166 Poly house unit and MIS
Activity /item No. Rate (Rs/centre) Dimensions (m) Total Cost (Rs)
Poly house unit &MIS 6 125000 100 m2 750000
Total 6 750000
P 1.167 Animal Husbandry
Activity /Item
Breed Area Rate (Rs)
Total cost (Rs)
Project share
Beneficiaries share
Convergence
Fodder 12 20000 240000 240000 - -
Grasses Napeir, Steria and Barseem
14 4200 kg
58800 58800 - -
Total 298800 298800 - -
P 1.168 Soli Conservation
Activity /item No. Rate Dimensions (m) Total Cost (Rs)
Dry Check Dam 203 3600 4x2x1 730800
Crate wall 4 5500 4x2x1 22000
Total 207 752800
P 1.169 Micro Enterprises
Activity /Item Total No. of families Requirement Cost (Rs)
Carpentry 25 Tools and training. 250000
Weaver 02 Training and tools 20000
Basket making 07 Training and tools 70000
Masonry 05 Training and tools 50000
Vermin 36 Pits and verms 252000
Dairy farming 03 Cows 60000
Bee keeping 10 Bee hives 60000
Cobbler 02 Training and tools 20000
Goatry 03 Pair of improved breeds 15000
Seed village concept 5 New Concept 625000
Hotri. Nursery 2 Installation of infrastructure
300000
Total 1722000
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-93]
Action Plan for IWMP-V Theog Name of the State:- Himachal Pradesh Name of the District:- Shimla Name of Block:- Theog Name of Panchayat:- Ghoond Total Area in Hectare: - 1509 hectare Total Sanctioned Amount:- Rs.2,26,35,000 Total Village- 9
Sr. No.
Work Component
Total Proposed Work including Convergence
Fund s Allocated
1st year Plan 2
nd year Plan 3
rd year Plan 4
th year 5
th year
IWMP IWMP IWMP IWMP IWMP
Physical
Financial Physical Financial Physical Financial Physical Financial Physical Financial
A) General
1 Administrative cost
2263500 - 452700 - 452700 - 452700 - 452700 - 452700
2 Monitoring 226350 - - - 75450 - 75450 - 75450 - -
3 Evaluation 226350 - - - 528150 - 75450 - 75450 - 75450
Total 2716200 - 452700 - 1056300 - 603600 - 603600 - 528150
B Institution & capacity building
a Awareness 7 105000 - 105000 - - - - - - - -
b Block level 7 140000 - 140000 - - - - - - - -
c District level 5 250000 - 250000 - - - - - - - -
d Institutional training
4 420000 - - - 420000 - - - - - -
e Exposure visit 2-3 150000 - - - 150000 - - - - - -
f Expert visits/services and Misc.
66750 - - - - - 66750 - - - -
Total 1131750 - 495000 - 570000 - 66750 - - - -
C Detailed Project Report (DPR)
226350 - - - - - - - - - 226350
Total 226350 - - - - - - - - - 226350 D ) Consolidation
phase 1131750 1131750
Total-D 1131750 1131750
E) Entry point activities
a Vegetable collection centre
4 905400 80 905400 - - - - - - - -
Total 4 905400 80 905400 - - - - - - - -
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-94]
Sr. No.
Work Component Total Proposed Work including Convergence
Fund s Allocated
3rd
year Plan 4th
year Plan
IWMP Convergence IWMP Convergence
Physical Financial Physical Financial Physical Financial Physical Financial
C ) Watershed Development Phase
1 Watershed Development Works
a Kachha talab 31 units 1405500 125 1405500 - - - - - -
b Roof water 5 units 461000 41 461000 - - - - - -
c Tank 74 units 7052000 627 7052000 - - - - - -
d Dam 1 units 330000 29 330000 - - - - - -
Total 111 units 9248500 822 9248500 - - - - - -
2 Agriculture
a Provision for crop seed 47970 2 23895 - - 2 23895 - -
b Vermicompost 22 Units 154000 7 77000 - - 7 77000 - -
Total 22 Units 201970 9 100895 - - 9 100895 - -
3 Horticulture
a c) Apple 21040 Plants 526000 24 263000 - - 24 263000 - -
b d) Pear 15780 Plants 189360 16 94680 - - 16 94680 - -
c Vegetable seed 371030 16 185515 - - 16 185515 - -
d Vegetable collection center
5 1300000 69 780000 - - 46 520000 - -
e Poly house & MIS 6 750000 33 375000 - - 33 375000 - -
Total 3136390 158 1698195 - - 135 1438195 - -
4 Animal Husbandry
a Fodder 13200 240000 - - - - 12 240000 - -
b Grasses 490 kg 58800 - - - - 14 58800 - -
Total 298800 - - - - 26 298800 - -
5 Soil Conservation
a Dry Check Dam 203 Units 730800 54 605890 - 124910 - - - -
b Crate Wall 4 Units 22000 2 22000 - - - - - -
Total 207 Units 752800 56 627890 - 124910 - - - -
6 Drinking water
a Bawari 25 Nos. 500000 44 500000 - - - - - -
b Tank 9 Nos. 513000 46 513000 - - - - - -
c Well 1 Nos. 40000 0 40000 - - - - - -
d Khurli 41 Nos. 235000 20 235000 - - - - - -
Total 76 Nos. 1288000 110 1288000 - - - - - -
7 Livelihood activities for the asset less persons
a Carpentry 25 Nos. 250000 - 250000 - - - - - -
b Weaver 2 Nos. 20000 - 20000 - - - - - -
c Masonry 5 Nos. 50000 - 50000 - - - - - -
d Cobbler 2 Nos. 20000 - - - - - 20000 - -
e Basket Making 7 Nos. 70000 - - - - - 70000 - -
Total 41 Nos. 410000 - 320000 - - - 90000 - -
7 Production system & micro enterprises
a Vermi Compost 36 Nos. 252000 23 252000 - - - - - -
b Dairy 3 Nos. 60000 - - - - - 60000 - -
c Goatry 3 Nos. 15000 - - - - - 15000 - -
d Horti. Nursery 2 Nos. 300000 13 150000 - - 13 150000 - -
e Bee keeping 10 Nos. 60000 - - - - - 60000 - -
f Seed village concept 5 Nos. 625000 11 125000 - - 44 500000 - -
Total 69 Nos. 1312000 47 527000 - - 57 785000 - -
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-95]
SUMMARY
Located at an altitude of 7410 feet above mean sea level Gram Panchayat Ghoond comprises the total area of 1509 hac. The total amount sanctioned for watershed development works, production systems, micro- enterprises, livelihood activities including preparation of DPR and other phases is 226.35 lacs. Data regarding socio-economic profile, land use pattern, livestock position and cropping pattern, etc was collected from panchayat secretaries, patwaries and through household surveys and PRA exercises. Total population of the panchayat is 2993 out of which 399 families are general 2 families are schedule tribe/OBC and are 125 families are of scheduled caste. In total 111 new water harvesting structures will be constructed including convergence existing structures in which repair work will be done. Construction and repair of these structures will enhance the storage capacity to 7534 m3 with total cost of Rs 92,48,500 which will irrigate 39.67 hac area of the panchayat.
The main agricultural crops grown in the panchayat are maize and pulses with total area of 275 bigha. In total 2125 Kg seeds of agricultural crops will be provided in the panchayat which will cost Rs 201970 and 22 Vermicompost units will be developed as demonstration unit in the panchayat which will cost Rs 1,54,000 In agriculture there will be skill development and capacity building of about 25-30 farmers from the panchayat.
Horticulture is the major source of income to the farmers. The farmers are growing apple and vegetable crops in the watershed area. The total 18410 Plants of apple and pear will be distributed to the farmers costing Rs 715360. Improved varieties seeds of different vegetable crops will be distributed to the farmers which will be cost Rs 371,030. The technique of low volume high value crops will be demonstration by installing Polly houses (MIS) and seed village concept for the BPL and SHGs. The total 6 pollyhouse and 5 seed village concept will be demonstrated the Rs. 7,50,000 and 6,25,000 respectively has been earmarked for the purpose.
Total number of animals in the panchayat is 1972 for which fodder trees and grasses will be provided in each ward. In total 13200 plants of fodder and 490 Kg of grass seeds will be provided in the ward, which will cost Rs 2, 40,000 and Rs 58,800 respectively. Drinking water is a pre requisite for the well- being of the area.76 new drinking water structures like bawaries and wells will be constructed in different locations of the panchayat. Construction of new structures and repair of old structures will enhance the storage capacity to 361150 lt with cost estimate of Rs 12,88,000. Per capita availability of drinking water will increase from 49 liter to 106 liter after project.
Soil conservation is the main objective of watershed programme. So to check soil erosion construction of crate wall will be done. Only River Banks will be constructed to prevent soil erosion, which will cost a total of Rs 752800 The overall objective of watershed development programme is poverty elevation by investing in micro- enterprises and enhancing rural livelihoods. Income generating activities reported in the panchayat are rural artisans making, Goatry, carpentry, weaver,masonary, cobbler and dairy farming. A total of Rs 10,97,000 will be given to the beneficiaries of these groups with necessary trainings and tools.
Amount spent on different activities like entry point activities (905400), water harvesting structures (9248500), agriculture development (2,01,970), horticulture development (31,36,390), animal husbandry (2,98,800), drinking water (Rs12,88,000), soil conservation (Rs 7,52,800), micro- enterprises and livelihood (Rs 10,97,000) and capacity building (Rs 11,31,750) .
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-96]
Annexure –I Water harvesting Structure of Gram Panchayat Ghoond Target for 3rd year Existing and Proposed water harvesting structures in Ghoond Panchayats of IWMP V Theog are presented as under Activity
Ward Name
Proposed No.
Location GIS coordinates Benefitied Families
Size Estimated Cost (Rs.) Latitude Longitude Altitude
Kachha talab Godhari 1 Baghar 31005.836 77
025.513 7474 All 10x8x2 62500
1 Lohala –I 31004.689 77
026.840 7631 All 10x8x2 62500
1 Tir 31004.900 77
025.600 7490 All 8x8x2 39200
1 Lohala-II 31004.667 77
026.803 7624 All 8x6x2 36700
1 Magholi 31004.677 77
026.790 7710 All 5x4x2 22500
1 Bharot 31004.710 77
026.820 7690 All 8x6x2 36700
Ghoond-I 1 Randri 31004.615 77
025.854 7456 All 8x8x2 39200
1 Jarawal 31004.590 77
025.875 7435 All 10x8x2 62500
1 Panthaghati Kufta 31004.520 77
025.137 6890 All 10x8x2 62500
Ghoond-II 1 Kharari 31004.520 77
025.845 7297 All 8x8x2 39200
1 Naranti 31004.672 77
025.740 7299 All 8x8x2 39200
1 Kufta 31004.620 77
025.830 7440 All 8x8x2 39200
1 Ghoond 31004.640 77
025.810 7410 All 5x4x2 22500
Palu 1 Darewara 31004.010 77
025.745 6485 All 5x4x2 22500
1 Bagail 31004.995 77
025.740 6490 All 5x4x2 22500
1 Palu 31005.090 77
025.775 6521 All 8x8x2 39200
1 Namana 31004.990 77
025.725 6498 All 8x6x2 36700
Shaloha 1 Bagra 31005.180 77
025.140 5880 All 10x8x2 62500
1 Majheth 31005.226 77
025.135 6041 All 10x8x2 62500
1 Khaloth 31005.220 77
025.130 6320 All 10x8x2 62500
1 Shakreth 31005.111 77
025.097 6292 All 10x8x2 62500
Charain 1 Bagin 31004.405 77
025.630 7152 All 10x8x2 62500
1 Natu ka Nala 31004.435 77
025.680 7188 All 8x6x2 36700
Tikkar 1 Rachhain 31004.510 77
025.790 7320 All 10x8x2 62500
1 Tikkar Juber 31004.500 77
025.780 7310 All 10x8x2 62500
1 Jarash 31004.485 77
025.790 7225 All 8x6x2 36700
1 Tilu 31004.547 77
024.966 6943 All 10x8x2 62500
1 Pagara 31005.150 77
024.640 6626 All 8x6x2 36700
1 Madog 31005.350 77
025.720 6893 All 8x6x2 36700
1 Ghasigoan 31004.395 77
025.830 6984 All 8x6x2 36700
1 Khayna 31004.540 77
025.690 6780 All 8x6x2 36700
Total 31 31004.667 77
026.803 7624 1405500
Roof Water Gadhari 1 Lohala 31005. 836 77
025.513 7493 3 3x3x2 92000
1 Gadhari 31004. 672 77
025.845 7297 8 3x3x2 92000
Palu 2 Jhaltu 31005. 090 77
025.775 6521 4 3x3x2 184000
Shaloha 1 Kair Shaloha 31005.356 77
025.035 6041 4 3x3x2 92000
Total 5 31004.730 77
026.800 7580 461000
Tank Gadhari 1 Bharot-I 31004.689 77
026.840 7631 6 5x4x2 82000
1 Bharot-II 31004.510 77
026.720 7580 5 5x4x2 82000
1 Lohala 31005.836 77
025.513 7685 6 5x4x2 82000
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-97]
1 Kufta 31005.730 77
025.820 7680 7 5x4x2 82000
1 Nagar 31005.680 77
025.730 7590 9 5x4x2 82000
1 Jubber 31005.780 77
025.430 7430 5 5x4x2 82000
1 Galan 31005.836 77
025.513 7493 10 5x4x2 164000
1 Chalawanti 31004.450 77
025.570 7590 7 5x4x2 82000
1 Ghadhari 31004.580 77
025.789 7430 8 5x4x2 82000
1 Chalan Nala(Near Kharyan)
31004.490 77
025.630 7390 5 5x4x2 82000
Ghoond-I 1 Chadail 31004.480 77
025.570 7410 10 5x4x2 164000
1 Khadla 31004.520 77
025.137 6990 8 5x4x2 82000
1 Shillaghat 31004.540 77
025.180 1010 9 5x4x2 82000
1 Kufta-I 31004.530 77
025.140 6980 7 5x4x2 82000
1 Kufta-II 31004.580 77
025.160 7120 8 5x4x2 82000
1 Baloth 31004.520 77
025.174 7010 5 5x4x2 82000
1 Pargail 31004.615 77
025.854 7456 5 5x4x2 82000
1 Baroth-II 31004.672 77
025.845 7297 8 5x4x2 82000
Ghoond –II 1 Ghoond-I 31004.680 77
025.820 7230 7 5x4x2 82000
1 Ghoond-II 31004.630 77
025.790 7190 13 5x4x2 164000
1 Thumu 31004.616 77
026.479 7550 8 5x4x2 82000
1 Ghoond-III 31004.625 77
026.482 7580 6 5x4x2 82000
1 Narainty-I 31004.640 77
026.490 7596 7 5x4x2 82000
1 Narainty-II 31005.140 77
025.760 6534 9 5x4x2 82000
1 Kufta (Narainty ) 31005.110 77
025.765 6530 9 5x4x2 82000
Palu 1 Jhatlu 31005.125 77
025.760 6535 6 5x4x2 82000
1 Palu upper 31005.040 77
025.770 6505 3 5x4x2 82000
1 Thanadhar 31005.115 77
025.773 6518 3 5x4x2 82000
1 Polu lower 31005.090 77
025.775 6521 5 5x4x2 82000
1 Derewara 31005.105 77
025.770 6526 8 5x4x2 82000
1 Palu 31005.110 77
025.770 6210 9 5x4x2 82000
1 Mandal 31005.095 77
025.702 6123 6 5x4x2 82000
1 Nayabag 31005.185 77
025.745 6505 3 5x4x2 82000
1 Kanthri 31005.190 77
025.740 6510 8 5x4x2 82000
1 Lower Bagail 31005.990 77
025.715 6490 7 5x4x2 82000
1 Upper Bagail 31005.100 77
025.691 6362 8 5x4x2 82000
1 Namana 31005.125 77
025.664 6425 14 5x4x2 164000
1 Gohan 31005. 030 77
025.452 6269 5 5x4x2 82000
1 Matahvan 31005. 055 77
024.986 6360 3 5x4x2 82000
Shaloha 1 Bhamphi 31005. 125 77
024.960 6320 8 5x4x2 82000
1 Painalati 31005.190 77
025.150 5910 11 5x4x2 82000
1 Rachah/Shaloh 31005.356 77
025.035 5580 12 5x4x2 164000
1 Kayar 31005.111 77
025.097 6292 10 5x4x2 82000
1 Shaloha(Majhoth) 31005.220 77
025.130 6320 16 (1-lac) 5x4x2 164000
1 Shakroha 31005.220 77
025.135 6350 12 5x4x2 164000
1 Khaloth 31005.250 77
025.110 6340 13 5x4x2 164000
1 Dhunkhar-I 31005.002 77
024.790 6462 5 5x4x2 82000
1 Dhunkhar-II 31005.226 77
025.135 5890 6 5x4x2 82000
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-98]
1 Kathlog 31005.220 77
025.110 6340 15 5x4x2 164000
1 Shaloha (IPH Tank repair)
31005.440 77
025.625 7172 1 5x4x2 82000
1 Dhunkar (repair) 31005.430 77
025.685 7190 1 5x4x2 82000
Charain 1 Charain-I 31005.510 77
025.590 7210 6 5x4x2 82000
1 Karau 31005.425 77
025.610 7135 6 5x4x2 82000
1 Kun 31005.390 77
025.590 7175 8 5x4x2 82000
1 Darog 31005.398 77
025.620 7210 7 5x4x2 82000
1 Jaroth 31005.432 77
025.617 7218 9 5x4x2 82000
1 Kundharata 31005.438 77
025.625 7224 9 5x4x2 82000
1 Charain (SC) 31005.441 77
025.632 7241 10 5x4x2 164000
1 Kaunti 31005.410 77
025.610 7140 7 5x4x2 82000
1 Charain Kanchi 31004.510 77
025.792 7328 5 5x4x2 82000
1 Upper-I Chaila 31004.535 77
025.792 7326 6 5x4x2 82000
Tikkar 1 Tikkar-I 31004.510 77
025.790 7320 10 5x4x2 82000
1 Tikkar-II 31004.547 77
024.966 6943 12 5x4x2 164000
1 Rachain 31004.548 77
024.986 6984 6 5x4x2 82000
1 Tillu 31004.580 77
024.876 6991 5 5x4x2 82000
1 Nahi 31004.530 77
024.780 6962 11 5x4x2 82000
1 Kamolta 31004.550 77
024.910 6987 7 5x4x2 82000
1 Pani Nala 31004.510 77
024.785 7235 10 5x4x2 164000
1 Janahar Pagara 31004.535 77
024.769 7210 7 5x4x2 82000
1 Ghassi gaun 31004.540 77
025.690 7197 7 5x4x2 82000
1 Madog 31004.546 77
025.698 7210 8 5x4x2 82000
1 Ghassigaun-II 31004.552 77
025.720 7352 5 5x4x2 82000
1 Khagna 31004.626 77
025.737 7225 6 5x4x2 82000
1 Tikkar-III (SC) 31004.640 77
025.756 7210 6 5x4x2 82000
Total 74 7052000
Dam 1 Narainty Nallah (Dhalli Jubbar)
31004.720 77
025.890 7085 All 10x3 mtr 330000
Total 330000
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-99]
Annexure -II Drinking water Gram panchayat Ghoond
Activity
Ward Name Existing No.
Proposed No.
Location GIS coordinates Benefitied Families
Size (mt)
Estimated Cost (Rs.) Latitude Longitude Altitude
Bawari Ghadhari 3 1(repair) Lohala 31004.689 77
026.840 7631 All 20000
1 1(repair) Ghadhari 31005.836 77
026.513 7474 All 20000
1 1(repair) Tir 31004.720 77
026.894 7692 All 20000
1 Galana 31004.724 77
026.895 7696 All 0
1 1(repair) Nagain 31004.672 77
026.835 7280 All 20000
1 1(repair) Shakarani 31004.710 77
026.810 7690 All 20000
1 Nera Nal 31004.510 77
026.720 7580 All 0
Ghoond-I 3 2(repair) Kholla 31004.690 77
026.820 7659 All 40000
1 1(repair) Bharot 31004.715 77
026.795 7696 All 20000
1 Kufta –II 31004.680 77
026.820 7230 All 0
1 1(repair) Raiyudari 31005.090 77
025.775 6521 All 20000
1 1(repair) Chadail 31005.110 77
025.764 6534 All 20000
Ghoond-II 4 4(repair) Thumu 31005.106 77
025.783 6494 All 80000
Palu 2 1(repair) Palu 31005.112 77
025.789 6525 All 20000
1 1(repair) Darewala 31005.116 77
025.815 6528 All 20000
1 Upper Palu 31005.100 77
025.691 6362 All 0
1 Khalalu 31005.119 77
025.694 6410 All 0
1 1(repair) Konthali 31005.356 77
025.035 5580 All 20000
2 1(repair) Namala 31005.220 77
025.130 6320 All 20000
2 1(repair) Baigail 31004.405 77
025.630 7152 All 20000
Shaloha 2 2(repair) Shaloha 31004.510 77
025.790 7320 All 40000
1 1(repair) Kalthog 31004.090 77
025.775 6521 All 20000
Charain 1 1(repair) Charain (Devta ki Bawari
31004.404 77
025.632 7154 All 20000
Tikkar 1 Tikkar 31004.501 77
025.780 7382 All 0
1 1(repair) Jarash 31004.527 77
025.720 7301 All 20000
1 Rachhan 31004.580 77
025.730 7302 All 0
1 Pagoda 31004.550 77
025.759 7317 All 0
1 Nohra 31004.576 77
025.765 7407 All 0
1 Madog 31004.570 77
025.782 7402 All 0
1 1(repair) Khagna All 20000
Total 25 31004.720 77
026.830 7635 500000
Tank Gadheri 1 Bramu Nala 31004.701 77
026.805 7615 All 3x3x2 57000
1 Jujar Nala 31004.650 77
026.801 7655 All 3x3x2 57000
Ghoond-I 1 Lohala 31004.657 77
026.810 7659 All 3x3x2 57000
1 kharaina 31004.107 77
025.780 6755 All 3x3x2 57000
Ghoond-II 1 Ind 31004.118 77
025.795 6760 All 3x3x2 57000
1 Lohala 31004.121 77
025.777 6710 All 3x3x2 57000
Palu 1 Jhaltu Nala 31004.090 77
025.779 6521 All 3x3x2 57000
Shaloha 1 Indtek Mandeper Nala 31004.404 77
025.630 7155 All 3x3x2 57000
Charain 1 Madawan 31004.410 77
025.635 7156 All 3x3x2 57000
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-100]
Total 9 513000
Well Charain 1 1(repair) Kun 31004.730 77
025.839 7636 40000
Total 40000
Khurli (animal drinking)
Gadheri 4 4 (repair) Different places in village
31004.660 77
026.815 7659 All 20000
(5000 each)
Ghoond-I 4 4 (repair) Different places in village
31005.110 77
025.788 6759 All 20000
(5000 each)
Ghoond-II 7 7 (repair) Different places in village
31005.232 77
025.130 6320 All 35000
(5000 each)
Palu 4 4 (repair) Different places in village
31004.305 77
025.795 7320 All 20000
(5000 each)
Shaloha 5 5(repair) Different places in village
31004.570 77
025.790 7320 25000
(5000 each)
1(New) Shaloha 31004.501 77
025.725 7380 1x3x1 10000
Tikkar 6 6 (repair) Different places in village
31004.515 77
025.765 7407 30000
(5000 each)
1(New) Madog 31004.503 77
025.758 7302 1x3x1 10000
1 Jarash 31004.506 77
025.760 7305 1x3x1 10000
1 Tikkar 31004.404 77
025.778 7306 1x3x1 10000
Charain 5 5 (repair) Different places in village
31004.410 77
025.633 7158 25000
(5000 each)
1(New) Koon 31004.425 77
025.641 7180 1x3x1 10000
1(new ) Darag 31004.501 77
025.780 7382 1x3x1 10000
Total 235000
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-101]
Annexure –III
Soil conservation Measures Gram Panchayat Ghoond Target for 3rd year
Activity
Ward Name
Location Proposed GIS coordinates Benefited Families
Size (mt)
Estimated Cost (Rs.) Latitude Longitude Altitude
Dry Check Dam
Gadhari Kufta nala 10 31004. 689 77
026.840 7631 All 4x2x1 36000
Lohala Nala 15 31005. 510 77
025.720 7580 All 4x2x1 54000
Kahar Nala 10 31005. 836 77
025.513 7493 All 4x2x1 36000
Gadhari Nala 15 31004. 792 77
025.534 7530 All 4x2x1 54000
Jubber Nala 15 31004. 615 77
025.854 7456 All 4x2x1 54000
Ghoond-I Jarewal Nala 5 31004. 520 77
025.137 6990 All 4x2x1 18000
Baroth 5 31004. 619 77
025.864 7445 All 4x2x1 18000
Riundri 2 31004. 621 77
025.835 7448 All 4x2x1 7200
Kufta-II 5 31004. 633 77
025.841 7454 All 4x2x1 18000
Kharain Nala 4 31004. 615 77
025.854 7456 All 4x2x1 14400
Ghoond-II Narainty Nala 10 31005. 614 77
025.835 7464 All 4x2x1 36000
Jhal Nala 15 31005.090 77
025.775 6521 All 4x2x1 54000
Palu Roani Nala 10 31005.094 77
025.771 6519 All 4x2x1 36000
Palu Nala 5 31005.104 77
025.765 6535 All 4x2x1 18000
Dereware Nala 10 31005.225 77
025.130 6345 All 4x2x1 36000
Sholoha Padeper Nala 10 31005.220 77
025.110 6340 All 4x2x1 36000
Sholoha nala 8 31005.220 77
025.140 6045 All 4x2x1 28800
Panalalti nala 8 31005.225 77
025.136 6041 All 4x2x1 28800
Kayar Nala 12 31004.408 77
025.620 7158 All 4x2x1 43200
Charain Charain Nala 3 31004.418 77
025.613 7162 All 4x2x1 10800
Darag Nala 5 31004.510 77
025.790 7320 All 4x2x1 18000
Tikkar Khilna Nala 5 31004.504 77
025.794 7380 All 4x2x1 18000
Dhar Nala 4 31004.519 77
025.776 7374 All 4x2x1 14400
Jarash Nala 4 31004.520 77
025.769 7364 All 4x2x1 14400
Madog Nala 4 31004.515 77
025.761 7410 All 4x2x1 14400
Gashi Nala 4 31004.530 77
025.770 7420 All 4x2x1 14400
Total 203 730800
Crate Wall Ghoond-II Narainty 4 31004.620 77
025.842 7467 All 4x2x1 22000
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-102]
Annexure-IV List of Beneficiaries Roof
Tank Ward Village Name List of Beneficiaries
Godhari Bharot Paniya Ram SC (BPL)
Sachi Ram
Keshav Ram SC
Anant Ram SC (BPL)
Raju SC
Nand Lal SC
Bharot-II Ganga Ram
Ramesh
Laiq Ram
Joginder
Rajinder
Lohala Prem Singh
Paras Ram
Chauru Ram
Sunder Singh
Hari Singh
Bansi Lal
Ward Village Name Beneficiaries Name
Godhari Lohala Suresh Verma
Bansi Lala Verma
Hari Singh
Godhari -II Chet Ram Chaidel
Cher Ram -II
Het Ram
Devi Ram
Daulat Ram
Anant Ram,
Neck Ram
Sant Ram
Ghoond-II Ghoond Hari Ram SC
Baliya ram SC
Nand Lal SC
Chariya Ram SC
Liaq Ram SC
Chet Ram
Kewal Ram
Dinesh Kumar
Nariya Ram
Kirpa Ram-I
Kirpa Ram-II
Charntu Ram
Madha Ram
Dhani Ram
Daram Das
Pinjru Ram
Paras Ram
Dhani Ram-II
Narain Singh
Neck Ram
Palu Jhaltu Budhi Ram
Sidiya Ram
Keshav Ram
Dila Ram
Shalocha Kiar Shalocha Virender Chandal
Not5i Ram
Puran Dutt
Krishan Dutt
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-103]
Kufta Prem Singh
Devi Ram
Suresh –I
Laiq Ram
Suresh-II
Mophi Ram
Nardass
Nagar Mangat Ram
Anant Ram
Beli Ram
Shri Ram
Kanshi Ram
Balbir Singh
Dila Ram
Laiq Ram
Sadh Ram
Jubber Kewal Ram SC
Dharam dass SC
Sahi RamPrem SC
LalJogmohan SC
Jagmohan SC
Galan Karam Singh
Bali Ram
Ashoke Kumar
Kishore Kumar
Ishwar Singh
Beli Ram
Dyal Singh
Laiq Ram
Pardeep
Murtu Devi
Chalawanti Charanji Lal SC
Naresh Kumar SC
Rajesh Kumar SC
Sunil Chauhan SC
Aatma Ram SC
Ramesh SC
Roshan SC
Gadhari Sant Ram
Neck Ram
Anant Ram
Devi Ram
Het Ram
Chet Ram
Daulat Ram,
Chet Ram Chandel
Chalan Nala Sunder Singh
Chure Ram
Suresh
Laiq Ram
Prem Singh
Ghoond-I Chadail Devinder Singh
Deep Ram
Joginder
Rajinder
Naresh
Ramlal
Rakesh
Jagdish
Mohan-I
Mohan lal-II
Khadla Keshav Ram
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-104]
Sohan Lal
Kishori Lal
Rajinder Singh
Rakesh
Prem Singh
Kewal Ram
Roshan
Sheel Ghat Jeevan Lal
Narinder Singh
Budhu Devi
Hira Singh
Devi Ram
Prem Singh
Narain Singh
Kewal Ram
Joginder Singh
Kufta-I Anant Ram
Rajinder Singh
Sunder Singh
Pinjru Ram
Chariya Ram
Dhana Ram
Hari Singh
Kufta-II Sahi Ram
Laiq Ram
Deep Ram
Dhani rma
Roshan Lal
Uma Dutt
Hari dutt
Prem Singh
Baloth-I Amar Singh
Shyam Singh
Pardeep Kumar
Bheem Singh
Budhi Ram
Paragail Mohan lal
Narain Signh
Gain Singh
Yashwant Singh
BR Chauhan
Baloth-II Sanjay Suresh
Suresh
Dhani Ram
Beli Ram
Virender Kumar
Hem Raj
Anant Ram
Satish kumar
Ghoond -II Ghoond Dinesh
Kirpa Ram
Nariya Ram
Kirpa Ram –II
Charntu Ram
Baliya Ram
Hari Ram
Ghoond -II Narender Singh
Deep Ram
Laiq Ram
Chet Ram
Kewal Ram
Chariya Ra,
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-105]
Nand Lal
Dhani Ram
Paras Ram
Dharam Dass
Pinjru Ram
Madha Ram
Kewal
Thumu Neck Ram
Hari Ram –I
Padam Ram
Yograj
Mani Ram
Anant ram
Hari Ram
Uma Devi
Ghoond-III Ravinder Singh
Narian Singh
Roshan Lal
Beli Ram
Parmanand
Rukmi Devi
Narainty-II Charanje Lal
Baliya Ram
Shiv Ram
Chet Ram
Mehender Singh
Neck Ram
Rajinder Singh
Narainty-II Gujar Ram SC
Paras Ram SC
Gindo Devi SC
Parakash SC
Rukhmi Devi SC
Dhani Ram SC
Mohan lal SC
Ganga Ram SC
Basiya Ram SC
Kufta (Narainty ) Anant Ram SC
Sahi Ram SC
Ramesbh SC
Lachi Ram SC
Budhi Ram SC
Roshan Lal SC
RoshanLal-II SC
Sunder Singh SC
Dhani Ram SC
Palu Jhaltu Budhi Ram SC
Sidiya Ram SC
Keshav Ram
Dila Ram SC
Kripa Ram SC
Laiq Ram SC
Upper Palu Paniya Ram SC
Beli Ram SC
Papu SC
Thanadhar JiyaLal SC
Brijlal SC
Beena Devi SC
Lower Palu Prem Singh
Rakesh
Mohan Lal
Khushi Ram
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-106]
Janki Devi
Dewara Prem Singh
Ram Lal
Mehar Singh
Mohan lal
Sita Ram
Devinder Singh
Udam Singh
Inder Singh
Palu VEd Prakash
Kehar Singh
Jai Ram –I
Jai Ram-II
Paras Ram
Rajinder Singh
Durga Singh
Mandal BK Sharma
Ram Nath
Mahi Ram
Keshav Ram
Tulsi Ram
Deep Ram
New Baag Roshan Lal-I
Roshan Lal-II
Gangi Devi
Kaunthri Laiq Ram
Bala Ram
Budhi Ram
Gita Ram
Shiv Ram
Krishana
Het Ram
Ram Lal
Lower Bagail Sita Ram
Hira Singh
Budhi Ram
Devi Ram
Gori Ram
Atma Ram
Sita Ram –I
Thakur Dass
Rajinder Singh
Upper Bagail Madhia Ram
Alam Chand
Satya Parakash
Udi Ram
Mast Ram
Paras Ram
Geeti Devi
Paniya Ram
Namena Meela Ram
Devi Ram
Jeet Ram
Bala Ram
Ram Dutt
Mast Ram
Gian Singh
Dev Parkash
Hira Singh
Mohan Lal
Mast Ram –II
Payare lal
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-107]
Ram Lal
Moti Lal
Gohan Ramanand
Paraksah Chand
Ramanand-II
Mast Ram
Hari Dutt
Matahun Amba Dutt
Mali Ram
Sohan Lal
Shalocha Panelty Taradutt
Ram Singh
Sohan Lal
Devi Ram
Jagdish
Inder Singh
Devi Ram
Rajinder
Hari Singh
Sonu
Mohan Lal
Dhani Ram
Rachah Budh Ram
Dhani Ram
Puran Dutt
Kewal Ram
Narain Dutt
Nika Ram
Sita Ram
Hari Singh
Hira Singh
Tej Singh
Inder Singh
Ganga Ram
Kayar Moti Ram
Jeet Ram
Krishan Dutt
Puran Dutt
BS Parmar
Ratan
Devender
Suresh
Rakesh Sharma
Shiv Ram
Shaloha (majhoth) Sita Ram
Hira Singh
Dhani Ram
Ganga Ram
Padam
Anant Ram
Sohan Lal
Devi Ram
Narain Singh
Budhi Ram
Inder Singh
Tej Singh
Tara dutt
Parakash
Dinesh
Surat Ram
kathyog Kewal Ram
Karam Chand
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-108]
Roshan Lal
Hari Ram
Rajinder Singh
Budh Ram
Suresh
Mohan Lal
Khush Ram
Rajesh
Chet Ram
Dharam Das
Beli Ram
Puran Dutt
Devi Dutt
Dhunker-I Budhi Ram
Rajinder
Beli Ram
Deep Ram
Jeet Ram
Bhamphi Devi dutt
Prem Dutt
Beli Ram
Sita Ram
Devi Ram
Virender
Rajinder
Het Ram
Dhunkar-II Mathu Ram Mehta
Sunpa
Surato
Geeta
Partap
Shyam Singh
Bheem Singh
Inder Singh
Amba Dutt
Hari Singh
Surender Kumar
Devi Ram
khaloth Ramlal
Mehar Singh
Prem Singh
Mohan Lal
Roshan Lal
Jeet Ram
Mohan Lal
Narain Singh
Mast Ram
Keshav Ram
Tulsi Ram
Kanshi Ram
Geeta Devi
Shakroha Mahar singh
Puren dutt
Rakesh
Nekha Ram
Brij Lal
Shiv Lal
Balak Ram
Om Prakash
Ramesh Chand
Hari Ram
Prem Singh
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-109]
Goodu
Charain Charain-I Daleep Singh
Virender Singh
Mohan Singh
Umesh Singh
Suresh
Karan Singh
karau Rajesh
Brijeshwar Singh
Anant Ram
Prem Singh SC
Nika Ram SC
Bansi Lal SC
koon Laiq Ram
Het Ram
Balak Ram
Beli Ram
Sant Ram
Inder Singh
Parakash
Aatma Ram
Darog Budhi Ram
Dilu Devi
Ganga Ram
Roshan
Raju
Nika Ram
Bansi Lal
Jhaloth Kanshi Ram
Muni Lal
Jagdish
Jai Ram
Hari krishan
Durga Dutt
Ramesh Sharma
Prem Sharma
Laxshaman
Kundharata Jiya lal
Sanjeev
Rajesh
Dinesh
Mahender
Suresh Kawar
Kehar Singh
Sant Ram
Sabla Ram
Charain (SC) Duniya Ram
Charnje lal
Dila Ram
Rajinder
Devinder
Roshan Lal
Ramesh
Parakash
Nika Ram
Anant Ram
Kaunti Surat Ram
Shri Ram
Ramesh
Suresh
Sunil
Anil
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-110]
Aatma Ram
Charain kenchi Sudesh kumara
Sanjjay Kumar
Keshav Ram
/arvind Sood
Surender
Upper Chella Inder Singh
Geeta Devi
Mathi Devi
Partap
Pravbhu Dyal
Bittu
Tikkar Tikkar-I Kanshi Ram
Sadh Ram
Shri Ram
Beli Ram
Dhani Ram
Khushi Ram
Chet Ram
Keeewal Ram
Rajesh VErma
Rajesh Bhandari
Dharam Dass
Tikkar-II Daulat Ram
Radhi Devi
Prem Singh
Banu Lal
Suresh
Kewal Ram
Ramesh
Kanshi Ram
Mohan Singh
Anant Ram
Geeta Ram
Anant Ram-II
Rachhani Gian Singh
Rajender Singh
Vinod
Shiv Ram
Shishu Pal
Bhagat Ram
Tillu Prem Singh
Devender Singh
Jitender Singh
Baldev Singh
Parakash Singh
Nahi Radhi Devi
Narain Singh
Surender Singh
Durga Singh
Jalam Singh
Ram Singh
Nigam Singh
Mool Raj
Shyam Singh
Surat Singh
Daleep Singh
Kamolta Bhoop Ram
Shanti Devi
Pnant Ram
Banu Lal
Rajender Singh
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-111]
Laiq Ram
Mehender Singh
Pani Nala Daulat Ram
Anant Ram
Kanshi Ram
Ramesh
Mohar Singh
Naresh
Yash Pal
Prem Singh
Laiq Ram
Devi Ram
Jamahar/Pagora Prem Singh
Devi Ram
Udam Singh
Kanta Devi
Ramesh Kawar
Tara Devi
Rajinder
Ghassigaon-I Kedar Nath
Ram lal
Prem Dutt
Ramesh
Krishan dutt
Dila Ram
Madhi
Madog Roshan Lal
Lachi Ram
Hari Ram
Sohan Lal
Sitar Ram
Devi Ram Chandel
Chaman
Pushpa
Ghassigoan-II Jagat Ram
Keshav Ram
Rajesh
Inder Singh
Vidya Nand
Khagna Baldev Singh
Devender
Prem Singh
Devender Chauhan
Prakash
Sohan Lal
Tikkar-III Harizan Basti Surat Ram
Thuku Ram
Shyam Singh
Jai Ram
Ram Singh
Bhagat Ram
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-112]
Annexure-V List of Micro Enterprises GP- Ghoond
Carpentry Sr. No. Name Village Ward
1 Keshu Ram S/o Dila Ram Bharot Gadhari
2 Mohan lal S/o Shai Ram Bharot Gadhari
3 Naresh S/o Charnjee lal Chanawati Gadhari
4 Duni Chand S/o Anant Ram Bharot (lohala) Gadhari
5 Anant Ram S/o Matha Ram Bharot Gadhari
6 Beli Ram S/o Kashi Ram Narainty Ghoond -II
7 Nek Ram S/o Dharma Ram Ghoond Ghoond -II
8 Narayan Singh S/o Dharma Ram Ghoond Ghoond -II
9 Devi Ram S/o Sudama Ram Ghoond Ghoond -II
10 Padma Ram S/o Sl Chandiya Ghoond Ghoond -II
11 Hari Ram S/o Padma Ram Ghoond Ghoond -II
12 Durga S/o Sudama Ram Ghoond Ghoond -II
13 Keshav Ram S/o Lt.Hiru Ram Jhaltu Palu
14 Suresh S/o Jeet Ram Namana Palu
15 Beli Ram S/o Ratnu Bhambi Saloha
16 Sita Ram S/o Ratanu Bhambi Saloha
17 Rajinder S/o Heera Singh Bhambi Saloha
18 Het Ram S/o Kanshi Ram Bhambi Saloha
19 Devi Ram S/o Ratnu Bhambi Saloha
20 Dhani Ram S/o Pritam Dukhari Saloha
Masonry
Sr. No. Name Village Ward
1 Mohan Lal Chadail Ghoond-I
2 Sandeep Chadail Ghoond-I
3 Shyam Singh Tikkar Tikkar
4 Sabla Ram Charain Charain
Basket Making
Sr. No. Name Village Ward
1 Mast Ram Chadail Ghoond-I
2 Charantu Ghoond -II Ghoond-II
3 Ram Singh Tikkar Tikkar
4 Chet Ram Tikkar Tikkar
5 Thanku Tikkar Tikkar
6 Surat Tikkar Tikkar
7 Bhagat Ram Tikkar Tikkar
Shoe Maker
Sr. No. Name Village Ward
1 Matha Ram Baroth Ghoond-I
2 Joginder Ghoond Ghoond-II
Weaver
Sr. No. Name Village Ward
1 Gajar Singh S/o Lt. Gama Ram Narainty Ghoond-II
2 Chariya Ra S/o Lt. Dana Ram Ghoond Ghoond-II
Goatry
Sr. No. Name Village Ward
1 Matha Ram S/o Lt. Thunthru Ram Ghoond Ghoond-II
2 Beli Ram S/o Lt. Gantu Upper Palu Palu
3 Anant Ram S/o Aklu Ram Tikkar Tikkar
Bee keeping
Sr. No. Name Village Ward
1 Jitender Chauhan Tikkar Tikkar
2 Naresh Regta Tikkar Tikkar
3 Yashpal Chauhan Tikkar Tikkar
4 Sandeep Chauhan Tikkar Tikkar
IWMP-V-Theog (2009-10)-Ghoond (2c6c6K2c), Shimla[page-113]
5 Rajesh Chauhan Tikkar Tikkar
6 Gajender Chauhan Tikkar Tikkar
7 Vinod Bhandari Tikkar Tikkar
8 Deepak Tikkar Tikkar
9 Pardeep Tikkar Tikkar
Dairy
Sr. No. Name Village Ward
1 Indra Devi W/o Lt.Aatma Ram Tharu Gadheri
2 Rukmani Devi W/o Lt. Atma Ram Narainty Ghoond-II
3 Mona Devi W/o Lt. Bansi Lal Ghoond Ghoond-II
Vermin Compost
Sr. No. Name Village Ward
1 Sunder Singh Gadheri Gadheri
2 Sant Ram Gadheri Gadheri
3 Anant Ram-I Gadheri Gadheri
4 Paras Ram Gadheri Gadheri
5 Ganga Ram Gadheri Gadheri
6 Anant Ram-II Gadheri Gadheri
7 Keshav Ram Gadheri Gadheri
8 Chet Ram Gadheri Gadheri
9 Sahi Ram Gadheri Gadheri
10 Mohi Ram Gadheri Gadheri
11 Chet Ram Narainty Ghoond -II
12 Prakash Mehta Narainty Ghoond -II
13 Divesh Narainty Ghoond -II
14 Prateek Narainty Ghoond -II
15 Chirnjilal Narainty Ghoond -II
16 Beli Ram Narainty Ghoond -II
17 Anant Ram Narainty Ghoond -II
18 Mahinder Narainty Ghoond -II
19 Mehar Singh Derewara Palu
20 Kalu Chauhan Tikkar -I Tikkar
21 Deepu Bhandari Tikkar -I Tikkar
22 Geeta Chauhan Tikkar -I Tikkar
23 Rita Bhandari Tikkar -I Tikkar
24 Virender Chauhan Tikkar -I Tikkar
25 Sarla Devi Tikkar -I Tikkar
26 Krishna Bhandari Tikkar-II Tikkar
27 Shakuntla Tikkar-II Tikkar
28 Sumitra Verma Tikkar-II Tikkar
29 Leela Verma Tikkar-II Tikkar
30 Sushma Verma Tikkar-II Tikkar
31 Asha Tikkar-III Tikkar
32 Lalita Tikkar-III Tikkar
33 Hemlata Tikkar-III Tikkar
34 Veena Mehta Tikkar-III Tikkar
35 Pushpa Tikkar-III Tikkar
36 Jia Lal Charain Charain
Note: addition and deletion of the beneficiaries under carpentry, beekeeping and masonry can be considered during the execution of the programme.
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-114]
Part 3.01
P 3.01 INTRODUCTION AND BUDGET P3.01a Introduction
Watershed : IWMP- V- Theog Gram panchayat : Ghorna Area : 2557 ha Amount : 383.55 lacs Gram Panchayat Ghorna is located at 45 km distance from the Block headquarter, Theog. The total Geographical area of the panchayat is 2557 hectare. The Gram Panchayat is situated at 310.02.332 latitude and 770.25.050 longitude. The height of Gram Panchayat of Ghorna is 4910 feet from above mean sea level. The Panchayat is covered with GP Deothi, Parghiya, Bagri, and Basadhar The catchment area watershed is Chandni, Kanoti, Ghorna, Khari, Paral, Jarari and Jaria nallahs. The total population of the Panchayat is 2141 covering 7 (seven) wards.
P3.01b BUDGET
Sr. No. Budget Component % of the budget Amount (lacs)
1 Administrative cost Monitoring Evaluation
10 01 01
3835500 383550 383550
2 Preparatory Phase Entry point activities Institution & capacity building Detailed Project Report (DPR)
04 05 01
1534200 1917750 383550
3 Watershed Works Phase Watershed Development Works Livelihood activities for the asset less persons Production system & micro enterprises
50 10 13
19177500 3835500 4986150
4 Consolidation phase 05 1917750
Total 100 38355000
P3.01c Methodology
A. District level
e. Collection of data at district level
iii. DRDA and Line department
f. Meeting with CEO (DRDA), Project Officer, Heads of Line Departments
B. Block level
g. Data collection
h. One day orientation with pradhan secretaries and panchayat sahayak at block level
i. Meeting with line department officials of agriculture, horticulture and animal husbandry department
C. Panchayat Level
k. General meeting at Panchayat level with members of Panchayat Samiti, Pradhan and Ward members
l. Collection of revenue data from Patwari
m. Collection of socio economic data from Panchayat Secretary
n. Village level meeting organized, PRA exercises and transect walks
o. Identification of beneficiary group for different activities
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-115]
Part 3.02
P 3.02 GENERAL DESCRIPTION OF PROJECT AREA
P3.021 Socio economic profile of panchayat
Total families : 539 Total population of the Panchayat : 2141 General families : 413 (population =1579) Schedule caste families : 116 (population = 509) Schedule tribe/OBC families : 10 (population = 53)
P 3.021a Population in different categories (ward wise)
Name of ward
General Families SC Families Schedule tribe/OBC
No of families
Male Female Total No of families
Male Female Total No of families
Male Female Total
Ghorna 46 98 87 185 28 63 57 120 - - - -
Deha 91 79 73 152 14 28 32 60 - - - -
Shirgulli 77 150 162 312 15 43 31 74 - - - -
Kadharan 60 176 156 332 4 9 10 19 10 18 35 53
Chandni 43 105 101 206 20 39 36 75 - - - -
Tarapur 57 83 80 163 18 43 50 93 - - - -
Shilla 39 112 117 229 17 34 34 68 - - - -
Total 413 803 776 1579 116 259 250 509 10 18 35 53
Source: Gram Panchayat, 2010
P 3.022 BPL Families
Total BPL Families : 82 Total Antoyodaya Families : 53
P 3.022a Population of BPL and Antoyodaya families (ward wise)
Name of Ward General Families SC Families Schedule tribe/OBC
BPL Antoyodaya BPL Antoyodaya BPL Antoyodaya
Ghorna 7 3 3 2 - -
Deha 0 0 2 2 - -
Shirgulli 13 5 6 5 - -
Kadharan 19 11 2 1 1 1
Chandni 10 8 4 4 - -
Tarapur 3 2 2 1 - -
Shilla 6 4 4 4 - -
Total 58 33 23 19 1 1 Source: Gram Panchayat, 2010
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-116]
P 3.023 Land use pattern
The total land of Ghorna panchayat is 2557 hectare and whole area is rainfed. The cultivated land is 352 hectare under different farming system i.e. agriculture, horticulture and vegetables. The rest of area is under pasture, ghasni and forests etc. The barren is 2138 hectare.
P3.023a Areas (ha) of panchayat (village wise) under different land use systems
Sr. No.
Name of village
Total land
Un irrigated
Agri. Horti. Veg. Fellow Barren Pasture Ghasni Forest Other
1 Godher 81 81 4 18 4 3 3 2 4 47 0
2. Ghog 241 241 6 32 6 121 2 0 41 39 0
3 Katharan 72 72 2 13 2 2 2 1 3 49 0
4 Deha 101 101 6 34 6 11 4 10 13 23 0
5 Tarapur 103 103 8 40 8 11 2 3 5 34 0
6 Darber Balsan 132 132 8 37 8 14 7 2 18 46 0
7 Shirguli 143 143 2 58 2 9 4 4 2 64 0
8 Raksha 82 82 4 18 4 7 2 0 10 41 0
9 Shella 130 130 11 40 12 7 2 2 6 61 0
10 Jangle Dhoba 74 74 0 0 0 4 0 0 0 70 0
11 Jangle Deha 276 276 0 1 0 1 0 0 13 261 0
12 Jangle Docha 40 40 0 1 0 1 0 0 0 38 0
13 Jangle Khagna
264 264 0 2 0 0 2 4 0 256 0
14 Jangle Chodha
534 534 6 2 6 1 11 1 41 472 0
15 Jangle Katharan
94 94 0 0 0 2 0 0 0 92 0
16 Jangle Chadni 25 25 0 0 0 0 0 0 0 25 0
17 Jangle Ghorna
115 115 0 0 0 0 0 0 0 115 0
18 Jangle Kofta 27 27 0 0 0 0 0 0 0 27 0
19 Jangle Barog 15 15 0 0 0 0 0 0 0 15 0
20 Jangle Jairna 8 8 0 0 0 0 0 0 0 8 0
Total 2557 2557 57 296 58 194 41 29 156 1783 0
Source: Revenue Patwari
Note: Agri+ Horti+ Fallow+Barren+Pasture+Ghasni+Forest+Other=total land
P 3.024 Status of Livestock
The animal rearing is the integrated part of farming system in the watershed area. The major animals are cows (local and improved), buffaloes, sheep, goats etc. The people face acute problem of fodder and drinking water for these animals during the stress period. The details of livestock reared by the people in Ghorna panchayat are given below:
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-117]
P3.024a Number of milch and dry cows (Local and improved) and Buffaloes
Name of Ward
Local cow Improved cow Buffaloes
Milch Dry Total Milch Dry Total Milch Dry Total
Ghorna 20 10 30 70 - 70 - - -
Deha 7 3 10 15 - 15 - - -
Shirgulli 20 10 30 115 5 120 - - -
Kadharan 15 5 20 105 15 120 - - -
Chandni 28 20 48 72 - 72 - - -
Tarapur 20 4 24 96 - 96 1 - 1
Shilla 20 10 30 50 - 50 - - -
Total 130 62 192 523 20 543 1 0 1 Source: NAEB, UHF, 2010
P 3.024b Livestock population (ward wise)
Name of Ward Bullock Calf Goat Sheep Poultry Total
Ghorna 16 60 40 - 20 236
Deha 4 10 - - 20 59
Shirgulli 20 80 - - - 250
Kadharan 30 90 115 - - 375
Chandni 40 50 50 25 20 305
Tarapur 30 25 40 10 - 226
Shilla 28 50 10 12 10 190
Total 168 365 255 47 70 1641 Source: NAEB, UHF, 2010
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-118]
Part 3.03
P3.03 SWOT ANALYSIS
A critical analysis of strengths, weaknesses, opportunities and threats (SWOT) of any region is a good analysis for developing strategies /programmes as it provides valuable insights on potentials, constraints, opportunities and threats based on the primary, secondary and technical data a detailed analysis of SWOT is carried out.
P3.031 Strengths of the watershed area Road infrastructure is available.
Area is suitable for seasonal and offseason vegetable crops.
Area is suited to quality seed production of Vegetable crops
Area is also suitable for fruit crop production.
Unemployed educated youth.
Nearest market is available.
People are well versed with animal husbandry.
Farmers are innovative and ready to adopt new technologies.
P3.032 Weaknesses Area is rainfed.
Soil erosion in the cropped area.
Unconsolidated land holding
Scarcity of fodder.
Hailstorm prone area.
The pasture, grazing and forest areas are shrinking.
Unequal distribution of available water for irrigation.
Big farmers are getting more water for irrigation on the traditional right basis which needs to be reconsidered.
P3.033 Opportunities Introduction of organic farming
Roof water harvesting
Training to the farmers on horticulture management, floriculture, poultry and mushroom production etc.
Revival of Mahila Mandals and SHGs which are dysfunctional presently
Installation of vegetable collection centre at ward/panchayat level
Introduction of crossbred animals
P3.034 Threats Available land for agriculture is declining if S.M.C practices are not adopted.
Soil erosion in the sloppy lands.
Unscientific farming practices.
Deforestation.
Declining of the traditional artisans.
Social distress.
Declining of fodder sources.
Lack of interest and motivation.
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-119]
Part 3.04
P 3.04 ENTRY POINT ACTIVITIES
Entry point activities are necessary part to orient the community members towards thrift and credit activities of the project. Success of government initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and this amount plays vital role to involve more people in different project development activities. Different entry point activities suggested by farmers during PRA exercise as given below. P 3.041 Entry point activities suggested at different locations of watershed Ward Activity Location Size Beneficiaries Cost Purpose /use
Tarapur Vegetable collection centre
kath nala 6x5 50 255700 To collect farm produce
Chandni Vegetable collection centre
Raksha 6x5 35 255700 To collect farm produce
Ghorna Vegetable collection centre
Ghorna 6x5 36 255700 To collect farm produce
Shilla Vegetable collection centre
Shilla 6x5 29 255700 To collect farm produce
Kadharan Vegetable collection centre
kadharan 6x5 38 255700 To collect farm produce
Shirguli Vegetable collection centre
Darah 6x5 35 255700 To collect farm produce
Total 223 1534200
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-120]
Part 3.05
P 3.05 WATER HARVESTING
The main sources of irrigation in the gram Panchayat are Tallab, Dam, tanks and water schemes. The most of the cultivated area is rainfed. The existing water resources are drying due to climatic change. The people face acute problem of water during stress period, specifically for the irrigation of vegetable crops etc.
P 3.051 Existing and proposed water harvesting structures with storage capacity Name of structure
Number of structure
Capacity m3) Project intervention No. of beneficiaries
Old New Old New Old New Old New
Kachha talab 1 57 15 8968 15 8968 All All
Roof water harvesting
- 74 - 2960 - 2960 All All
Tanks 1 49 40 3472 40 3472 All All
Dam 2 300 300 All All
Total 2 182 55 15700 55 15700 All All
P 3.051a WATER BODIES /WATER HARVESTING STRUCTURES
Work Name of the Ward
Proposed No
Location No of Beneficiaries
Dimension (m)
Estimated budget (Rs.)
Kachha Talab
Tara pur 1 Bharar kufta All 10x8x2 62500
1 Kufta -II All 10x8x2 62500 Chandni 1 Dhali All 10x8x2 62500 1 Shiv mandir All 5x4x2 22500
1 Raksha All 10x8x2 62500 1 Chanari All 10x8x2 62500 Deha 1 Kalariya jungle All 10x8x2 62500 1 Khonoti All 10x8x2 62500 Ghorna 3 Bharaun All 10x8x2 62500 1 Balaha All 8x8x2 39200
1 Ghorna All 10x8x2 62500 1 Ganog All 10x8x2 62500 Kadharan 1 Kufta (Naleha) All 10x8x2 62500 1 Kadharan All 10x8x2 62500 1 Lahi All 10x8x2 62500 1 Ghogh(maroli) All 10x8x2 62500 1 Dhal (Ghog) All 10x8x2 62500 1 Tillu-I (near lachu resi.) All 10x8x2 62500 1 Tillu-II (near sai ram resi.) All 10x8x2 62500 1 Shavkar-I All 10x8x2 62500 1 Shavkar-II All 10x8x2 62500 1 Matri-I All 10x8x2 62500 1 Matri –II All 10x8x2 62500 1 Matri –III All 10x8x2 62500 1 Matri-IV All 10x8x2 62500 1 Matri-V All 10x8x2 62500 1 Chambi –I All 10x8x2 62500
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-121]
1 Chambi –II All 10x8x2 62500 1 Rachoth-I All 10x8x2 62500 1 Rachoth-II All 10x8x2 62500 1 Kuffer -I All 10x8x2 62500 1 Devinder chowki All 10x8x2 62500 1 Bhraun-I All 10x8x2 62500 1 Bhraun-II All 10x8x2 62500 1 Bhraun-III All 10x8x2 62500 1 Bhraun –IV(Bhuni-dahabar) All 10x8x2 62500 1 Bhraun –V(sukhi kuffer) All 10x8x2 62500 1 Kuffer-II (Gom dhar) All 10x8x2 62500 1 Alli dhar-I All 10x8x2 62500 1 Alli dhar-II All 10x8x2 62500 1 Alli dhar- III All 10x8x2 62500 1 Aldeha All 10x8x2 62500 1 Kufta (Nelaho-II) All 10x8x2 62500 1 Kufta (Nelaho –III) All 10x8x2 62500 1 Kala kufta All 10x8x2 62500 1 Kadharan –I( near bawari) All 10x8x2 62500 1 Kadharan-II
(Kund ke pas) All 10x8x2 62500
1 Kadharan-III (Jubbar)
All 10x8x2 62500
1 Arshala-I All 10x8x2 62500 1 Arshala-II(Chandri ki jubri) All 10x8x2 62500 1 Arshala –III(Chandri ki jubri) All 10x8x2 62500 Shirguli 1 Ram ki karie All 10x8x2 62500 1 Khagana All 10x8x2 62500 1 Shirguli kufer All 10x8x2 62500 1 Chadoh(Poper) All 10x8x2 62500 Total 57 3374200
Roof water Tarapur 1 Kath –I 3 5x4x2 92000
1 Kath-II 2 5x4x2 92000
1 Tara pur –I 3 5x4x2 92000
1 Tarapur-II 2 5x4x2 92000
1 Kath –III 3 5x4x2 92000
1 Kath-IV 5 5x4x2 92000
1 Bharar –I 2 5x4x2 92000
1 Bharar-II 3 5x4x2 92000
1 Bharar-III 1 5x4x2 92000
1 Tarapur-III 3 5x4x2 92000
Chandani 1 Lower chandani –I All 5x4x2 92000
1 Lower chandani-II All 5x4x2 92000
1 Chandani village All 5x4x2 92000
1 Lower chandani –III All 5x4x2 92000
1 Chandani village-II All 5x4x2 92000
1 Chandani village-III 5 5x4x2 92000
1 Chandani village-IV All 5x4x2 92000
1 Dhali 5 5x4x2 92000
Deha 1 Deha-I 3 5x4x2 92000
1 Deha-II near panchayat 3 5x4x2 92000
1 Deha –III 3 5x4x2 92000
Ghorna 1 Ghorna 16 5x4x2 92000
1 Ghanog-I 3 5x4x2 92000
1 Ghanog –II 3 5x4x2 92000
1 Ghanog –III 2 5x4x2 92000
1 Ghanog –IV 3 5x4x2 92000
1 Ghanog –V 3 5x4x2 92000
1 Ghanog –VI 3 5x4x2 92000
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-122]
1 Ghanog –VII 3 5x4x2 92000
1 Balaha –I 3 5x4x2 92000
1 Balaha-II 3 5x4x2 92000
1 Ghorna-II 20 5x4x2 92000
Shilla 1 Shilla-I 3 5x4x2 92000
1 Shilla-II 3 5x4x2 92000
1 Shilla-III 2 5x4x2 92000
1 Shilla-IV 3 5x4x2 92000
1 Shukhar-I 3 5x4x2 92000
1 Shukhar-II 5 5x4x2 92000
1 Shukhar-III 3 5x4x2 92000
1 Jhola All 5x4x2 92000
kadharan 1 Rachot-I 3 5x4x2 92000
1 Rachot –II 4 5x4x2 92000
1 Ghogh-I 3 5x4x2 92000
1 Lhali All 5x4x2 92000
1 Arshala All 5x4x2 92000
1 katheicha All 5x4x2 92000
1 Kadharan-I 4 5x4x2 92000
1 Kadharan-II 3 5x4x2 92000
1 Kadharan-III 3 5x4x2 92000
1 Kadharan-IV 3 5x4x2 92000
1 Kadharan-V 3 5x4x2 92000
1 Kadharan-VI 3 5x4x2 92000
1 Kadharan-VII 5 5x4x2 92000
1 Kadharan-VIII 7 5x4x2 92000
1 Ghondhar 3 5x4x2 92000
1 Kadharan-IX 3 5x4x2 92000
1 Arshala –II 3 5x4x2 92000
1 Ghondhar-II 3 5x4x2 92000
1 Bejo-I 3 5x4x2 92000
Shirguli 1 Pateha-I 4 5x4x2 92000
1 Pateha-II 4 5x4x2 92000
1 Chamroti-I 4 5x4x2 92000
1 Khgana 3 5x4x2 92000
1 Shirguli –I 4 5x4x2 92000
1 Shirguli –II 5 5x4x2 92000
1 Shirguli –III 4 5x4x2 92000
1 Shirguli –IV 4 5x4x2 92000
1 Shirguli –V 5 5x4x2 92000
1 Shirguli –VI 3 5x4x2 92000
1 Shirguli –VII 3 5x4x2 92000
1 Shirguli –VIII 3 5x4x2 92000
1 Shirguli –IX 2 5x4x2 92000
1 Patog-I 3 5x4x2 92000
1 Patog-II 3 5x4x2 92000
Total 74 6808000
Tank Tarapur 1 Kath –I 14 8x6x2 164000
1 Kath-II 9 8x6x2 164000
1 Tarapur-I 13 8x6x2 164000
1 Tarapur-I (Balaha) 8 8x6x2 164000
1 Bharar 4 5x4x2 82000
1 Tarapur –II 3 5x4x2 82000
1 Tarapur-III 8 8x6x2 164000
1 Chandani nala (near bharog village)
4 5x4x2 82000
1 Tarapur –IV 12 8x6x2 164000
Chandani 1 Lower chandani-I 4 5x4x2 82000 1 Lower chandani-II 6 5x4x2 82000
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-123]
1 Lower chandani –III 13 8x6x2 164000
1 Rakasha 3 5x4x2 82000 1 Chandani 5 5x4x2 82000 1 Dhali 9 8x6x2 164000
1 Lower chandani 6 5x4x2 82000 1 Chandani village 4 5x4x2 82000 Deha 1 Deha –I 7 8x6x2 164000
1 Khanolti 25 8x6x2 164000
1 Deha 25 8x6x2 164000
1 Primary school 5 5x4x2 82000 1 Dhar-I 5 5x4x2 82000 1 Deha –II 3 5x4x2 82000 1 Deha –III 5 5x4x2 82000 1 Deha –IV 15 8x6x2 164000
Ghorna 1 Ganog lower 5 5x4x2 82000 1 Ganog upper 8 8x6x2 164000
1 Ganog (rod head) 20 8x6x2 164000
1 Gohrna –I 16 8x6x2 164000
1 Gohrna(Dobha nala) 10 8x6x2 164000
1 Baleha 12 8x6x2 164000
Shilla 1 Patti shilla 20 8x6x2 164000
1 Kiyal shilla 9 8x6x2 164000
1 Janjteri 12 8x6x2 164000
1 Jhola 6 8x6x2 164000
Kadharan 1 Rachot 7 8x6x2 164000
1 Ghog-I 7 8x6x2 164000
1 Kuffer 14 8x6x2 164000
1 Arshala 8 8x6x2 164000
1 Ketheicha 1 5x4x2 82000 1 Kadharan 3 5x4x2 82000 1 Dobha 3 5x4x2 82000 1 Beza 15 8x6x2 164000
Shirguli 1 khagna 31 8x6x2 164000
1 Much ramna 5 5x4x2 82000 1 Chadoh-I 3 5x4x2 82000 1 Chadoh-II 5 5x4x2 82000 1 Nerwa 4 5x4x2 82000 1 Shirguli All 5x4x2 82000 Total 49 6232000
Dam Kadharan 1 Kadharan khori ka nala
All 450000
1 Kadharan (Ramchu ke gharat ke pass
All 450000
Total 2 900000
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-124]
P3.051b Storage capacity and cost of new water harvesting structures under watershed programme and convergence.
Structure Watershed Convergence
No. Capacity (m3) Cost (Rs) No. Capacity (m3) Cost (Rs)
Kaccha Pond
57 8968 3374200 - - -
Roof water harvesting
74 2960 6808000 - - -
Irrigation tank
49 3472 6232000 - - -
Dam 2 300 900000 - - -
Total 182 15700 17314200 - - - Note: Details as in annexure
P 3.051c Storage capacity and cost of existing water harvesting structures under watershed programme and convergence.
Structure Watershed Convergence
No. Capacity (m3) Cost (Rs) No. Capacity (m3) Cost (Rs)
Kaccha Pond
1 15 - - - -
Roof water harvesting
- - - - - -
Irrigation tank
1 40 50000 - - -
Dam 0 - - - -
Total 2 55 50000 - - -
P3.051d Total Storage Capacity of Existing and New structures
Scheme Existing structures(m3) New structures (m3) Total capacity (m3)
Watershed 55 15700 15755
Convergence - - -
Total Capacity 55 15700 15755
P3.052 Budget
Scheme Existing structures (Rs) New structures (Rs) Total (Rs)
Watershed 50000 17314200 17364200
Convergence - - -
Total 50000 17314200 17362400
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-125]
P3.053 Total storage capacity and cost through watershed and convergence programme
Particulars Capacity (m3) Cost (Rs)
Watershed 15755 17364200
Convergence - -
Total 15755 17362400
Presently, if all the existing watershed structures are renovated, this will enhance storage capacity to 15755 m3 with cost estimate of Rs. 173624200 (Total water harvesting potential Storage capacity (watershed) + storage capacity (convergence) =15755 m3 Area to be irrigated under watershed programme = 79 ha. Note : Total area is calculated by dividing total water available under watershed with
depth of irrigation i.e. 0.02 cm
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-126]
Part 3.06
P3.06 AGRICULTURE
The main agricultural crops grown in the Panchayat are wheat, Barley, maize, among cereal crops rajmash and Mash among pulses. The productivity of crop was observed very low due to rainfed condition. This can be increased through increase in irrigation facilities and latest technology.
Part 3.061 Prevalent Farming System under Agriculture
1. Agriculture (Maize/ pulses + Wheat/Barley/ Pluses) 2. Agriculture + Animal Rearing 3. Agriculture + Horticulture (fruit crops+ Vegetables) + Animal Rearing 4. Agriculture + Labour + Rural Artisans
P 3.062 Present status of Agriculture Crops and Proposed interventions:
P 3.062a Cereals Crops
Crops grown: Maize, Wheat and Barley Total Productions : 95+ 23 + 31= 149 qt (based on PRA exercise)
Status Particulars Maize Wheat Barley
Existing Area under cultivation 76Bigha 18Bigha 18Bigha
Production 95Q 23Q 31Q
Productivity 1.25 Q/ bigha
1.28 Q/ bigha
1.75Q/ bigha
Variety Local Local Local
Technology Indigenous Indigenous Indigenous
Proposed Increase in area 9 Bigha 5 Bigha 6 Bigha
Variety Kanchan Sonalika Dolma
Seed Quantity required by beneficiary group
255 Kg 345 Kg 288 Kg
Source: Household survey, Regionla Centre, NAEB, UHF, 2010
P3.062b Pulses
Crops grown : Rajmash and Mash Total Productions: 18+3.6=21.6 qt( based on PRA exercise)
Source: Household survey, Regional Centre, NAEB, UHF, 2010
Status Particulars Rajmesh Mash
Existing Area under cultivation 36 Bigha 9 Bigha
Production 18 qt 3.6 qt
Productivity 50 kg/ bigha 40 kg/ bigha
Variety Red capsule Local
Technology Indigenous Indigenous
Proposed Increase in area 8 Bigha 3 Bigha
Variety Jawala Local
Seed Quantity required by beneficiary group 440 Kg 48 Kg
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-127]
P 3.062c Requirement of improved seed under different crops
Particulars Quantity Project contribution with 10% Seed replacement rate (Kg)
Estimated Budget (Rs.)
Cereals
Maize 255 25.5 510
Wheat 345 34.5 863
Barley 288 28.8 725
Pulses
Mash 48 4.8 432
Rajmash 440 44 3300
Total 1376 137.6 5830 Note: Target for 3
rd and 4
th year
The quantity of seed for each crop has been determined by multiplying the seed rate per bighas with the total area cultivated under different crops i.e. Maize (85 x 3), Wheat (23 x 15), Barley (24 x 12), Pulses mash(12 x4) and Rajmash (44 x10) by number of beneficiaries (list annexure). The project intervention would be replacement of local varieties by improved varieties at 10 percent replacement rate each year for two years. This seed may be given as demonstration units among the beneficiaries.
P 3.063 Critical Gaps in Agriculture Production
Lack of irrigation facilities.
Lack of scientific agricultural practices.
Timely unavailability of seeds, fertilizers and chemicals for insect-pest management.
Improved seed varieties not adequately used.
P3.064 Marketing
Not sold used only for self consumption
P3.065 Project Interventions
k) Introduction of improved seed Improved seed of maize, wheat and pulses will be introduced as demonstration units
l) Introduction of vermin-composting: Twenty units will be developed as
demonstration, in each village of the panchayat.
For better and productive utilization of FYM Vermicompost is being recommended.
Ward Name No. Of Units Budget
Ghorna 3 21000
Deha 5 35000
Shirgulli 4 28000
Kadharan 3 21000
Chandni 3 21000
Tarapur 4 28000
Shilla 3 21000
Total 25 175000 Note: Target for 3
rd and 4
th year
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-128]
Unit Dimension= 3mx1.85mx0.45m
Vermi compost rate - 7000 /unit
Item Budget estimate cost (Rs) Contribution Total
Project Beneficiaries
Seed 5830 5830 583
Vermi Composting 175000 175000 17500
Total 180830 180830 18083
m) Human Resource Development (HRD)/ Capacity Building and training in Agriculture
Training on cultivation practices of various agriculture crops.
Training on insects & pests management.
Training on post harvest management.
Training on vermicomposting
Exposure visits and experience sharing.
n) Numbers of trainings / Exposure visits Number of Trainings =3
Number of Trainees=30-35
Duration = 3 days
o) Exposure visit One exposure visit of 30 -40 farmers
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-129]
P 3.066 Project Impact a)
Crops Existing families
Addition in families
Total families after project interventions
Seed requirement after project intervention (kg)
Maize 40 9 49 255
Wheat 10 8 18 345
Barley 10 8 18 288
Mash 5 4 9 48
Rajmash 40 10 50 440
Total 105 39 144 1376
Presently 105 families are involved in agriculture production. After project intervention 39 additional families will be involved in agriculture (i.e 9 families in maize, 8 in wheat, 8 in Barley and Pluses 14 families). In total 144 families will be benefited after project intervention and the seed requirement for all these families will be 1376 kg i.e. 255 kg seeds for maize, 345 kg for wheat, and 288 kg for Barley and 488 kg seed of Pulses.
b) Skill development and capacity building of about 25 to 30 farmers from the Panchayat c) Encouragement towards organic farming and improving fertility of soils through
vermincompost
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-130]
Part 3.07
P 3.07 HORTICULTURE
The chapter deals with the fruit and vegetable crops. Among fruits apple, pear, and walnut etc. are grown .Apple is the major cash crop. The watershed area is also cultivated with different types of vegetables. These includes cabbage, beans, capsicum, potato, peas, cauliflower, red chilli etc. the vegetable production is the main farm activity and a good source of employment and income.
P3.071 Prevalent Farming Practices under Horticulture
Horticulture + vegetables
Vegetable + Animal rearing
Vegetable crops(Cabbage + Beans) (Peas + Potato)(Cauliflower +Capsicum)
Fruit crop (Apple + Pear)
Agriculture + Horticulture + Animal rearing. P3.072 Present status of horticulture crops and proposed interventions:
P3.072a Fruits Total production = 4147 Q (Based on PRA Exercise)
Status Particular Apple Pear
Existing Area under cultivation 188.5 Bigha -
Present Production 4147 Qt -
Productivity 22 Qt -
Variety Red royal, Golden Redbartlet
Technology Indigenous indigenous
Proposed Increase in area 307 Bigha 201 Bigha
Varieties Red chief, top red Bartlet, Red bartlet
Plants requirement 10745 8040
P 3.072b Vegetables crops Total Production = 10554 Q (based on PRA exercise)
Status Vegetable crops
Cabbage Bean Peas Cauliflower Potato Capsicum Tomato
Existing Area under cultivation
350Bighas 418 Bighas
450 Bighas
50 Bighas 175 Bighas 40 Bighas 45 Bighas
Present Production
4900 Quintal
334 Quintal
3600 Quintal
500 Quintal 875 Quintal 120 Quintal
225 Quintal
Productivity 14 Q/Bighas
8Q/ Bighas
8Q/ Bighas
10 Q/ Bighas 5 Q/ Bighas
3 Q/ Bighas
5 Q/ Bighas
Variety Hybrid Falguni Azad, P-1, Linken
Shaweta Kufri,Jayoti Bharat Himsona
Technology Indigenous Indigenous Indigenous Indigenous Indigenous Indigenous Indigenous
Proposed Increase in area
40 Bighas 55 Bighas 60 Bighas 10 Bighas 20 Bighas 5 Bighas 5 Bighas
Variety Improved hybrid
Falguni Azad, P-1,Linken
Shaweta Kugri,Jayoti Bharat Himsona
Total seed requirement
19500 gm 2838 Kg 4080kg 3000 gm 292 Q 1350 gm 1000 gm
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-131]
P 3.073 Critical Gaps in Horticulture Production
Lack of vegetable collection centre
Lack of sufficient irrigation facilities
Quality seedling of fruit crop.
Lack of technical knowledge for cultural operation
Knowledge about PHT.
Lack of value addition.
Availability of fertilizers P 3.074 Marketing
c) Vegetable are sold at Theog, Dhalli, Shimla market and Apple are sold at Dhalli, Solan, Chandigarh and Delhi.
P3.075 Project Interventions
o) Supply of improved verities of fruit crops seedlings. p) Vegetable collection centre. q) Training on cultural operations and on value addition. r) Farm based enterprises s) Irrigation through moisture conservation measures t) Drip irrigation Sprinkler u) Vegetable seed production area
P 3.075a Proposed fruit crop intervention in the Project Area Apple
Sr. No.
Name of ward No. of household
No. of Plants
Area (Bigha)
Amount(RS)
1 Ghorna 74 1480 42 37000
2 Deha 105 2100 60 52500
3 Shirgulli 92 1840 52 46000
4 Kadharan 74 1480 42 37000
5 Chandni 63 1260 36 31500
6 Tarapur 75 1500 43 37500
7 Shilla 56 1120 32 28000
Total 539 10780 307 269500 Note: Target for 3
rd and 4
th year
Pear:
Sr. No.
Name of ward No. of household
No. of Plants
Area (Bigha)
Amount(RS)
1 Ghorna 74 1110 28 13320
2 Deha 105 1575 39 18900
3 Shirgulli 92 1380 34 16560
4 Kadharan 74 1110 28 13320
5 Chandni 63 945 23 11340
6 Tarapur 75 1125 28 13500
7 Shilla 56 840 21 10080
Total 539 8085 201 97020 Note: Target for 3
rd and 4
th year
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-132]
The quantity of plant for each crop has been determined by the total number of plants x Bigha i. e apple 35 plant /bigha and pear 40/bigha. P 3.075b Requirement of Improved Vegetable Seed in Project Area Crops Seed requirement
Quantity (Kg)
Project contribution with 10% seed replacement
Estimated Budget(Rs)
Cabbage 19.50 1.950 39000
Beans 2838 283.8 136320
Peas 4080 408.0 36720
Cauliflower 3.00 0.300 12000
Potato 29200 2920.0 350400
Capsicum 1.35 0.135 7425
Tomato 1.00 0.100 5000
Total 36142.85 3614.285 586865 Note: Target for 3
rd and 4
th year
The quantity of seed for each vegetable crop has been determined by multiplying the seed rate per bigha with the total area cultivated under different crops i.e. Cabbage (50 gm), Beans (6 kg), Peas (10 kg), Potato (150 kg), Capsicum (30 gm) by number of beneficiaries (list annexure). The project intervention would be replacement of local varieties by improved varieties at 10 per cent replacement rate each year for 2 years. This seed may be given as samples among the beneficiaries for development and demonstration units
P 3.076 Impact/Project Outcome
11. Skill development /capacity building of 76 farmers 12. Cropping pattern changed. Area under vegetable increased (44 bighas) 13. Farming systems changed. Areas under fruit crops increased (30 bighas) 14. Production of fruit and vegetable from the areas enhanced 15. Livelihood of 43 more farming families linked with horticulture
Species Existing families Addition in
families Total families after project intervention
Fruits
Apple 431 60 491
Pear - 201 201
Vegetables
Cabbage 296 150 446
Beans 300 160 460
Peas 350 130 480
Cauliflower 125 75 200
Potato 218 100 318
Capsicum 105 50 155
Tomato 125 50 175
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-133]
P 3.077 Vegetable Collection Centre Ward Location No. Size Beneficiaries Cost
Ghorna Ghorna 1 6x5 74 260000
Deha Deha 1 6x5 105 260000
Shirgulli Shirgulli 1 6x5 92 260000
Kadharan Beja and lower kadharan 2 6x5 74 520000
Chandni Chandni 1 6x5 63 260000
Tarapur Tarapur 1 6x5 75 260000
Shilla Shilla 1 6x5 56 260000
Total 8 539 2080000 Note: Target for 3
rd and 4
th year
Poly house Demonstration unit for low volume high value crops of vegetable, floriculture and MIS
Ward Location No. Size Cost
Ghorna Ghorna 1 100m2 125000
Deha Deha 1 100m2 125000
Shirgulli Shirgulli 1 100m2 125000
Kadharan Kadharan 2 100m2 250000
Chandni Chandni 1 100m2 125000
Tarapur Tarapur 1 100m2 125000
Shilla Shilla 1 100m2 125000
Total 8 1000000 Note: Target for 3
rd and 4
th year
Before introducing the Poly House at ward level PIA will be authorized to decide the location and beneficiaries.
Part 3.08
P 3.08 ANIMAL HUSBANDRY
Animal rearing is the second important activity for livelihood along with Agriculture. Animals are reared by farmers mainly for milk, FYM, Milch animals are local as well as improved. Hence milk production is low.
P 3.081 Milk Production and fodder requirement
Total numbers of milching cattle in the panchayat are 653 and average production of milk per day is 2.5 lt from local cows, 5.0 lt from jersey cows per day. The total milk production/day is 2940 lt for different species.
P 3.081a Average and Total milk production
Milch cattle Number Average milk production lt./day
Total production (lt.)
Cow(Local) 130 2.5 325
Cow (improved) 523 5 2615
Total 653 2940
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-134]
P 3.082 Fodder availability, requirement and Deficit (tons)
Green fodder available in project area is 7069 tons whereas dry fodder available is 4241 ton. Total 11310 ton fodder is available in project area. But requirement of green fodder is 16966 ton whereas requirement of dry fodder is 5655 ton. Total fodder required is 22621 ton. Deficit of green fodder in project area is 9897 ton and that of dry fodder is 1414 tons.
P 3.082a Fodder availability, requirement and Deficit (tons)
Available Required Deficit
Green Dry Total Green Dry Total Green Dry Total
7069 4241 11310 16966 5655 22621 9897 1414 11311
Note - Available Fodder
Green - 25kg/day x 30 days x 6months x Total live stock Dry -15 kg/day x 30days x 6months x Total live stock
Required Fodder: Green -30kg/day x 30days x 12months x Total live stock
Dry -10kg/day x 30days x 12months x Total live stock
P 3.082b Gap between Demand and supply of total Fodder
Particulars Fodder (tons)
Supply 11310
Demand 22621
Deficit 11311
P 3.083 Project interventions Plantation and cultivation of fodder trees and grasses Construction of talabs , Johars in grass land and community lands Training/Capacity building
g) Plantation and cultivation of fodder trees and grasses
Species:
Tree: Buel, Ban, Robinia
Grasses: Berseem, Orchard grass, Napier etc.
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-135]
P 3.083a Requirement of fodder trees and grasses in wards
Name of Ward
Fodder Trees Estimated Budget(Rs.)
Grasses Estimated Budget(Rs.)
Area (ha.)
No. of Plants
Area (ha.)
Quantity of seeds (kg)
Ghorna 3 3300 60000 2 70 8400 Deha 2 2200 40000 1 35 4200 Shirgulli 3 3300 60000 2 70 8400 Kadharan 3 3300 60000 2 70 8400 Chandni 3 3300 60000 2 70 8400 Tarapur 3 3300 60000 2 70 8400 Shilla 3 3300 60000 2 70 8400
Total 20 22000 400000 13 455 54600 Note: Target for 4th year
h) Construction of talabs , Johars in grass land and community lands i) Training and Capacity Building
Live stock management
Animal Health
Artificial insemination
Improved grasses / Fodder trees
Exposure visits Number of Training
Four trainings with 5-7 farmers in each trainings
Exposure visits for 5-7 farmers P 3.084 Project outcome/impact
P 3.084a Estimated production of milk after project intervention
Milk production after project intervention will increase to 5 lt. /day and total production of milk after project intervention will be 4051 liters.
P 3.084b Milk production from cows and buffaloes
Milch cattle No. Milk production lt./day
Total production (lt.)
Cow(Local) 130 3 390
Cow (improved) 523 7 3661
Total 653 4051
P 3.084c Total milk production before and after project intervention.
Increase in milk production is 1111 lt. with total production of 4051 lt.
Milch cattle Before project (lt.) After project (lt.) Increase after project
Buffaloes - - -
Improved cows 2615 3661 1046
Local cows 325 390 65
Total 2940 4051 1111
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-136]
Part 3.09
P 3.09 FISHERY Fisheries can be one of the additional sources of income to the farmers of the watershed area, but due to the lack of fresh water, the people enable to take up this activity as a source of income. Secondly the people of the watershed area are practicing agriculture, horticulture and vegetable cultivation which are giving good returns to the farmers. Hence fish cultivation cannot suggest for the watershed areas of the theog block. P 3.09a Existing and Proposed water bodies for fish culture
Existing water bodies Proposed water bodies Owner ship private /common No Size (ft) location No Size (ft) Location
1 Nil Nil Nil Nil Nil Nil
2 Nil Nil Nil Nil Nil Nil
P 3.09ab Availability and requirement of fish seed /fingerlings
Ward Existing families
Proposed families
Present quantity of fish
Requirement of fish seed
Breeds
1 Nil Nil Nil Nil Nil
2 Nil Nil Nil Nil Nil
P 3.091 Project Interventions
Introducing of fisheries among more families
Requirement of improved seed (fingerlings)
Training on fish culture
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-137]
Part 3.10
P3.10 DRINKING WATER
The panchayat area falls in the rain fed area. Water resources are very limited which has been taped fully by the local people for drinking and irrigation purposes. In earlier days there were water bodies (Bawaries) from which the people used to take water for drinking purpose. During the field visit and interaction with the local people and transect- walk of the water shed area source some of fact regarding drinking water come up.
* Dried up of the water bawaries due to the climate change. * Heavy pressure on the existing water bodies due to increase in population. * Less care of maintenance of water bodies, which is due to the habit of tap water
provided at door step provided by the IPH department, lifted from Giri River. * Less percolation for the existing Bawaries due to less range and drying up of Johar at
the watershed area * Presently people take the water through taps, which is provided in alternative days.
P3.101 Availability of water in the panchayat P 3.101a Availability of water before and project interventions
Sr. No
Particulars Capacity (lt)
Present After Project intervention
1 Total supply of water per day 98700 1184100
2 Total House holds 539 539
3 Total population 2141 2141
4 Water Available per house hold per day 183 lt 2197 lt
5 Per capita Availability 46 lt 553 lt
P 3.102 Status of Drinking water in different wards of Panchayat
P 3.102a Structure, water availability on daily and monthly basis Ward/Village Name of Structure Availability
of water /day from the source
No. of months water available during the year
Tap/ WST Handpump Well Bawaries
No Capacity No Capacity No Capacity No Capacity
Ghorna 2 57000 2 Dry - - 3 1500 20000 6-8 months/year
Deha 1 10000 1 3000 - - 2 7500 10800 12-12 months/year
Shirgulli - - - - - - 1 1000 500 6 months
Kadharan - - 1 3000 4 2500 2 1200 6000 6 months
Chandni 3 49600 2 6000 - - 1 1500 35800 6 months
Tarapur 2 6720 2 6000 - - 2 3000 12900 6 months
Shilla 4 19500 - - - - 4 5000 12700 6 months
Total 12 142820 8 18000 4 2500 15 20700 98700
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-138]
P 3.102b Structure with number of beneficiaries and dimensions. Work Name of
the Ward Existing number
Proposed number
Location No. of Beneficiaries
Dimension (m)
Estimated Budget (Rs.)
Tank Tarapur 2 1 Sheel nala source
All 5x4x2 82000
1 Kath All 5x4x2 82000
Chandni 3 1 Chanari 40 5x4x2 82000
1 Lower chandni 30 5x4x2 82000
1 Raksha 30 5x4x2 82000
1 Chandni All 5x4x2 82000
Deha 1 1 Deha All 5x4x2 82000
Ghorna 2 1 Ghanog All 5x4x2 82000
1 Ghorna All 5x4x2 82000
1 Balah All 5x4x2 82000
1 Ghorna All 5x4x2 82000
Shilla 4 1 Jhola near jungle
All 5x4x2 82000
1 Shilla All 5x4x2 82000
1 Halai All 5x4x2 82000
Joytai All 5x4x2 82000
Jhola All 5x4x2 82000
Kadharan 1 Ghog All 5x4x2 82000
1 Kadharan All 5x4x2 82000
1 (Dotti ka khallin)
All 5x4x2 82000
1 Kadharan kund ke pass
All 5x4x2 82000
1 Daba All 5x4x2 82000
1 Beza All 5x4x2 82000
Shirguli 1 Khagna All 5x4x2 82000
1 Muchramna All 5x4x2 82000
1 Nerwa All 5x4x2 82000
Total 23 2050000
Bawari Tarapur 2 1(repair) Tarapur 10 20000
1(repair) Kath 10 20000
Chandani 1 (dry) 1(repair) Chandani 12 20000
Deha 2 2(repair) Deha All 40000
Ghorna 3 (dry) - - -
Shilla 4(dry) 4(repair) Shilla All 80000
Kadharan 2 (dry) 2(repair) Kadharan All 20000
Shirguli 1 (dry) - - -
Total 11 200000
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-139]
P 3.103 Storage capacity and availability of water from existing structures
Sr. No.
Collecting structures
Storage capacity(lt)
Availability of water/ day from the source(lt)
No. of months water available during the year
1 Well 2500 2500 6 Months
2 WST/Tap 142900 65700 4-5 Months After the Interval of three days
3 Bawaries 20700 12500 6-7 Months
4 Hand pump 18000 18000 12 Months
Total 184100 98700
P 3.104 Proposed activities for increase in the water capacity/ availability through
renovation/new construction of structure P 3.104a Size, location, capacity of structures with beneficiaries
Structure Size (m) Location Capacity (lt) Benefited families
Old New Old New Old After intervention (lt)
Old New
Handpump
As per annexure
18000 18000 All All
Bawaries 12500 20700 All All
WST/Taps 65700 1142900 All All
Well 2500 2500 All All
Total 98700 1184100
P 3.105 Critical Gaps to be covered (item/activity) Irregular supply of drinking water
Improper drainage of the catchment area to the ponds
P 3.106 Outcome
Source Present storage capacity(lt)
Proposed storage capacity(lt)
Total Families benefitted
Present Requirement/ day(lt)
Quantity after intervention (new + repair lt)
Handpump 18000 18000
539 46 553 Bawaries 12500 20700
WST/Taps 65700 1142900
Well 2500 2500
Total 98700 1184100 539 46 553
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-140]
Part 3.11
P3.11 SOIL CONSERVATION
The watershed area comprises of hill steep slopes having mixed layers of soil, facing problems of major soil erosion during rainy season. During the field visit and interaction with the local people and farmers, it was observed that soil erosion is increasing at a faster rate, due to the following reasons:
Heavy and uncontrolled grazing
Deforestation in the watershed areas
Construction of roads and dumping of debris along Nala side
Cutting of bushes and hedges by local people for fuel and fodder purpose
Lake of physical and bio logical structures, which facilitate water conservation
Excessive use of cultivated land for Veg. purpose.
P3.110 To check soil erosion, following interventions are recommendation
Construction of check dams from top to bottom to minimize the flow of water.
Construction of crate walls to sloppy land sliding area.
Construction of Contour and trenches to check soil erosion.
Proper bunding on the cultivated lands by planting grasses
Biological/vegetative engineering measures along the slope land
P 3.111 Various structure are required to be constructed at different location for checking soil erosion
P 3.111a Structure with number of beneficiaries
Activity Ward Name Location Proposed (No)
Families Benefited
Size(m) Estimated Budget(Rs.)
Dry Check dam
Tarapur Kath nala to noti khad 30 All 4x2x1 108000
Chandani Chandani khad to Deha
40 All 4x2x1 144000
Deha Kanor nala 20 25 4x2x1 72000 Ghorna Ghorna nala 18 All 4x2x1 64800
Shilla Nalana nala 18 All 4x2x1 64800 Ramola nala 20 All 4x2x1 72000 kadharan Kheri ka nala 18 All 4x2x1 64800 Paral ka nala (Dovri 20 All 4x2x1 72000 Shirguli Jarari nala 28 All 4x2x1 100800 Jaria nala 20 All 4x2x1 72000 Total 232 835200 Crate wall Deha Deha 26 All 4x2x1 143000 Total 26 143000
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-141]
Soil conservation work includes formation of crate walls and gully plugging, drainage and contour trenching. In this panchayat total 6 crate walls will be constructed which will benefit all families of the area. Total 122 gully plugging/dry check dam will be constructed which will benefit 256 families.
Vegetative Measure: Various types of trees (Robinia,kenth), Shrubs (|Berbris, Ruses) and grasses (Chrysopogon falues, Cynodon dactylon, Napier etc.) can be grown in the areas prone to soil erosion. Fodder grasses like Napier grass can be used on farm bunds. For demonstration in each panchayat about 10,000 cuttings could be planted/ distributed to farmers.
Outcome
To minimize the impact of rainfall
To reduce soil erosion
To improve moisture conditions of the area
To improve soil properties, etc.
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-142]
Part 3.12
P3.12 CONVERGENCE The linkage of the IWMP-V, Ghorna with the other development programme is also one of the important components. The possibilities of identifying different activities under the IWMP and their association with other activities of different line departments can be assured through convergence. This is the best tool to derive support from different line departments.
The following activities can be converged from one head to another:
Developmental activities like roads and irrigation facilities can be converged with PMGSY, PWD, IPH and MNREGA programmes
Employment Generation with MNREGA programme run by Rural Development Department
To improve productivity, distribution of improved seeds, fertilizers, insecticides and pesticides can be converged with State Agriculture Department under Pandit Dindayal Krishi Yojna
Construction of poly houses and vegetable Collection Centres at watershed level can be constructed under the Horticulture Technology Mission run by Department of Horticulture
Income generating activities and micro-enterprises with rural employment programme, Prime Minster Employment Generation Programme. Self –Employment Schemes etc.
Diary development and sheep-goats rearing for the resource less people under Dudh Ganga Pariyojana run by the Animal Husbandry Department
Table: Activity/ work to be taken other programme/scheme Sr.No. Activity
/work Programme /scheme for convergence
Agency/Deptt
Budget contribution
Watershed convergence Beneficiaries Total
1 Dry check dam
MNREGA RD 822920 12280 - 835200
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-143]
Part 3.13
P3.13 MICRO ENTERPRISES
Income generating activity reported in the watershed areas are carpentry, masonry, shoe making and weavers, diary, poultry, sheep and goats rearing, pattal and basket making etc,. These income generating activities can transform the rural poor, if they have given more opportunities in the form of trainings, equipments and machine etc., cutting and tailoring, achar making, jam, jelly, candy and juices making can be other options for rural women to improve their socio-economic conditions.
The skills of local artisans can be improved by providing more opportunities at their door steps. Keeping in view the above mentioned facts, the following activities will be taken up under watershed programme for farmers.
P3.131 Income enhancement and employment generation through different income generating activities
P3.131a Number of households with activities and income
Sr. No
Activity Existing No. of household
Proposed No of household
Present income/ mandays (Rs/day)
After intervention income/ mandays
1 Carpentry 10 10 120000/600 180000/900
2 Black Smith 1 1 4500/30 9000/60
3 Cutting & tailoring - 4 - 10000/240
4 Dairy farming 4 5 100800/840 147000/1050
5 Vermicompost - 38 - 228000/2280
6 Spain 1 2 72000/90 192000/120
7 Seed village concept - 3 - Introducing the new concept
8 Horti. nursery - 4 - Introducing the new concept
The above mention activities are considered for the farmer/rural artisan land holding less than 3 bighas which will be verified during the implementation by the PIA.
P 3.132 Activity Wise Projects
1. Carpentry
i. Purpose : Livelihood/ Enhancement of income j. Category : SC/ IRDP k. No. of families involved : 10 l. Project intervention
v. Training vi. Tools and equipments
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-144]
Outcomes of Projects
Present income/mandays After intervention income
Requirement for intervention
Approximate cost
120000/600 180000/900 Machine plainer and training.
100000
4. Black smith
e. Purpose : Livelihood/Enhancement of income f. Category : SC/IRDP g. No. of families involved : 1 h. Project Intervention
iii. Training iv. Tools /equipment
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
4500/30 9000/60 Training and tools 10000
5. Cutting & tailoring
e. Purpose : Livelihood/Enhancement of income f. Category : SC/IRDP g. No. of families involved : 4 h. Project Intervention
iii. Training iv. Tools /equipment
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
- 10000/240 Training and Machine 40000
4. Dairy farming
e. Purpose : Livelihood/Enhancement of income f. Category : NSC g. No. of families involved : 5 h. Project Intervention
iii. Training iv. Cows
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
100800/840 147000/1050 Cows 100000
5. Vermicompost
e. Purpose : Livelihood/Enhancement of income f. Category : SC/IRDP g. No. of families involved :38 h. Project Intervention
iii. Training iv. Pits &worms
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-145]
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
- 228000/2280 Pits & worms 266000
6 Spain
a. Purpose : Livelihood/Enhancement of income b. Category : SC/IRDP c. No. of families involved : 2 d. Project Intervention
I. Training II. Necessary input
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
72000/90 192000/120 Necessary input 300000 Note 50 % contribution will be provided by the Beneficiaries
7. Introduction of Seed Village Concept at ward level:
Ward Location No. Beneficiaries Cost Chandni Chandni 1 60 125000
Tarapur Tarapur 1 65 125000
Shilla Shilla 1 45 125000
Total 3 170 375000 Note: Seed of vegetable/floriculture will be produced at different locations
8 Horticulture Nursery:
Ward Location No. Beneficiaries Cost Kadharan Kadharan 1 55 150000
Shirguli Shirguli 1 70 150000
Ghorna Ghorna 1 74 150000
Chandani Chandani 1 60 150000
Total 4 259 600000
Before introducing the Seed village concept and Nursery at ward level PIA will be authorized to decide the location and beneficiaries.
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-146]
Part 3.14
P3.14 LIVELIHOOD CONCERNS The land resource is the primary and major source of livelihood activities in the watershed area. These natural resources can be used properly by adopting integrated farming system to get more return per unit space per unit time. Area is suitable for the cultivation of apple, pear, pomegranate and walnut. These fruits plants can be integrated with agriculture and animal‟s husbandry to increase the productivity of land. The shortage of fodder leads farmers to rear only local breeds of animals that are too for self consumption of milk and farm yard manure. This shortage of fodder can be overcome by introducing multipurpose tree species. Other option of livelihood is the revival of rural artisans and for this best options with the rural artisans are carpenter, masonry, weaving, crafting and shoe making. The rural poor can earn good amount of money from these professions. These are some of important income generating activities need to be introduced in the watershed area. There is a dire need to aware, motivate and trained the local poor artisans. These artisans should be provided with equipments to earn their livelihood and to improve their socio economic conditions.
P3.141 Existing nature of livelihood in the watershed
Sr. No.
Category wise Total No. of household
Livelihood linked in the project
1 General 413 Agriculture + Horticulture + Animal husbandry + Micro enterprises
2 SC 116 Agriculture + Horticulture + Animal husbandry + Micro enterprises
3 ST and OBC 10 Agriculture + Horticulture + Animal husbandry + Micro enterprises
4 BPL 82 Agriculture + Horticulture + Animal husbandry + Micro enterprises
Total household 539
P3.142 AGRICULTURE
Sr. No.
Particulars Before project
After project intervention
1 No. of days/year food grain sufficiently at home per family
4 months 5 months
2 Average production from agriculture 5.8 qt/family 6.5 Q
3 Income from agriculture Self consumption Self consumption
4 No. of families who want to increase areas (all crops in agriculture combined)
539 539
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-147]
P3.143 HORTICULTURE
P3.143a Fruits production
Sr. No.
Particulars Before project
After project intervention
1 No. of households with orchards 539 539
2 Area per household under horticulture (fruit trees)
4-6 5-7
3 Total production 4147 qt 6070 qt
P3.143b Vegetable Productions
Sr. No.
Particulars Before project
After project intervention
1 No. of households having commercial vegetable production
539 539
2 Average area per household under vegetable
2 bighas per household
3bighas per household
3 Total production 10554 qt 12000 qt
P3.143c Handling and Processing
Crops Particulars Before project
After project Intervention
Fruits Number of persons involved with no of day per year
1persons 1persons/3months/year
Vegetable Number of persons involved with No of day per year
1persons 1 persons/3months/year
P3.143d Value Addition
Sr. No.
Particulars Before project
After project Intervention
1 Number of persons involved with no of day per year
Nil 2
P3.143e Marketing
Sr. No. Particulars Before project After project Intervention
1 Number of persons involved with no of day per year
1-2 1-2
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-148]
P3.144 ANIMAL HUSBANDRY P3.144a Production: (Milk/Egg/Meat/Wool/Fodder)
Product Particulars Before project After project Intervention
Milk No of families involved 539 539
Quantity of milk produced 2940 4051
No of milch cattle 653 653
P3.144b Milk
Sr. No.
Particulars Products Before project
After project Intervention
Curd ,Cheese, Ghee Self use Self use
1 Number of families involved 539 539 539
2 Total No of days per year 240 240 240
P3.145 MICRO ENTERPRISES P3.145a Activity Wise
Activity Particulars Before
project After project Intervention
Carpentry No of households 10 10
No of mandays/year/household 60 90
Income per household 12000 18000
Black smith No of households 1 1
No of mandays/year/household 30 60
Income per household 4500 9000
Cutting & tailoring No of households - 4
No of mandays/year/household - 60
Income per household - 2500
Dairy Farming No of households 4 5
No of mandays/year/household 210 210
Income per household 25200 25200
Vermicompost No of households - 38
No of mandays/year/household - 60
Income per household - 6000
Spain No of households 1 2
No of mandays/year/household 90 120
Income per household 72000 96000
Seed village concept No of households - 2
No of mandays/year/household - 240
Income per household - New concept
Horti. nursery No of households - 2
No of mandays/year/household - 150
Income per household - New concept
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-149]
Part 3.15
P 3.15 CAPACITY BUILDING
To implement watershed activities more effectively skill development and capacity building at Panchayat level is very important. The activities proposed are given below: P3.151 Modules
P3.151a Awareness Camps
Will be organized at Panchayat level
P3.151b Training:
Training will be organized at
Block level
DRDA level
Institutional level P3.151c Exposure Visits:
Exposure visits will be conducted at University/ Institutions /Field
P3.151d Special Trainings will be organized in the professional institutes P3.152 Activities with number of participants P3.152a Target groups and location of programme Target group No. of
participants Activity Location
Member of Gram Shabha
All Awareness camps Panchayat level
PRI, VLI Members 10 Watershed Implementation and management Block level
Self Help Groups, User Groups and Beneficiary groups
3 to 5/panchayat
Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.
Block level (One trainings for such activities)
Self Help Groups, User Groups and Beneficiary groups
1 to 2/ ward/ panchayat
Exposure visits (university/professional institute/field visits)
State/Outside State
Self Help Groups, User Groups and Beneficiary groups
1 to 2 / ward/ panchayat
Kissan Melas/ Pradashanis State/Outside State
Self Help Groups, User Groups and Beneficiary groups
2 to 3/ activity/ panchayat
Specialized trainings (Mushroom production, floriculture, fruit crops, nursery raising techniques, dairy development, poultry farming, goat breeding, cereals crops, agriculture and insect-pest management etc.
Professional Institutes / University
PIAs, WDTs members
10 Project implementation and management trainings, report writing and accounts maintenance
DRDA level
The capacity building of farmers and youth in the watershed areas can also be done under
the micro enterprises and livelihood through Industrial Training Institute (ITI) occupation\trades as well as other entrepreneurs programmes which provide self-employment or wage employment within the watershed areas.
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-150]
Part 3.16
P 3.16 ACTIVITY AND BUDGET
P 3.161 Agriculture (For 2 years)
Activity /item Variety Quantity (kg)
Cost for 3rd year
Cost for 4th year Improved Seeds
Maize Kanchan/Pioneer 7.7 150 450
Wheat Madurai and S-308 24 600 1800
Barley Dolma 12 300 900
Pulses (urad) Improved(T-9) 4 360 1080
Rajmash Local 12 900 2700
Total 2310 6930
P 3.162 Vermi Composting
Activity /item No. Rate (Rs/unit) Dimensions (m) Total Cost (Rs)
Vermicomposting units one in each village
41 7000 3 x 1.8 x 0.45 287000
Note : As per agriculture department norms
P 3.163 Horticulture (For 2 years)
Activity /Item
Variety No. of Plants required
Rate (Rs/plant)
Cost for 3rd year
Cost for 4th year
Apple Red royal, Golden 10780 25 269500 269500
Pear Red bartlet 8085 12 97020 97020
Total 18865 366520 366520
P 3.164 Vegetable (For 2 years)
Activity /Item
Variety Quantity (kg)
Cost for 3rd year
Cost for 4th year
Cabbage Hybrid 1.950 39000 39000
Bean Falguni 283.8 136320 136320
Peas Hybrid, P-1, Linken & Azad 408.0 36720 36720
Cauliflower Shweta 0.300 12000 12000
Potato Kufri jyoti 2920.0 350400 350400
Capsicum Bharat 0.135 7425 7425
Tomato Himsona 0.100 5000 5000
Total 3614.285 586865 586865
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-151]
P 3.165 Vegetable collection Centres
Activity /item No. Rate (Rs/centre) Dimensions (m) Total Cost (Rs)
Vegetable collection centre
8 260000 6x5 2080000
Total 8 2080000
Note : As per agriculture department norms P 3.166 Polyhouse unit and MIS
Activity /item No. Rate (Rs/centre) Dimensions (m) Total Cost (Rs)
Polyhouse unit &MIS 8 125000 1002 m 1000000
Total 8 1000000
P 3.167 Animal Husbandry
Activity /Item
Breed Area Rate (Rs)
Total cost (Rs)
Project share
Beneficiaries share
Convergence
Fodder 12 20000 240000 240000
Grasses Napeir, Steria and Barseem
13 4200/ Ha or 120/kg
54600 54600 - -
Total 25 294600 294600 - -
P 3.168 Soli Conservation
Activity /item No. Rate Dimensions (m) Total Cost (Rs)
Dry Check Dam 122 3600 4x2x1 439200
Crate wall 6 5500 4x2x1 33000
Total 472200
P 3.169 Micro Enterprises
Activity /Item Total No. of families Requirement Cost (Rs)
Carpentry 10 Tools and training. 100000
Black Smith 1 Training and tools 10000
Cutting & tailoring 4 Training and tools 40000
Dairy farming 5 Cows 100000
Vermicompost 38 Pits and verms 266000
Spain 2 Necessary input 300000
Seed village concept 3 New Concept 375000
Horti. nursery 4 Installation of infrastructure 600000
Total 67 1791000
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-152]
Action Plan for IWMP-V Theog
Name of the State:- Himachal Pradesh Name of the District:- Shimla Name of Block:- theog Name of Panchayat:- Ghorna Total Area in Hectare: - 2557 hector Total Sanctioned Amount:- Rs.3,83,55000 Total Village- 20 Sr. No.
Work Component
Total Proposed Work including Convergence
Fund s Allocated
1st year Plan 2
nd year Plan 3
rd year Plan 4
th year 5
th year
IWMP IWMP IWMP IWMP IWMP
Physical
Financial Physical Financial Physical Financial Physical Financial Physical Financial
A) General
1 Administrative cost
3835500 767100 767100 767100 767100 767100
2 Monitoring 383550 - 127850 127850 127850 -
3 Evaluation 383550 - - 127850 127850 127850
Total 4602600 767100 894950 1022800 1022800 894950
B Institution & capacity building
a Awareness 7 105000 - 105000 - - - - - - - - b Block level 7 140000 - 140000 - - - - - - - - c District level 7 350000 - 350000 - - - - - - - - d Institutional
training 7 735000 - - - 735000 - - - - - -
e Exposure visit 6 400000 - - - 400000 - - - - - - f Expert
visits/services and Misc.
- 187750 - - - - - 187750 - - - -
Total 1917750 - 595000 - 1135000 - 187750 - - - - C Detailed
Project Report (DPR)
383550 - 383550 - - - - - - - -
Total 383550 - 383550 - - - - - - - - D ) Consolidation
phase 1917750 - - - - - - - - - 1917750
Total-D 1917750 - - - - - - - - - 1917750
E) Entry point activities
a Vegetable collection centre
6 1534200 135 1534200 - - - - - - - -
Total 6 1534200 135 1534200 - - - - - - - -
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-153]
Sr. No.
Work Component Total Proposed Work including Convergence
Funds Allocated
3rd year Plan 4th year Plan
IWMP Convergence IWMP Convergence
Physical Financial Physical Financial Physical Financial Physical Financial
C ) Watershed Development Phase
1 Watershed Development Works
a Kachha talab 57 3374200 296 3374200 - - - - - -
b Roof water 74 6808000 597 6808000 - - - - - -
c Tank 49 6282000 551 6282000 - - - - - -
d Dam 2 900000 79 900000 - - - - - -
Total 182 17364200 1523 17364200 - - - - - -
2 Agriculture
a Provision for crop seed 11660 1 5830 - - 1 5830 - -
b Vermicompost 25 175000 7 84000 - - 8 91000 - -
Total 25 186660 8 89830 - - 9 96830 - -
3 Horticulture
a e) Apple 21560 Plants 539000 25 269500 - - 25 269500 - -
b f) Pear 16170 Plants 194040 16 97020 - - 16 97020 - -
c Vegetable seed - 1173730 51 586865 - - 51 586865 - -
d Vegetable collection center
8 2080000 91 1040000 - - 91 1040000 - -
e Poly house & MIS 8 1000000 44 500000 - - 44 500000 - -
Total 4986770 227 2493385 - - 227 2493385 - -
4 Animal Husbandry
a Fodder 22000 400000 - - - - 20 400000 - -
b Grasses 455 kg 54600 - - - - 13 54600 - -
Total 454600 - - - - 33 454600 - -
5 Soil Conservation
a Dry Check Dam 232 835200 72 822920 - 12280 - - - -
b Crate Wall 26 143000 13 143000 - - - - - -
Total 258 978200 85 965920 - 12280 - - - -
6 Drinking water
a Bawari 11 200000 17 200000 - - - - - -
b Tank 23 2050000 180 2050000 - - - - - -
Total 34 2250000 197 2250000 - - - - - -
7 Livelihood activities for the asset less persons
a Carpentry 10 100000 - 100000 - - - - - -
b Black Smith 1 10000 - - - - - 10000 - -
c Cutting & Tailoring 4 40000 - - - - - 40000 - -
Total 15 150000 - 100000 - - - 50000 - -
7 Production system & micro enterprises
a Dairy 5 100000 - 100000 - - - - - -
b Horti. Nursery 4 600000 26 300000 - - 26 300000 - -
c Seed village concept 3 375000 22 250000 - - 11 125000 - -
d Spain work 2 300000 13 150000 - - 13 150000 - -
e Vermicompost 38 266000 - - - - 23 266000 - -
Total 52 1641000 61 800000 - - 73 841000 - -
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-154]
SUMMARY
Located at an altitude of 4910 feet above mean sea level Gram Panchayat Ghorna comprises the total area of 2557 hac. The total amount sanctioned for watershed development works, production systems, micro- enterprises, livelihood activities including preparation of DPR and other phases is 383.55 lacs. Data regarding socio-economic profile, land use pattern, livestock position and cropping pattern, etc was collected from panchayat secretaries, patwaries and through household surveys and PRA exercises. Total population of the panchayat is 2141out of which 413 families are of general,10 families are of OBC and are 116 of scheduled caste. In total 182 new water harvesting structures will be constructed including convergence existing structures in which repair work will be done. Construction and repair of these structures will enhance the storage capacity to 15700 m3 with total cost of Rs 1,73,64,200 which will irrigate 79 hac area of the panchayat.
The main agricultural crops grown in the panchayat are maize and pulses with total area of 188 bigha. In total 1376 Kg seeds of agricultural crops will be provided in the panchayat which will cost Rs 11660 and 25 vermicomposting units will be developed as demonstration unit in the panchayat which will cost Rs 1,75,000 In agriculture there will be skill development and capacity building of about 25-30 farmers from the panchayat.
Horticulture is the major source of income to the farmers. The farmers are growing apple and vegetable crops in the watershed area. The total 37730 Plants of apple and pear will be distributed to the farmers costing Rs 7,33,040. Improved verities seeds of different vegetable crops will be distributed to the farmers which will be cost Rs 11,73,730 The technique of low volume high value crops will be demonstration by installing pollyhouses (MIS) and seed village concept for the BPL and SHGs. The total 8 pollyhouse and 3 seed village concept will be demonstrated the Rs. 10,00,000 and 3,75,000 has been earmarked for the purpose.
Total number of animals in the panchayat is 1571 for which fodder trees and grasses will be provided in each ward. In total 22000 plants of fodder and 455 Kg of grass seeds will be provided in the ward, which will cost Rs 4,00,000. and Rs 54,600 respectively. Drinking water is a pre requisite for the well- being of the area. 34 new drinking water structures like bawaries and wells will be constructed in different locations of the panchayat. Construction of new structures and repair of old structures will enhance the storage capacity to 1184100 lt with cost estimate of Rs 22,50,000 Per capita availability of drinking water will increase from 46 liter to 553 liter after project.
Soil conservation is the main objective of watershed programme. So to check soil erosion construction of crate wall will be done. Only River Banks will be constructed to prevent soil erosion, which will cost a total of Rs 97,82,00 The overall objective of watershed development programme is poverty elevation by investing in micro- enterprises and enhancing rural livelihoods. Income generating activities reported in the panchayat are rural artisans making, Cutting& tailoring, dairy, carpentry,black smith, Poultry, and dairy farming. A total of Rs 14,16,000 will be given to the beneficiaries of these groups with necessary trainings and tools. one poluhouse unit is introduce as demonstration in panchayat with cost of 1,25,000
Amount spent on different activities like entry point activities (15,34,200, water harvesting structures (1,73,64,200), agriculture development (1,86,660), horticulture development (49,86,770, animal husbandry (4,54,600), drinking water (Rs 22,50,000), soil conservation (Rs 9,78,200), micro- enterprises and livelihood (Rs 14,16,000) and capacity building (Rs 19,17,750)
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-155]
Annexure -I Water harvesting Target for 3rd year
Existing and Proposed water harvesting structures in Ghorna Panchayats of IWMP V Theog are presented as under
Activity Ward Name
Proposed No.
Location GIS coordinates Benefitied Families
Size (mt)
Estimated Cost (Rs.) Longitude Latitude Altitude
Kachha Talab Tara pur 1 Bharar kufta 31003.05 77
027.11 1740 All 10x8x2 62500
1 Kufta -II 31003.04 77
027. 12 1742 All 10x8x2 62500
Chandni 1 Dhali 31002.35 77
027. 37 2065 All 10x8x2 62500
1 Shiv mandir 31002.34 77
027. 39 2070 All 5x4x2 22500
1 Raksha 31002.46 77
027. 41 2070 All 10x8x2 62500
1 Chanari 31002.40 77
027. 40 2072 All 10x8x2 62500
Deha 1 Kalariya jungle 31002.51 77
027. 42 2079 All 10x8x2 62500
1 Khonoti 31002.49 77
027.41 2071 All 10x8x2 62500
Ghorna 3 Bharaun 31002.47 77
028.59 1992 All 10x8x2 62500
1 Balaha 31002.35 77
028.56 1967 All 8x8x2 39200
1 Ghorna 31002.28 77
028.51 1925 All 10x8x2 62500
1 Ganog 31002.30 77
028.56 2050 All 10x8x2 62500
Kadharan 1 Kufta (Naleha) 31001.49 77
029.50 2025 All 10x8x2 62500
1 Kadharan 31001.48 77
030.00 1023 All 10x8x2 62500
1 Lahi 31001.41 77
029.29 1073 All 10x8x2 62500
1 Ghogh(maroli) 31001.57 77
029.32 2021 All 10x8x2 62500
1 Dhal (Ghog) 31001.59 77
029.33 2025 All 10x8x2 62500
1 Tillu-I (near lachu resi.) 31002.20 77
029.31 2017 All 10x8x2 62500
1 Tillu-II (near sai ram resi.) 31002.26 77
029.39 2020 All 10x8x2 62500
1 Shavkar-I 31002.31 77
029.42 2025 All 10x8x2 62500
1 Shavkar-II 31002.33 77
029.45 2022 All 10x8x2 62500
1 Matri-I 31002.37 77
029.41 2029 All 10x8x2 62500
1 Matri –II 31002.40 77
029.49 2032 All 10x8x2 62500
1 Matri –III 31002.45 77
029.52 2035 All 10x8x2 62500
1 Matri-IV 31002.49 77
029.57 2039 All 10x8x2 62500
1 Matri-V 31002.52 77
029.55 2045 All 10x8x2 62500
1 Chambi –I 31002.58 77
029.51 2027 All 10x8x2 62500
1 Chambi –II 31002.59 77
029.59 2038 All 10x8x2 62500
1 Rachoth-I 31002.57 77
029.49 2035 All 10x8x2 62500
1 Rachoth-II 31002.56 77
029.36 2039 All 10x8x2 62500
1 Kuffer -I 31002.49 77
029.35 2051 All 10x8x2 62500
1 Devinder chowki 31002.41 77
029.38 2059 All 10x8x2 62500
1 Bhraun-I 31002.46 77
029.58 1995 All 10x8x2 62500
1 Bhraun-II 31002.40 77
029.59 1991 All 10x8x2 62500
1 Bhraun-III 31002.47 77
029.59 1002 All 10x8x2 62500
1 Bhraun –IV(Bhuni-dahabar) 31002.47 77
029.01 2008 All 10x8x2 62500
1 Bhraun –V(sukhi kuffer) 31002.42 77
029.06 2009 All 10x8x2 62500
1 Kuffer-II (Gom dhar) 31002.47 77
029.39 2053 All 10x8x2 62500
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-156]
1 Alli dhar-I 31002.52 77
028.49 2428 All 10x8x2 62500
1 Alli dhar-II 31002.50 77
028.51 2431 All 10x8x2 62500
1 Alli dhar- III 31002.54 77
028.53 2433 All 10x8x2 62500
1 Aldeha 31002.57 77
028.57 2439 All 10x8x2 62500
1 Kufta (Nelaho-II) 31002.42 77
029.30 2056 All 10x8x2 62500
1 Kufta (Nelaho –III) 31002.37 77
029.26 2059 All 10x8x2 62500
1 Kala kufta 31002.30 77
029.21 2063 All 10x8x2 62500
1 Kadharan –I( near bawari) 31001.43 77
030.03 2954 All 10x8x2 62500
1 Kadharan-II (Kund ke pas)
31001.47 77
030.08 2250 All 10x8x2 62500
1 Kadharan-III (Jubbar)
31001.49 77
030.10 2251 All 10x8x2 62500
1 Arshala-I 31001.40 77
030.11 2256 All 10x8x2 62500
1 Arshala-II(Chandri ki jubri) 31001.41 77
030.09 2260 All 10x8x2 62500
1 Arshala –III(Chandri ki jubri) 31001.42 77
030.12 2262 All 10x8x2 62500
Shirguli 1 Ram ki karie 31001.46 77
030.00 2096 All 10x8x2 62500
1 Khagana 31001.40 77
030.22 2090 All 10x8x2 62500
1 Shirguli kufer 31001.45 77
030.18 2095 All 10x8x2 62500
1 Chadoh(Poper) 31001.49 77
030.14 2092 All 10x8x2 62500
Total 57 3374200
Roof water Tarapur 1 Kath –I 31003.10 77
027.30 1749 3 5x4x2 92000
1 Kath-II 31003.11 77
027.32 1752 2 5x4x2 92000
1 Tara pur –I 31003.07 77
027.15 1743 3 5x4x2 92000
1 Tarapur-II 31003.06 77
027.12 1749 2 5x4x2 92000
1 Kath –III 31003.12 77
027.29 1750 3 5x4x2 92000
1 Kath-IV 31003.11 77
027.25 1748 5 5x4x2 92000
1 Bharar –I 31003.15 77
027.19 1750 2 5x4x2 92000
1 Bharar-II 31003.19 77
027.21 1761 3 5x4x2 92000
1 Bharar-III 31003.20 77
027.22 1760 1 5x4x2 92000
1 Tarapur-III 31003.08 77
027.19 1761 3 5x4x2 92000
Chandani 1 Lower chandani –I 31002.49 77
027.50 2063 All 5x4x2 92000
1 Lower chandani-II 31002.53 77
027.53 2065 All 5x4x2 92000
1 Chandani village 31002.51 77
027.57 2095 All 5x4x2 92000
1 Lower chandani –III 31002.47 77
027.54 2019 All 5x4x2 92000
1 Chandani village-II 31002.50 77
027.51 2061 All 5x4x2 92000
1 Chandani village-III 31002.52 77
027.52 2069 5 5x4x2 92000
1 Chandani village-IV 31002.54 77
027.57 2072 All 5x4x2 92000
1 Dhali 31002.48 77
027.41 2070 5 5x4x2 92000
Deha 1 Deha-I 31002.37 77
027.21 2082 3 5x4x2 92000
1 Deha-II near panchayat 31002.36 77
027.22 2080 3 5x4x2 92000
1 Deha –III 31002.39 77
027.18 2085 3 5x4x2 92000
Ghorna 1 Ghorna 31002.28 77
028.49 1931 16 5x4x2 92000
1 Ghanog-I 31002.32 77
028.54 2052 3 5x4x2 92000
1 Ghanog –II 31002.34 77
028.51 2057 3 5x4x2 92000
1 Ghanog –III 31002.37 77
028.57 2058 2 5x4x2 92000
1 Ghanog –IV 31002.37 77
029.02 2063 3 5x4x2 92000
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-157]
1 Ghanog –V 31002.39 77
029.04 2067 3 5x4x2 92000
1 Ghanog –VI 31002.41 77
029.06 2072 3 5x4x2 92000
1 Ghanog –VII 31002.40 77
029.05 2070 3 5x4x2 92000
1 Balaha –I 31002.31 77
029.10 2061 3 5x4x2 92000
1 Balaha-II 31002.29 77
029.11 2062 3 5x4x2 92000
1 Ghorna-II 31002.41 77
029.03 2072 20 5x4x2 92000
Shilla 1 Shilla-I 31`02.17 77`29.27 2312 3 5x4x2 92000
1 Shilla-II 31`02.14 77`29.26 2345 3 5x4x2 92000
1 Shilla-III 31`02.17 77`29.21 2378 2 5x4x2 92000
1 Shilla-IV 31`02.19 77`29.28 2365 3 5x4x2 92000
1 Shukhar-I 31`02.10 77`29.31 2345 3 5x4x2 92000
1 Shukhar-II 31`02.05 77`29.29 2357 5 5x4x2 92000
1 Shukhar-III 31`02.01 77`29.27 2367 3 5x4x2 92000
1 Jhola 31`02.08 77`29.23 2363 All 5x4x2 92000
kadharan 1 Rachot-I 31002.57 77
029.49 2035 3 5x4x2 92000
1 Rachot –II 31002.56 77
029.37 2039 4 5x4x2 92000
1 Ghogh-I 31001.57 77
029.31 2024 3 5x4x2 92000
1 Lhali 31001.40 77
029.30 2072 All 5x4x2 92000
1 Arshala 31001.40 77
030.13 2257 All 5x4x2 92000
1 katheicha 31001.27 77
030.17 2281 All 5x4x2 92000
1 Kadharan-I 31001.47 77
030.01 2029 4 5x4x2 92000
1 Kadharan-II 31001.50 77
030.04 2032 3 5x4x2 92000
1 Kadharan-III 31001.51 77
030.06 2035 3 5x4x2 92000
1 Kadharan-IV 31001.52 77
030.05 2040 3 5x4x2 92000
1 Kadharan-V 31001.49 77
030.03 2046 3 5x4x2 92000
1 Kadharan-VI 31001.47 77
030.09 2051 3 5x4x2 92000
1 Kadharan-VII 31001.44 77
030.11 2055 5 5x4x2 92000
1 Kadharan-VIII 31001.46 77
030.13 2063 7 5x4x2 92000
1 Ghondhar 31001.37 77
030.20 2060 3 5x4x2 92000
1 Kadharan-IX 31001.45 77
030.06 2053 3 5x4x2 92000
1 Arshala –II 31001.41 77
030.12 2260 3 5x4x2 92000
1 Ghondhar-II 31001.35 77
030.23 2063 3 5x4x2 92000
1 Bejo-I 31001.30 77
030.16 2061 3 5x4x2 92000
Shirguli 1 Pateha-I 31001.32 77
030.57 2097 4 5x4x2 92000
1 Pateha-II 31001.30 77
029.58 2093 4 5x4x2 92000
1 Chamroti-I 31001.27 77
029.56 2099 4 5x4x2 92000
1 Khgana 31001.24 77
029. 53 2044 3 5x4x2 92000
1 Shirguli –I 31001.31 77
029. 58 2078 4 5x4x2 92000
1 Shirguli –II 31001. 33 77
029. 59 2079 5 5x4x2 92000
1 Shirguli –III 31001. 30 77
029. 57 2083 4 5x4x2 92000
1 Shirguli –IV 31001. 35 77
029. 55 2081 4 5x4x2 92000
1 Shirguli –V 31001. 34 77
029. 57 2082 5 5x4x2 92000
1 Shirguli –VI 31001. 37 77
030. 02 2095 3 5x4x2 92000
1 Shirguli –VII 31001. 27 77
030. 01 2090 3 5x4x2 92000
1 Shirguli –VIII 31001. 29 77
030. 05 2088 3 5x4x2 92000
1 Shirguli –IX 31001. 31 77
030. 07 2093 2 5x4x2 92000
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-158]
1 Patog-I 31001. 19 77
030. 41 2090 3 5x4x2 92000
1 Patog-II 31003. 17 77
029. 39 2091 3 5x4x2 92000
Total 74 6808000
Tank Tarapur 1 Kath –I 31003. 12 77
029. 32 1747 14 8x6x2 164000
1 Kath-II 31003. 13 77
027. 35 1755 9 8x6x2 164000
1 Tarapur-I 31003. 09 77
027. 19 1749 13 8x6x2 164000
1 Tarapur-I (Balaha) 31003. 05 77
027. 14 1754 8 8x6x2 164000
1 Bharar 31003. 16 77
027. 19 1760 4 5x4x2 82000
1 Tarapur –II 31003. 19 77
027. 23 1754 3 5x4x2 82000
1 Tarapur-III 31003. 20 77
027. 25 1756 8 8x6x2 164000
1 Chandani nala (near bharog village)
31002. 57 77
027. 41 2060 4 5x4x2 82000
1 Tarapur –IV 31003. 11 77
027. 20 1751 12 8x6x2 164000
Chandani 1 Lower chandani-I 31002. 51 77
027. 53 2065 4 5x4x2 82000
1 Lower chandani-II 31002. 52 77
027. 54 2096 6 5x4x2 82000
1 Lower chandani –III 31002. 59 77
027. 47 2092 13 8x6x2 164000
1 Rakasha 31002. 47 77
027. 40 2070 3 5x4x2 82000
1 Chandani 31002. 49 77
027. 47 2071 5 5x4x2 82000
1 Dhali 31002. 48 77
027. 46 2070 9 8x6x2 164000
1 Lower chandani 31002. 50 77
027. 52 2079 6 5x4x2 82000
1 Chandani village 31002. 50 77
027. 43 2074 4 5x4x2 82000
Deha 1 Deha –I 31002. 39 77
027. 22 2079 7 8x6x2 164000
1 Khanolti 31002. 33 77
027. 19 2072 25 8x6x2 164000
1 Deha 31002. 37 77
027. 24 2079 25 8x6x2 164000
1 Primary school 31002. 35 77
027.20 2081 5 5x4x2 82000
1 Dhar-I 31002.42 77
027.31 2045 5 5x4x2 82000
1 Deha –II 31002.37 77
027.21 2072 3 5x4x2 82000
1 Deha –III 31002.40 77
027.19 2079 5 5x4x2 82000
1 Deha –IV 31002.38 77
027.33 2081 15 8x6x2 164000
Ghorna 1 Ganog lower 31002.27 77
028.50 2083 5 5x4x2 82000
1 Ganog upper 31002.39 77
028.50 2081 8 8x6x2 164000
1 Ganog (rod head) 31002.37 77
028.47 2083 20 8x6x2 164000
1 Gohrna –I 31002.28 77
028.51 2084 16 8x6x2 164000
1 Gohrna(Dobha nala) 31002.29 77
028.46 2052 10 8x6x2 164000
1 Baleha 31002.30 77
029.13 2050 12 8x6x2 164000
Shilla 1 Patti shilla 31`02.22 77`29.23 2345 20 8x6x2 164000
1 Kiyal shilla 31`02.17 77`29.21 2367 9 8x6x2 164000
1 Janjteri 31`02.14 77`29.27 2367 12 8x6x2 164000
1 Jhola 31`02.17 77`29.22 2345 6 8x6x2 164000
Kadharan 1 Rachot 31002.57 77
029.47 2034 7 8x6x2 164000
1 Ghog-I 31002.58 77
029.29 2026 7 8x6x2 164000
1 Kuffer 31002.47 77
029.34 2053 14 8x6x2 164000
1 Arshala 31001.40 77
030.11 2256 8 8x6x2 164000
1 Ketheicha 31001.27 77
030.17 2280 1 5x4x2 82000
1 Kadharan 31001.47 77
030.03 2030 3 5x4x2 82000
1 Dobha 31001.37 77
030.10 2040 3 5x4x2 82000
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-159]
1 Beza 31001.23 77
030.14 2059 15 8x6x2 164000
Shirguli 1 khagna 31001.25 77
029.57 2095 31 8x6x2 164000
1 Much ramna 5 5x4x2 82000
1 Chadoh-I 31001. 48 77
030.16 2093 3 5x4x2 82000
1 Chadoh-II 31001. 45 77
030.17 2091 5 5x4x2 82000
1 Nerwa 31001. 38 77
030.20 2087 4 5x4x2 82000
1 Shirguli 31001. 48 77
030.00 2025 All 5x4x2 82000
Total 49 6232000
Dam Kadharan 1 Kadharan khori ka nala
31001. 11 77
030.21 2125 All 450000
1 Kadharan (Ramchu ke gharat ke pass
31001. 13 77
030.26 2130 All 450000
Total 2 900000
Annexure -II
Drinking water Gram panchayat Ghorna Target for 3rd year Activity
Ward Name Existing No.
Proposed No.
Location GIS coordinates Benefitied Families
Size (mt)
Estimated Cost (Rs.) Longitude Latitude Altitude
Tank Tarapur 2 1 Sheel nala source 31003.10 77
027.20 All 5x4x2 82000
1 Kath 31003.14 77
027.31 1750 All 5x4x2 82000
Chandni 3 1 Chanari 31002.44 77
027.59 1743 40 5x4x2 82000
1 Lower chandni 31002.48 77
027.50 2018 30 5x4x2 82000
1 Raksha 31002.43 77
027.46 2060 30 5x4x2 82000
1 Chandni 31002.50 77
027.52 2068 All 5x4x2 82000
Deha 1 1 Deha 31002.36 77
027.20 2080 All 5x4x2 82000
Ghorna 2 1 Ghanog 31002.36 77
027.50 2053 All 5x4x2 82000
1 Ghorna 31002.27 77
028.51 2056 All 5x4x2 82000
1 Balah 31002.29 77
028.13 2061 All 5x4x2 82000
1 Ghorna 31002.41 77
029.04 2072 All 5x4x2 82000
Shilla 4 1 Jhola near jungle 31002.12 77
029.22 2313 All 5x4x2 82000
1 Shilla 31002.13 77
029.30 2356 All 5x4x2 82000
1 Halai 31002.10 77
029.26 2376 All 5x4x2 82000
Joytai 31002.05 77
029.23 2343 All 5x4x2 82000
Jhola 31001. 58 77
029.30 2028 All 5x4x2 82000
Kadharan 1 Ghog 31001. 18 77
030.30 2033 All 5x4x2 82000
1 Kadharan 31001. 27 77
030.03 2042 All 5x4x2 82000
1 (Dotti ka khallin) 31001. 13 77
030.09 2046 All 5x4x2 82000
1 Kadharan kund ke pass 31001. 38 77
030.13 2040 All 5x4x2 82000
1 Daba 31001. 24 77
030.11 2057 All 5x4x2 82000
1 Beza 31001. 26 77
029.17 2095 All 5x4x2 82000
Shirguli 1 Khagna 31001.99 77
029.59 2083 All 5x4x2 82000
IWMP- V (2009-10) Ghorna (2c6c2Nia) Theog Shimla[page-160]
1 Muchramna 31001.34 77
030.55 2088 All 5x4x2 82000
1 Nerwa 31001.42 77
030.51 2081 All 5x4x2 82000
Total 23 2050000
Bawari Tarapur 2 1(repair) Tarapur 31003.07 77
027.17 1747 10 20000
1(repair) Kath 31002.48 77
027.51 2069 10 20000
Chandani 1 (dry) 1(repair) Chandani 31002.34 77
027.23 2079 12 20000
Deha 2 2(repair) Deha 31002.40 77
027.05 2073 All 40000
Ghorna 3 (dry) - 31001.05 77
029.32 2083 - -
Shilla 4(dry) 4(repair) Shilla 31001.13 77
027.12 2058 All 80000
Kadharan 2 (dry) 2(repair) Kadharan 31001.48 77
030.00 2067 All 20000
Shirguli 1 (dry) - 31001.35 77
030.57 2051 - -
Total 11 200000
Annexure –III
Soil conservation Measures Target for 3rd year
Activity
Ward Name Location Proposed GIS coordinates Benefitied Families
Size (mt)
Estimated Cost (Rs.) Longitude Latitude Altitude
Dry Check dam
Tarapur Kath nala to noti khad 30 31003.17 77
027.32 1755 All 4x2x1 108000
Chandani Chandani khad to Deha 40 31002.48 77
027.45 2054 All 4x2x1 144000
Deha Kanor nala 20 31002.31 77
027.17 2087 25 4x2x1 72000
Ghorna Ghorna nala 18 31002.24 77
028.47 2058 All 4x2x1 64800
Shilla Nalana nala 18 31002.12 77
029.27 2346 All 4x2x1 64800
Ramola nala 20 31002.15 77
029.25 2354 All 4x2x1 72000
kadharan Kheri ka nala 18 31001.16 77
030.19 2062 All 4x2x1 64800
Paral ka nala (Dovri 20 31001.17 77
030.17 2062 All 4x2x1 72000
Shirguli Jarari nala 28 31001.29 77
029.51 2097 All 4x2x1 100800
Jaria nala 20 31001.29 77
029.53 2109 All 4x2x1 72000
Total 232 835200 Crate wall Deha 26 31
001.36 77
027.25 2077 All 4x2x1 143000
Total 26 143000
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-161]
Annexure –IV
List of beneficiary Name RoofWater Ward Village Name Beneficiaries Name
Chandani Lower Chandani-I Surinder
Narinder
Lower Chandani-II Ved Prakash
Kedar Singh
Chandani -I Narinder Singh
Uma Nand
Mangat Ram
Lower Chandani -III Balbir Signh
Sanjeev Singh
Upper Chandani village -II Ram Dayal
Kewal Ram
Surinder
Sahi Ram
Hira Singh
Dhali (Chandani) Virender Verma
Kundan Singh
Dev Raj
RS Verma
Veena Chauhan
Lower Chandani -IV Padam Singh
Surinder Singh
Shella Shella Shyam Lal
Vidya
Kasha Ram
Shella-II Aatma Ram
Kali Ram
Daulat Ram
Shell-III Palak Ram
Dila Ram
Shella -IV Balak Ram
Lata
Prakash
Shukhr-I Rakesh
Sant Ram
Dhani Ram
Shukhar-II Hari Thakur
Seeta Ram
Keshaw Ram
Surender
Pushpa Devi
Shukhar-III Prakash
Het Ram
Sahi Ram
Jholla Pawan
Adarsh
Mahender
Tarapur Kath Dhani Ram
Mamta
Meera
Kath-II Roshan Lal
Daulat Ram
Kath-III Daulat Ram
Amer jeet
Inder Singh
Kath-IV Bharwan Dass
Ramesh
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-162]
Narender
Giyan Singh
Baldev
Tarapur Chet Ram
Durga Singh
Kewal Ram
Tarapur -II Ramesh
Bhagwan Dass
Kath-II Parmanad
Bhagat Ram
Sohan Lal
Kath (Near Bhagat Ram) Bhagat Ram
Ramesh
Bharar-I Ramesh
Gulabi Devi
Bharari -II Jhamtu Ram
Hariya Ram
Gulabi Devi
Ghorna Ghorna-I Dinesh Bhandury
Roshan Lal
Kedar Singh Thakur
Anat Ram
Ganog-I Om Praksah
Bhagat Ram
Bhatnagar
Ganog-II Mohan Singh
Surinder
Padam Singh
Ganog-III Daulat Ram
Inder Singh
Ganog -IV Kewal Ram
Jai Ram
Charanji Lal
Ganog -V Ramesh Chand
Mohan Lal
Ram Lal
Ganog -VI Nika Ram
Dalip Singh
Mohi Ram
Ganog-VII Mehar Singh
Harinder
Hari Ram
Balaha-I Kewal Ram
Devi Ram
Jeet Ram
Balaha-II Mast Ram
Jeet Ram
Vidya Nand
Ghorna-II Padam Singh
Ranjeet Singh
Ishwar Singh
Roshan Lal
Tulsi Ram
Ishwar Singh
Padam Singh
Ranjeet Singh
Roshan Lal
Ramesh
Inder Signh
Balak Ram
Balbir
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-163]
Bhagat Ram
Man Singh
Vikram Singh
Vimla Devi
Doulat Ram
Prakash
Narain Singh
Ghorna Padam Singh
Daulat Ram
Hira Singh
Mehar Singh
Dhani Ram
Narain Singh
Ishwar Singh
Roshan Lal
Ramesh
Rati Ram
Inder Singh
Tulsi Ram
Man Sing
Jai Ram
Balbir
Balak Ram
Balaha Mast Ram
Jeet Ram
Davi Ram
Vidya
Rama Nand
Surinder
Mathu Ram
Jai Ram
Kewal Ram
Laxmi Nand
Deha -I Mohan Chauhan
Narain Singh
Laiq Ram
Deha –II (Near P-Ghar) Mohinder Chauhan
Aadresh Chauhan
Pawan
Deha -III Nisha
Asha
Saroji
Kadharan Rachot Honey Thakur
Krishana Metha
Rati Ramn Thakur
Rachot-II Prem Lal
Dadish Negi
Dimple Thakur
Bhagmal
Ghog-I Surender Mehta
Indere Mehta
Brij Lal Bhandhari
Lhaili Man Singh
Gopal
Chanrnji lal
Sukh Lal
Madhuv Thakur
Arashla Mangat Ram
Suresh
Roshan Lal
Arashla-II Ranbir
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-164]
Amar
Dig Vijay
Katheicha Daulat Ram Himta
Laik Ram
Surender Himta
Narvada
Kadharan -I Padam Singh
Balbir Singh
Sunder Singh
Jitender Singh
Kadharan-II Chet Ram
Sunil
Ashok
Kadharan -III Charnji Lal
Man Singh
Gopal
Kadharan-IV Ramesh
Mahender
Narendere
Kadharan-V Chet Ram Thakur
Susheel Thakur
Balbir Thakur
Kadharan-VI Ranjeet Himta
Satish Himta
Pratap Himta
Kadharan-VII Mangat Ram
Chet Ram Himta
Naryan Singh
Inder Singh
Raghuvir
Kadharan –VIII Inder Mehta
Surender Mehta
Kirpa Ram
Sunil
Kadharan -IX Amer
Ranvir
Digvijay
Goandhar-II Amer
Ranvir
Digvijay
Beza Man Singh
Amer Singh
Gopal
Shirguli Peteha Narvir
Prakash
Shamsher
Davender
Pateha-II Hari Ram
Deep Ram
Mohan Singh
Ranjeer Singh
Chamroti-I Padam Singh
Balak Ram
Mohan Singh
Baldew Singh
Khagana -I Bhagat Ram
Prem Singh
Baldew Singh
Shirguli -I Ranjeet Signh
Naryan Signh
Surender
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-165]
Sandeep
Shirguli-II Daluat Ram
Mast Ram
Prakash Chand
Rakesh
Laiq Ram
Shirguli-III Mast Ram kalnu
Harinder Signh
Davinder Signh
Belu Devi
Shirguli-IV Beli Ram
Roshan Lal
Aatma Ram
Dalut Ram
Shirguli-V Pratap Singh
Surender
Surat Ram
Man Mohan Singh
Padam Singh
Shirguli-VI Laiq Ram
Sarita Devi
Kuldeep
Shirguli-VII Davender
Viraender
Rati Ram
Shirguli-VII Inder Singh
Rati Ram
Bablu
Shirguli-IX Davender Chauhan
Virender Chauhan
Inder Singh
Nerwa Rati Ram
Deep Ram
Padam Singh
Bhoop Ram
Beli Ram
Patog Devender
Virender
Ravinder
Patog-II Harinder
Chet Ram himta
Narender
Tank
Ward Village Name Beneficiaries Name
Chandani Lower Chandani Kedar Singh
Narain Singh
Mast Ram
Hira Ram
Rajinder Singh
Mohan Lal
Partap Singh
Satya Singh
Bansi Lal
Padam Singh
Mohan Singh
Lower Chanani-II Narinder
Mohi Ram
Mohan Singh
Balbir Singh
Lower Chandani-III Mohan Singh
Surinder Singh
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-166]
Ved Prakash
Adhi Ram
Partap Singh
Dayal Singh
Virender Verma
Kundan Singh
Dev Raj
RS Verma
Veena Chauhan
Neena Verma
Lower Chandani Parma Nand
Dalip Singh
Sunil
Bansi Lal
Ranjeet S/o Sahi Ram
Ranjeet
Sushma
Anant Ram
Raju
Chandani Village Anant Ram
Parma Ram
Adhi Ram
Kewal Ram
Uma Nand
Bitu
Raksha Chanari Mathu Ram
Bali Ram
Dohlu Ram
Shanti Devi
Aatma Ram
Surinder Singh
Sahi Ram
Devi Saran
Laiq Ram
Laiq Ram –II
Padam Singh
Kewal Singh
Mohan Singh
Shella Patti Shella Lata Devi
Balak Ram
Jagdish
Nitu
Ram lal
Prakash
Shyam Lal
Vidya Devi
Ram Lal
Kashi Ram
Aatma Ram
Sohan Lal
Daulat Ram
Kali Ram
Palak Ram
Dila Ram
Joginder
Kiyal Sheela Keshaw Ram
Rajinder
Devraj
Narinder Thakur
Rakesh
Padam Dev
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-167]
Surat Ram
Laiq Ram
Chet Ram
Balak Ram
Sunil
Balbir
Kewal Ram
Dinesh
Dhani Ram
Rajinder
Pawan
Aadrash
Yashpal
Shri Ram
Pratap Singh
Inser Singh
Janjtari Daulat Ram
Hari Ram
Dilender
Harmesh
Sunder Singh
Chet Ram
Rati Ram
Sahi Ram
Gopal
Het Ram
Pawan chauhan
Narender Chauhan
Shri Ram
Inder Singh
Rakesh Mehta
Sant Ram
Dhulu
Joginder
Dhani Ram
Prakash
Tarapur Kath -I Roshan Lal
Parmanand
Kewal Ram
Kath-II Narain Singh
Parmanand
Sohan Lal
Bhagat Ram
Daulat Ram
Roshan Lal
Dhani Ram
Manoj kumar
Sandeep
Dela Singh
Deep Ram
Ramesh
Charan Dass
Mohan Lal
Hari Ram
Mahhinder Singh
Tarapur-I Chet Ram
Durga Singh
Kewal Ram
Mohan Lal
Ramesh
Bhagwan Dass
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-168]
Deep Ram
Prakash
Shiv Singh
Bharar Inder Singh
Surender Singh
Sonu Sharma
Montu
Ramesh
Roshan Lal
Keshaw Ram
Saniya-I
Rati Ram
Laxmi Singh
Sanuru Devi
Saniya -II
Bharar-I Deep Ram Sharma
Ramesh Chand
Daulat Ram
Mohan Singh
Daleep Singh
Uttar Singh
Beli Ram
Gulab Devi
Tarapur-II Daulat Ram
Hari Ram
Mohender Singh
Jai Ram
Ghorna -I Ganog lower Daulat RamSharma
Inder Singh
Kewal Ram
Jai Ram
Ramesh
Bhagat Ram
Ram Lal
Mohan Lal
Charanjee Lal
Mohan Chauhan
Padam Chauhan
Mehar Singh
Nika Ram
Mohi Ram
Hari Prakash
Ganog Upper Chet Ram
Sandeep
Pardeep
Dinesh
Ganog (Road side) Padam Chauhan
Surinder
Mohan Chauhan
Mehar Singh
Harinder
Hari Ram
Manoj
Chander Prabhu
Ghorna-I Dinesh Bhandaru
Roshan Lal
Kedar Singh
Anant Ram
Tulsi Ram
Ishwar Singh
Padam Singh
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-169]
Ranjeeet Singh
Roshan Lal
Ramesh
Inder Singh
Balak Ram
Bhagat Ram
Man Singh
Vikram Singh
Vimla Devi
Daulat Ram
Prakash
Narain Singh
Ghorna Padam Singh
Daulat Ram
Hira Singh
Mehar Singh
Dhani Ram
Narain Singh
Ishwar Singh
Roshan Lal
Ramesh Lal
Ramesh
Rati Ram
Deha Deha –I Mohan Singh
Kamla
Narain Singh
Mathu Ram
Knoti Mohan Verma
Mohar Singh
Puni mal
Sumetra Devi
Puran Chand
Jhaina Ram
Shri Ram
Near primary School -2 Saroop krishan
Jai Ram
Mohan Chauhan
Dalip Singh
Kalyan Singh
Mohan Verma
Inder Singh
Naryan Chauhan
Daulat Ram
Parmod Nand
Laxmi Singh
Gopal Singh
Aswani Sood
Rajinder Sood
Praveen Sood
Shyam Singh
Mohan Lal
Mohinder Chauhan
P Mahima Verma
Nisha Devi
Aatma Ram
Devi sir
Madan
Dhar -I Anant Ram
Ramesh
Mahinder
Raju
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-170]
Parmanand
Deha -II Mohar Singh
Dalip Singh
Pratap Singh
Inder Singh
Kalyan Singh
Deha-IV Pratap Singh
Kalyan Singh
Inder Singh
Dalip Singh
Mohar Singh
Kadharan Rachot Rati Ram
Prem Singh
Dadish Negi
Krishna Mehta
Dimple Thkur
Bhagmal
Ghog-I Surinder Mehta
Inder Mehta
Brij Lal Bhandhari
Prem Bhandhari
Ramesh Nagraik
Naresh Bhandhari
Kuffer Rajinder Thakur
Roshan Lal
Bhagmal
Kamal
Laiq Ram
Lokender Thakur
Dig Vijay koitak
Arashal Ranvir
Sunil
Digvijay
Jai Ram
Joginder
Daulat Ram Himta
Kehar Singh
Sudhama Ram
Sunder Singh katiak
Roshan Lal
Mangat Ram
Chet Ram
MohanSingh
Seeta Ram
Ketheicha Ashoke
Roshna Devi
Daulat Ram
Subhash
Gopal
Devender
Laiq Ram
Surinder Himta
Kadharan-I Amar
Dhoba Balvir
Jitender
Padam Singh
Beza Man Sigh
Amer
Gopal
Shirguli Pateha-I Beli Ram
Khagna –I Durga Singh
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-171]
Machramana-I Balak Ram
Shirguli Bhagat Ram
Chadoh-I Devinder Chauhan
Surender Chauhan
Mohan Singh
Padam Singh
Joginder Singh
Chadoh-II Virender Singh
Partap Singh
Padam Singh
Narayan Singh
Beli Ram
Drinking Water
Ward Village Name List of Beneficiaries
Shilla Jhola (Near jungal) Bablee
Shyam Singh
Hari Singh
Ramesh
Kaku
Dhani Ram
Adarsj
Mehender
Pawan
Raju
Surender Chauhan
Kadharan Beza Maan Singh
Amer Singh
Gopal Singh
Virender Singh
Devinder Singh
Bimla
Puran
Balvir
Narender
Bhagat Singh
Sunil
Ashoke
Nerwa Rati Ram
Deep Ram
Padam Singh
Bhoop Singh
Beli Ram
Spain
Ward Village Name List of Beneficiaries
Kadharan Beza to Baid Man Singh
Gopal Singh
Amer Singh
Ranbir Singh
Punu Devi
Balvir Thakur
Devinder Thakur
Virender Thakur
Narender
Sunil
Ashoke
Mangat Ram
Chranjilal
Ranbir Himta
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-172]
IWMP-V(2009-10) -Ghorna (2c6c2Nia) Theog Shimla[page-173]
Annexure-V List of Micro Enterprises Vermi Compost Sr. No. Name Village Ward
1 Roshan lal Kath Tarapur
2 Parmanand Kath Tarapur
3 Surender Singh Chandani Chandani
4 Padam Singh Chandani Chandani
5 Sahi Ram Chandani Chandani
6 Parma nand Chandani Chandani
7 Mohinder chauhan Deha Deha
8 Moher Singh Deha Deha
9 Ramesh Kumar Deha Deha
10 Dinesh bhandari Ghorna Ghorna
11 Anant Ram Ghorna Ghorna
12 Roshan lal Ghorna Ghorna
13 Padem Dev Halai Shila
14 Kashav Ram Halai Shila
15 Mohinder Halai Shila
16 Sunil Shila Shila
17 Aatma Ram Shila Shila
18 Palak Ram Shila Shila
19 Harithakur Shila Shila
20 Rakesh Shila Shila
21 Rat Ram Rachot Kadharan
22 Gopal kataik Beza Kadharan
23 Roshan Lal Arshala Kadharan
24 Rajender Thakur Gondhar Kadharan
25 Ashok Gondhar Kadharan
26 Dig Vijay Gondhar Kadharan
27 Ranveer Gondhar Kadharan
28 Jitender Kadharan Kadharan
29 Sunil Kadharan Kadharan
30 Man Singh Kadharan Kadharan
31 Gopal Kadharan Kadharan
32 Satish Kadharan Kadharan
33 Ranjeet himta Kadharan Kadharan
34 Nardass himta Kadharan Kadharan
35 Chet Ram himta Kadharan Kadharan
36 Daulat Ram Shirguli Shirguli
37 Sandeep Shirguli Shirguli
38 Mast Ram Shirguli Shirguli
Carpentary
Sr. No. Name Village Ward
1 Bali Ram Chandani Chandani
2 Roshan Lal Raksha Chandani
3 Dhan Ram Nallah Chandani
4 Keshav Ram Nallah Sheela
5 SantRam Nallah Sheela
6 Seeta Ram Nallah Sheela
7 Balak Ram Jorna Kadharan
8 Padam Singh Shirguli Shirguli
9 Raju S/oKana Ram Deha Deha
10 Raju S/oBeli Ram Deha Deha
Cutting & Sewing
Sr. No. Name Village Ward
1 Neela Deha Deha
2 Sumitra Deha Deha
3 Muni Ram Deha Deha
4 Reena Shirguli Shirguli
Black Smith
Sr. No. Name Village Ward
1 Dhanpat Deha Deha
Dairy
Sr. No. Name Village Ward
1 Bansi Lal Chandani Chandani
2 Narayan Singh Chandani Chandani
3 Mast Ram Chandani Chandani
4 Mohan Lal Ghorna Ghorna
IWMP-IV (2010-11) Parghiya (2c6c2Gia) Theog -Shimla[page-174]
Part 2.01
P 2.01 INTRODUCTION AND BUDGET P2.01a Introduction
Watershed : IWMP- V Theog Gram panchayat : Parghiya Ward : Banari Panchayat Area : 576 ha
Ward Area to be treated : 131 ha Amount : 19.65 lacs The Parghiya Panchayat is located at the distance of 35 Km from the block headquarter, Theog. The total geographical area of the panchayat is 576 hectare and area of Banari ward of Parghiya Panchayat to be treated is 131 hectare. The Gram Panchayat/ward is situated at the 310.04.193 latitude and 770.26.950 longitude. The altitude is 7630 feet above mean sea level. The Panchayat is covered with GP Bagri, Balghar, Ghorna, Ghoond and Deothi. The catchment area of watershed is Jhal Nala(Mihana),Sahroti and Karellu Nala . The total population of the Gram Panchayat is 1137 covering 5 wards.
P2.01b BUDGET
Sr. No. Budget Component % of the budget Amount (lacs)
1 Administrative cost Monitoring Evaluation
10 01 01
1.9650 0.1965 0.1965
2 Preparatory Phase Entry point activities Institution & capacity building Detailed Project Report (DPR)
04 05 01
0.7860 0.9825 0.1965
3 Watershed Works Phase Watershed Development Works Livelihood activities for the asset less persons Production system & micro enterprises
50 10 13
9.8250 1.9650 2.5545
4 Consolidation phase 05 0.9825
Total 100 19.650
P2.01c Methodology
A. District level
g. Collection of data at district level
iv. DRDA and Line department
h. Meeting with CEO (DRDA), Project Officer, Heads of Line Departments
B. Block level
j. Data collection
k. One day orientation with pradhan secretaries and panchayat sahayak at block level
l. Meeting with line department officials of agriculture, horticulture and animal husbandry department
C. Panchayat Level
p. General meeting at Panchayat level with members of Panchayat Samiti, Pradhan and Ward members
q. Collection of revenue data from Patwari
r. Collection of socio economic data from Panchayat Secretary
s. Village level meeting organized, PRA exercises and transect walks
t. Identification of beneficiary group for different activities
IWMP-IV (2010-11) Parghiya (2c6c2Gia) Theog -Shimla[page-175]
Part 2.02
P 2.02 GENERAL DESCRIPTION OF PROJECT AREA P2.021 Socio economic profile of panchayat
Total families of the Panchayat : 251 Total families of the ward (Banari) : 50 Total population of the Panchayat : 1374 Total population of the ward (Banari) : 225 Total families (General) of panchayat : 177 (population =809) Total General Families of ward (Banari) : 42 (population =193) Total families (Schedule caste) panchayat : 74(Population =328) Total Schedule Caste families of ward (Banari) : 8 (population =32)
P 2.021a Population in different categories (ward wise)
Name of ward
General Families SC Families
No of families
Male Female Total No of families
Male Female Total
Tihana 46 105 99 204 16 33 33 66
Mihana-I 16 36 26 62 32 80 65 145
Mihana-II 35 81 74 155 1 7 4 11
Pargiya 38 90 105 195 17 42 32 74
Banari 42 91 102 193 8 15 17 32
Total 177 403 406 809 74 177 151 328
Note: Scheduled tribe and other backward classes are absent in this panchayat Source: Gram Panchayat, 2010
P 2.022 BPL Families
Total BPL Families : 95 Total Antoyodaya Families : 63
P 2.022a Population of BPL and Antoyodaya families (ward wise)
Name of Ward General Families SC Families
BPL Antoyodaya BPL Antoyodaya
Tihana 14 9 4 3 Mihana-I 5 1 10 10 Mihana-II 12 9 4 1
Pargiya 11 8 9 8 Banari 22 10 4 4 Total 64 37 31 26 Note: Scheduled tribe and other backward classes are absent in this panchayat
Source: Gram Panchayat, 2010
IWMP-IV (2010-11) Parghiya (2c6c2Gia) Theog -Shimla[page-176]
P 2.023 Land use pattern
The total land of Parghiya panchayat is 576 hectare only 1 hectare is irrigated and wrest of area is rainfed. The cultivated land is 171 hectare under different farming system i.e. agriculture, horticulture and vegetables. The wrest of area is under pasture, ghasni and forests etc. The barren land is 19 hectare.
P2.023a Areas (ha) of panchayat (village wise) under different land use systems
Sr. No.
Name of village
Total land
irrigated Un irrigated
Agri. Horti. Veg. Fellow Barren Pasture Ghasni Forest Other
1 Tihana 107 - 107 10 4 3 6 3 44 44 - -
2. Thanadhar 81 1 80 15 8 2 6 7 26 27 - -
3 Mihana 155 - 155 44 26 6 10 5 51 45 - -
4 Pargiya 102 - 102 23 15 2 3 2 44 30 - -
5 Banari 131 - 131 1 25 25 - 2 28 4 69 2
Total 576 1 575 93 78 38 25 19 193 150 69 2
Source: Revenue Patwari
Note: Agri+ Horti+ Fallow+Barren+Pasture+Ghasni+Forest+Other=total land
P 2.024 Status of Livestock
The animal rearing is the integrated part of farming system in the watershed area. The major animals are cows (local and improved), buffaloes, sheep, goats etc. The people face acute problem of fodder and drinking water for these animals during the stress period. The details of livestock reared by the people in Parghiya panchayat are given below: P2.024a Number of milch and dry cows (Local and improved) and Buffaloes
Name of Ward
Local cow Improved cow Bullock Calf Goat Sheep Poultry Mules Total
Milch Dry Total Milch Dry Total
Tihana 50 6 56 8 - 8 10 30 40 - - 144
Mihana-I 5 2 7 30 3 33 6 20 4 2 50 1 123
Mihana-II 20 15 35 15 - 15 20 20 - - - 4 94
Parghiya 15 5 20 18 2 20 20 40 25 10 - - 135
Banari 30 20 50 9 - 9 6 25 - - - - 90
Total 120 48 168 80 5 85 62 135 69 12 50 5 586 Source: NAEB, UHF, 2010
IWMP-IV (2010-11) Parghiya (2c6c2Gia) Theog -Shimla[page-177]
Part 2.03
P2.03 SWOT ANALYSIS A critical analysis of strengths, weaknesses, opportunities and threats (SWOT) of any region is a good analysis for developing strategies /programmes as it provides valuable insights on potentials, constraints, opportunities and threats based on the primary, secondary and technical data a detailed analysis of SWOT is carried out.
P2.031 Strengths of the watershed area Road infrastructure is available.
Area is suitable for seasonal and offseason vegetable crops.
Area is suited to quality seed production of Vegetable crops
Area is also suitable for fruit crop production.
Unemployed educated youth.
Nearest market is available.
People are well versed with animal husbandry.
Farmers are innovative and ready to adopt new technologies.
P2.032 Weaknesses Area is rainfed.
Soil erosion in the cropped area.
Unconsolidated land holding
Scarcity of fodder.
Hailstorm prone area.
The pasture land/ grazing land are shrinking.
Unequal distribution of available water for irrigation.
Big farmers are getting more water for irrigation on the traditional right basis which needs to be reconsidered.
P2.033 Opportunities Introduction of organic farming
Roof water harvesting
Training to the farmers on horticulture management, floriculture, poultry and mushroom production etc.
Revival of Mahila Mandals and SHGs which are dysfunctional presently
Installation of vegetable collection centre at ward/panchayat level
Introduction of crossbred animals
P2.034 Threats Available land for agriculture is declining if S.M.C practices are not adopted.
Soil erosion in the sloppy lands.
Unscientific farming practices.
Deforestation.
Declining of the traditional artisans.
Social distress.
Declining of fodder sources.
Lack of interest and motivation.
IWMP-IV (2010-11) Parghiya (2c6c2Gia) Theog -Shimla[page-178]
Part 2.04
P 2.04 ENTRY POINT ACTIVITIES
Entry point activities are necessary part to orient the community members towards thrift and credit activities of the project. Success of government initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and this amount plays vital role to involve more people in different project development activities. Different entry point activities suggested by farmers during PRA exercise as given below. P 2.041 Entry point activities suggested at different locations of watershed Ward Activity
Location Size Beneficiaries Estimate
Cost Watershed Convergence Purpose /use
Banari Traditional water bawari (Baun)
Bhambi ki bawari
All 100000 78600 21400 Drinking
IWMP-IV (2010-11) Parghiya (2c6c2Gia) Theog -Shimla[page-179]
Part 2.05
P 2.05 WATER HARVESTING
The main sources of irrigation in the gram Panchayat are Tallab, Dam, tanks and water schemes. The most of the cultivated area is rainfed. The existing water resources are drying due to climatic change. The people face acute problem of water during stress period, specifically for the irrigation of vegetable crops etc.
P 2.051 Existing and proposed water harvesting structures with storage capacity
Name of structure
Number of structure
Capacity (m3) Project intervention
No. of beneficiaries
Old New Old New Old New Old New
Kachha talab
2 - 40 - 40 - All All
Roof water harvesting
- 3 - 54 - 54 All All
Tanks 1 7 24 280 24 280 All All
Total 64 334 64 334 All All
P 2.051a WATER BODIES /WATER HARVESTING STRUCTURES
Work Name of the Ward
Proposed No
Location No of Beneficiaries
Dimension (m)
Estimated budget (Rs.)
Roof Water Banari 1 Banatri 4 3x3x2 57000
1 Janath 3 3x3x2 57000
1 Majholi 4 3x3x2 57000
Total 3 11 171000
Tank Banari 1 Banari 12 5x4x2 82000
1 Banatri 9 5x4x2 82000
1 Banari Dhak ke Niche 3 5x4x2 82000
1 Tharu 3 5x4x2 82000
1 Majholi 7 5x4x2 82000
1 Nagan Biran 3 5x4x2 82000
1 Nagan( SC) 6 5x4x2 82000
Total 7 43 574000
P2.051b Storage capacity and cost of new water harvesting structures under
watershed programme and convergence.
Structure Watershed Convergence
No. Capacity (cu.lt)
Cost (Rs) No. Capacity (cu. lt)
Cost (Rs)
Kaccha Pond
Nil Nil Nil Nil Nil Nil
Roof water harvesting
3 54 171000
Irrigation tank
7 280 574000
Total 10 334 745000
IWMP-IV (2010-11) Parghiya (2c6c2Gia) Theog -Shimla[page-180]
Note: Details as in annexure
P 2.051c Storage capacity and cost of existing water harvesting structures under
watershed programme and convergence.
Structure Watershed Convergence
No. Capacity (m3) Cost (Rs) No. Capacity (m3) Cost (Rs)
Kaccha Pond
2 40 30000 - -
Irrigation tank
1 24 - - - -
Total 3 64 30000 - - -
P2.051d Total Storage Capacity of Existing and New structures
Scheme Existing structures(m3)
New structures (m3)
Total capacity (m3)
Watershed 64 334 398
Convergence - - -
Total Capacity 64 334 398
P2.052 Budget
Scheme Existing structures (Rs) New structures (Rs) Total (Rs)
Watershed 30000 745000 775000
Convergence - - -
Total 30000 745000 775000
P2.053 Total storage capacity and cost through watershed and convergence
programme
Particulars Capacity (m3) Cost (Rs)
Watershed 398 775000
Convergence - -
Total 398 775000 Presently, if all the existing watershed structures are renovated, this will enhance storage capacity to 398 m
3 with cost estimate of Rs. 775000
(Total water harvesting potential Storage capacity (watershed) + storage capacity (convergence) =398 m
3
Area to be irrigated under watershed programme =1.99 ha. Note : Total area is calculated by dividing total water available under watershed with depth of irrigation
i.e. 0.02 cm
IWMP-IV (2010-11) Parghiya (2c6c2Gia) Theog -Shimla[page-181]
Part 2.06
P2.06 AGRICULTURE
The main agricultural crops grown in the Panchayat wheat, Barley, maize, among cereal crops rajmash and Mash among pulses. The productivity of crop was observed very low due to rainfed condition. This can be increased through increase in irrigation facilities and latest technology.
Part 2.061 Prevalent Farming System under Agriculture
1. Agriculture (Maize/ pulses + Wheat/Barley/ Pluses) 2. Agriculture + Animal Rearing 3. Agriculture + Horticulture (fruit crops+ Vegetables) + Animal Rearing 4. Agriculture + Labour + Rural Artisans
P2.062 Present status of Agriculture Crops and Proposed interventions: P 2.062a Cereals Crops Crops grown: Maize, Wheat Total Productions: 12 + 7.20 + 3.84 = 23.04 qt ( based on PRA exercise)
Period Particulars Maize Wheat Barley
Existing Area under cultivation 10 Bigha 8 Bigha 4 Bigha
Production 12.0 qt 7.20 qt 3.84 qt
Productivity 120 kg/ bigha
90 kg/ bigha 96 kg/ bigha
Variety Kanchan, Pioneer
S-308 Sonalika, Madurai
Local
Technology indigenous Indigenous Indigenous
Proposed Increase in area 5 Bigha 2 Bigha 3 Bigha
Variety Kanchan, Pioneer
S-308 Sonalika, Madurai
local
Seed Quantity required by beneficiary group
45 Kg 150 Kg 84 Kg
Source: Household survey, Regional Centre,NAEB, UHF, 2010
P2.062b Pulses
Crops grown : Rajmash, Mash Total Productions : 9.75 + 2.70 = 12.45 qt (based on PRA exercise)
Period Particulars Rajmesh Mash
Existing Area under cultivation 15 Bigha 6 Bigha
Production 9.75 qt 2.70 qt
Productivity 65 Kg/ bigha 45 Kg/ bigha
Variety Red capsule Local
Technology Indigenous Indigenous
Proposed Increase in area 4 Bigha 2 Bigha
Variety Jawala Local
Seed Quantity required by beneficiary group 190 Kg 32 Kg Source: Household survey, Regional Centre, NAEB, UHF, 2010
IWMP-IV (2010-11) Parghiya (2c6c2Gia) Theog -Shimla[page-182]
P 2.062d Requirement of improved seed under different crops
Particulars Quantity Project contribution with 10% Seed replacement rate (Kg)
Estimated Budget (Rs) for one year
Cereals Maize 45 4.5 90 Wheat 150 15.0 375 Barley 84 8.4 210 Pulses Mash 32 3.2 288 Rajmash 190 19.0 1425 Total 501 50.1 2388
Note: Target for 3rd
and 4th
year
The quantity of seed for each crop has been determined by multiplying the seed rate per bighas with the total area cultivated under different crops i.e. Maize (15 x 3), Wheat (10x 15),Barley (7x12),Pulses mash(8 x4) and Rajmash (19x10) by number of beneficiaries ( list annexure). The project intervention would be replacement of local varieties by improved varieties at 10 percent replacement rate each year for three years. This seed may be given as demonstration units among the beneficiaries.
P2.063 Critical Gaps in Agriculture Production
Lack of irrigation facilities.
Lack of scientific agricultural practices.
Timely unavailability of seeds, fertilizers and chemicals for insect-pest management.
Improved seed varieties not adequately used.
P2.064 Marketing
Not sold used only for self consumption
P2.0644 Project Interventions
p) Introduction of improved seed Improved seed of maize, wheat and pulses will be introduced as demonstration units
q) Introduction of vermin-composting: Twenty units will be developed as
demonstration, in each village of the panchayat.
For better and productive utilization of FYM vermin composting is being recommended.
Ward Name No. of Unit Amount (Rs)
Banari 4 28000 Note: Target for 3
rd and 4
th year
Unit Dimension= 3mx1.85mx.45m
Vermi compost rate - 7000 /unit
IWMP-IV (2010-11) Parghiya (2c6c2Gia) Theog -Shimla[page-183]
Item Budget estimate cost (Rs)
Contribution Total
Project Beneficiaries Seed 2388 2388 238 Vermi Compost 28000 28000 2800
Total 30388 30388 3038
r) Human Resource Development (HRD)/ Capacity Building and training in
Agriculture
Training on cultivation practices of various agriculture crops.
Training on insects & pests management.
Training on post harvest management.
Training on vermin composting
Exposure visits and experience sharing.
s) Numbers of trainings / Exposure visits Number of Trainings =3
Number of Trainees=30-35
Duration = 3 days t) Exposure visit
One exposure visit of 30 -40 farmers
P 2.066 Project Impact a)
Crops Existing families
Addition in families
Total families after project interventions
Seed requirement after project intervention (kg)
Maize 24 6 30 4.5
Wheat 28 7 35 15.0
Barley 28 5 33 8.4
Mash 24 5 29 3.2
Rajmash 34 10 44 19.0
Total 50 33 50 50.1
Presently 50 families are involved in agriculture production in various crops. After project intervention 5-10 additional families will be involved in agriculture (i.e 6 families in maize, 7 in wheat, 5 in Barley and in Pluses 5 families in mash and 10 families in Rajmash). In total 50 families will be benefited after project intervention and the seed requirement for all these families will be 50.1 kg i.e. 4.5 kg seeds for maize, 15 kg for wheat, 8.4 kg for Barley and 22.2 kg seed of Pulses.
b) Skill development and capacity building of about 25 to 30 farmers from the Panchayat c) Encouragement towards organic farming and improving fertility of soils through vermin
compost
IWMP-IV (2010-11) Parghiya (2c6c2Gia) Theog -Shimla[page-184]
Part2.07
P2.07 HORTICULTURE The chapter deals with the fruit and vegetable crops. Among fruits apple, pear, peach and walnut etc. are grown .Apple is the major cash crop. The watershed area is also cultivated with different types of vegetables. These includes cabbage, beans, capsicum, potato, peas, cauliflower etc. the vegetable production is the main farm activity and a good source of employment and income.
P2.071 Prevalent Farming Practices under Horticulture
Horticulture + vegetables
Vegetable + Animal rearing
Vegetable crops(Cabbage+Beans)(Peas+Potato)(Cauliflower +Capsicum)
Fruit crop (Apple + Pear)
Agriculture + Horticulture + Animal rearing. P2.072 Present status of horticulture crops and proposed interventions: P2.072a Fruits Status Particular Apple Pear
Existing Area under cultivation 212 Bigha -
Present Production 5300 Qt -
Productivity 25 Qt -
Variety Red royal, Golden -
Technology Indigenous -
Proposed Increase in area 61 Bigha 40 Bigha
Varieties Red chief, top red Bartlet, Red bartlet
Plants requirement 9555 1600
P2.072b Vegetables crops
Status Vegetable crops
Cabbage Bean Tomato Capsicum Cauliflower Peas Potato
Existing Area under cultivation
38 Bighas 25 Bighas 6 Bighas 13 Bighas 8 Bighas 39 Bighas 8 Bighas
Present Production
5.32 Quintal
2.0 Quintal 30.0 Quintal 39 Quintal 80 Quintal 304 Quintal 40 Quintal
Productivity 14 Q/Bighas
8 Q/Bighas 5 Q/Bighas 3 Q/Bighas 10 Q/Bighas 8 Q/Bighas 5 Q/Bighas
Variety Hybrid Falguni Him sona, Minakshi
Bhgarat Hybrid Shweta
Linkan, Azad P-1 & P-3
Kufri Jyoti
Technology Indigenous Indigenous Indigenous Indigenous Indigenous Indigenous Indigenous
Proposed Increase in area
7 Bighas 5 Bighas 2 Bighas 2 Bighas 1 Bighas 8 Bighas 2 Bighas
Variety Improved hybrid
Falguni Him sona, Minakshi
Bhgarat Shweta Linkan, Azad P-1 & P-3
Kufri Jyoti
Seed requirement
2250 gm 180 kg 160 gm 450 gm 450 gm 376 kg 1500 Kg
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-185]
P2.073 Critical Gaps in Horticulture Production
Lack of vegetable collection centre
Lack of sufficient irrigation facilities
Quality seedling of fruit crop.
Lack of technical knowledge for cultural operation
Knowledge about PHT.
Lack of value addition.
Availability of fertilizers
P2.074 Marketing
d) Vegetable are sold at Theog, Dhalli, Shimla market and Apple are sold at Dhalli, Solan, Chandigarh and Delhi.
P2.075 Project Interventions
v) Supply of improved verities of fruit crops seedlings. w) Vegetable collection centre. x) Training on cultural operations and on value addition. y) Farm based enterprises z) Irrigation through moisture conservation measures aa) Drip irrigation Sprinkler bb) Vegetable seed production area
P2.075a Proposed fruit crop intervention in the Project Area
Apple
Sr. No.
Name of ward No. of household
No. of Plants
Area (Bigha) Amount(RS)
1 Banari 50 1000 29 25000 Note: Target for 3
rd and 4
th year
Pear
Sr. No.
Name of ward No. of household
No. of Plants
Area (Bigha) Amount(RS)
1 Banari 50 750 19 9000 Note: Target for 3
rd and 4
th year
The quantity of plant for each crop has been determined by the total number of plants x Bigha i. e apple 35/bigha and pear 40/bigha.
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-186]
P 2.075b Requirement of Improved Vegetable Seed in Project Area
Crops Seed requirement quantity
Project contribution with 10% seed replacement
Estimated Budget(Rs)
Cabbage 2.250 0.225 45000
Beans 180 18.00 8640
Tomato 0.160 0.016 3200
Cauliflower 0.450 0.045 18000
Peas 376 37.60 3010
Capsicum 0.450 0.045 24750
Potato 1500 150.00 18000
Total 205.931 120600 Note: Target for 3
rd and 4
th year
The quantity of seed for each vegetable crop has been determined by multiplying the seed rate per bigha with the total area cultivated under different crops i.e. Cabbage (50 gm), Beans (6 kg), Cauliflower (50gm), Tomato (20gm), Peas(8kg), Capsicum(30 gm)and Potato(150 kg) by number of beneficiaries (list annexure). The project intervention would be replacement of local varieties by improved varieties at 10 per cent replacement rate each year for 2 years. This seed may be given as samples among the beneficiaries for development and demonstration units
P2.076 Impact/Project Outcome
16. Skill development /capacity building of 59 farmers 17. Cropping pattern changed. Area under vegetable increased (27bighas) 18. Farming systems changed. Areas under fruit crops increased ( 101bighas) 19. Production of fruit and vegetable from the areas enhanced 20. Livelihood of 43 more farming families linked with horticulture
Species Existing families Addition in families
Total families after project intervention
Fruits
Apple 50 - 50
Pear - 50 50
Vegetables
Cabbage 38 6 44
Beans 33 8 41
Tomato 19 10 29
Cauliflower 27 13 40
Peas 37 6 43
Capsicum 27 10 37
Potato 21 15 36
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-187]
Part 2.08
P 2.08 ANIMAL HUSBANDRY
Animal rearing is the second important activity for livelihood along with Agriculture. Animals are reared by farmers mainly for milk, FYM, Milch animals are local as well as improved. Hence milk production is low.
P 2.081 Milk Production and fodder requirement
Total numbers of milching cattle in the Banari ward of the Parghiya panchayat ward are 90 and average production of milk per day is 2.5 lt from local cows, 5.0 lt from jersey cows per day. The total milk production/day is 120 lt for different species.
P 2.081a Average and Total milk production
Milch cattle Number Average milk production lt./day Total production (lt.)
Cow(Local) 30 2.5 75
Cow (improved) 9 5.0 45
Total 39 120
P 2.082 Fodder availability, requirement and Deficit (tons)
Green fodder available in project area is 405 tons whereas dry fodder available is 243 ton. Total 648 ton fodder is available in project area. But requirement of green fodder is 972 ton whereas requirement of dry fodder is 324 ton. Total fodder required is 1296 ton. Deficit of green fodder in project area is 567 ton and that of dry fodder is 81 tons.
P 2.082a Fodder availability, requirement and Deficit (tons)
Available Required Deficit
Green Dry Total Green Dry Total Green Dry Total
405 243 648 972 324 1296 567 81 648
Note - Available Fodder
Green - 25kg/day x 30 days x 6months x Total live stock Dry -15 kg/day x 30days x 6months x Total live stock
Required Fodder: Green -30kg/day x 30days x 12months x Total live stock Dry -10kg/day x 30days x 12months x Total live stock
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-188]
P 2.082b Gap between Demand and supply of total Fodder
Particulars Fodder (tons)
Supply 648
Demand 1296
Deficit 648
P 2.083 Project interventions Plantation and cultivation of fodder trees and grasses Construction of talabs , Johars in grass land and community lands Training/Capacity building
j) Plantation and cultivation of fodder trees and grasses
Species:
Tree: Buel, Ban, Robinia
Grasses: Berseem, Orchard grass, Napier etc.
P 2.083a Requirement of fodder trees and grasses in wards
Name of Ward
Fodder Trees Estimated Budget(Rs.)
Grasses Estimated Budget(Rs.)
Area (ha.)
No. of Plants
Area (ha.)
Quantity of seeds (kg)
Banari 2 2200 40000 2 70 8400
Total 2 2200 40000 2 70 8400 Note: Target for 4
th year
k) Construction of talabs , Johars in grass land and community lands l) Training and Capacity Building
Live stock management
Animal Health
Artificial insemination
Improved grasses / Fodder trees
Exposure visits
Number of Training
Four trainings with 5-7 farmers in each trainings
Exposure visits for 5-7 farmers
P 2.084 Project outcome/impact
P 2.084a Estimated production of milk after project intervention
Milk production after project intervention will increase to 5 lt. /day and total production of milk after project intervention will be 153 liters.
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-189]
P 2.084b Milk production from cows and buffaloes
Milch cattle No. Milk production lt./day
Total production (lt.)
Cow(Local) 30 3 90
Cow (improved) 9 7 63
Total 39 153
P 2.084c Total milk production before and after project intervention.
Increase in milk production is 33 lt. with total production of 153 lt.
Milch cattle Before project (lt.) After project (lt.) Increase after project
Improved cows 45 63 18
Local cows 75 90 15
Total 120 153 33
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-190]
Part 2.09
P 2.09 FISHERY Fisheries can be one of the additional source of income to the farmers of the watershed area, but due to the lack of fresh water, the people unable to take up this activity as a source of income. Secondly the people of the watershed area is practicing agriculture, horticulture and vegetable cultivation which is giving good returns to the farmers . Hence fish cultivation cannot be suggested for the watershed areas of the theog block. P 2.09a Existing and Proposed water bodies for fish culture
Existing water bodies Proposed water bodies Owner ship private /common No Size (ft) location No Size (ft) Location
1 Nil Nil Nil Nil Nil Nil
2 Nil Nil Nil Nil Nil Nil
P 2.09ab Availability and requirement of fish seed /fingerlings
Ward Existing families
Proposed families
Present quantity of fish
Requirement of fish seed
Breeds
1 Nil Nil Nil Nil Nil
2 Nil Nil Nil Nil Nil
P2.091 Project Interventions
Introducing of fisheries among more families
Requirement of improved seed (fingerlings)
Training on fish culture
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-191]
Part 2.10
P2.10 DRINKING WATER
The panchayat area falls in the rain fed area. Water resources are very limited which has been taped fully by the local people for drinking and irrigation purposes. In earlier days there were water bodies (Bawaries) from which the people used to take water for drinking purpose. During the field visit and interaction with the local people and transect- walk of the water shed area source some of fact regarding drinking water come up.
* Dried up of the water bawaries due to the climate change. * Heavy pressure on the existing water bodies due to increase in population. * Less care of maintenance of water bodies, which is due to the habit of tap water
provided at door step provided by the IPH department, lifted from Giri River. * Less percolation for the existing Bawaries due to less range and drying up of Johar at
the watershed area * Presently people take the water through taps, which is provided in alternative days.
P2.101 Availability of water in the panchayat P 2.101a Availability of water before and project interventions
Sr. No
Particulars Capacity (Lt)
Present After Project intervention
1 Total supply of water per day 27600 46800
2 Total House holds 50 50
3 Total population 225 225
4 Water Available per house hold per day 552 936
5 Per capita Availability 122 187
P 2.102 Status of Drinking water in different wards of Panchayat
P 2.102a Structure, water availability on daily and monthly basis Ward/Village Name of Structure Availability
of water /day from the source
No. of months water available during the year
Tap/ WST Handpump Well Bawaries
No Capacity No Capacity No Capacity No Capacity
Banari 1 24000 - - - - 3 3600 27600 6-8 months/year
Total 1 24000 - - - - 3 3600 27600
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-192]
P 2.102b Structure with number of beneficiaries and dimensions. Work Name of
the Ward Existing No.
Proposed No.
Location No. of Beneficiaries
Dimension (m)
Estimated Budget (Rs.)
Bawari Banari 3 1 Janath 8 3x2x1.5 20000
Total 20000
Tank Banari 1 1 Janath 25 3x3x2 57000
Total 1 57000
P 2.103 Storage capacity and availability of water from existing structures Sr. No.
Collecting structures
Storage capacity(lt)
Availability of water/ day from the source(lt)
No. of months water available during the year
1 WST/Tap 1 24000 4-5 Months After the Interval of three days
2 Bawaries 3 3600 6-7 Months
Total 4 27600
P 2.104 Proposed activities for increase in the water capacity/ availability through
renovation/new construction of structure P 2.104a Size, location, capacity of structures with beneficiaries
Structure Size (m) Location Capacity (lt) Benefited families
Old New Old New Old After intervention (lt)
Old New
Bawaries As per annexure
3600 4800 All All
WST/Taps 24000 42000 All All
Total 27600 46800
P 2.105 Critical Gaps to be covered (item/activity)
Irregular supply of drinking water
Improper drainage of the catchment area to the ponds
P 2.106 Outcome
Source Present storage capacity(lt)
Proposed storage capacity(lt)
Total Families benefitted
Present Requirement/ day(lt)
Quantity after intervention (new + repair lt)
Bawaries 3600 4800 50 122 208
WST/Taps 24000 42000
Total 27600 46800 50 122 208
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-193]
Part 2.11
P2.11 SOIL CONSERVATION
The watershed area comprises of hill steep slopes having mixed layers of soil, facing problems of major soil erosion during rainy season. During the field visit and interaction with the local people and farmers, it was observed that soil erosion is increasing at a faster rate, due to the following reasons:
Heavy and uncontrolled grazing
Deforestation in the watershed areas
Construction of roads and dumping of debris along Nala side
Cutting of bushes and hedges by local people for fuel and fodder purpose
Lake of physical and bio logical structures, which facilitate water conservation
Excessive use of cultivated land for Veg. purpose.
P2.110 To check soil erosion, following interventions are recommendation
Construction of check dams from top to bottom to minimize the flow of water.
Construction of crate walls to sloppy land sliding area.
Construction of Contour and trenches to check soil erosion.
Proper bunding on the cultivated lands by planting grasses
Biological/vegetative engineering measures along the slope land
P 2.111 Various structure are required to be constructed at different location for checking soil erosion
P 2.111a Structure with number of beneficiaries
Activity Ward Name Location Proposed (No)
Families Benefited
Size(m) Estimated Budget(Rs.)
Gully Plugging(Kachha Check Dam)
Banari Tilu nala 15 50 4x2x1 54000
Soil conservation work includes formation of crate walls and gully plugging, drainage.
Total 15 gully plugging/dry check dam will be constructed which will benefit 50 families.
Vegetative Measure: Various types of trees (Robinia,kenth), Shrubs (|Berbris, Ruses) and grasses (Chrysopogon falues, Cynodon dactylon, Napier etc.) can be grown in the areas prone to soil erosion. Fodder grasses like Napier grass can be used on farm bunds. For demonstration in each panchayat about 10,000 cuttings could be planted/ distributed to farmers.
Outcome
To minimize the impact of rainfall
To reduce soil erosion
To improve moisture conditions of the area
To improve soil properties, etc.
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-194]
Part 2.12
P2.12 CONVERGENCE
The linkage of the IWMP-V, Parghiya with the other development programme is also one of the important components. The possibilities of identifying different activities under the IWMP and their association with other activities of different line departments can be assured through convergence. This is the best tool to derive support from different line departments.
The following activities can be converged from one head to another:
Developmental activities like roads and irrigation facilities can be converged with PMGSY, PWD, IPH and MNREGA programmes
Employment Generation with MNREGA programme run by Rural Development Department
To improve productivity, distribution of improved seeds, fertilizers, insecticides and pesticides can be converged with State Agriculture Department under Pandit Dindayal Krishi Yojna
Construction of poly houses and vegetable Collection Centres at watershed level can be constructed under the Horticulture Technology Mission run by Department of Horticulture
Income generating activities and micro-enterprises with rural employment programme, Prime Minster Employment Generation Programme. Self –Employment Schemes etc.
Diary development and sheep-goats rearing for the resource less people under Dudh Ganga Pariyojana run by the Animal Husbandry Department
Table: Activity/ work to be taken other programme/scheme Sr.No. Activity
/work Programme /scheme for convergence
Agency/ Deptt
Budget contribution
Watershed convergence Beneficiaries Total
1 Dry Check dam
MNREGA RD 50074 3926 - 54000
2 Bawari (EPA) MNREGA RD 78600 21400 - 100000
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-195]
Part 2.13
P2.13 MICRO ENTERPRISES
Income generating activity reported in the watershed areas are carpentry, masonry, shoe making and weavers, diary, poultry, sheep and goats rearing, pattal and basket making etc,. These income generating activities can transform the rural poor, if they have given more opportunities in the form of trainings, equipments and machine etc., cutting and tailoring, achar making, jam, jelly, candy and juices making can be other options for rural women to improve their socio-economic conditions.
The skills of local artisans can be improved by providing more opportunities at their door steps. Keeping in view the above mentioned facts, the following activities will be taken up under watershed programme for farmers.
P2.131 Income enhancement and employment generation through different income generating activities
P2.131a Number of households with activities and income
Sr. No
Activity Existing No. of household
Proposed No of household
Present income/ mandays (Rs/day)
After intervention income/ mandays
1 Basket making 1 1 4500/30 9000/60
2 Vermi - 1 - 6000/60
3 Horticulture Nursery
- 1 - New concept
The above mention activities are considered for the farmer/rural artisan land holding less than 3 bighas which will be verified during the implementation by the PIA.
Note: Target for 3
rd and 4
th year
P 2.132 Activity Wise Projects
1. Basket Making
i. Purpose : Livelihood/Enhancement of income j. Category : SC/IRDP k. No. of families involved : 1 l. Project Intervention
v. Training vi. Tools /equipment
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
4500/30 9000/60 Training and tools 10,000
2. Vermi Compost
i. Purpose : Livelihood/Enhancement of income j. Category : SC/IRDP k. No. of families involved : 1
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-196]
l. Project Intervention v. Training vi. Pits & worms
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
- 6000/60 Pits & worms 7000
3 Horticulture Nursery:
Ward Location No. Beneficiaries Cost Banari Banari 1 All 125000
Before introducing the Nursery at ward level PIA will be authorized to decide the location and beneficiaries.
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-197]
Part 2.14
P2.14 LIVELIHOOD CONCERNS The land resource is the primary and major source of livelihood activities in the watershed area. These natural resources can be used properly by adopting integrated farming system to get more return per unit space per unit time. Area is suitable for the cultivation of apple, pear, pomegranate and walnut. These fruits plants can be integrated with agriculture and animal‟s husbandry to increase the productivity of land. The shortage of fodder leads farmers to rear only local breeds of animals that are too for self consumption of milk and farm yard manure. This shortage of fodder can be overcome by introducing multipurpose tree species. Other option of livelihood is the revival of rural artisans and for this best options with the rural artisans are carpenter, masonry, weaving, crafting and shoe making. The rural poor can earn good amount of money from these professions. These are some of important income generating activities need to be introduced in the watershed area. There is a dire need to aware, motivate and trained the local poor artisans. These artisans should be provided with equipments to earn their livelihood and to improve their socio economic conditions.
P2.141 Existing nature of livelihood in the watershed
Sr. No.
Category wise Total No. of household
Livelihood linked in the project
1 General 42 Agriculture +horticulture +animal husbandry + micro enterprises
2 SC 08 Agriculture
3 BPL 26 Agriculture and labourers
P2.142 AGRICULTURE
Sr. No.
Particulars Before project
After project intervention
1 No. of days/year food grain sufficiently at home per family
4 months 5 months
2 Average production from agriculture 5.8 qt/family 6.5 Q
3 Income from agriculture Self consumption
Self consumption
4 No. of families who want to increase areas (all crops in agriculture combined)
50 50
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-198]
P2.143 HORTICULTURE
P2.143a Fruits production
Sr. No.
Particulars Before project
After project intervention
1 No. of households with orchards 50 50
2 Area per household under horticulture (fruit trees) 2.5 to 3.0 4 to 5
3 Total production 5300 Q 7400 Q
P2.143b Vegetable Productions
Sr. No.
Particulars Before project
After project intervention
1 No. of households having commercial vegetable production
50 50
2 Average area per household under vegetable 3 bighas per household
4.5 bighas per household
3 Total production 50 qt 80 qt
P2.143c Handling and Processing
Crops Particulars Before project
After project Intervention
Fruits Number of persons involved with no of day per year
1 persons 1 persons/3months/year
Vegetable Number of persons involved with No of day per year
2 persons 2 persons/3months/year
P2.143d Value Addition
Crops Particulars Before project
After project Intervention
Fruits Number of persons involved with no of day per year
1 persons 1 persons/3months/year
Vegetable Number of persons involved with No of day per year
2 persons 2 persons/3months/year
P2.143e Marketing
Sr. No. Particulars Before project After project Intervention
1 Number of persons involved with no of day per year
1 1
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-199]
P2.144 ANIMAL HUSBANDRY
P2.144a Production: (Milk/Egg/Meat/Wool/Fodder)
Product Particulars Before project After project Intervention
Milk No of families involved 50 50
Quantity of milk produced 120 153
No of milch cattle 39 39
P2.144b Milk
Sr. No.
Particulars Products Before project
After project Intervention
Curd ,Cheese, Ghee
Self use Self use
1 Number of families involved
50 Self use Self use
2 Total No of days per year
50 Self use Self use
P2.145 MICRO ENTERPRISES
P2.145a Activity Wise
Activity Particulars Before project
After project Intervention
Basket making No of households 1 1
No of mandays/year/household 30 60
Income per household 4500 9000
Vermin Compost No of households - 1
No of mandays/year/household - 60
Income per household - 6000
Horticulture Nursery No of households - 1
No of mandays/year/household - -
Income per household - New concept
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-200]
Part 2.15
P 2.15 CAPACITY BUILDING
To implement watershed activities more effectively skill development and capacity building at Panchayat level is very important. The activities proposed are given below:
P2.151 Modules
P2.151a Awareness Camps
Will be organized at Panchayat level
P2.151b Training: Training will be organized at
Block level
DRDA level
Institutional level
P2.151c Exposure Visits:
Exposure visits will be conducted at University/ Institutions /Field P2.151d Special Trainings will be organized in the professional institutes P2.152 Activities with number of participants P2.152a Target groups and location of programme
Target group No. of participants
Activity Location
Member of Gram Shabha
All Awareness camps Panchayat level
PRI, VLI Members 10 Watershed Implementation and management Block level
Self Help Groups, User Groups and Beneficiary groups
3 to 5/panchayat
Water harvesting, agriculture, horticulture, forestry, animal husbandry, fisheries and micro enterprises etc.
Block level (One trainings for such activities)
Self Help Groups, User Groups and Beneficiary groups
1 to 2/ ward/ panchayat
Exposure visits (university/professional institute/field visits)
State/Outside State
Self Help Groups, User Groups and Beneficiary groups
1 to 2 / ward/ panchayat
Kissan Melas/ Pradashanis State/Outside State
Self Help Groups, User Groups and Beneficiary groups
2 to 3/ activity/ panchayat
Specialized trainings (Mushroom production, floriculture, fruit crops, nursery raising techniques, dairy development, poultry farming, goat breeding, cereals crops, agriculture and insect-pest management etc.
Professional Institutes / University
PIAs, WDTs members
10 Project implementation and management trainings, report writing and accounts maintenance
DRDA level
The capacity building of farmers and youth in the watershed areas can also be done under
the micro enterprises and livelihood through Industrial Training Institute (ITI) occupation\trades as well as other entrepreneurs programmes which provide self-employment or wage employment within the watershed areas.
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-201]
Part 2.16
P 2.16 ACTIVITY AND BUDGET
P 2.161 Agriculture (for 2 years)
Activity /item Variety Quantity (kg)
Cost For 3rd year
Cost for 4th year Improved Seeds
Maize Kanchan/Pioneer 4.5 90 90
Wheat Madurai and S-308 15.0 375 375
Barley Dolma 8.4 210 210
Pulses (urad) Improved(T-9) 3.2 288 288
Rajmash Local 19.0 1425 1425
Total 50.1 2388 2388
P 2.162 Vermi Composting
Activity /item No. Rate (Rs/unit) Dimensions (m) Total Cost (Rs)
Vermin composting units one in each village
4 7000 3x1.85x0.45 28000
Note : As per agriculture department norms
P 2.163 Horticulture (for 2 years)
Activity /Item
Variety No. of Plants required
Rate (Rs/plant)
Cost For 3rd year
Cost for 4th year
Apple Red royal, Golden 1000 29 25000 25000
Pear Red bartlet 750 19 9000 9000
Total 34000 34000
P 2.164 Vegetable
Activity /Item
Variety Quantity (kg)
Cost For 3rd year
Cost for 4th year
Cabbage Hybrid 0.225 45000 45000
Bean Falguni 18.00 8640 8640
Peas Hybrid, P-1, Linken & Azad 37.60 3010 3010
Potato Kufri jyoti 150.00 18000 18000
Capsicum Bharat 0.045 24750 24750
Cauliflower Shweta 0.045 18000 18000
Tomato Himsona 0.016 3200 3200
Total 120600 120600
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-202]
P 2.165 Animal Husbandry
Activity /Item
Breed Area Rate (Rs)
Total cost (Rs)
Project share
Beneficiaries share
Convergence
Fodder 2 20000 40000 40000 4000 -
Grasses Napeir, Steria and Barseem
2 120 /kg
8400 8400 840
Total 4 48400 48400 4840 -
P 2.166 Soli Conservation
Activity /item No. Rate Dimensions (m) Total Cost (Rs)
Dry Check Dam 15 3600 4x2x1 54000
Total 15 54000
P 2.167 Micro Enterprises
Activity /Item Total No. of families Requirement Cost (Rs) Basket making 1 Training and tools 10000 Vermin 1 Pits and verms 7000 Hotri. Nursery 1 Installation of infrastructure 125000 Total 3 142000
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-203]
Action Plan for IWMP- V Theog
Name of the State:- Himachal Pradesh Name of the District : Shimla Name of Block:- Theog Name of Panchayat : Parghiya Total Area in Hectare:- 131hectare Total Sanctioned Amount: : Rs.19,65,000 Total Village- 5 Sr. No.
Work Component
Total Proposed Work including Convergence
Fund s Allocated
1st year Plan 2
nd year Plan 3
rd year Plan 4
th year 5
th year
IWMP IWMP IWMP IWMP IWMP
Physical
Financial Physical Financial Physical Financial Physical Financial Physical Financial
A) General
1 Administrative cost
196500 - 39300 - 39300 - 39300 - 39300 - 39300
2 Monitoring 19650 - - - 6550 - 6550 - 6550 - -
3 Evaluation 19650 - - - - 6550 - 6550 - 6550
Total 235800 - 39300 - 45850 - 52400 - 52400 - 45850
B Institution & capacity building
a Awareness 1 15000 - 15000 - - - - - - - -
b Block level 1 20000 - 20000 - - - - - - - -
c District level Adjusted with other wards
15000 - 15000 - - - - - - - -
d Institutional training
Adjusted with other wards
21000 - - 21000 - - - - - -
e Exposure visit Adjusted with other wards
15000 - - 15000 - - - - - -
f Expert visits/services and Misc.
12250 - - 36000 - 12250 - - - -
Total 98250 - 50000 - 36000 - 12250 - - - -
C Detailed Project Report (DPR)
19650 - 19650 - - - - - - -
Total 19650 - 19650 - - - - - - -
D ) Consolidation phase
98250 - - - - - - - 98250
Total-D 98250 - - - - 98250 E) Entry point activities
a Bawari 1 100000 7 78600 - - - - - - - -
Total 1 100000 7 78600 21400* - - - - - - -
*Convergence amount -----21400
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-204]
Sr. No.
Work Component Total Proposed Work including Convergence
Fund s Allocated
3rd
year Plan 4th
year Plan
IWMP Convergence IWMP Convergence
Physical Financial Physical Financial Physical Financial Physical Financial
C ) Watershed Development Phase
1 Watershed Development Works
a Kachha talab 2(rep) 30000 3 30000 - - - - - -
b Roof water 3 171000 15 171000 - - - - - -
c Tank 7 574000 50 574000 - - - - - -
Total 12 775000 68 775000 - - - - - -
2 Agriculture
a Provision for crop seed 4 4776 2388 - - - 2388 - -
b Vermicompost 4 28000 1 14000 - - 1 14000 - -
Total 8 32776 16388 - - 1 16388 - -
3 Horticulture
a g) Apple 2000 50000 2 25000 - - 2 25000 - -
b h) Pear 1500 18000 1.5 9000 - - 1.5 9000 - -
c Vegetable seed - 241200 10 120600 - - 10 120600 - -
Total - 309200 13.5 154600 - - 13.5 154600 - -
4 Animal Husbandry
a Fodder 2200 40000 - - - - 2 40000 - -
b Grasses 70 8400 - - - - 2 8400 - -
Total 2270 48400 - - - - 4 48400 - -
5 Soil Conservation
a Dry Check Dam 15 54000 - 50074 - 3926 - - - -
Total 15 54000 - 50074 - 3926 - - - -
6 Drinking water
a Bawari 1 20000 2 20000 - - - - - -
b Tank 1 57000 5 57000 - - - - - -
Total 2 77000 7 77000 - - - - - -
7 Livelihood activities for the asset less persons
a Basket Making 1 10000 - 10000 - - - - - -
Total 1 10000 - 10000 - - - - - -
7 Production system & micro enterprises
a Vermin Compost 1 7000 - - - - .5 7000 - -
b Horti. Nursery 1 125000 11 125000 - - - - - -
Total 132000 11 125000 - - .5 7000 - -
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-205]
SUMMERY
Located at an altitude of 7630 feet above mean sea level Gram Panchayat parghiya comprises the total area of 131 hac. The total amount sanctioned for watershed development works, production systems, micro- enterprises, livelihood activities including preparation of DPR and other phases is 19.65 lacs. Data regarding socio-economic profile, land use pattern, livestock position and cropping pattern, etc was collected from panchayat secretaries, patwaries and through household surveys and PRA exercises. Total population of the Ward is 225 out of which 42 families are 8 of scheduled caste. In total 12 new water harvesting structures will be constructed including convergence existing structures in which repair work will be done. Construction and repair of these structures will enhance the storage capacity to 334 m3 with total cost of Rs 7,75,000 which will irrigate 1.99 hac area of the Ward.
The main agricultural crops grown in the Ward are maize and pulses with total area of 59 bigha. In total 501Kg seeds of agricultural crops will be provided in the Ward which will cost Rs 4776 and 4 vermicomposting units will be developed as demonstration unit in the Ward which will cost Rs 28000 In agriculture there will be skill development and capacity building of about 25-30 farmers from the ward
Horticulture is the major source of income to the farmers. The farmers are growing apple and vegetable crops in the watershed area. The total 3500Plants of apple and pear will be distributed to the farmers costing Rs 68000 Improved verities seeds of different vegetable crops will be distributed to the farmers which will be cost Rs 2,41,200 .
Total number of animals in the Ward is 536 for which fodder trees and grasses will be provided in each ward. In total 2200 plants of fodder and 70 Kg of grass seeds will be provided in the ward, which will cost Rs 40000. and Rs 8400 respectively. Drinking water is a pre requisite for the well- being of the area. 2 new drinking water structures like bawaries and wells will be constructed in different locations of the Ward. Construction of new structures and repair of old structures will enhance the storage capacity to 46800 lt. with cost estimate of Rs 77000 Per capita availability of drinking water will increase from 122 lt liter to 187 lt liter after project.
Soil conservation is the main objective of watershed programme. So to check soil erosion construction of crate wall will be done. Only River Banks will be constructed to prevent soil erosion, which will cost a total of Rs 54,000 The overall objective of watershed development programme is poverty elevation by investing in micro- enterprises and enhancing rural livelihoods. Income generating activities reported in the panchayat are rural artisans making, Basket making, vermicompost, nursery. A total of Rs 1,42,000 will be given to the beneficiaries of these groups with necessary trainings and tools.
Amount spent on different activities like entry point activities (1,00,000, water harvesting structures (7,75,000), agriculture development (32,776), horticulture development (30,92,000, animal husbandry (48,400), drinking water (Rs 77,000), soil conservation (Rs 54,000), micro- enterprises and livelihood (Rs 1,42,000) and capacity building (Rs 98,250)
IWMP-V(2009-10) Parghiya (2c6c2Gia) Theog -Shimla[page-206]
Annexure –I
Water harvesting Structure of Gram Panchayat Parghiya Target for 3rd year
Existing and Proposed water harvesting structures in Parghiya Panchayats of IWMP V Theog are presented as under Activity
Ward Name Proposed No. Location GIS coordinates Benefited Families
Size (mt)
Estimated Cost (Rs.) Latitude Longitude Altitude
Roof Water Banari 1 Banatri 31004.193 77
026.950 7630 4 3x3x2 57000
1 Janath 31004.190 77
026.948 7620 3 3x3x2 57000
1 Majholi 31004.180 77
025.930 7590 4 3x3x2 57000
Total 3 31004.193 77
026.950 7630 11 171000
Tank Banari 1 Banari 31004.180 77
026.935 7610 12 5x4x2 82000
1 Banatri 31004.193 77
026.950 7615 9 5x4x2 82000
1 Banari Dhak ke Niche 31004.170 77
025.920 7590 3 5x4x2 82000
1 Tharu 31004.180 77
025.930 7600 3 5x4x2 82000
1 Majholi 31004.195 77
026.954 7640 7 5x4x2 82000
1 Nagan Biran 31004.195 77
026.954 7640 3 5x4x2 82000
1 Nagan( SC) 31004.183 77
026.900 7649 6 5x4x2 82000
Total 7 43 574000
Annexure -II Dinking water Gram panchayat Parghiya Target for 3rd year Activity
Ward Name Existing No.
Proposed No.
Location GIS coordinates Benefited Families
Size (mt)
Estimated Cost (Rs.) Latitude Longitude Altitude
Work Name of the Ward
Existing No.
Proposed No.
Location 31004.193 77
026.948 7620 8 3x2x1.5 20000
Bawari Banari 3 1 Janath 31004.150 77
026.900 7580 20000
Total 1 25 3x3x2 57000
Tank Banari 1 1 Labhar (Source tank)
31004.145 77
026.910 7583 57000
Total 1
Annexure -III Soil conservation Measures Gram Panchayat Parghiya Target for 3rd year Activity
Ward Name
Existing No.
Location Proposed No. GIS coordinates Benefited Families
Size (mt)
Estimated Cost (Rs.) Latitude Longitude Altitude
Gully Plugging(Kachha Check Dam)
Banari - Tilu Nala 1 km)
15 31004.200 77
026.960 7650 50 4x2x1 54000
Total 54000
IWMP-V Theog, Shimla [page-207]
Annexure-IV List of Beneficiaries Roof Water Ward Village Name Beneficiaries Name
Banari Banatri Kewal
Ramesh (BPL)
Chet Ram
Paniya (BPL)
Janath Sat Pal
Daulat Ram
Bali Ram (BPL)
Majholi Ramesh (BPL)
Gopal (BPL)
Ram Lal (BPL)
Kewal Ram
Water Storage Tank
Ward Village Name Beneficiaries Name
Banari Banari Jai Ram
Bali Ram
Deep Prakesh
Beli Ram –II
Ranjeet (BPL)
Chandu Lal
Mohinder (BPL)
Hari Ram (BPL)
Bharatn Bhushan (BPL)
Atma Ram
Daulat Ram
Daleep Singh (BPL)
Banatri Hari Singh (BPL)
Prakesh
Devi Singh
Roshan
Paniya (BPL)
Ramesh (BPL)
Chet Ram
Rakesh (BPL)
Kewal Ram
Banari (Dhak ke Niche) Hari Ram (BPL)
Mohinder (BPL)
Bharatn Bhushan (BPL)
Tharu Ranjeet Singh (BPL)
Bali Ram (BPL)
Khushi Ram
Majholi Ramesh (BPL)
Gopal (BPL)
Ram Lal (BPL)
Khushi Ram
Kewal Ram
Baldev
Partap Singh
Nagan Biran Dashu Ram SC
Sunder Singh SC
Jhanju SC
Nagan ( SC) Kuldeep SC
Thara SC
Mast Ram SC
Kanshi Ram
Prem Singh
Ram “Lal
Annexure-V
List of Micro Enterprises Basket making Sr. No.
Name Village Ward
1 Beli Ram S/o chinga Ram (BPL) Banari Banari
Vermi Composting
Sr. No. Name Village Ward
1 Ramesh Chand S/o Rati Ram (BPL) Majholi Banari
IWMP-V Theog, Shimla [page-208]
Chapter- I
1.0 INTRODUCTION
1.1 INTRODUCTION OF THE PROJECT AREA The IWMP-V (Integrated Watershed Management Programme) Theog was sanctioned for the Theog Development Block in the year 2008 by the ministry of rural development (GOI). The project is being executed by the state government under rural development department. The district rural development agency is the nodal agency to execute the programme at district level. At the block level Block Development Officer Theog is the project implementing agency (PIA) to coordinate with different gram panchayats at field level. There are 50 Gram Panchayats in Theog block. The IWMP project is being started in 33 Gram Panchayat in different watershed/ catchment area. The different Nallahas and Khuds of the watershed drains into Giri River which is a tributary of river Yamuna. The IWMP-V Theog covers the four Gram panchayats of Theog block .The main feature of the watershed area is as under:
1. Acute shortage of drinking water. 2. The water resources for irrigation are drying day by day and existing resources
have been fully utilized. 3. Problems of soil erosion. 4. The contiguity of the watershed area. 5. People awareness and participation of the watershed area for natural resource
management is good. 6. The watershed area comprises of schedule caste population too. 7. Productivity potential of the land is high. 8. Whole area of the watershed is rain fed. 9. Fruit crops, cereals, Pulses and vegetables are the major crops of the
watershed. 10. Animal rearing is also an integral part of the watershed. 11. Basic infrastructure of roads, electricity and communication are available. 12. Majority of people are dependent on farm land based activities.
IWMP-V Theog, Shimla [page-209]
1.1a Sanctioned Budgetary Provosions Watershed : IWMP- V Theog
Area : 5741ha Amount : 861.15lacs
Gram panchayats under IWMP- V Theog
Sr. No. Gram Panchayat Area No. of villages
1 Ghoond 1509 9
2 Parghiya (Banari ward) 131 5
3 Ghorna 2557 20
4 Deothi (Deothi,Janahan and Dhar) 1544 13
Total 5741 43
1.1b ACTIVITY AND BUDGET
Amount in Lacs
Sr.No Budget Component % of the budget
Ghoond Parghiya (Banari ward)
Ghorna Deothi (Deothi, Janahan and Dhar)
Total
A) Administrative Cost
1 Administrative cost 10 22.6350 1.9650 38.355 23.16 86.115
2 Monitoring 01 2.2635 0.1965 3.835 2.316 8.6115
3 Evaluation 01 2.2635 0.1965 3.835 2.316 8.6115
B) Preparatory Phase
1 Entry point activities 04 9.0540 0.7860 15.342 9.264 34.446
2 Institution & capacity building 05 11.3175 0.9825 19.177 11.580 43.0575
3 Detailed Project Report (DPR)
01 2.2635 0.1965 3.835 2.316 8.6115
C ) Watershed Works Phase
1 Watershed Development Works
50 113.1750 9.8250 191.775 115.800 430.575
2 Livelihood activities for the asset less persons
10 22.6350 1.9650 38.355 23.16 86.115
3 Production system & micro enterprises
13
29.4255 2.5545 49.861 30.108 111.9495
D ) Consolidation phase 05 11.3175 0.9825 19.177 11.580 43.0575
Total 100 226.35 19.65 383.55 231.6 861.150
1.1c Methodology
A. District level i. Collection of data at district level
v. DRDA and Line department j. Meeting with CEO (DRDA), Project Officer, Heads of Line Departments
B. Block level
m. Data collection n. One day orientation with pradhan secretaries and panchayat sahayak at block level o. Meeting with line department officials of agriculture, horticulture and animal husbandry
department
C. Panchayat Level u. General meeting at Panchayat level with members of Panchayat Sameeti, Pradhan and
Ward members v. Collection of revenue data from Patwari w. Collection of socio economic data from Panchayat Secretary x. Village level meeting organized, PRA exercises and transect walks
y. Identification of beneficiary group for different activities
IWMP-V Theog, Shimla [page-210]
Chapter- II
2.0 GENERAL DESCRIPTION OF PROJECT AREA
2.1 DISTRICT The district Shimla was formed by merging of old princely states of Belsan, Bajhi, Bushar, Darkoti, Throch, Dari, Kumarsain, Jubbal, Dartesn, Theog etc. The name of the Shimla district was derived from goddess Shiyamali. It was summer capital of the British India. It was also the capital of East Punjab before Independence. In 15 April 1948 Shimla was merged with Himachal and was made district in 1966. In 1971 it was made capital of the Himachal Pradesh.
2.1.1 Geographical Feature
Himachal Pradesh has 12 districts and Shimla is one of them. Both state and district H.Q is situated in Shimla town. Shimla district lies in outer and lower Himalayas between 30‟.45” latitude and 77‟ to 78‟.25” longitude and altitude of district varies between 2500 to 16000 feet. The lowest and highest point being the Sunni Tehsil and Chanshal pass respectively. It is located in North East region of the state. On North side it is surrounded by Kullu and Kinnaur districts of the state, on South East and West by Sirmour district of the state and Dehradun of the Uttrakhand and North West by Solan and Mandi of Himachal Pradesh. The hills and mountain ranges are generally aligned in the east –west directions which present a complicated pattern of relief. The predominately rough terrain, the prevalence of introducing spurs, narrow and steep side valleys throughout the district reflects the youthfulness of its topography.
2.1.2 Population
The total population of the district is 7,21,745 (census 2001) comprising of 3,80,244 males and 3, 41,501 females. The schedule caste population is 1,67,482 and schedule tribes are 4,369. The density of the population is 141 persons per square meter. Shimla town is the most densely populated town in the district. The literacy rate of the district is 77 percent. The district has 6 towns, 12 tehsils and 331 Gram Panchayats.
2.1.3 Rivers
The major rivers following in the district are Satluj, Pabbar, Giri, and Nogli Khad.
2.1.4 Climate
The district has temperate climate. The average annual precipitation is 1028 mm and the temperature of the district ranges from subfreezing to 400 Celsius. The average temperature during summer is between 200 C to 400C, and between -7 0C and 10 0C in winter. Precipitation varies from 24 mm in November to 415 mm in July. Snowfall in the region, takes place in the month of December, has lately (over the last 15 years) been happening in January or early February every year. There are four broad seasons December wards the outset of winter which continues till the end of February, some time
IWMP-V Theog, Shimla [page-211]
continuing till the month of March and it is stormy with occasional frosts. The snow and sleet fall in the upper regions while rains are confined to lower area from March onward. Weather begins to warm up from March to June. Summer is followed by monsoon and humidity is high. Monsoon ends in mid of September and autumn begins and last till the end of November. Maximum temperature varies from 15.40 C to 30.60 C (June) and -20 C to 150 C during winter. Annual precipitation varies from 447 to 1084mm.
2.1.5 Soil
On the whole soils are young and thin deep ploughing is neither possible nor advisable. Generally the soil on the northern slope is thicker than those of southern slopes. The texture of the soil ranges from silty loam to clay loam, the colour varies from dark to brown. The organic content is higher, Nitrogen availability is from medium to high, and Potash availability is medium. The presence of Phosphorous is from low to medium. The soil reaction ranges from moderately acidic to neutral.
2.1.6 Irrigation
Most of the area is rainfed. The irrigation facilities are limited. The main sources for irrigation are kuhals and nallahs.
2.1.7 Land Classifications
2.1.7(1) Various type of lands available alongwtih areas (ha)
1 Total geographical area 513100
2 Forest 128700
3 Barren and unculturable land 12000
4 Land put to Non agriculture land 15000
5 Culturable waste 12400
6 Permanent pasture 249200
7 Land under miscellaneous trees, crops etc 68000 Source: Statistical out line of HP 2008-09
2.1.8 Agriculture
The Rabi and Kharif are the two cropping seasons of the district. The major cereal crops of the district are Wheat, Barley, maize, and among pulses Rajmash, Mash and Kulath etc. are grown in the watershed area.
2.1.8(I) Area under agriculture crops
Particulars Area (ha)
Total area 56,056
Sr. No. Crop
1 Paddy 2,923
2 Maize 16,685
3 Wheat 19,758
4 Barley 4,574
5 Pulses 5,544
6 Others 6,572 Source: - Department of Economics- & statistics 2002
IWMP-V Theog, Shimla [page-212]
2.1.9 Horticulture
The climate of the district is very suitable for fruit crops; the apple of the Shimla district is very familiar for its quality, flavour, taste and colour in the country and world over. The main fruit crops grown in district are apple, pear, plum, almond, apricot, cherry etc. The farmers are shifting towards protected cultivation by installing green house, polyhouse for vegetable and flower cultivation.
2.1.9(I) Area under Fruit Crops
Particulars Area (ha)
Total area 42,434
Sr. No. Crop
1 Apple 35,905
2 Other temperate fruits 3,415
3 Subtropics fruits 278
4 Nuts & dry fruits 2,041
5 Citrus 795 Source: Department of Economics &Statics HP.
2.1.10 Animal Husbandry/ Livestock
The major animals reared by the farmers are goats, cows, bullock, sheep, horses etc. The details are as under.
Sr. No. Livestock Population
1 Total 5,82,368
2 Buffaloes 22,450
3 Cows and Bullock 3,27,690
4 Sheep 1,29,949
5 Goat 96,378
6 Pig 1,031
7 Others 4,870
2.2 THEOG BLOCK The Theog development block is situated at the distance of 32 km from the district Headquarter. The altitude of the Theog block ranges from 1000 m 2500 m above mean sea level (abmsl). The geographical area of the block is 47,547 ha. The population of the block is 74,200 comprising of 37,816 male and 36384 females. The schedule caste population is 20,541 and there are 42 numbers of scheduled tribe. There are 50 Gram Panchayats 400 villages and 14,234 numbers of households in the block. There are 4522 BPL families, 2995 Antoyadaya families and 2,724 families are availing PDS facilities. The literacy rate of the block is 72 percent of the total population.
IWMP-V Theog, Shimla [page-213]
2.2.1 Geography Theog is located at 310N. It has average elevation of 1965 metres (6446 feet). It is situated on National Highway NH22 (on the Hindustan-Tibet Road), a 32km away from Shimla, and is a town of five „Ghats‟: Rahi Ghat, Deori Ghat, Prem Ghat, Janoghat, and Bagaghat.
Theog is growing vegetable which include Cabbage, Cauliflower, Broccoli, and Capsicum and also growing fruits which includes Apple, Peach, Cherry and Apricots. Local people live a happy and healthy life, enjoy their culture to the hilt. Women folk are educated and equally participate with their male counterparts, in the day to day activities. Theog is the number one producer of vegetables in Asia.
2.2.2 Climate
The climate of the Theog block is temperate. There is variation in climate. Different kind of flora is found in the Theog block. The major species found in the area are Beol, Tuni, Drake, Kachnar at the lower elevation, Kail, Devdar, Ban, Moru, etc, at the higher elevation. The temperatures of the block ranges between sub freezing to 370 Celsius. The average annual rainfall is 800 to 1,400 m.m.
2.2.3 Soil
The soil of the Theog block is clay, sandy, loam and black. The productivity of the soil is very high for vegetable and fruit crops. The water retaining capacity is moderate in whole of the block. The land use pattern of the Theog block is as under.
2.2.4 Land Classification 2.2.4 (I) Various types of lands available alongwtih areas (ha)
Sr. No. Agriculture land 8211 (ha)
1 Irrigated 105
2 Barren land 579
3 Grass land 11186
4 Pasture land 13259
5 Forests land 7559
6 Horticulture land 359
7 Others 6394
8 Total geography area 47547 Source: Department of Economics and statistics
2.2.5 Agriculture /Horticulture Development
The area under major crops and pluses is as under.
2.2.5 (I) Agriculture Crops Crops Area (ha)
A Food Crops 1575.00
1 Maize 1140.00
2 Paddy -
3 Wheat 265.00
4 Barley 170.00
IWMP-V Theog, Shimla [page-214]
B Pulses 147.00
1 Black Gram, Rajmash 111.00
2 Gram, red gram 36.00
C Non food crops 16.00 Source: - Department of Agriculture 2007-08
2.2.6 Horticulture The main fruits crops grown in the Theog block is apple, plum, apricot, almond and among vegetable peas, potato, cabbage, cauliflowers, capsicum are grown.
2.2.6(I) Vegetables Sr.no. Vegetables Crops Area (ha)
Total 1913.00
1 Peas 1000.00
2 Tomato 28.00
3 Cabbage 420.00
4 Cauliflower 125.00
5 French Bean 110.00
6 Capsicum/Chillies 148.00
7 Lady Finger 4.00
8 Brinjal 2.00
9 Cucurbits 10.00
10 Onion 2.00
11 Radish/Turnip 14.00
12 Others 50.00 Source: -Department of Agriculture Field Survey 2007-08
2.2.7 Animal Husbandry/Livestock Population The animals reared by the farmers of the Theog block are cows, sheep‟s, goat, horses, mules, buffaloes etc. The numbers are as under.
2.2.7 (I) Livestock population
Sr. No. Live stock name Population
1 Cows 31,083
2 Bullock 17,099
3 Sheep 3,032
4 Horses 736
5 Mules 897
6 Buffaloes 27,151 Source: - Animal husbandry Distt. Shimla
IWMP-V Theog, Shimla [page-215]
2.3 WATERSHED AREA (IWMP- V THEOG)
The IWMP project was sanctioned to the Theog Block in the year 2008 by the ministry of rural development (GOI). The project is being executed by the state government under the state rural development department. The district rural development agency (DRDA) is the nodal agency to execute the programme at district level. At the block level Block Development Officer Theog is the field level project implementing agency (PIA) to coordinate with different Gram Panchayats at field level. There is 50 Gram Panchayats in Theog block. The IWMP project is being started in 33 Gram Panchayat in different watershed/catchment area. DPR of IWMP V is prepared for the treatment of 5741 ha land area which is spread over in 4 Panchayats and 3 Micro watersheds naming Ghoond, Parghiya, Ghorna and Deothi.
2.3(I) Sanctioned Budgetary provisions for the different Panchayat/Micro Watersheds
Sr. No. Gram Panchayat Area Budget No. of villages
1 Ghoond 1509 22635000 9
2 Parghiya ( Banari) 131 1965000 1
3 Ghorna 2557 38355000 20
4 Deothi ( Deothi, Janahan & Dhar)
1544 23160000 13
Total 5741 86115000 43
2.3.1 Soil Status The soil of the watershed area is sandy loam, clay and black soil. The soil is shallow to moderate and in some places deep soil is also found. The terrain of the land is very sloppy.
2.3.2 Demography
The total population of the watershed area is 6701 out of which 3375 are males and 3326 female. The schedule caste and schedule tribe population constitute 27 percent of the total population.
2.3.3 Socio-economic profile
The total population of the watershed areas is 6701 out of which 3375 are males and 3326 females. The scheduled caste population is 1717 and Scheduled tribe/OBC population is 63. Table 2.3.3 (I) Demographic profile of different panchayats
Name of Panchayat
General Schedule Caste Schedule tribes Total
Sr. No
M F T M F T M F T M F T
1 Ghoond 1135 1108 2243 378 362 740 6 4 10 1519 1474 2993
2 Parghiya ( Banari)
91 102 193 15 17 32 0 0 0 106 119 225
3 Ghorna 803 776 1579 259 250 509 18 35 53 1080 1061 2141
IWMP-V Theog, Shimla [page-216]
4 Deothi (Deothi, Janahan and Dhar)
455 451 906 215 221 436 0 0 0 670 672 1342
G. Total 2484 2437 4921 867 850 1717 24 39 63 3375 3326 6701
M - Male, F-Female, T-Total.
Table 2.3.3 (II) Details of household population of the watershed areas Sr. No Name of Panchayat Total Number of Household Total population
1 Ghoond 526 2993
2 Parghiya( Banari) 50 225
3 Ghorna 539 2141
4 Deothi ( Deothi,Janahan & Dhar)
304 1342
Total 1419 6701
Table 2.3.3 (III) Antodaya and BPL Families under different castes Gram Panchayats General Scheduled Caste Schedule Tribes/OBC
BPL Antodaya BPL Antodaya BPL Antodaya
Ghoond 68 36 49 41 1 1
Parghiya( Banari) 22 10 4 4
Ghorna 58 33 23 19 1 1
Deothi ( Deothi, Janahan & Dhar)
N.A N.A N.A N.A N.A N.A
Total 79 79 316 158 2 2
2.3.4 Land use pattern of watershed areas
Land of the watershed is put for different uses which constitute agriculture, horticulture, vegetable, pasture, ghasni, forest etc
Table 2.3.4 (I) The land use pattern of IWMP-V
Source: – Revenue Patwar
Circle.
2.3.5 Livestock Population
The animal rearing is the integral part of the watershed area. The major animals
are cows, (locals and improved), bullocks, horses, goats, sheep‟s etc. The detail of livestock reared by the people in watershed area is as under
Sr. No.
Name of micro watershed
Name of panchayat
Total land
Irrigated Un irrigated
Agri. Horti. Veg. fellow Barren Pasture Ghasni Forest Other
1 Ghoond Ghoond 1509 2 1507 142 239 239 - 67 175 319 503 64
2 Parghiya ( Banari)
131 - 131 1 25 25 - 2 28 4 69 2
3 Ghorna Ghorna 2557 - 2557 57 296 58 194 41 29 156 1783 0
4 Deothi Deothi (Deothi, Dhar & Janahan)
1544 - 1544 10 207 22 - 34 15 199 1031 26
Total 5741 2 5739 210 767 344 194 144 247 678 3386 92
IWMP-V Theog, Shimla [page-217]
2.3.5(I) Status of local and improved cows of IWMP-V Theog block
Name of GP Cows Local Cows Improved Buffaloes
Milch Dry Total Milch Dry Total Milch Dry Total
Ghoond 329 81 410 532 48 580 4 0 4
Parghiya(Banari) 30 20 50 9 0 9 0 0 0
Ghorna 130 62 192 523 20 543 1 0 1
Deothi ( Deothi Janahan & Dhar)
100 100 200 365 25 390 4 0 4
G.T 589 263 852 1429 93 1522 9 0 9 Household Survey-2010
2.3.5(II) Status of other animals of IWMP-VTheog
Gram Panchayats Bullocks Calves Goats Sheep Poulty Mule Total
Ghoond 252 430 203 52 4 41 1976
Parghiya( Banari) 6 25 0 0 - - 90
Ghorna 168 365 255 47 70 - 1641
Deothi ( Deothi Janahan & Dhar)
120 270 35 8 8 6 1041
G.T 546 1090 493 107 78 6 4748
2.3.6 Livelihood in watershed area
The land is the primary source for livelihood activity of the watershed area. The people have adopted integrated farming system. The major source of the income of the people is vegetable cultivation. The cereals crops are grown at very low level. The people are getting good return from the vegetable and fruits crops. The animal reared fulfils the domestic need for milk and FYM of the people. But, due to the shortage of fodder, people are facing acute problem of fodder. The rural artisan in the watershed area are carpenter, masonry, cobbler and weavers but these community has very meagre sources of income for which income generating activities needs to be introduced in the watershed programme. There is a need to revive traditional rural artisans by providing trainings on skill development. The major sources of the livelihood are
Agriculture
Horticulture- Fruit and vegetable crops
Animal rearing
Rural artisans
Labour
Govt. employees
IWMP-V Theog, Shimla [page-218]
CHAPTER-III
3.0 SWOT ANALYSIS A critical analysis of strengths, weaknesses, opportunities and threats (SWOT) of any region is a good analysis for developing strategies /programmes as it provides valuable insights on potentials, constraints, opportunities and threats based on the primary, secondary and technical data a detailed analysis of SWOT is carried out.
3.1 Strengths of the watershed area Road infrastructure is available.
Area is suitable for seasonal and offseason vegetable crops.
Area is suited to quality seed production of chilli.
Area is also suitable for fruit crop production.
Unemployed educated youth.
Nearest market is available.
People are well versed with animal husbandry.
Farmers are innovative and ready to adopt new technologies.
3.2 Weaknesses
Area is rainfed.
Soil erosion in the cropped area.
Unconsolidated land holding
Scarcity of fodder.
Hailstorm prone area.
The pasture land/ grazing land are shrinking.
Unequal distribution of available water for irrigation.
Big farmers are getting more water for irrigation on the traditional right basis which needs to be reconsidered.
3.3 Opportunities
Considerable area can be brought under irrigation by adopting water harvesting techniques.
Fruits and vegetable production to raise the socio-economic status by increasing the area under these high yielding crops.
Generation of employment for rural poor, youths and women.
Convergence of different development schemes of different departments.
Opportunity to take other farm based enterprises like Mushroom cultivation, Floriculture, Vermicompost, Bee-keeping and Dairy development.
Capacity building of the youth and unskilled labourers.
IWMP-V Theog, Shimla [page-219]
3.4 Threats
Available land for agriculture is declining if S.M.C practices are not adopted.
Soil erosion in the sloppy lands.
Unscientific farming practices.
Deforestation.
Declining of the traditional artisans.
Social distress.
Declining of fodder sources.
Lack of interest and motivation.
3.5 Characteristics of DPR based on SWOT analysis
Conserve and harvest the water resources.
Bring waste land under agriculture and horticulture crops.
Plantation of fodder and grasses to overcome fodder problems. Revival of traditional occupation related to rural artisan.
Capacity building of farmers regarding scientific farm practices.
Promotion for protected cultivation
To encourage livelihood activities like bee- keeping, dairy, nursery raising and Vermicompost etc. and non farming activities like cutting and tailoring, cobbler, masonry, carpentry etc.
Introduction of improved breeds of milch animals and to minimise the less productive animal‟s population.
IWMP-V Theog, Shimla [page-220]
CHAPTER-IV
4.0 ENTRY POINT ACTIVITIES
Entry point activities are necessary part to orient the community members towards thrift and credit activities of the project. Success of government initiated programme largely depends upon the preference given to the entry point activities suggested under the programme. Main objective of entry point activities is to increase people participation in various developmental activities initiated by the government. The money earmarked for entry point activities is 4 per cent of total budget outlay and this amount plays vital role to involve more people in different project development activities. Different entry point activities suggested by farmers during PRA exercise include construction of vegetable collection centers, Talabs, and irrigation tanks etc
4.1 Total Budget: Rs 34.446 lac
Gram Panchayat
Activity Location Estimate Cost
Watershed Convergence
Ghoond Vegetable collection centre Ghadhari 226350 226350 -
Vegetable collection centre Chadail 226350 226350 -
Vegetable collection centre Palu (Jai Ram)
226350 226350 -
Vegetable collection centre Shaloha 226350 226350 -
Total 905400 905400 -
Parghiya Traditional water bawari (Baun)
Bhambi ki bawari
100000 78600 21400
Total 100000 78600 21400
Ghorna Vegetable collection centre kath nala 255700 255700 -
Vegetable collection centre Raksha 255700 255700 -
Vegetable collection centre Ghorna 255700 255700 -
Vegetable collection centre Shilla 255700 255700 -
Vegetable collection centre kadharan 255700 255700 -
Vegetable collection centre Darah 255700 255700 -
Total 1534200 1534200 -
Deothi Vegetable collection centre Beteowari 258800 258800 -
Tank with pipe Nerwa khad to Ninkara
150000 150000 -
Janahan Vegetable collection centre Janahan (Near middle school)
258800 258800 -
Dhar Vegetable collection centre Dhar 258800 258800 -
Total 926400 926400 -
Grand Total 3466000 3444600 21400
IWMP-V Theog, Shimla [page-221]
CHAPTER-V
5.0 WATER HARVESTING
5.1 Availability of Water There are very few sources of irrigation in Theog block of Shimla District. The nallahs, bawaries and tanks are the main sources of drinking/ irrigation water.
5.2 Water harvesting In past, the water harvesting has been done by constructing different water structures villagers have now suggested to increase the capacity of water bodies. Therefore new construction/repair/renovation of different structure is suggested. The existing and proposed water harvesting structures are as under. 5.2 (I) Existing and proposed water harvesting structures with storage capacity
Name of structure
Status Panchayat No Area/ Capacity (cu.lt)
Project Intervention
No of Beneficiaries
Old/new
Kachha talab
Old Ghoond 8 160 - All
Parghiya( Banari) 2 40 - All Ghorna 1 15 - All
Deothi ( Deothi Janahan & Dhar)
4 560 - All
Total 15 775 - All
New Ghoond 31 3712 Construction 250
Ghorna 57 8968 Construction All
Deothi ( Deothi Janahan & Dhar)
15 2400 Construction All
Total 103 15080 All
Roof Water
New Ghoond 5 232 Construction 19
Parghiya( Banari) 3 54 Construction All
Ghorna 74 2960 Construction All
Deothi ( Deothi Janahan & Dhar)
6 130 Construction 30
Total 88 3376 All
Tank Old Ghoond 8 80 - All
Parghiya( Banari) 1 24 - All
Ghorna 1 40 - All
Deothi ( Deothi Janahan & Dhar)
2 36 - All
Total 12 180 All
New Ghoond 74 3440 Construction All
Parghiya( Banari) 7 280 Construction All
Ghorna 49 3472 Construction All
Deothi ( Deothi Janahan & Dhar)
88 3520 Construction 279
Total 218 10712 All
Dam New Ghoond 1 150 Construction All
IWMP-V Theog, Shimla [page-222]
Ghorna 2 300 Construction All
Total 3 450 Construction All
Kuhal Old Deothi 1 10 Repair All
Total 1 10 All
Note: List of Beneficiaries, location, area and Budget in Annexure
5.2(II) Table: Existing and Proposed Water Availability in the Watershed
Name of structure Existing
No. Existing Capacity (lt)
Proposed No.
Capacity Total after Project Completion
Kachha Talab 15 775 103 15080 15855
Roof Water - - 88 3376 3376
Tanks 12 180 218 10712 10892
Dam - - 3 450 450
Kuhals 1 10 0 0 10
Total 28 965 412 29618 30583
5.2 (III) Total estimated budget with contribution from project beneficiaries and convergence funds
Name of structure
Budget estimate cost (Rs)
Contribution Convergence
Project Beneficiaries
Kachha Talab 5747200 5747200 0 -
Roof Water 7817000 7817000 781700 -
Tanks 21124000 21124000 21122400 -
Dam 1230000 1230000 0 -
Kuhal 1500000 1500000 0 -
Total 37418200 37418200 21904100 -
5.2 (IV) Outcomes
Present capacity 965
After project intervention 29618
Total availability 30583
Total Cost 37418200
Total land 5674
Un irrigated land 5672
Irrigated land 2
After project intervention 152.90
Total irrigated land after project intervention
154.90
IWMP-V Theog, Shimla [page-223]
CHAPTER-VI
6.0 AGRICULTURE
The rainfed agriculture is practiced in the watershed area. People grow wheat, Barley, maize, paddy and pulses.
6.1 Prevalent Farming System under Agriculture
1. Agriculture (Maize/ pulses + Wheat/Barley/ Pluses) 2. Agriculture + Animal Rearing 3. Agriculture + Horticulture (fruit crops+ Vegetables) + Animal Rearing 4. Agriculture + Labour + Rural Artisans
In agriculture development the emphasis is put on the increase in production and productivity. This could be possible by increasing the area under cultivation and by investing in improved agricultural technology adoption. 6.1(I) Cereals
Crops grown: Maize, Wheat, Barley Total Production: 254 +78.20 +93.84 = 426.04 qt (Based on PRA exercise)
Status Particulars Maize Wheat Barley
Existing Area Cultivated by beneficiary group
203 bighas 68 bigha
59 bighas
Present Production/season 254 qt 78.20 qt 93.84 qt
Productivity 1.25 qt/bighas 1.15qt/bighas 1.59qt/bighas
Variety Local Local Local
Technology Indigenous Indigenous Indigenous
Proposed Increase in area 40 bigha 28 bighas 25 bighas
Varieties Kanchan, Pioneer
S-308, Sonalika
Improved varieties
Total Seed Quantity required by beneficiary group
729 kg 1440 kg
1008 kg
6.1(II) Pulses
Pulses grown: Urad,Rajmash Total Production: 17.5+72.45=89.95 qt( Based on PRA exercise)
Status Particulars Urad(Blackmash) Rajmash
Existing Area Cultivated by beneficiary group
43 bighas 122bighas
Production/season 17.5 qt 72.45 qt
Productivity 41 kg/bighas 60 kg/bighas
Variety Local Redcap
Technology Broad casting Indigenous
Proposed Increase in area 17 bighas 31 bighas
Varieties Improved Jawala
Total Seed Quantity required by beneficiary group
240 kg 1530 kg
IWMP-V Theog, Shimla [page-224]
6.2 Critical Gaps in Agriculture Production
Lack of irrigation facilities.
Lack of scientific agricultural practices.
Timely unavailability of seeds, fertilizers and chemicals for insect-pest management.
Improved seed varieties not adequately used.
6.3 Marketing Negligible quantity is marketed used only for self consumption
6.4 Project Intervention a) Improved seed b) Capacity Building c) Irrigation facility d) Scientific Management e) Integrated diseases pest management
6.4. (I) Requirement of improved seed under different crops is as follows
Cereals Seed rate quantity
Project contribution with 10% Seed replacement rate (Kg)
Estimated Budget (Rs.)
Maize 729 73.00 1460
Wheat 1440 144.00 18788
Barley 1008 101.2 2535
Pulses
Mash 240 24 2160
Rajmash 1530 153 11475
Total 36418 Note: Target for 3
rd and 4
th year
The quantity of seed for each crop has been determined by multiplying the seed rate per bighas with the total area cultivated under different crops i.e. maize (243x3), wheat (96x15), barley(144x7), urad (48x5) and rajmash (153x10) by number of beneficiaries (list annexure). The project intervention would be replacement of local varieties by improved varieties at 10 per cent replacement rate each year for 2 years. This seed may be given as demonstration units among the beneficiaries.
6.5 Capacity Building and training
Training on cultivation practices of various agriculture crops.
Training on insects & pests management.
Training on post harvest management.
Exposure visits and experience sharing. 6.6 No. of training
Three trainings to a group of 30-35 farmers each for three days 6.7 Exposure visit
IWMP-V Theog, Shimla [page-225]
One visit of 30 -40 farmers
6.8 Vermi composting The cultivated area of the watershed is exposed to high doses of chemical fertilizers for obtaining maximum production. The fertility status of the soil is deteriorating day by day. To improve the soil structure and texture, hence Vermicompost of cow dung is being recommended. 6.8 (I) Proposed Vermicompost units
Sr.No Gram panchayat No. of Units Budget (Rs.)
1 Ghoond 22 154000
2 Parghiya(Banari) 4 28000
3 Ghorna 25 175000
4 Deothi ( Deothi Janahan & Dhar) 30 210000
Total 81 567000
Note: Target for 3rd and 4th year
Unit size 3mx1.85mx0.45m Vermi compost rate 7000 / unit
6.9 Budget in Agriculture
Item Contribution Convergence Total
Project Beneficiaries
Seed 36418 3640 - 40058
Vermi Composting 567000 56700 - 623700
Total 603418 60340 - 663758
IWMP-V Theog, Shimla [page-226]
CHAPTER-VII
7.0 HORTICULTURE The chapter deals with the fruit and vegetable crops. Among fruits apple, pear and walnut etc. are grown. Apple is the major cash crop. The watershed area is also cultivated with different types of vegetables. These includes cabbage, bean, capsicum, potato, peas, cauliflower, red chilli etc. the vegetable production is the main farm activity and a good source of employment and income.
7.1 Present Horticulture Practices
1. Horticulture + vegetables 2. Vegetable + Animal rearing 3. Vegetable crops (Cabbage+ Beans)(Peas + Potato)(Cauliflower +Capsicum) 4. Fruit crop (Apple + Pear + Plum +Walnut) 5. Agriculture + Horticulture + Animal rearing
7.2.1 Fruits Total Production= 12027qt. (Based on PRA Exercise)
Table 7.2.1 (I) Area, production and productivities of various fruit trees
Status Particulars Apple Pear
Existing Area Cultivated by beneficiary group
520.5 bigha 4 bigha
Production 12027 qt -
Productivity 23 qt/bigha -
Variety Red Royal, Golden Red bartlet
Technology Indigenous Indigenous
Proposed Increase in area 840 bigha 552 bigha
Varieties Red Chief, Top Red Bartlert, Red Bartlet
Total plant Quantity required by beneficiary group
36820 plants
22080 Plants
Source: Household Survey, Regional Centre, NAEB, UHF, Solan, 2010
IWMP-V Theog, Shimla [page-227]
7.2.2 Vegetables Total Production= 15770 qt. (Based on PRA Exercise)
Table 7.2.2 (I) Area, production and productivities of various vegetable crops
Status Particulars Cabbage Bean Peas
Existing Area Cultivated by beneficiary group
490 bighas 543 bighas 609 bighas
Production 6934 qt 1036 qt 4864 qt
Productivity 14 qt/bigha 7.50 qt/bigha 8 qt/bigha
Variety Megha Falguni Azad P-I, Lankan
Technology Indigenous Indigenous Indigenous
Proposed Increase in area 87 bigha 90 bigha 116 bigha
Varieties Hybrid Hybrid Hybrid
Total Seed Quantity required by beneficiary group
28850 gm 3198 kg 5800 kg
Table 7.2.2 (II) Area, production and productivities of various vegetable crops
Status Particulars Cauliflower Potato Capsicum Tomato
Existing Area Cultivated by beneficiary group
85 bighas 255 bighas 107 bighas 98 bighas
Production 850 qt 1275 qt 321 qt 490 qt
Productivity 10 qt/bigha 5 qt/bigha 3 qt/bigha 5 qt/bigha
Variety Shaweta Kufri-Jyoti Bharat Himsona
Technology Indigenous Indigenous Indigenous Indigenous
Proposed Increase in area
22 bigha 37 bigha 21 bigha 23 bigha
Varieties Hybrid Hybrid Hybrid Hybrid
Total Seed Quantity required by beneficiary group
5350 gm 1922.5 qt 3740 gm 2420 gm
7.3 Critical gaps in Horticulture
Lack of sufficient irrigation facilities
Quality seedling of fruit crop.
Lack of technical knowledge for cultural operation
Knowledge about PHT.
Lack of value addition.
Availability of fertilizers , insecticides and pesticides
IWMP-V Theog, Shimla [page-228]
Lack of vegetable collection centre
Modern equipments
Seed production
7.4 Marketing e) Vegetable are sold at Theog, Dhalli and Shimla market and Apple are sold at
Dhalli, Solan,Chandigarh and Delhi.
7.5 Project Intervention
f) Supply of improved verities of fruit crops seedlings. g) Vegetable collection centre.
h) Training on cultural operations and on value addition. i) Drip / sprinkle irrigation. j) Supply of hybrid seed of vegetable. k) Irrigation facilities. l) Certified seed production.
7.5 (I) Proposed Physical and Financial targets in Fruit Crops
Fruit/ Apple Pear GP No. of
Plants Area bigha
Cost for 3rd
year
Cost for 4
th
year
No of plants
Area bigha
Cost for 3
rd
year
Cost for 4
th
year
Ghoond 10520 298 263000 263000 7890 197 94680 94680
Parghiya (Banari) 1000 29 25000 25000 750 19 9000 9000
Ghorna 10780 307 269500 269500 8085 201 97020 97020
Deothi ( Deothi Janahan and Dhar)
6080 174 152000 152000 4560 114 54720 54720
G.Total 28380 808 709500 709500 21285 531 255420 255420 Note: Target for 3
rd and 4
th year
7.5 (II) Improved vegetable seeds
Species Seed requirement quantity(kg)
Project contribution with 10 % seed replacement rate (Kg)
Estimated Budget (Rs.)
Cabbage 28.850 2.885 98200
Beans 3798 379.800 182880
Peas 5800.000 580.000 52150
Cauliflower 5.350 0.535 37800
Potato 43750.000 4375.000 525000
Capsicum 3.840 0.384 44000
Tomato 2.420 0.242 12300
Cost for 1st year 952330
Cost for 2nd year 952330
Total 1904660
Note: Target for 3rd
and 4th
year
IWMP-V Theog, Shimla [page-229]
7.6 Vegetable Collection Centre
Panchayat N o. Location Size Beneficiaries Cost
Ghoond 5 Lohala, Pantha ghati (Naranty village), Khaloth , Charain (Near School) & Tikker
6x5 All 1300000
Ghorna 8 Ghorna, Deha ,Shirgulli Beja, lower kadharan Chandni, Tarapur & Shilla
6x5 All 2080000
Deothi ( Deothi Janahan & Dhar)
4 Deothi Pajna, Panji and Sujna- Kalna
6x5 All 1040000
Total 17 4420000 Note: Target for 3
rd and 4
th year
7.7 Poly house Demonstration unit for low volume high value crops of vegetable,
floriculture and MIS Panchayat N o. Location Size Beneficiaries Cost
Ghoond 6 Gadheri, Baroth, Bagail, Shaloha, Charain & Tikker
100m2 All 750000
Ghorna 8 Ghorna, Deha, Shirgulli, Kadharan, Chandni, Tarapur and Shilla
100m2 All 1000000
Deothi ( Deothi Janahan & Dhar)
4 Deothi, Bateowari, Janahan & Dhar
100m2 All 500000
Total 18 2250000
Note: Target for 3rd
and 4th
year
The above mentioned activity will be executed through SHGs, Mahila Mandal and
Yuvak Mandals/ unemployed/drop out educated youngsters by forming societies.
7.8 Budget in Horticulture
Item Estimated Budget (Rs.)
Contribution Convergence Total
Project Beneficiaries
Seedlings 1929840 1929840 192984 - 2122824
Veg. Seed 1904660 1904660 190466 - 2095126
Veg collection centre
4420000 4420000 0 - 4420000
Poly house & MIS
2250000 2250000 225000 - 2475000
Total 10504500 10504500 608450 11112950
IWMP-V Theog, Shimla [page-230]
CHAPTER-VIII
8.0 ANIMAL HUSBANDARY Animal husbandry plays very important role in the lives of the farmers. They depend upon animals for sustaining their day to day lives. The large numbers of farmers have adopted animal husbandry as livelihood activity along with agriculture and horticulture. The animals reared by the farmers are mainly for milk, FYM and meat purpose. Most of farmer rear animals for milk production which is mainly used for self consumption. The livestock kept by the farmers includes cows (local and jersey) buffaloes, goat and bullocks etc. Most of the animals are indigenous (local breed) having very low milching capacity. In order to improve the living standard of the farmers, the animal husbandry department is doing a pioneering job.
8.1 (I) Live stock population in IWMP-V
Name of GP Cows local
Cows improved
Buffaloes Bullocks Calves Goats Sheep Mule Total
Ghoond 410 580 4 252 430 203 52 41 1976
Parghiya(Banari) 50 9 0 6 25 0 0 - 90
Ghorna 192 543 1 168 365 255 47 - 1641
Deothi ( Deothi Janahan & Dhar)
200 390 4 120 270 35 8 6 1041
G.T 852 1522 9 546 1090 493 107 6 4748
Household Survey-2010
Milk production Total no. of milch cattle in the watershed area is 2026 and average production of milk per day is 2.5 to 5 lt per day of different species. The total milk production/ day is 8645 lt from different species. 8.2 Table: Average and Total milk production
Milch cattle Number Average milk production lt./day
Total production (lt.)
Buffaloes 8 3.5 28
Cow(Local) 589 2.5 1472.5
Cow (improved) 1429 5.0 7145
Total 2026 8645.5
8.3 Fodder availability, requirement and Deficit (tons)
Green fodder available in project area is 19665 tons whereas dry fodder available is 11798 ton Total 31463 ton fodder is available in project area. But requirement of green fodder is 47195 ton whereas requirement of dry fodder is 15732 ton. Total fodder required is 62927 ton. Deficit of green fodder in project area is 27530 ton. And that of dry fodder is 3934 tons.
IWMP-V Theog, Shimla [page-231]
Available Required Deficit
Green Dry Total Green Dry Total Green Dry Total
19665 11798 31463 47195 15732 62927 27530 3934 31464
Note a) Available Fodder
Green - 25kg/day x 30 days x 6months x Total live stock Dry - 15 kg/day x 30days x 6months x Total live stock
b) Required Fodder
Green - 30kg/day x 30days x 12months x Total live stock Dry - 10kg/day x 30days x 12months x Total live stock
8.3 (a) Gap between Demand and supply of total Fodder
Supply - 31463 tons. Demand - 62927 tons. Deficit - 31464 tons.
8.4 Project interventions Plantation and cultivation of fodder trees and grasses Construction of talabs, Johars in grass land and community lands Training/Capacity building
m) Plantation and cultivation of fodder trees and grasses Species: Buel, Ban, Robinia, Kachnar and Kharak etc.
Grasses: Orchard Grass, Napier, Barseem etc.
Name of Ward Fodder Trees Estimated Budget(Rs.)
Grasses Estimated Budget(Rs.)
Area (ha.)
No. of Plants
Area (ha.)
Quantity of seeds (kg)
Ghoond 12 13200 240000 14 490 58800
Parghiya(Banari) 2 2200 40000 2 70 8400 Ghorna 20 22000 400000 13 455 54600
Deothi ( Deothi Janahan and Dhar)
14 15400 280000 12 420 50400
Total 48 52800 960000 41 1435 172200 Note: Target for 3
rd and 4
th year
n) Construction of talabs, Johars in grass land and community lands o) Training and Capacity Building
Live stock management
Animal Health
Artificial insemination
Improved grasses / Fodder trees Exposure visits
IWMP-V Theog, Shimla [page-232]
8.5 Number of Training
Four trainings with 5-7 farmers in each trainings
Exposure visits for 5-7 farmers
8.6 Project outcome/impact
(a) Estimated production of milk after project intervention
Milk production after project intervention will increase to 3.5 to 7.0 lt. /day and total production of milk after project intervention will be 12409 litters.
Sr. No. Milch cattle No. Milk production lt./day
Total production (lt.)
1 Buffaloes 8 5.5 44
2 Local cows 589 3.5 2096
3 Improved cows 1429 7.0 10269
Total 2026 12409
(b)Total milk production before and after project intervention.
Increase in milk production is 3763 lt. with total production of 12409 lt.
Sr. No.
Milch cattle Before project (lt.)
After project (lt.)
Increase after project
1 Buffaloes 28.0 44 16.0
2 Local cows 1472.5 2096 623.5
3 Improved cows
7145.0 10269 3124.0
Total 8645.5 12409 3763.5
(c) Area brought under grass cover is 34 ha which will reduce soil erosion and
provide fodder (d) Area brought under trees cover 31 ha.
IWMP-V Theog, Shimla [page-233]
CHAPTER-IX
9.0 FISHERY Fisheries can be one of the additional source of income to the farmers of the watershed area, but due to the lack of fresh water, the people enable to take up this activity as a source of income. Secondly the people of the watershed area is practicing agriculture, horticulture and vegetable cultivation which is giving good returns to the farmers. Hence fish cultivation cannot suggest for the watershed areas of the theog block.
9.1 Existing and Proposed water bodies for fish culture
Existing water bodies Proposed water bodies Owner ship private /common No Size (ft) location No Size
(ft) Location
1 Nil Nil Nil Nil Nil Nil
9.2 Availability and requirement of fish seed /fingerlings
Ward Existing families
Proposed families
Present quantity of fish
Requirement of fish seed
Breeds
1 Nil Nil Nil Nil Nil
9.3 Project Interventions
Introducing of fisheries among more families
Requirement of improved seed (fingerlings)
Training on fish culture
IWMP-V Theog, Shimla [page-234]
CHAPTER-X
10.0 DRINKING WATER 10.1 Availability of drinking water
Water plays an important role in the day to day activities of human as well as animals for drinking. So the presence of drinking water facilities is a prerequisite to the well being of area. Rain fed conditions of the watershed areas falling under Theog makes this natural resource more important. Earlier wells, ponds and wells were the main sources of irrigation as well as drinking water. At present, water resources are very limited and have been taped fully by the local people for drinking as well as irrigation purposes. In earlier days, there were water bodies (bawaries) from which the people used to take water for drinking purpose. During the field visits and interaction with the local people and transect walks of the watershed area, some of facts regarding drinking water came into light which are as follows :
Water dried up in bawaries due to the climate change
Heavy pressure on the existing water bodies due to increase in human population
Negligence of traditional water bodies due to the availability tap water
Low percolation in the existing bawaries due to low lying water table
10.2 Demand and Supply
Particulars Capacity (lt)
Present After project intervention
Total supply of water per day 334750 2134550
Total House holds 1419 1419
Total population 6701 6701
Water Available per house hold per day 236 1504
Per capita Availability 50 Lt 318 lt
Table: 10.3 Present status of Drinking water source in watershed areas
Sr. No
Name of Panchayat
Tap/ WST
Capacity (ltr.)
Bauri Capacity (ltr.)
Handpump Capacity (ltr.)
Well/Pound Capacity (ltr)
1 Ghoond 22 88000 41 51700 5 5000 25 10200
2 Parghiya (Banari)
1 24000 3 3600 - - - -
3 Ghorna 12 142820 15 20700 8 18000 4 2500
4 Deothi (Deothi, Janahan and Dhar)
7 78000 20 8500 - - 2 250
Total 42 332820 79 83500 13 23000 31 12950
IWMP-V Theog, Shimla [page-235]
Table: 10.4 Project interventions for rennovation
Sr. No
Name of Panchayat
Tap/ WST
Capacity (ltr.)
Bauri Capacity (ltr.)
Handpump Capacity (ltr.)
Well/ Pound
Capacity (ltr)
Khurli Capacity (ltr)
1 Ghoond 31 250000 41 51700 5 5000 25 10200 40 44250
2 Parghiya (Banari)
2 42000 3 3600 0 0 0 0 0 0
3 Ghorna 37 1142900 15 20700 8 18000 4 2500 0 0
4 Deothi (Deothi, Janahan and Dhar)
20 578000 20 8500 0 0 2 250 0 0
Total 90 2012900 79 83500 13 23000 31 12950 40 44250
Table:10.5 Panchayat wise increase in total capacity after project intervention
Sr. No Name of Panchayat Existing After intervention Total 1 Ghoond 146700 170200 316900 2 Parghiya (Banari) 27600 19200 46800 3 Ghorna 98700 1085400 1184100 4 Deothi (Deothi, Janahan &
Dhar) 61750 525000 586750
Total 334750 1799800 2134550
Table: 10.6 Imporving Availability of Water and Quality of Drinking Water in
Gram Panchayat
Table: 10.7(I) Proposed activities for increase in the water capacity /availability
a) Renovation/Repair(Old Structures)
Structure No. Location Existing capacity (lt)
After intervention(lt)
No. of families benefitted
Approximate Cost
Well 1
As per list
4750 12950
1419
40000
WST/Tap
46 235700 2012900 3874000
Bawari 56 71300 85700 1100000
Handpump 0 23000 23000 0
Khurli 41 - - 235000
Total 334750 2134550 5249000
Sr. No
Source No. Present capacity
Availability of water/day from the source
No of months water available during the year Collecting
structure Storage capacity (ltr.)
1 Well 31 4732 12950 6 Months
2 WST/Tap
90 235700 2012900 4-5 Months After the interval of three days
3 Bawari 79 71300 85700 6-7 Months
4 Handpump 13 23000 23000 12 months
Total 209 334750 2134550
IWMP-V Theog, Shimla [page-236]
(b) Cost Estimates and funds available under project Budget
Activity/item Funds from Beneficiaries
Funds from Project
Funds from Line Department
Total
Well 5% to 10% as per list enclosed
5249000 Nil 5249000
Bawari
Tank
Table: 10.8(I) Outcome: Existing and proposed drinking water interventions
Source Present
storage Capacity
Proposed storage capacity
Increase In Total Capacity
Total Families Benefitted
Present Requirement day/person
Quantity After Intervention (lt)
Well 4750 8200 12950
1419 236 1504 WST/Tap 235700 1777200 2012900
Bawari 71300 14400 85700
Handpump 23000 0 23000
Total 334750 1799800 2134550
10.9 Critical Gaps to be covered
1) Source development 2) Regular Supply of drinking water 3) Cleanness and colorinization of water 4) Proper drainage of the catchment area to the pound/Johar 5) Sensitization of the community for judicious use of water
IWMP-V Theog, Shimla [page-237]
CHAPTER-XI
11.0 SOIL CONSERVATION
Soil conservation practices are helpful in solving the problems of land degradation, particularly accelerated soil erosion, faulty land use system, construction of roads and other development activities are responsible for soil erosion. To improve the fertility of soil and to check the soil erosion, it is important to conserve the soil. Soil can be conserved through various interventions including plantation and bioengineering structures etc.
The watershed area comprises of hill steep slopes having mixed layers of soil, facing problems of major soil erosion during rainy season. During the field visit and interaction with the local people and farmers, it was observed that soil erosion is increasing at a faster rate, due to the following reasons:
Deforestation in the watershed area.
Herbs and shrubs over exploitation for fodder and by grazing animals
Construction of roads leading to the local villages and dumping of debris along Nallaha side.
Lack of drainage system
Steep slope and improper bounding of cultivated land has also caused soil erosion.
Lack of physical and biological structures which could facilitates water percolation. 11.1 To check the soil erosion the following intervention are recommended
Construction of check dam from top to button to minimise the velocity of water.
Construction of crate walls to stop landslides.
Biological protection measures.
Proper bounding on the cultivated land by plantation of improved grasses and trees.
Bio engineering measures along the slopes ion ghasnies and pastures. Percolation tanks, ponds and johars.
11.2 Number of check dams and crate walls
GP Ward Activity Location No. Estimated Cost (Rs)
Ghoond Dry Check Dam
Gadhari Kufta nala 10 All 4x2x1 36000
Lohala Nala 15 All 4x2x1 54000
Kahar Nala 10 All 4x2x1 36000
Gadhari Nala 15 All 4x2x1 54000
Jubber Nala 15 All 4x2x1 54000
Ghoond-I Jarewal Nala 5 All 4x2x1 18000
Baroth 5 All 4x2x1 18000
Riundri 2 All 4x2x1 7200
Kufta-II 5 All 4x2x1 18000
Kharain Nala 4 All 4x2x1 14400
Ghoond-II Narainty Nala 10 All 4x2x1 36000
IWMP-V Theog, Shimla [page-238]
Jhal Nala 15 All 4x2x1 54000
Palu Roani Nala 10 All 4x2x1 36000
Palu Nala 5 All 4x2x1 18000
Dereware Nala 10 All 4x2x1 36000
Sholoha Padeper Nala 10 All 4x2x1 36000
Sholoha nala 8 All 4x2x1 28800
Panalalti nala 8 All 4x2x1 28800
Kayar Nala 12 All 4x2x1 43200
Charain Charain Nala 3 All 4x2x1 10800
Darag Nala 5 All 4x2x1 18000
Tikkar Khilna Nala 5 All 4x2x1 18000
Dhar Nala 4 All 4x2x1 14400
Jarash Nala 4 All 4x2x1 14400
Madog Nala 4 All 4x2x1 14400
Gashi Nala 4 All 4x2x1 14400
Total 203 730800
Parghiya
Dry Check Dam)
Banari Tilu nala 15 50 4x2x1 54000
Total 15 54000
Ghorna
Dry Check dam
Tarapur Kath nala to noti khad
30 All 4x2x1 108000
Chandani Chandani khad to Deha
40 All 4x2x1 144000
Deha Kanor nala 20 25 4x2x1 72000
Ghorna Ghorna nala 18 All 4x2x1 64800
Shilla Nalana nala 18 All 4x2x1 64800
Ramola nala 20 All 4x2x1 72000
kadharan Kheri ka nala 18 All 4x2x1 64800
Paral ka nala (Dovri
20 All 4x2x1 72000
Shirguli Jarari nala 28 All 4x2x1 100800
Jaria nala 20 All 4x2x1 72000
Total 232 835200
Deothi Dry check Dam
Dhar Dhar ka nala 30 All ward 4x2x1 108000
Kolu Nala 12 All ward 4x2x1 43200
Sujna Khad 15 All ward 4x2x1 54000
Total 57 205200
Ghoond Crate Wall Ghoond-II Narainty 4 All 4x2x1 22000
Total 4 22000
Ghorna Crate wall Deha Deha 26 All 4x2x1 143000
Total 26 143000
IWMP-V Theog, Shimla [page-239]
CHAPTER-XII
12.0 CONVERGENCE
The linkage of the IWMP-V Theog, with the other development programme is also one of the important components. The possibilities of deriving support from the other line department have been explored here.
The following activities are taken into account for convergence:
Development like roads and irrigation facilities can be converged with PMGSY, PWD, IPH and MNREGA programmes.
Employment Generation MREGA programme run by rural development department.
For productivity enhancement distribution of improved seeds, fertilizer insecticide & pesticides with state agriculture department under Pandit Dindyal Krishi Yojna.
Construction of Polly house and Vegetable collection centre at watershed level can be converged under the Horticulture technology mission run by department of Horticulture H.P.
Micro enterprise installation & development with the rural industrial programme, Prime minister Employment Generation Programme. Self-employment scheme etc.
Livestock development programme with the animal husbandry department and livestock development programme with animal husbandry department under Doodh Ganga project.
Name of Gram Panchayat
Activity /work
Programme /scheme for convergence
Agency/ Deptt
Budget contribution (Rs.)
Watershed Convergence Beneficiaries Total
Ghoond Dry check
Dam
MNREGA RD 605890 124910 - 730800
Parghiya (Banari)
Dry Check
dam
MNREGA RD 50074 3926 - 54000
Bawari
(EPA)
MNREGA RD 78600 21400 - 100000
Ghorna Dry check
dam
MNREGA RD 822920 12280 - 835200
Deothi (Deothi, Janahan & Dhar)
Dry check dam
MNREGA RD 86480 118820 - 205300
Total 1643964 281336 1925300
IWMP-V Theog, Shimla [page-240]
Chapter -XIII
13.0 MICRO ENTERPRISES FOR BPL FAMILIES
In Himachal Pradesh about 24 % rural households are living below poverty line. Apart from BPL families, some other households are having small land holdings and others under the category of land less. These families depend for their survival on animal rearing and other labour intensive works such as agricultural labourer, rural artisans and working in agriculture and horticultural activities. But these professions are having limited opportunities and young rural generation has started to migrate the urban areas in search of employment. In the IWMP V Theog the rural youths, rural artisans, and women groups needs to be trained regarding Vermi composting, Bee Keeping, Cutting & tailoring Goatery/sheeps and dairy which can enhance their income and improve the livelihood. In the watershed area fruits and vegetables are produced at large scale, some time farmer do not receive better prices at the market, it will be better if they are trained on post harvest techniques of these crops by making Jam, Jelly, Achar, and Juices etc. It will create value addition of the product when the market rates for row produce are not good. Carpentry, Masonry, Cobblers, Weavers and basket making are also important means of income generation in rural areas; But, these professional are still working on tradition/ old tools and techniques. Under the watershed programme their skill can be enhanced by providing latest equipments and by imparting training at professional institutes. It will create self employment opportunities and services to the local consumer at door step. Keeping in view of the above facts the following activities will be under taken in watershed programme for the self help groups, landless labour, rural artisans, etc.
Vermicompost
Dairy Development
Goat/Sheep rearing
Bee keeping
Incentive for Rural artisans in terms of training/ equipments
Cutting & tailoring
Skill development regarding horticulture cultural operations e.g. pruning
Certified seed production
Income enhancement and employment generation through different income generating activities
Sr. No
Activity Existing No of household
Proposed No of household
Present income/ mandays (Rs/ day)
After intervention income/ mandays
1 Carpentry 28 41 12000/60 18000/90
2 Weaver 2 2 12000/60 18000/90
3 Black Smith 2 2 4500/30 9000/60
4 Cobbler 2 2 3000/60 6000/90
5 Basket Making 6 8 4500/30 9000/60
6 Masonry 5 6 12000/60 18000/90
7 Cutting &Tailoring 0 6 3000/30 4500/60
IWMP-V Theog, Shimla [page-241]
8 Vermin 0 85 - 6000/60
9 Dairy 10 29 Self use 25200/210
10 Goatry 4 7 Self use 4000/annual work
11 Spain 1 2 72000/90 192000/120
12 Bee Keeping 0 10 - 2000/Seasonal
work
13 Nursery 0 14 - New concept
14 Seed Village Concept
0 15 New concept
Total 60 229
The above mention activities are considered for the farmer/rural artisan land holding less than 3 bighas which
will be verified during the implementation by the PIA.
Note: Target for 3rd
and 4th
year
1. Carpentry m. Purpose : Livelihood/ Enhancement of income n. Category : SC/ IRDP o. No. of families involved : 41 p. Project intervention
vii. Training viii. Tools and equipments
Outcomes of Projects
Present income/mandays
After intervention income
Requirement for intervention
Approximate cost
12000/60 18000/90 Machine plainer & training.
410000
2. Weavers
a. Purpose : Livelihood/Enhancement of income b. Category : SC/IRDP c. No. of families involved : 2 d. Project Intervention
i. Training ii. Tools /equipment
Outcome of project
Present income/mandays(Rs.)
After intervention income
Requirement for intervention
Approximate cost
12000/60 18000/90 Training and tools 20000
3. Black Smith
i. Purpose : Livelihood/Enhancement of income j. Category : NSC k. No. of families involved : 2 l. Project Intervention
v. Training vi. Tools /equipment
Outcome of project
Present income/mandays(Rs.)
After intervention income
Requirement for intervention
Approximate cost
12000/60 18000/90 Training and tools 20000
IWMP-V Theog, Shimla [page-242]
4. Cobbler a. Purpose : Livelihood/Enhancement of income b. Category : NSC c. No. of families involved : 2 d. Project Intervention
i. Training ii. Tools /equipment
Outcome of project
Present income/mandays(Rs.)
After intervention income
Requirement for intervention
Approximate cost
3000/60 6000/90 Training and tools 20000 5. Basket Making
i. Purpose : Livelihood/Enhancement of income j. Category : NSC k. No. of families involved : 8 l. Project Intervention
v. Training vi. Tools /equipment
Outcome of project
Present income/ mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
27000/180 72000/480 Training & tools 80000
6. Masonry m. Purpose : Livelihood/Enhancement of income n. Category : SC/IRDP o. No. of families involved : 6 p. Project Intervention
vii. Training viii. Tools /equipment
Outcome of project
Present income/mandays(Rs.)
After intervention income
Requirement for intervention
Approximate cost
12000/60 18000/90 Training & tools 60000
7. Cutting and Tailoring
a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 6 d. Project Intervention
i. Training ii. Tools /equipment
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
3000/30 4500/60 Sewing Machine 60000
8. Vermicompost
IWMP-V Theog, Shimla [page-243]
a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 85 d. Project Intervention
i. Training ii. Pits & worms
Outcome of project
Present income/mandays(Rs.)
After intervention income
Requirement for intervention
Approximate cost
- 6000/60 Pits and worm 595000
9. Dairy a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 29 d. Project Intervention
i. Training ii. Cows
Outcome of project
Present income/mandays(Rs.)
After intervention income
Requirement for intervention
Approximate cost
Self use 25200/210 Cows 580000
10. Goatry a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 7 d. Project Intervention
i. Training ii. Improved pair of Goats
Outcome of project
Present income/mandays (Rs.)
After intervention income
Requirement for intervention
Approximate cost
Seasonal work 4000/Routine work Improved pair of Goats
35000
11. Spain
a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 2 d. Project Intervention
i. Training ii. Necessary Input
Outcome of project
Present income/mandays(Rs.)
After intervention income
Requirement for intervention
Approximate cost
72000/90 192000/120 Necessary input 300000 Note 50 % contribution will be provided by the Beneficiaries
IWMP-V Theog, Shimla [page-244]
12. Bee keeping i. Purpose : Livelihood/Enhancement of income j. Category : SC k. No. of families involved : 10 l. Project Intervention
v. Training vi. Bee Hives
Outcome of project
Present income/mandays(Rs.)
After intervention income
Requirement for intervention
Approximate cost
- 60000/Seasonal work Bee hives 60000
13. Horticulture Nursery a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 14 d. Project Intervention
i. Training ii. Seedling & Technology
Outcome of project
Present income/mandays(Rs.)
After intervention income
Requirement for intervention
Approximate cost
- New concept Seedling & Technology
2100000
14. Seed village concept a. Purpose : Livelihood/Enhancement of income b. Category : SC c. No. of families involved : 15 d. Project Intervention
i. Training ii. Seeds & Technology
Outcome of project
Present income/mandays(Rs.)
After intervention income
Requirement for intervention
Approximate cost
- New concept Seeds & Technology 1875000
IWMP-V Theog, Shimla [page-245]
Chapter- XIV
14.0 LIVELIHOOD CONCERN
The land is the primary source for livelihood activity in the watershed area. The people are adopting integrated farming system. The major source of the income is vegetable cultivation. The cereals crops are grown at very low level. The people are getting good return from the vegetable and fruits crops. The animal reared is only for milk and FYM purpose. Rural employment inter of artisan need to be strengthened by investing in their skill development and by providing necessary tools/equipments for carrying out the work with good remuneration. The rural artisans in the watershed area are carpentry, masonry, cobbler and weavers.
A) Existing nature of livelihood in the watershed
Number of Household
Sr.No. Category Total No. of households
Livelihood linked in the project
1 General 1053 Hort.+ Agri.+ Animal +Micro Enterprises
2 SC 354 Horti+ Agri + Animal + Rural Artisans
3 BPL 397 Horti+ Agri + Animal + Rural Artisans +Micro Enterprises
Total families 1419 Horti+ Agri + Animal + Rural Artisans +Micro Enterprises
Agriculture
Sr.No. Particular Before project After project Intervention
1 No. of days/ year food grain sufficiency at home per family
4 months 5 months
2 Average production in Q per family 4.8 qt 5.5 qt
3 Income from agriculture Self use Self use
4 No. of families who want to increase area(all crops in agriculture combined)
899 725
Horticulture
A) Production i) Fruits:
Sr. No.
Particular Before Project After Project Intervention
1 No. of household with fruit trees 1114 1149
2 Average Area per households under Horticulture (Fruit trees)
2 bigha 4 bigha
3 Total Production 12027 qt 28320 qt
ii) Vegetables:
IWMP-V Theog, Shimla [page-246]
Sr. No.
Particular Before Project
After Project Intervention
1 No. of household having commercial vegetable production
1009 1114
2 Average Area per households under Vegetable Production
2.5 bigha 3.6 bigha
3 Total Production 24033 qt 30956 qt
B) Processing
Crops Before Project After Project Intervention
Fruits 4families 6 families
Vegetable 5 families 7 families
C) Marketing
Dhalli – Theog – Sainj- Shimla-Solan- Chandigarh-Delhi
Animal Husbandry
Total Number of households involved:1419
A) Production: (Milk)
i) Milk
Sr.No. Before Project After Project
1 No. of families involved 1419 1419
2 Quantity of Milk Produced 8646 12409
3 No. of Milch cattle 2026 2026
Micro Enterprises
Total Number Household: 273
Activity Particulars Before project
After project intervention
Carpenter No. of households 28 41
No. of mandays 2 months 3 month
Income per household 12000 18000
Weaver No. of households 2 2
No. of mandays 2 months 3 month
Income per household 12000 18000
Black smith No. of households 2 2
No. of man days 1months 2 months
Income per household 4500 9000
Cobbler No. of households 2 2
No. of mandays 3months 5 months
Income per household 4500 9000
Basket Making No. of households 6 8
No. of mandays 2 months 3months
IWMP-V Theog, Shimla [page-247]
Income per household 4500 9000
Masonry No. of households 5 6
No. of man days 2 months 3 months
Income per household 12000 18000
Cutting & Tailoring No. of households - 6
No. of mandays - 2 months
Income per household - 2500
Vermi Composting No. of households - 85
No. of mandays 3 months
Income per household 6000
Dairy No. of households 10 29
No. of mandays 7 months 7 months
Income per household 25200 25200
Goatry/Sheep Rearing No. of households 4 7
No. of mandays 365 days 360 days
Income per household Self use 4000
Spain No. of households 1 2
No. of mandays 3 months 4 months
Income per household 72000 96000
Bee Keeping No. of households - 10
No. of mandays - 365 days
Income per household - 6000
Horticulture Nursery No. of households - 14
No. of man days - 2 months
Income per household - New concept
Seed village concept No. of households - 15
No. of man days - 6 months
Income per household - New concept
IWMP-V Theog, Shimla [page-248]
Chapter-XV
15.0 MONITORING Monitoring and evaluation should be carried out from time to time by the technical authority. So that physical and financial target achieved is visible and impact of work /progress is observed. The first monitoring should be carried out after one year start of the project work in the field.
15.1 Mechanism of Monitoring
15.1 (I) Financial
Social auditing of financial transaction
Expenditure booked as per Detailed Project Report (DPRs) approved programmes/works
Progress reports by PIA to DRDA countersigned by watershed committee forest departments, GIS web based on line monitoring
Work assessment of the user groups
Social auditing of the financial transaction
Constitution of the village level committee to monitor the quality of work and financial transaction
15.1 (II) Physical
Work assessment by user groups
Constitution of the village level committees to monitor the quality of work and financial transaction.
15.2 Outcome of Monitoring
To ensure the work under watershed programme as per satisfaction of the user groups the economic indicators will also be ensured on the following points:
Increases in income level
Generation of employment at watershed level
Availability of food
Improvement in standard of living
Enhancement in the production of the farm produce
IWMP-V Theog, Shimla [page-249]
Chapter-XVI
16.0 EVALUATION Periodic evaluation is required for assessing the impact of the project intervention. This would asses the progress of the intervention in term of physical, financial and social improvement targets. The concurrent and post project evaluation should be carried out by the team of expert from agriculture, horticulture and water resource management who will give true report based on figure and facts and would be in position to suggest appropriate strategies for the future modification. The following socio - economic indicators should be followed:
Increase in income level
Generation of employment at watershed level
Foods security
Improvement in standard of livelihood
Enhancements in Productivity of the farm produce
Increase in soil moisture content
Increase in green cover
People participation for conservation of natural resources
Increase in milk
IWMP-V Theog, Shimla [page-250]
Chapter –XVII
17.0 CAPACITY BUILDING The capacity building strategy and action plan under the project aims to build the competenc and capability of targeted village communities including the poor to collectively enable them to achieve the project targets.
Under this sub component the core administrative capacity of the Gram Panchayat in planning,budgeting, financial management, implementation and reporting would be strengthened. The capacity will also be built up of the Project Implementing Agency(PIA) i.e block and district level for the efficient and effective functioning of the project. At the initial level the capacity will be build at Gram panchayat level, which includes Gram Panchayat elected officials, community, representatives of SHG, beneficiaries and watershed staff through trainings, exposure visits and awareness camps. Training of the all stakeholders in applying the new technologies in various components including water harvesting, agriculture, horticulture, fisheries, animal husbandry and micro enterprises. The exposure visits to different institution and field areas within and outside state. 17.1 Training Module for different stake holders
1. Farmers 2. Panchayati Raj Institutions (PRI) 3. Village Level Institutions(VLI) 4. Project Implementing Agency(PIA) 5. Watershed Development Team(WDT) 6. Community organization etc.
16.2 Modules 16.2(I) Awareness Camps
Panchayat level
Training
Block Level
DRDA level
Institutional level
Exposure Visits
University/Institutions/Field
Special Trainings (Professional Institutions)
Nursery Development
Dairy Development
Vegetable Cultivation
Water harvesting
Marketing Miscellaneous (Trainings/visits) topic not covered above
IWMP-V Theog, Shimla [page-251]
Capacity Building Schedule for IWMP – V Theog Sr.No
Topic Level Target group Duration No. of Person
No. of Trainings
Budget (Rs)
1 eneral concept of watershed management
Awareness generation at village GP/ Level
All community One day All stake holder
21 315000
2 Role and responsibility of GP WDT etc maintenance of accounts
At block level Pradhan, Secretary and members SHG, and watershed
2 days 30 21 420000
3 Seminar workshop
District level Officials and public representative of the watershed area
1 day 30 18 915000
4 General training on watershed management
Institutional Training
Members of PRI, WDT, SHG,UG etc.
5 day 30-35 4 420000
5 Nursery raising techniques orchard management
Training on orchard management at UHF. Nauni
Farmers 3 day 35 3 315000
6 Dairy development
IGA. Panchayat Activities
Farmers 3 day 35 3 315000
7 Vermicompost IGA. Panchayat Activities
Farmers 3 day 35 3-4 441000
8 Cereals crops pulses
Exposure Panchayat visits
Farmers 5 day 35 13 815000
9 Expert visit/services and Misc.
Experts Farmers - 349750
Total 4305750
The capacity building of farmers and youth in the watershed areas can also be done
under the micro enterprises and livelihood through Industrial Training Institute (ITI)
occupation\trades as well as other entrepreneurs programmes which provide self-employment or
wage employment within the watershed areas.
IWMP-V Theog, Shimla [page-252]
Chapter – XVIII
18.0 CONSOLIDATION & SUSTAINABILITY OF THE PROJECT The project is formulated by keeping in mind its sustainability. The resources augmented and economic plans developed in the phase II are the foundation of future sustainable livelihood. The major objective under this phase will be as follows.
a) Consolidation and completion of the works. b) Capacity building of the community based organisation to carry out the project
activities for the post project period. c) Sustainable management of the assets created under the project by the local
committees. d) Management of the natural resources. e) Large scale implementation of the successful experiences regarding farm
production.
Sustainability
Maintenance of infrastructure by the committee.
Regular use of the infrastructure.
User charges of infrastructure
Documentation of success stories
Promotion of agro – processing marketing arrangements of produce and off farm and informal sector enterprises.
Farmers will be encouraged to develop low cost production technologies and linked with market price
Periodical evolution of the project.
Mechanism for project withdrawal
User group will be empowered to take decision regarding the further implementation of the project after its completion. The assets created under the project will be handed over to the user group. They will look all the activities. The training will be imparted to the user groups self group etc from time to time. The watershed committee can use the watershed development fundus for repair and maintenance of structures created under phase –II.
The village level federation will be formed in order to support marketing of farm and non-farm produce. They will be linked with the different agencies to sell the produce of local communities.
The financial agencies will also be involved to provide financial assistance to the villagers.
IWMP-V Theog, Shimla [page-253]
Action Plan for IWMP-V Theog
Name of the State:- Himachal Pradesh Name of the District : Shimla Name of Block:- Theog Name of Panchayat: Ghoond, Ghorna, Deothi and Parghiya Total Area in Hectare:- 5741 hectare Total Sanctioned Amount: Rs. 8,61,15,000 Total Village- 43 Sr. No.
Work Component
Total Proposed Work including Convergence
Fund s Allocated
1st year Plan 2
nd year Plan 3
rd year Plan 4
th year 5
th year
IWMP IWMP IWMP IWMP IWMP
Physical
Financial Physical Financial Physical Financial Physical Financial Physical Financial
A) General
1 Administrative cost
8611500 - 1722300 - 1722300 - 1722300 - 1722300 - 1722300
2 Monitoring 861150 - - - 287050 - 287050 - 287050 - -
3 Evaluation 861150 - - - - - 287050 - 287050 - 287050
Total 10333800 - 1702200 - 2009350 - 2296400 - 2296400 - 2009350
B Institution & capacity building
a Awareness 21 315000 - 315000 - - - - - - - -
b Block level 21 420000 - 420000 - - - - - - - -
c District level 18 915000 - 915000 - - - - - - - -
d Institutional training
14 1491000 - - - 1491000 - - - - - -
e Exposure visit 13 815000 - - - 815000 - - - - - -
f Expert visits/services and Misc.
349750 - - - - - 349750 - - - -
Total 4305750 - 1650000 - 2306000 - 349750 - - - -
C Detailed Project Report (DPR)
4 861150 - 861150 - - - - - - - -
Total 4 861150 - 861150 - - - - - - -
D ) Consolidation phase
4305750 - - - - - - - - - 4305750
Total-D 4305750 - - - - - - - - - 4305750 E) Entry point activities
a Tank with pipe
1 150000 13 150000 - - - - - - - -
b Vegetable collection center
13 3216000 286 3216000 - - - - - - - -
c Bawari 1 100000 7 78600 - 21400* - - - - - -
Total -B 15 3466000 306 3444600 - 21400 - - - - - -
Convergence amount of Bawari *
IWMP-V Theog, Shimla [page-254]
Sr. No.
Work Component Total Proposed Work including Convergence
Fund s Allocated
3rd
year Plan 4th
year Plan
IWMP Convergence IWMP Convergence
Physical Financial Physical Financial Physical Financial Physical Financial
C ) Watershed Development Phase
1 Watershed Development Works
a Kachha talab 105 5747200 511 5747200 - - - - - -
b Roof water 88 7817000 695 7817000 - - - - - -
c Tank 218 21124000 1870 21124000 - - - - - -
d Dam 3 1230000 109 1230000 - - - - - -
e Kuhal 1 1500000 111 1500000 - - - - - -
Total 415 37418200 3296 37418200 - - - - - -
2 Agriculture
a Provision for crop seed 72836 3 36418 - - 3 36418 - -
b Vermicompost 81 567000 23 280000 - - 23 287000 - -
Total 639836 26 316418 - - 26 323418 - -
3 Horticulture
a i) Apple 56760 Plants 1419000 65 709500 - - 65 709500 - -
b j) Pear 42570 Plants 510840 42 255420 - - 42 255420 - -
c Vegetable seed 1904660 85 952330 - - 85 952330 - -
d Vegetable collection center
17 4420000 208 2340000 - - 185 2080000 - -
e Poly house & MIS 18 2250000 100 1125000 - - 100 1125000 - -
Total 10504500 500 5382250 - - 477 5122250 - -
4 Animal Husbandry
a Fodder 52800 960000 - - - - 48 960000 - -
b Grasses 1435 kg 172200 - - - - 41 172200 - -
Total 45435 1132200 - - - - 89 1132200 - -
5 Soil Conservation
a Dry Check Dam 397 1825150 139 1565214 - 255936 - - - -
b Crate Wall 10 165000 15 165000 - - - - - -
Total 407 1990150 154 1730214 - 255936 - - - -
6 Drinking water
a Bawari 56 1100000 80 1100000 - - - - - -
b Tank 46 3874000 340 3874000 - - - - - -
c Khurali 41 235000 21 235000 - - - - - -
d Well 1 40000 3 40000 - - - - - -
Total 144 5249000 444 5249000 - - - - - -
7 Livelihood activities for the asset less persons
a Carpentry 41 410000 - 410000 - - - - - -
b Masonry 6 60000 - 50000 - - - 10000 - -
c Weaver 2 20000 - 20000 - - - - -
d Basket Making 8 80000 - 10000 - - - 70000 - -
IWMP-V Theog, Shimla [page-255]
e Black smith 2 20000 - 10000 - - - 10000 - -
f Cutting & Tailoring 4 40000 - - - - - 40000 - -
g Cobbler 2 20000 - - - - - 20000 - -
Total 65 650000 - 500000 - - - 150000 - -
7 Production system & micro enterprises
a Vermicompost 85 598000 29 322000 - - 24 273000 - -
b Dairy 29 580000 - 100000 - - - 480000 - -
c Goatry 7 35000 - 20000 - - - 15000 - -
d Spain 2 300000 13 150000 - - 13 150000 - -
e Horti. Nursery 14 2075000 140 1625000 - - 40 450000 - -
f Seed village concept 15 1875000 33 375000 - - 131 1500000 - -
g Cutting & Tailoring 2 20000 - - - - - 20000 - -
h Bee keeping 10 60000 - - - - - 60000 - -
Total 164 5543000 215 2592000 - - 208 2948000 - -
IWMP-V Theog, Shimla [page-256]
SUMMARY
Located at an altitude of 4910-9375 ft above mean sea level Gram Panchayat IWMP-V comprises the total area of 5741 hac. The total amount sanctioned for watershed development works, production systems, micro- enterprises, livelihood activities including preparation of DPR and other phases is 861.15 lacs. Data regarding socio-economic profile, land use pattern, livestock position and cropping pattern, etc was collected from panchayat secretaries, patwaries and through household surveys and PRA exercises. Total population of the watershed is 6701 out of which 1053 families are of general and 366 of scheduled caste. In total 415 new water harvesting structures will be constructed including convergence existing structures in which repair work will be done. Construction and repair of these structures will enhance the storage capacity to 29618 m3 with total cost of Rs 3,74,18,200 which will irrigate 152.90 hac area of the panchayat.
The main agricultural crops grown in the panchayat are maize and pulses with total area of 636 bigha. In total 4947 Kg seeds of agricultural crops will be provided in the panchayat which will cost Rs 72,836 and 81 vermicomposting units will be developed as demonstration unit in the panchayat which will cost Rs 5,67,000 In agriculture there will be skill development and capacity building of about 30-35 farmers from the panchayat.
Horticulture is the major source of income to the farmers. The farmers are growing apple and vegetable crops in the watershed area. The total 99330 Plants of apple and pear will be distributed to the farmers costing Rs 19,29,840. Improved verities seeds of different vegetable crops will be distributed to the farmers which will be cost Rs 30,32,330 The technique of low volume high value crops will be demonstration by installing pollyhouses (MIS) and seed village concept for the BPL and SHGs. The total 18 pollyhouse and 15 seed village concept will be demonstrated the Rs. 22,55,000 and 18,75,000 has been earmarked for the purpose.
Total number of animals in the panchayat is 4625 for which fodder trees and grasses will be provided in each ward. In total 52800 plants of fodder and 1435 Kg of grass seeds will be provided in the ward, which will cost Rs 8,00,000 and Rs 1,72,200 respectively. Drinking water is a pre requisite for the well- being of the area. 144 new drinking water structures like bawaries and wells will be constructed in different locations of the panchayat. Construction of new structures and repair of old structures will enhance the storage capacity to 334750 lt with cost estimate of Rs 52,49,000 Per capita availability of drinking water will increase from 50 lt to 318 ly after project.
Soil conservation is the main objective of watershed programme. So to check soil erosion construction of crate wall will be done. Only River Banks will be constructed to prevent soil erosion, which will cost a total of Rs 19,90,150 The overall objective of watershed development programme is poverty elevation by investing in micro- enterprises and enhancing rural livelihoods. Income generating activities reported in the panchayat are rural artisans making, Goatry, Poultry, and dairy farming. A total of Rs 43,18,000 will be given to the beneficiaries of these groups with necessary trainings and tools. One polyhouse unit is introduce as demonstration in each panchayat which will cost of Rs.1,25,000/unit
Amount spent on different activities like entry point activities (3,44,44,600), water harvesting structures (3,74,18,200), agriculture development (6,39,836), horticulture development (1,05,04,500), animal husbandry (11,32,200), drinking water (Rs 52,49,000), soil conservation (Rs 19,90,150), micro- enterprises and livelihood (Rs 43,18,000) and capacity building (Rs 43,05,750)