DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED BRIDGE Douglass Robb, P.E. IRIB Project Manager DelDOT Winter Workshop February 18, 2010

DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

DESIGN-BUILD OF

THE INDIAN RIVER INLET

CABLE STAYED BRIDGE

Douglass Robb, P.E.IRIB Project ManagerDelDOT Winter WorkshopFebruary 18, 2010

Page 2: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

2 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Presentation Overview

Bridge History

Design-Build Proposal

Design Considerations/Challenges

Bridge Features

Questions

Page 3: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

3 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge HistoryBridge History (5th Replacement in 75 Years)

1. 1934 Timber bridge – washed away

2. 1938 Concrete and steel swing span, ice flow & extreme tides destroyed

3. 1952 Concrete and steel swing span

4. 1965 Existing steel girder bridge (Widened in 1976)

5. 2008 New Construction Begins

Page 4: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

4 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge History

Courtesy of Mr. Jay Erwin Jr

Page 5: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

5 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Looking EastScour Hole, 100’+/-

Piers

Stone Armor

Remnants of 1952 Piers

2004 Bathymetric Survey

Page 6: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

6 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge History

Is the Bridge Safe to Drive On?

Page 7: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

7 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge History

Page 8: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

8 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

Who Are We Getting?

Page 9: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

9 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

IBT

S&ME

Maunsell

Urban Engineering

RWDI

Contractor:

Designer:

Design/Construction QC:

Sub-consultants:

Freyssinet Inc

Interlock

Aldridge Electric

Sub contractors:

NXL

Sub-consultants:

Who Are We Getting?

Page 10: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

10 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

What Are We Getting?

Page 11: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

11 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

Lowest Price Proposal Just Under $150M budget

Highest Technical Proposal Score 3 Excellent Proposals

Earliest Proposed Completion Date April 30th, 2011 Open to Traffic (8 months early)

What Are We Getting?

Page 12: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

12 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

Page 13: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

13 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

Page 14: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

14 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Bridge Hydraulics and Scour

Page 15: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

15 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Bridge Hydraulics and Scour

No foundations in the inlet

Located within Hurricane Zone

Storm surge still estimated 5 feet +/- over F.G.

Coastal Storm Surge Modeling (SWAN)

Coastal Wave Action Modeling (ADCIRC)

100-YR and 500-YR Return Intervals Considered

30 ft and 35 ft scour depths estimated in RFP• Attempted to minimize risk to Proposers

Page 16: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

16 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Why Design For Scour?

Page 17: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

17 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Page 18: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

18 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Page 19: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

19 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Page 20: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

20 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Page 21: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

21 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Page 22: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

22 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Page 23: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

23 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Page 24: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

24 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Page 25: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

25 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Page 26: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

26 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind Analysis

Page 27: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

27 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind Analysis

Site Specific Wind Profile Developed

RWDI Wind Tunnel Testing Just Recently Completed, Over 50% of Pylon Piles Driven

Initial Design Assumptions and Preliminary Results Validated

Page 28: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

28 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind Analysis - Sectional Model

Page 29: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

29 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind Analysis - Aeroelastic Model

Page 30: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

30 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind Analysis - Aeroelastic Model

Page 31: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

31 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind and Weather

Page 32: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

32 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Page 33: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

33 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Geotechnical

Page 34: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

34 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Geotechnical – Soil Profile

Page 35: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

35 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Geotechnical – Pile Installation Method

Page 36: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

36 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Piles

Footings/Substructure

Pylons

Falsework

Superstructure

Form Traveler

Cable Stay System

Page 37: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

37 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Pile Details and Pile Driving

Page 38: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

38 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Pile Details

Page 39: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

39 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 40: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

40 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 41: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

41 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 42: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

42 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 43: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

43 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 44: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

44 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 45: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

45 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 46: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

46 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 47: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

47 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 48: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

48 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 49: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

49 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 50: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

50 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 51: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

51 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 52: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

52 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 53: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

53 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 54: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

54 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 55: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

55 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 56: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

56 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 57: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

57 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Footings and Substructure

Page 58: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

58 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 59: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

59 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 60: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

60 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 61: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

61 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 62: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

62 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 63: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

63 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 64: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

64 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 65: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

65 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 66: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

66 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 67: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

67 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 68: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

68 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 69: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

69 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Pylons

Page 70: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

70 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 71: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

71 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 72: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

72 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 73: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

73 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 74: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

74 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 75: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

75 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 76: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

76 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 77: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

77 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 78: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

78 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 79: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

79 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 80: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

80 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 81: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

81 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 82: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

82 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Falsework

Page 83: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

83 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 84: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

84 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 85: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

85 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 86: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

86 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 87: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

87 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 88: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

88 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 89: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

89 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 90: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

90 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 91: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

91 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Superstructure

Page 92: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

92 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Typical Section for the ApproachesAASHTO 69” Bulb-T Girders

Bridge Features

Page 93: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

93 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

CIP Concrete Edge Girders & Precast and CIP Transverse Floor Beams

Bridge Features

Page 94: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

94 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 95: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

95 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 96: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

96 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 97: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

97 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 98: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

98 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 99: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

99 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 100: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

100 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 101: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

101 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Form Traveler

Page 102: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

102 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 103: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

103 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 104: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

104 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 105: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

105 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Cable Stay System

Page 106: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

106 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 107: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

107 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Strands 0.62” Diameter Coextruded HDPE Sheathing Wax Filled

External HDPE Stay Pipe (Blue)

Strands are non bonded and parallel

Strands are individually stressed

Benefits: High fatigue resistance Good geometry control High grade corrosion protection Stays are easy to replace

Bridge Features

Page 108: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

108 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Page 109: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

109 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Erect stay pipe and master strand

Bridge Features

Page 110: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

110 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Conclusion

NTP Issued September 15, 2008

Design is Approximately 95% Complete

Construction is Approximately 40% Complete

Phase II Roadway Work Begins Late Summer 2010

Traffic on Bridge by Spring 2011

Project To Be Completed by Summer 2011

Existing Bridge Demo Late 2011 (Separate Contract)

Page 111: DESIGN-BUILD OF THE INDIAN RIVER INLET CABLE STAYED …...Indian River Inlet Bridge Design-Build Winter Workshop - February 18, 2010 Doug Robb, DelDOT Project Manager Bridge Features

111 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Questions and Comments?