Changing the way you succeed.
Company UpdateDeepwater Pipelay
Capabilities1
Changing the way you succeed.
Health, Safety and Environment
2
An Occupational Health and Safety Policy Statement is merely a declaration of hope unless there is an action plan for improvement.
Top 10 Incident Prevention Actions
• Active Management Engagement
• Behavioral Safety Process
• Communications
• Hazard Hunt
• Risk Assessment
• Management of Change
• Permit to Work
• Safety Gram
• Last Minute Risk Assessment
• Stop Work Authority
24,139 BSP Cards Submitted in 2008
Changing the way you succeed.
2009 Companywide TRIR Totals
3
Description Canyon ERT HSC RDS CorporateCapital
ProjectsWell Ops PROFAC TOTAL
Hours 1,001,969 641,972 1,390,771 94,500 322,080 257,297 1,302,195 22,979 5,033,763
Medical 2 0 1 0 0 2 1 0 6
Restricted Duty
Cases0 0 0 0 0 0 4 0 4
Lost Work Day
Cases2 2 5 0 0 0 5 0 14
Fatalities 0 0 0 0 0 0 0 0 0
First Aid Cases 38 8 10 1 2 11 42 0 112
Near Miss 59 2 36 1 0 7 58 0 163
Equipment Damage 43 0 17 0 0 0 18 0 778
Fire 0 0 2 0 0 0 2 0 4
Pollution 18 1 3 0 0 2 4 0 28
OSHA 300 Total
Recordable Cases4 2 6 0 0 2 10 0 24
OSHA 300 TRIR 0.80 0.62 0.86 0.00 0.00 1.55 1.54 0.00 0.95
Changing the way you succeed.
Services For Each Stage of the Field Life Cycle
4
Changing the way you succeed.
Deepwater Pipelay Vessels- Intrepid
5
LENGTH 116 m (381 ft)
TRANSIT SPEED 6 knts
TENSION 138 mT (304 kips)
A&R WINCH 250 mT (551 kips)
PIPE DIAMETERS 3.5” to 10”
MAIN CRANE 400 mT (882 kips)
FRICTION CLAMP 200 mT (441 kips)
REEL CAPACITY 1550 mT (3417 kips)
ACCOMODATIONS 74 Persons
Intrepid has the flexibility to be deployed
as a pipelay, installation or saturation
diving vessel.
Thunder Hawk jumper fabrication and loadout onto Intrepid
Changing the way you succeed.
Deepwater Pipelay Vessels- Express
6
LENGTH 160 m (520 ft)
TRANSIT SPEED 12.5 knts
TENSION 160 mT (353 kips)
A&R WINCH 250 mT (551 kips)
PIPE DIAMETERS 2” to 14”
MAIN CRANE 400 mT (882 kips)
AUX CRANE 150 mT (882 kips)
REEL CAPACITY 2950 mT
FRICTION CLAMP 250 mT (551 kips)
DEP. ANGLE 30 to 90 degrees
ACCOMODATIONS 132 Persons
Express has established an extensive
track record of field installation projects
around the world.
Multipurpose VLS system Danny 8x12 PIP, installed Q1 2010
Changing the way you succeed.
Deepwater Pipelay Vessels- Caesar
7
LENGTH 146 m (479 ft)
TRANSIT SPEED 10 knts
TENSION 405 mT (891 kips)
A&R WINCH 450 mT (990 kips)
PIPE DIAMETERS 6” to 36”
STINGER LENGTH 90 m (295 ft)
MAIN CRANE 300 mT (660 kips)
A-FRAME 450 mT (990 kips)
ACCOMODATIONS 220 Persons
Caesar’s onboard pipe welding and
testing capability allows the vessel to S-
lay virtually unlimited lengths of pipe up to
36” in diameter.
Vessel awarded 46-mile 20” pipeline install in Gulf of Mexico
Changing the way you succeed.
Onshore Welding Capabilities
Ingleside, Texas shore base facility
– Pipe stalk length 5,230 feet
– Onsite subsea component fabrication
– 300’ x 700’slip can accommodate two
Helix Subsea Construction vessels side
by side
– Constructed Helix’s Danny 36-mile
8 x 12-inch pipe-in-pipe, including
jumpers and manifolds
Danny pip-in-pipe staging on racksHelix Danny pipe-in-pipe welding
8
Changing the way you succeed.
Shore Base Fabrication Capabilities
9
• 20,500 sq. ft. fabrication building area
• 120 acre site, with expansion capacity
• 40 acres storage capacity
• Deepwater slip allows cargo delivery via
barge
• Fabrication capabilities include:
– PLETs, PLEMs and manifolds
– 2D and 3D jumpers
– Risers and skids
– On-site SIT capability
Changing the way you succeed.
Offshore Welding Capabilities
10
Caesar welding capabilities
– Fully automated pipe handling systems
– 7 welding stations, 1 testing station and
1 coating station
– 3x 135 mt SAS track tensioners open
to 2.5 m clearance for passage of inline
components
– Pipe feeds from barges or from
onboard 6,500 mT storage hold
Changing the way you succeed.
Caesar Welding Systems Layout
11
135 mT track tensioner Pipe elevator First welding station
Changing the way you succeed.
In-House Project Execution Services
12
Integrated project management, design, engineering, fabrication and construction support services
Innovative engineering solutions and project management
Procurement support and execution
Risk management (i.e. technical capacity assurance, cost control and contract management)
Knowledge Management and Dissemination
Document control
Subcontract and interface management
Changing the way you succeed.
Helix Subsea Construction Differentiators
13
Helix has extensive experience in (ultra) deepwater construction(pipelines, PIP and insulated flowlines, umbilicals, manifolds, trees, jumpers, flying leads up to 9,000 fsw) and in installation and operation of owner furnished equipment from all different manufacturers (Coflexip, Wellstream, NKT, Cameron, Aker, Oil States, FMC)
Helix, as no other contractor, understands the full cost quality development of deepwater infrastructure and the importance of reliability as Helix is also performing development of Helix’s own oil & gas properties from cradle to grave
The Gulf of Mexico is Helix’s home field with dedicated vessels and a spool base. We can accommodate ever moving installation windows
Potential for one stop service with deepwater construction, diving, trenching and fabrication of jumpers and PLEM’s.
Changing the way you succeed.
Recent Experience- Reliance India
14
One of the largest offshore subsea gas field developments ever executed
on a fast track basis in a remote area
Changing the way you succeed.
Helix Scope of Work- Reliance India
15
Installation of 11 structure suction piles
Installation of 6 manifolds structures
Installation of UDH structure
Installation of 3 SDA’s structure
Installation of 28 umbilicals
Installation and fabrication of 58 rigid jumpers (2D and 3D)
Installation of ~200 flying leads
Installation of 12 X-Trees
Pull-in of 4 umbilicals at platform
Partial trenching of 24-inch deepwater pipeline
All metrology
As-built survey
Express, REM Forza, Olympic Canyon and Island Pioneer
have been deployed on this massive project in 2007/2008/2009
Changing the way you succeed.
Helix Fabrication Yards in India
16
Changing the way you succeed.
Recent Experience- ERT Noonan
17
• 3,000 ft. water depth
• EPIC
• Installation scope
– 36 mile umbilical
– 36 mile 8-inch
line
– PLET’s
– Jumper’s
– Flying leads
• Diving
• Hydrotest
• Pre-commissioning
Changing the way you succeed.
Recent Experience- ENI Longhorn
18
Install 2x 20 mile 8” / 2x 1 mile 6” flowlines
Install 210 Te. manifold
Install 2x 8” PLET’s and flexible jumpers to the manifold
Install 2x first end 6” PLET’s, 2x second end 6” PLET’s
Install 3x 6” well jumpers and 2x 6” infield pipeline to manifold jumpers.
Install 19 miles main umbilical from Crystal platform to manifold
Install 2x infield umbilicals and accompanying flying leads
Install 5 mile 12” export pipeline from Crystal platform to hot tap
Install 12”, 2x 8” risers and clamps and 16” I-tube and clamps on the Crystal platform
Install hot tap and subsea assembly and tie in the 12” and 8” pipelines
ENI Manifold (210 Te.) on deck of MSV Q4000 to be
installed in 2,440 fsw
• Pre-commissioning of complete system
• Project Management and installation engineering.
Changing the way you succeed.
Other Major Subsea Projects
19
Anadarko Independence Hub – 2007
– Installation of flowlines, umbilicals, PLET’s in water depths up to 9,000 ft.
– Set a water depth world record for jumper installation
EOG Trinidad – 2007
– Installation of 14” heavy wall pipeline and 6” in-field including diving construction
ATP Wenlock – North Sea 2006
– Installation of 8” pipe with 3” piggy back and 20 miles of umbilical including diving construction
Shell Pastel Pink - 2006
– Welded and installed 4” x 8” pipe-in-pipe for Shell Pastel Pink in water depth of 4,300 ft.
Dominion Rigel / 17 Hand – 2004/5
– Pipelay and jumper installation in 6,000 ft.
Kerr McGee Gunnison - 2003
– Installation of dual 6-inch flowline, umbilical, PLET, flexible riser, jumpers, and flying leads in 3,500 ft.
Kerr McGee Nansen / Boomvang 2002
– Installation of dual 6-inch flowlines, umbilicals and PLET’s, manifold and UTA’s in 3,700 ft.
Changing the way you succeed.
Recent Technical Achievements
20
Canyon Offshore achieved the world record depth for flow line burial on
the Coulomb project for Shell Oil. The 28 mile long Coulomb flow line
was buried in water depths up to 7,576 ft. The burial performed for flow
assurance improvement was a complete success with minimal
downtime and high profitability.
The Q4000 removed a hydrate plug in a Mariner deepwaterflowline in the Gulf of Mexico using five miles of drill pipe.
Helix Well Ops successfully abandoned 5 subsea wellheads wells for Total in Vietnam resulting in a world’s first with single pass severance of
conductor and casing strings in under 24 hours each.
Helix Well Ops set world depth record for subsea wireline intervention from a monohull vessel offshore Australia for Woodside by retrieving tubing hanger plugs from two subsea wells located in 392 m (1,286 ft) of water.
The MSV Express successfully installed a jumper for the Independence Hub development in the deepest recorded water depth of 9,083 feet.
Changing the way you succeed.
Thank You
21