3201 Stanley Street, Stevens Point, WI 54481, 715-345-5000, www.elliswi.com
Design Meeting #10 – Minutes
Design Development
Holy Spirit Catholic Parish – Addition and Remodeling
Ellis Office – Lower Level
January 16, 2019
Attendees
Lee Olsen, Holy Spirit
John Krupka, Holy Spirit
Kevin Czerwinski, Holy Spirit
Wendy Mitch, Holy Spirit
John Clifford, Holy Spirit
Jim Anderson, Project Manager, Ellis Construction
Steve D. Chizzo, Architect, Ellis Construction
Chase Rettler, Rettler Corp.
Previous Meeting:
Design Meeting #9 – 1-2-19 (minutes not reviewed)
General:
1. The main goals for this meeting were to finalize the floor plan and site plan.
2. The new ramp and baptistry area at the Altar were reviewed and discussed.
3. Also reviewed was the overall scope of work for electrical, plumbing and HVAC in the rest of
the existing building.
4. The next step in the design process is to create a revised “target cost” or “project budget”
based on these plans and decisions.
Site Design:
1. Chase Rettler from Rettler Corp. attended the meeting and presented the updated site plan.
(marked up plan is attached in these notes)
2. The net change in parking is approximately four (4) stalls.
3. The “big lot” will have 101 stalls (including six accessible), and the new south lot will have 25
stalls with no accessible spaces.
4. There will be six (6) accessible spaces in the “big lot” near the new covered entrance, not along
the school as shown on the plan. It may be necessary to re-stripe the lot to create space for
the access aisles.
5. The city will require curb and gutter around the new parking areas, which could impact access
to the existing garage building and stormwater movement on the site.
6. A concrete sidewalk will be built along the south side of the existing church as part of the new
parking lot work.
7. A concrete sidewalk will be built along the west side of the existing church and the new
addition as part of the new work.
8. The existing garage will be retained as-is. Access is needed to the east-facing garage doors.
Holy Spirit Parish – Addition and Remodeling page 2 of 2 Minutes – Design Meeting #10 (cont.)
9. Costs to demolish the Rectory should be figured into the project. The church will advertise a
little more to try to get someone to move the building off the site, but if that happens it will
just be a benefit to the budget and not something we are counting on.
10. The Easter vigil fire pit will not be a built-in, permanent structure. There will not be a spot
allocated for this function, knowing that it can be set-up in a few different location on-site.
11. The existing ground sign in the southeast corner should be retained or relocated.
12. Directional signage in the new south parking lot is needed to get people to park in the big lot
and enter the new “main entrance”. There will also need to be directional signs to accessible
parking stalls, as there are no accessible entrances near the new south lot.
13. There are currently two (2) parking lot light poles figured toward the east end of the “big lot”.
It may be possible to put lights on the adjacent buildings instead of having separate poles.
14. Rettler will schedule meetings with the City to get input on requirements for zoning and
stormwater that may impact the design.
Floor Plan:
1. Plans A4 and A4a were presented, with the major difference being the location of the exit
doors either from the Gathering Space by the Kitchen, or in the Multi-Purpose Room. (marked
up plans are included in these notes)
2. If A4a is used, the doors to the Multi-Purpose Hall would be reversed, and the door and pass-
thru window at the Kitchen would be straightened out on the wall of the Gathering Space.
3. Also on plan A4a, an exterior sidewalk could be added in the ‘alley’ on the east side up to the
upper level landing at the Sanctuary for convenience to the upper level. (this would require a
small retaining wall and railings)
4. It was decided that plan A4 works better.
5. Ellis should analyze the cost of the coiling door + decorative doors to the Sanctuary v. a fire-
rated glass door system at the Sanctuary. The rated door system is expensive but may still be
cost-effective.
6. Niches and space for statuary and artwork need to be considered.
7. The doors in the firewall to the Sanctuary and the existing elevator lobby should be lockable.
Scope of work in the existing building:
1. The current list of items used to establish the overall project cost does NOT include some
items from the original Conditions Report.
2. The items were removed from the Report due to prioritization of project costs and are
expected to be “maintenance” items that can be addressed separately.
3. There appears to be some items that should still be included in the current project due to the
complexity involved, or being required by code; however, the decision was made to just pursue
the current list and if there appear to be funds available as part of the DD cost updates, then
we can look at the Conditions Report list and determine if anything should or can be added.
4. Some items will be removed from both lists, like: “add dishwasher” and “install HC signage”.
5. An updated list is included in these notes.
Floor Plan - Sanctuary:
1. Joel Skinner from Church Interiors met with a sub-committee regarding the Sanctuary work,
showed examples of their work, and we discussed the scope of work for this project.
2. Joel will put together budgetary pricing for the painting and patching, and a separate price for
the Baptistry for reference.
3. Joel will not do any drawings or renderings for this price, but will supply a description of the
amount of work.
4. The water level in the Baptismal Pool is designed to be reached from the Sanctuary level, but
the level will be nearly at the level of the Altar.
5. The Font will not have water except for an actual baptism. The Pool will have water circulated
continuously. A portable pond heater will be used, or a mixing valve to temper the water.
RA
MP
UP2 STEPS
60"SPACE
UP
DOWN
UP
DO
WN
UP
FLOOR SLOPES ~3"
(betw. this door and locationfor new door to Gathering Space)
131 SF
VESTIBULEVESTIBULEVESTIBULEVESTIBULEVESTIBULEVESTIBULEVESTIBULEVESTIBULE
118 SF
MUSICMUSICMUSICMUSICMUSICMUSICMUSICMUSIC131 SF
SR BARBSR BARBSR BARBSR BARBSR BARBSR BARBSR BARBSR BARB
118 SF
COLLEENCOLLEENCOLLEENCOLLEENCOLLEENCOLLEENCOLLEENCOLLEEN 131 SF
JULIEJULIEJULIEJULIEJULIEJULIEJULIEJULIE
105 SF
STUDENT STAFFSTUDENT STAFFSTUDENT STAFFSTUDENT STAFFSTUDENT STAFFSTUDENT STAFFSTUDENT STAFFSTUDENT STAFF
81 SF
RISERRISERRISERRISERRISERRISERRISERRISER
111 S
F
VES
TIBU
LEVES
TIBU
LEVES
TIBU
LEVES
TIBU
LEVES
TIBU
LEVES
TIBU
LEVES
TIBU
LEVES
TIBU
LE
10,433 S.F.(NOT INCLUDING CANOPIES)
3-HOUR FIRE WALL
240 SF
PASTORPASTORPASTORPASTORPASTORPASTORPASTORPASTOR
POSSIB
LE R
ELO
CATI
ON O
F PO
SSIB
LE R
ELO
CATI
ON O
F PO
SSIB
LE R
ELO
CATI
ON O
F PO
SSIB
LE R
ELO
CATI
ON O
F
STA
INED
GLA
SS W
INO
DW
SSTA
INED
GLA
SS W
INO
DW
SSTA
INED
GLA
SS W
INO
DW
SSTA
INED
GLA
SS W
INO
DW
S
259 SF
CONFERENCE RMCONFERENCE RMCONFERENCE RMCONFERENCE RMCONFERENCE RMCONFERENCE RMCONFERENCE RMCONFERENCE RM
105 SF
ZACHZACHZACHZACHZACHZACHZACHZACH
298 SF
LIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RM
40 TABLES
210 CHAIRS
(35 CHAIRS ON 6 CARTS)
2487 SF
MULTIMULTIMULTIMULTI----PURPOSE HALLPURPOSE HALLPURPOSE HALLPURPOSE HALLMULTIMULTIMULTIMULTI----PURPOSE HALLPURPOSE HALLPURPOSE HALLPURPOSE HALL
495 SF
KITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHEN
2284 SF
GATHERINGGATHERINGGATHERINGGATHERINGGATHERINGGATHERINGGATHERINGGATHERING
247 SF
HALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAY
49 SF
TLT RMTLT RMTLT RMTLT RMTLT RMTLT RMTLT RMTLT RM95 SF
STORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGE
195 SF
WOMENWOMENWOMENWOMENWOMENWOMENWOMENWOMEN193 SF
MENMENMENMENMENMENMENMEN
46 SF
MOTHERS RMMOTHERS RMMOTHERS RMMOTHERS RMMOTHERS RMMOTHERS RMMOTHERS RMMOTHERS RM
72 SF
HALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAY
153 SF
ADMINADMINADMINADMINADMINADMINADMINADMIN
131 SF
WORK RMWORK RMWORK RMWORK RMWORK RMWORK RMWORK RMWORK RM
420 SF
HALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAY
29 SF
STORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGE30 SF
SAFESAFESAFESAFESAFESAFESAFESAFE
EXISTING CONFERENCE RM
TABLE FROM RECTORY
36" x 72" DESK
36" x 72" DESK
36" x
72" D
ESK
36" x
72" D
ESK
30" x 66" DESK36" x 72" DESK
25" x
48"
18" x
65" FILEFILELAT FILE
FILE
FILEFILE
FILE
FILE
FILE
BO
OKS
HLF
BO
OKS
HLF
SM
SAFE
LRG
SAFECOPIER
FILE
FILE
FILE
40"
TABLE
210 SEATED AT 35 TABLES210 SEATED AT 35 TABLES210 SEATED AT 35 TABLES210 SEATED AT 35 TABLES
CHAPEL AREACHAPEL AREACHAPEL AREACHAPEL AREA
40 SEATS40 SEATS40 SEATS40 SEATS
FILE
FILE
COAT
RACK
COAT
RACK
T.V./
PROJECTION
SCREEN
48"
TABLE 36" x
72" D
ESK 24" x 48"
24" x
72" CRED
ENZA
BO
OKS
HLF
48"
TABLE
36" x 72" DESK
T.V. / PROJECTION
SCREEN WALL
18 SF
CLSTCLSTCLSTCLSTCLSTCLSTCLSTCLST
264 SF
STORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGE
154 SF
KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.
40 SF
JAN.JAN.JAN.JAN.JAN.JAN.JAN.JAN.
24 SF
COATSCOATSCOATSCOATSCOATSCOATSCOATSCOATS
DishwashArea
ALIGN NEW BUILDINGw/ EXISTING BRICK.
GRADE LEVEL ENTRANCE AND
DRIVE
RAMP UP 3"RAMP UP 3"RAMP UP 3"RAMP UP 3"
COILING FIRE COILING FIRE COILING FIRE COILING FIRE
DOORDOORDOORDOOR
3'-0
"
8'-0" 110'-0" 6'-0" 4'-0"
19
'-4"
16
'-0"
5'-4
"3
2'-0
"5
'-4"
78
'-0"
61
'-4"
34
'-8"
8'-0"
17'-2 3/4" 4 7/8" 9'-6" 4 7/8" 10'-6" 4 7/8" 10'-6" 4 7/8" 9'-6" 4 7/8" 21'-0"4 7/8"4'-10 1/4"
4 7/8"21'-1 3/4" 1'-4"1'-7 1/8"
5'-6"
5'-6
3/4
"
9'-0
"4
7/8
"9
'-0"
4 7
/8"
15
'-5 3
/8"
1'-7
1/8
"
12
'-5 1
/4"
12
'-5 1
/4"
19
'-2 3
/16
"
10
'-2 7
/16
"1
1'-1
0 1
1/1
6"
13'-7 15/16"
19
'-1 1
/4"
9'-5" 7 1/4" 6'-7 5/8"
4 7/8"
6'-0"
7'-4
"
3'-0
1/4
"
9'-7 3/16" 9'-10 3/16"
11'-8 1/2"
120'-0"
LIFTLIFTLIFTLIFT
30'-0" 3'-8" 8" 3'-4" 8'-0" 6'-4" 3'-4"
29
'-4"
25
'-4"
14
'-8"
21
'-4"
3'-4" 5'-4" 3'-4" 6'-0" 3'-4" 2'-8"21'-0 7/8"
50'-0"
STEVENS POINT, WI(715) 345-5000
WWW.ELLISWI.COM
REV
ISIO
NS:
NO
.D
ATE
DES
CRIP
TIO
N
PROJECT NO.
DATE:
CHECKED BY:
DRAWN BY:
THIS DRAWING IS THE PROPERTY OF ELLIS CONSTRUCTION CO., INC. FOR THE SERVICES PERFORMED BY ELLIS CONSTRUCTION, AND WAS PREPARED FOR THE EXCLUSIVE USE OF ELLIS CONSTRUCTION OR IT'S SELECTED SUB-CONTRACTORS. ANY USE, PUBLICATION, DUPLICATION, OR REPRODUCTION OF ANY PART OF THIS DRAWING IS NOT ALLOWED WITHOUT THE PERMISSION OF ELLIS CONSTRUCTION CO., INC.PLO
T D
AT
E A
ND
TIM
E:
FIL
E L
OC
AT
ION
:1
/1
1/2
01
9 3
:44:4
3 P
MW
:\A
_R
EV
IT\1
70
54
Holy
Sp
irit
Pari
sh\1
70
54
Holy
Sp
irit
Pari
sh S
D 1
81
10
8.r
vt
HO
LY S
PIR
IT P
AR
ISH
838 F
REM
ON
T S
TR
EET
ST
EV
EN
S P
OIN
T, W
I 54481
AD
DIT
ION
AN
D R
EM
OD
ELIN
G
FLO
OR P
LAN
STA
IRS
BY S
AN
CTU
ARY
17054
SDC
SC
1-11-19
A4
1/8" = 1'-0"1 FLOOR PLAN - OPTION 4 STAIRS BY SANCTUARYNORTHNORTHNORTHNORTH
RA
MP
UP2 STEPS
60"SPACE
UP
DOWN
UP
DO
WN
UP
FLOOR SLOPES ~3"
(betw. this door and locationfor new door to Gathering Space)
143 SF
VESTIBULEVESTIBULEVESTIBULEVESTIBULEVESTIBULEVESTIBULEVESTIBULEVESTIBULE
118 SF
MUSICMUSICMUSICMUSICMUSICMUSICMUSICMUSIC131 SF
SR BARBSR BARBSR BARBSR BARBSR BARBSR BARBSR BARBSR BARB
118 SF
COLLEENCOLLEENCOLLEENCOLLEENCOLLEENCOLLEENCOLLEENCOLLEEN 131 SF
JULIEJULIEJULIEJULIEJULIEJULIEJULIEJULIE
105 SF
STUDENT STAFFSTUDENT STAFFSTUDENT STAFFSTUDENT STAFFSTUDENT STAFFSTUDENT STAFFSTUDENT STAFFSTUDENT STAFF
79 SF
RISERRISERRISERRISERRISERRISERRISERRISER
113 S
F
VES
TIBU
LEVES
TIBU
LEVES
TIBU
LEVES
TIBU
LEVES
TIBU
LEVES
TIBU
LEVES
TIBU
LEVES
TIBU
LE
10,433 S.F.(NOT INCLUDING CANOPIES)
3-HOUR FIRE WALL
240 SF
PASTORPASTORPASTORPASTORPASTORPASTORPASTORPASTOR
POSSIB
LE R
ELO
CATI
ON O
F PO
SSIB
LE R
ELO
CATI
ON O
F PO
SSIB
LE R
ELO
CATI
ON O
F PO
SSIB
LE R
ELO
CATI
ON O
F
STA
INED
GLA
SS W
INO
DW
SSTA
INED
GLA
SS W
INO
DW
SSTA
INED
GLA
SS W
INO
DW
SSTA
INED
GLA
SS W
INO
DW
S
259 SF
CONFERENCE RMCONFERENCE RMCONFERENCE RMCONFERENCE RMCONFERENCE RMCONFERENCE RMCONFERENCE RMCONFERENCE RM
105 SF
ZACHZACHZACHZACHZACHZACHZACHZACH
298 SF
LIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RMLIB / LOUNGE / MTG RM
40 TABLES
210 CHAIRS
(35 CHAIRS ON 6 CARTS)
2495 SF
MULTIMULTIMULTIMULTI----PURPOSE HALLPURPOSE HALLPURPOSE HALLPURPOSE HALLMULTIMULTIMULTIMULTI----PURPOSE HALLPURPOSE HALLPURPOSE HALLPURPOSE HALL
563 SF
KITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHEN
2226 SF
GATHERINGGATHERINGGATHERINGGATHERINGGATHERINGGATHERINGGATHERINGGATHERING
247 SF
HALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAY
49 SF
TLT RMTLT RMTLT RMTLT RMTLT RMTLT RMTLT RMTLT RM95 SF
STORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGE
195 SF
WOMENWOMENWOMENWOMENWOMENWOMENWOMENWOMEN193 SF
MENMENMENMENMENMENMENMEN
42 SF
MOTHERS RMMOTHERS RMMOTHERS RMMOTHERS RMMOTHERS RMMOTHERS RMMOTHERS RMMOTHERS RM
72 SF
HALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAY
153 SF
ADMINADMINADMINADMINADMINADMINADMINADMIN
131 SF
WORK RMWORK RMWORK RMWORK RMWORK RMWORK RMWORK RMWORK RM
420 SF
HALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAYHALLWAY
29 SF
STORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGE30 SF
SAFESAFESAFESAFESAFESAFESAFESAFE
EXISTING CONFERENCE RM
TABLE FROM RECTORY
36" x 72" DESK
36" x 72" DESK
36" x
72" D
ESK
36" x
72" D
ESK
30" x 66" DESK36" x 72" DESK
25" x
48"
18" x
65" FILEFILELAT FILE
FILE
FILEFILE
FILE
FILE
FILE
BO
OKS
HLF
BO
OKS
HLF
SM
SAFE
LRG
SAFECOPIER
FILE
FILE
FILE
40"
TABLE
210 SEATED AT 35 TABLES210 SEATED AT 35 TABLES210 SEATED AT 35 TABLES210 SEATED AT 35 TABLES
CHAPEL AREACHAPEL AREACHAPEL AREACHAPEL AREA
40 SEATS40 SEATS40 SEATS40 SEATS
FILE
FILE
COAT
RACK
COAT
RACK
T.V./
PROJECTION
SCREEN
48"
TABLE 36" x
72" D
ESK 24" x 48"
24" x
72" CRED
ENZA
BO
OKS
HLF
48"
TABLE
36" x 72" DESK
T.V. / PROJECTION
SCREEN WALL
18 SF
CLSTCLSTCLSTCLSTCLSTCLSTCLSTCLST
255 SF
STORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGESTORAGE
154 SF
KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.KITCHEN STOR.
39 SF
JAN.JAN.JAN.JAN.JAN.JAN.JAN.JAN.
24 SF
COATSCOATSCOATSCOATSCOATSCOATSCOATSCOATS
DishwashArea
ALIGN NEW BUILDINGw/ EXISTING BRICK.
GRADE LEVEL ENTRANCE AND
DRIVE
RAMP UP 3"RAMP UP 3"RAMP UP 3"RAMP UP 3"
COILING FIRE COILING FIRE COILING FIRE COILING FIRE
DOORDOORDOORDOOR
3'-0
"
8'-0" 110'-0" 6'-0" 4'-0"
19
'-4"
16
'-0"
5'-4
"3
2'-0
"5
'-4"
78
'-0"
61
'-4"
34
'-8"
8'-0"
17'-2 3/4" 4 7/8" 9'-6" 4 7/8" 10'-6" 4 7/8" 10'-6" 4 7/8" 9'-6" 4 7/8" 21'-0"4 7/8"5'-6 1/4"
4 7/8"20'-5 3/4" 1'-4"1'-7 1/8"
5'-6"
5'-6
3/4
"
9'-0
"4
7/8
"9
'-0"
4 7
/8"
15
'-5 3
/8"
1'-7
1/8
"
12
'-5 1
/4"
12
'-5 1
/4"
19
'-2 3
/16
"
10
'-2 7
/16
"1
1'-1
0 1
1/1
6"
13'-7 15/16"1
9'-1
1/4
"
16'-10 9/16"
9'-5" 7 1/4" 6'-7 5/8"
4 7/8"
6'-0"
7'-4
"
3'-0
1/4
"
9'-7 3/16" 9'-10 3/16"
11'-8 1/2"
120'-0"
LIFTLIFTLIFTLIFT
3'-4" 4'-0" 6'-4" 4'-0"3'-4"3'-8"30'-8"
29
'-8"
21
'-4"
14
'-8"
25
'-4"
2'-8"3'-4"5'-4"3'-4"4'-8"3'-4"22'-0"
50'-0"
SIDEWALK AT 1:20 SLOPESIDEWALK AT 1:20 SLOPESIDEWALK AT 1:20 SLOPESIDEWALK AT 1:20 SLOPE
STEVENS POINT, WI(715) 345-5000
WWW.ELLISWI.COM
REV
ISIO
NS:
NO
.D
ATE
DES
CRIP
TIO
N
PROJECT NO.
DATE:
CHECKED BY:
DRAWN BY:
THIS DRAWING IS THE PROPERTY OF ELLIS CONSTRUCTION CO., INC. FOR THE SERVICES PERFORMED BY ELLIS CONSTRUCTION, AND WAS PREPARED FOR THE EXCLUSIVE USE OF ELLIS CONSTRUCTION OR IT'S SELECTED SUB-CONTRACTORS. ANY USE, PUBLICATION, DUPLICATION, OR REPRODUCTION OF ANY PART OF THIS DRAWING IS NOT ALLOWED WITHOUT THE PERMISSION OF ELLIS CONSTRUCTION CO., INC.PLO
T D
AT
E A
ND
TIM
E:
FILE L
OC
AT
ION
:1
/1
1/2
01
9 3
:44:4
9 P
MW
:\A
_R
EV
IT\1
70
54
Holy
Sp
irit
Pari
sh\1
70
54
Holy
Sp
irit
Pari
sh S
D 1
81
10
8.r
vt
HO
LY S
PIR
IT P
AR
ISH
838 F
REM
ON
T S
TR
EET
ST
EV
EN
S P
OIN
T, W
I 54481
AD
DIT
ION
AN
D R
EM
OD
ELIN
G
17054
SDC
SC
1-11-19
A4a
1/8" = 1'-0"1 FLOOR PLAN - OPTION 4a - No Door at Stairs at SanctuaryNORTHNORTHNORTHNORTH
Holy Spirit Parish Jan. 17, 2019
Scope of work in Existing Building
Current List
blue items appear on this list but
not on previous Conditions List
List from Conditions
Report - Dec. 2016
green items appear on this list but not Current List
Include
in Project?
Current
Budgeted
Cost
Original
Opinion of
Cost
Desired Items (Existing Building)
a. Remove existing pews. TBD Deleted
b. Scaffolding for painting of worship space. Scaffolding for painting of worship space yes $75,000
c. Paint interior of worship space ‐ includes prime, base coat,
and decorative painting.
Decorative painting ‐ includes prime, base coat, and decorative painting yes $222,000
d. Install new or refinished pews. no Deleted
Other (Exst'g Bldg.)
e. Provide a baptismal font yes $45,000
Repair timber roof truss and strut bearing support. yes $16,000
d. Repair/tuck point face brick and stone veneer. Brick façade repair/pointing. yes $4,300
Repair deteriorated concrete at the base of the arches at the main entrance of
the church.
no $600
g. Provide a new mechanical system. Provide a new mechanical system yes
Architectural/Structural Construct a dedicated mechanical space yes $20,000
Plumbing Plumbing for new dedicated mechanical space yes $15,000
HVAC Provide a new HVAC system for the building yes $500,000
Electrical Electrical for new dedicated mechanical space yes $21,000
h. Add light switches in place of using ciruit breakers as the
main lighting control for the sanctuary.
Possibly add light switches in place of using the circuit breakers as the main
lighting control for the Sanctuary
yes Cost TBD
i. Provide accessibility to existing altar platform. Construct a ramp to provide access to altar platform yes $17,500
Construct a tapered floor access to altar platform no $3,000
j. Upgrade all older inefficient luminaires to a newer LED
type fixture or replace bulbs with LED type.
Upgrade all older inefficient luminaires to a newer LED type fixture or replace
bulbs with LED type
Sanctuary
only
Cost TBD
k. Replace flood lighting at altar area with efficient wall
mounted track lighting system.
The existing down lights and stage flood lighting in the Sanctuary could be
replaced with a wall mounted track lighting system that would be much more
efficient, easty to adjust and simple to maintain
yes $40,000
l. Add occupancy sensors in rooms that are used
intermittently to save energy.
Add occupancy sensors in rooms that are used intermittently to save energy no Deleted
m. Replace decorative pendant lights in worship space. The existing vintage decorative pendant luminaires in the sanctuary have great
value, but utilize up to 2000 watts of incandescent power. All the lower wattage
integral lamps in these fixtures have been upgraded with CFL lamps except for the
500 watt incandescent per lamp. There are no CFL or LED lamp replacements for
this. The 500 watt incandescent lamps will no longer be available. Look into
retrofitting fixtures versus replacing fixtures to keep down maintenance and
energy costs
modify
existing
fixtures for
new LED
Cost TBD
Replace all exterior luminaires with LED fixtures or replace the integral lamps no $4,200
Add battery back‐up exit signs and egress luminaires with integral monthly testing
to bring the building up to current code
yes $10,000
Provide junction boxes next to disconnect switches that are code violations and re‐
feed branch feeders. Provide blank covers on open spaces in the electrical panels.
Replace receptacles near sinks with GFCI type
no TBD
Have an electrical contractor trace all breakers and provide typed panel
directories. Have the electrfical contractor provide engraved nameplates for all
unlabeled panels, disconnects and starters
no $2,200
Investigate the purpose fo the 400 amp disconnect switch to see its purpose and
provide an engraved label
no TBD
Any sizeable remodel or addition to the building should inclue changing out the
eelctrical service to a 208V, 3ph, 4‐wire system. The 240V delta 3ph is becoming
obolete. Coordination required with existing equipment that is running on 240
volts. Some equiment may not be able to run on 208 volts
no TBD
n. Provide separate water service and water meter. Provide church with its own water service and water meter, so it's not dependent
on the school for domestic water
yes $12,000
o. Provide new gas hot water heater for west end. Provide new gas hot water heater for West side of building, sized for Sacristy,
toilet rooms, Janitors rooms and Kitchen.
yes $10,000
Provide new hot water or tank‐less water heaters for each of the Men's and
Women's toilet rooms for less wait time on hot water at faucet.
no $3,000
p. Provide grease interceptor in existing kitchen. Verify Kitchen use and provide grease interceptor as required. no ‐ new
kitchen only
$5,000
q. Add dishwasher no $2,700
r. Insulate all hot and cold domestic water piping with 1”
fiberglass insulation.
Insulate all hot and cold domestic water piping with 1" fiberglass insulation thru
out building
no Deleted
s. Reconfigure/reorder existing worship space. no Cost TBD
t. Upgrade sacristy toilets and lavatory faucets for low water
usage.
Upgrade fixtures at Sacristy toilet rooms to meet 1.6 gpf mas. Low water usage
requirements. Upgrade lavatory sinks with new 0.5 gpm faucets sensor or handle
operated
yes $1,800
Provide new 1 gpf flush valves at each urinal and replace urinal that is cracked no $2,200
Provide maintenance to lavatory faucets for proper operation, and upgrade to 0.5
gpm aerators
no $500
Upgrade mop sink faucets to type with screw‐on backflow preventers no $500
Provide independent water source and drain for ice machine no $1,500
Re‐install vent piping for sump pump to meet code no $1,200
Upgrade exteiror wall hydrants to key operated, freeze‐less hydrants with screw
on backflow preventers.
no $800
Basement Women's: provide water closet with right hand flush to comply with
ADA
no $600
Basement toilet rooms: lavatory sink meter faucets have long run times and need
more than 5 lb. of force to operate. (ADA = 5 lb. or less) Provide maintenance to
lavatory faucets for proper operation, or upgrade to sensor fauctes to ensure
operation and meet ADA
no $1,200
Basement toilet rooms: Lavatory sinks, provide pipe protection on lavatory sink
waste and supply pipes
no $200
Basement men's urinal: upgrade flush valve to sensor flush valve, handle flush
valves are beyond reach per ADA requirements
no $400
u. Movable partitions ‐ existing basement (Kostka Hall) no Deleted
Desired Items (Existing Site)
Demolish Existing Rectory yes $35,000
Install HC signage at accessible (7) parking spaces no $2,500
a. Remove existing asphalt parking lot. (43,500 SF) Remove existing asphalt parking lot. (43,500 sf) yes ‐ per
Rettler
Deleted
b. Provide new asphalt parking lot. (43,500 SF) Provide new asphalt parking lot. (43,500 sf) yes ‐ per
Rettler
Deleted
c. Build up curb around school basement windows. Build up curb around school basement windows yes $5,000
d. Remove cracked concrete flatwork along north side of the
church.
Remove cracked concrete flatwork along north side of the church ‐‐ Shifted to i.
e. New concrete flatwork @ north side of church (If north
side is not used for the building addition.
Provide new concrete flatwork along north side of the church ‐‐ Shifted to i.
f. Asphalt south parking lot. yes $55,000
g. Landscaping, Fire Pit, Fence Modifications, Etc. revise $75,000
h. Retaining Wall revise $50,000
i. Exterior Sidewalk & Stairs revise $36,000
j. Replace portion of northwest parking lot and include new
asphalt ramped drive
revise $40,000
Holy Spirit Parish – Addition and Remodeling page 3 of 3 Minutes – Design Meeting #10 (cont.) Miscellaneous Notes:
1. The next committee meeting will be to review the plans and the corresponding target price
for the project. A new design schedule with meeting dates will be prepared, which will carry
us through the remaining months of design work.
2. If the new target price and project design meet the budget and the committee approves, we
will move into the Construction Documents phase of design work which is more detail oriented
and will require sporadic meetings, not every 2 weeks.
Decisions Made:
1. Floorplan A4 will be used.
2. The proposed Site Plan will be used.
3. The repair items that appear on the Conditions Report but not the current budget list will not
be included unless there are funds available to do so.
Action Items
- Ellis
o Prepare a new budgetary / target cost for the project.
o Create revised design schedule indicating milestones and meetings.
- Holy Spirit
o Discuss with the Diocese a date in mid-February for review and approval of project.
- Rettler
o Set up meetings with the City to review the project.
Attachments
- C300 – revised 1-16-19.pdf
o (incl. marked up copy)
- A4 – floor plan – stairs by sanctuary – 1-11-19.pdf
o (incl. marked up copy)
- A4a – floor plan – no door by stairs by sanctuary – 1-11-19.pdf
o (incl. marked up copy)
- A1__ - remodeling plan – 1-16-19.pdf
- Target cost list comparison.pdf
Next meeting: Wednesday, February 6th at 3:00 pm.
If any of the preceding minutes are not per your understanding, or if there are items missing which
you would like added, please notify sender of such updates within (2) business days of receipt of
these minutes. Minutes will be amended and redistributed as necessary.
----- END OF MEETING MINUTES -----