4
STEEL BRIDGE • We design, fabricate and build a steel bridge. • Our objective: Using our engineering skills to design and analyze a bridge to compete against other universities. • Goals: Design a strong bridge under specified guidelines Create a cohesive build team Go To Nationals

STEEL BRIDGE We design, fabricate and build a steel bridge. We design, fabricate and build a steel bridge. Our objective: Our objective: Using our engineering

Embed Size (px)

Citation preview

Page 1: STEEL BRIDGE We design, fabricate and build a steel bridge. We design, fabricate and build a steel bridge. Our objective: Our objective: Using our engineering

STEEL BRIDGE

• We design, fabricate and build a steel bridge.

• Our objective:

• Using our engineering skills to design and analyze a bridge to compete against other universities.

• Goals:

• Design a strong bridge under specified guidelines

• Create a cohesive build team

• Go To Nationals

Page 2: STEEL BRIDGE We design, fabricate and build a steel bridge. We design, fabricate and build a steel bridge. Our objective: Our objective: Using our engineering

STEEL BRIDGE

Updates• Quality and Specifications

• Clarifications of Rules

• Design team

• Welcome to participate

• Currently working on a design w/ modifications

• Fabrication team

• Still looking for qualified members who is familiar with tools and/or welding.

• Build Team

• Max 6 members, but reserves are needed

• Practice building old bridge until Fab complete

• Aesthetics Team-Positions still open

• Poster & shirt design, bridge color, etc.

• Steel Bridge Manual

• You may participate on multiple teams

• ALL Members must be familiar w/ Rules

• ALL Members MUST be ASCE members

Page 3: STEEL BRIDGE We design, fabricate and build a steel bridge. We design, fabricate and build a steel bridge. Our objective: Our objective: Using our engineering

STEEL BRIDGE

What we are working on

Manual

Design

Page 4: STEEL BRIDGE We design, fabricate and build a steel bridge. We design, fabricate and build a steel bridge. Our objective: Our objective: Using our engineering

STEEL BRIDGE

• Upcoming Meetings• Meetings are held at the

Concrete Lab (ET C-162)

• Every Saturday • 10:30-12pm (scheduled)

• Could vary depending on the work load

• CONTACT INFORMATION:

• Jonathan Delacruz (Captain)• [email protected]

• Chris Wise (Vice-Captain)• [email protected]