1 1 Investor Field Trip 28-30 March 2012 OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi EGM, External & Govt Affairs Phil Caldwell EGM, PNG LNG Project Richard Robinson EGM, Operations Ann Diamant Investor Relations Manager 2

OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

11

Investor Field Trip28-30 March 2012

OSH PARTICIPANTS

Peter Botten Managing Director

Gerea Aopi EGM, External & Govt Affairs

Phil Caldwell EGM, PNG LNG Project

Richard Robinson EGM, Operations

Ann Diamant Investor Relations Manager

22

Page 2: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Field Trip Route

33

MORO

CPF

HIDESAmbua Lodge

PORT MORESBY

100km LNG Plant144°E

8°S

6°S

147°E

DAY 1DAY 2DAY 3

GOBE

MoranMananda 5

GorokoKundiawa

Mt. Hagan

Mendi

Kerema

Daru

Lae

Trapia

Key Oil and Gas Fields, PNG

Kumul Terminal

Port Moresby

PorgoraGold Mine

7°S

Juha Hides

Moran

Agogo

Mananda 5

Proposed JuhaFacility

PRL08

PPL240

PRL11

PDL7

PPL239

PDL1

PRL02

PDL2

PDL4PDL3

PRL09

PDL6PDL5

PRL14

260

233

PDL9PDL8

PPL233

APPL386

LNG Facility

Kutubu

Moro Airport

Flinders

6°S

8°S

9°S

PRL01

PPL234

PRL10

PPL244

Kiunga

Kundiawa

Mt. Hagan

Mendi

Kerema

Trapia

Barikewa

Pandora

SE Mananda

Uramu

P’nyang

Madang

Daru

Wabag

HidesConditioning Plant

& Komo Airstrip

Gobe/SE Gobe

PPL276

PPL338

338

338

338

PPL339

339

339

339

PPL339

339

PPL312 339 339

PPL260

Lae

145°E 146°E144°E143°E 147°E

Kimu

PRL3

APPL385

240

240

Kopi ScraperStation

142°E141°E

Kopi Wharf

PPL219

100km PNG LNG ProjectNew Facilities

PNG LNG ProjectGas Resources

Non PNG LNG Gas Resources

ExplorationGas Resources

Angore

Elk/Antelope

PPL277

Oil Field

Gas Field

Prospect

Oil Pipeline

Proposed Gas Pipeline

OSH Facility

LNG Facility

Major Road

PPL277

4

Page 3: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

DAY 1 – Port Moresby

Visit LNG Plant Site

Oil Search Health Foundation launch, Gateway Hotel

Overnight Airways Hotel

55Port Moresby, Papua New Guinea

PNG LNG Plant Site - Schematic

66

Page 4: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

PNG LNG Plant Site - Progress

7

February 2011

February 2012

PNG LNG Plant

LNG facility located on State Portion 152 near Port Moresby

2 x 3.3 MTPA LNG trains

LNG storage tanks at the facility

LNG loading jetty off the coast for tanker ships to berth and load

Supporting facilities and infrastructure:Large camp for construction (~7,500) and operations (~500) personnel

Upgrade of existing road between LNG facility and Port Moresby and rerouting of road around the LNG facility to maintain traffic flow to the north (completed)

Temporary laydown areas during construction only

88

Page 5: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

LNG Facility Location

99

Schematic of LNG facility site and loading terminal

DAY 2 – PNG Highlands

Presentations on PNG LNG Project and Gas Growth

View PNG LNG pipeline

Presentation on production and near field exploration, MENA

Visit CPF – AG activities

Overfly Kutubu, Moran

Overnight Ambua Lodge

1010PNG LNG Pipeline Construction

Page 6: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

11

PNG LNG plant site

PNG LNG Project Overview

Kumul Terminal

Port Moresby

7°S

145°E

HidesWellsJuha

Facility

EPC3LNG Facility

Kutubu CPF

145°E 146°E144°E143°E

6°S

8°S

9°S

GorokaKundiawa

Mt. Hagan

Mendi

Kerema

EPC5BKomo Airfield

100km

147°E

Daru

Wabag

Lae

EPC2Offshore pipeline

EPC5AOnshore pipelineand Infrastructure

Gobe PF

Kopi Wharf

C1 Southcomplete

C2Complete

C1 HGCP

EPC4Hides GasConditioning Plant

Oil Field

Gas Field

Prospect

Oil Pipeline

Proposed Gas Pipeline

OSH Facility

LNG Facility

Major Road

12

Page 7: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

PNG LNG Project Overview

6.6 MTPA, 2 train development, operated by ExxonMobilOver its 30-year life, PNG LNG expected to produce over 9 tcf of gas and 200+ million barrels of associated liquidsInitial Equities:

ExxonMobil - 33.2% Oil Search - 29.0%National Petroleum Company of PNG (PNG Government) -16.8% Santos - 13.5% Nippon Oil - 4.7% MRDC (PNG Landowners) - 2.8%

Fully contracted to Asian buyers, with continuing strong market interest

Sinopec (China) ~2.0 MTPATEPCO (Japan) ~1.8 MTPA Osaka Gas (Japan) ~1.5 MTPACPC (Taiwan) ~1.2 MTPA

131313

PNG LNG Project Overview

Main EPC contractors:LNG Plant: Chiyoda/JGCOffshore Pipeline SaipemHides Gas Plant CBI/Clough JVOnshore Pipeline SpiecapagInfrastructure McConnell Dowell/CCC JVEarly Works Clough/Curtain JVAssociated Gas (OSH only) Jacobs (formerly Aker Solutions)

Different labour environment to Australian LNG projectsFour-year construction period. First LNG sales expected 2014, capital cost US$15 billion

14

Page 8: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Milestones achieved in 2011- Upstream

Commenced construction activities at Hides Gas Conditioning Plant (HGCP) including commencement of piling work

Good progress at Komo, with significant improvement in earthworks and installation of first foundations for terminal building

Ongoing progress on onshore pipeline, with welding of over 100 kilometres and completion of first major onshore pipeline river crossing

Delivered first of two drilling rigs to PNG in preparation for development drilling

Completed major shutdown at oil facility for tie-ins and new equipment. Installed new export buoy

151515

Milestones achieved in 2011- Downstream

Commenced construction of process trains, utility areas, LNG tanks and jetty. In 4Q, completed LNG tank concrete foundations and commenced construction of outer LNG tank shells

Completed 130 kilometres of offshore pipeline including landfall site at LNG Plant site (Caution Bay), trenching, shore pull and trench backfilling

Contract for construction of two new LNG carriers let by Mitsui

At end 2011, more than 14,300 people employed on Project activities, 60% PNG citizens. Includes >1,000 females, of which 94% PNG citizens

Project budget increased by US$700 million primarily to address cost increase of strong A$

Project scheduled for first deliveries in 2014

161616

Page 9: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

2012 LandslideMajor landslide occurred at Hides in January 2012PNG Government’s National Disaster and Emergency Relief Office managed incidentEsso Highlands and Oil Search provided support/assistance to local community PNG LNG operations have resumed and road access restored Not expected to impact 2014 Project start-upGovernment to undertake independent investigation

171717

Focus items for 2012

Completion of Komo Airfield constructionStructural steel erection, mechanical construction of major equipment at HGCPContinued construction at LNG Plant site including commencement of topside jetty works and tank hydrostatic testingMechanical completion of offshore and Kopi / Kutubu sections of the onshore pipelineCompletion of AG CPF and Gobe plant modifications and PL2 Kumul refurbishment projects, including ready to supply commissioning gas statusCommencement of development drillingContinued focus on working with government and local communities, maximising opportunities for local content

181818

Page 10: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Timetable

1919

2010 2011 2012 2013 2014

FinancialClose

•Continued early works•Detailed design•Order long leads and place purchase orders

•Open supply routes•Contractor mobilisation•Commence AG construction

•Complete pipe lay•Ongoing drilling•Complete Hides plant•Commission LNG plant with Kutubu gas

•Ongoing procurement and mobilisation

•Airfield construction•Drilling mobilisation•Start offshore pipeline construction

•Onshore line clearing and laying

•Start LNG equipment installation

First Gas from Train 1,

then Train 2

•Complete AG •Continue onshore pipe lay

•Complete offshore pipe lay

•Start Hides plant installation

PNG LNG Plant Site

20

Page 11: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

PNG LNG ProjectOnshore Pipeline Construction

21Welded pipelinePipeline WeldingPipeline stringing

PNG LNG Project

22

Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I

LNG Plant - LNG storage LNG Plant - Condensers

Page 12: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

23

23

Angore Anticline, Southern Highlands

Gas Growth & Exploration

Key strategic priority for Oil Search is to grow gas business in PNG

Pursuing a two pronged strategy:PNG LNG Expansion

Gulf Area LNG

Focus on resource conversion from probable and possible to proven contractable reserves

New exploration in Highlands and Gulf Region

Continuing near-field exploration for gas and oil

Pursuing high-graded exploration outside PNG

2424

Page 13: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Global LNG Markets Outlook

Continued strong LNG demand from Asia (China, Japan due to contract roll-offs), new markets (India, Middle East etc). Requires substantial new capacity build to satisfy Multiple potential supply sources but some likely to be delayed and not all will happen North American LNG projects approved/proposed to take advantage of HH/Asian LNG arbitrage. Long term, exports from US likely to be limited by DOE for energy security reasonsCapex inflation in Australia is increasing. Puts new greenfield projects at riskPNG remains well placed to capture growth in the market

2525

Source: FACTS GLOBAL ENERGY, Feb 2009Source: Wood Mackenzie, February 2012

0

100

200

300

400

500

600

2007 2009 2011 2013 2015 2017 2019 2021 2023 2025

mmtpaGlobal LNG supply/demand outlook

Contracted LNG

Spot Cargoes

Probable

Possible

Speculative

Global Demand

Global Demand

0

50

100

150

200

250

300

350

400

450

2007 2009 2011 2013 2015 2017 2019 2021 2023 2025

mmtpa

Global LNG contracted supply and demand balance

Qatar

Malaysia

IndonesiaNigeria

Algeria

AustraliaTrinidad & Tobago

Egypt

OmanRussia EastBrunei

YemenU.A.E.

Other

P’nyang South 1

Appraisal well successfully discovered gas in southern fault blockSidetrack currently underway to establish gas:water contact and extent of discoveryPRL 3: ExxonMobil 49%, Oil Search 38.5%, JX Holdings 12.5%

26

2011 Seismic

Acquisition

6°S

8°S

144°E142°E

Hides

Kutubu

SE Gobe

Moran

Agogo

Juha

Angore

100km

P’nyang 1X

P’nyang South 1

P’nyang 2X

P’nyangSouth

Page 14: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Trapia 1

Trapia exploration well scheduled to follow P’nyang SouthPRL 11: Oil Search 52.5%, ExxonMobil 47.5% Series of prospects in area:

Reasonable seismic but structural uncertainty remainsMulti-tcf potential2D seismic programme in 2012/13 to mature prospects

Partial dependency. Exploration potential remains in event of success or failure at TrapiaRecent acquisition of adjacent licence, PPL 277, 50:50 with ExxonMobil

27

10km

PPL 277

PPL 2776°S

8°S

144°E142°E

Hides

Kutubu

SE Gobe

Moran

Agogo

Juha

Angore

100km

P’nyangSouth

Trapia

Gulf Area LNG Opportunity

Multi-licence, multi play type, multi well opportunity with material equityLarge, initial seismic programme completed in 2011:

~6,300 km2 3D offshore and 95 km 2D onshore

Significant resource potential identified in proven hydrocarbon (gas & condensate) province

Over 30 opportunities identified across multiple play typesPotential to support two LNG trains

Initiating additional 3D seismic programme

28

PRL01

PPL234

PRL10

9°S

145°E 146°E144°E

Gobe

PPL276

PPL312

PPL338

PPL339

PPL339

339

339

338

338

338

339

339

339

8°S

7°S

339

PPL244

50km

Elk/Antelope

KumulTerminal

Pandora

Flinders

3D Seismic Regions

3D Seismic Regions

2D Seismic Lines

2D Seismic Lines

Uramu

Page 15: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Gulf Area LNG Opportunity

29

High quality 3D dataset assembled

6 independent play types identified to date, each analogous to proven play types elsewhere:

Submarine fan & channel play types – as yet untested in PNG

Carbonate plays –proven in PNG

Several drill-ready prospects, with many follow-up opportunities, if successful

Amplitude Map6 km

NE

Mud/silts

SW

3 km100 m

Sand Filled Channel Complexes

2D Seismic LinesTurbiditeSheet Sands

Offshore 3D Seismic – PPL 234

30

?

Faulted Miocene

Faulted Miocene

Is gas migrating

from the deep kitchen

through faults in the

Miocene section?

Page 16: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Gulf Area Partner Strategy

Partnering:Opportunity for partner to gain material country entry positionData room opened, several highly credentialed parties have been through, strong interest expressedTargeting partnering deal mid 2012

Drilling:Initial 2+2 well offshore programmeRig selection and well planning underway

Site survey contractedWell design commencedRig & long lead item procurement process commenced

Plan to drill independent of partner process Timing:

Rig selection to be finalised in 2Q for 4Q spudTiming dependent on:

Rig selection and availabilityFinal strategy selection

31

32

32

Moran, SE Mananda, Agogo 6 wellsite & Agogo Production Facility

Page 17: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Safety Performance

33

Total Recordable Injury Frequency Rate of 1.85 in 2011TR

I /

1,0

00

,00

0 H

ou

rs

Oil Search

Australian Companies (APPEA)

InternationalCompanies(OGP)

Australian Benchmar

king

Total Recordable Injury Frequency Rate Data for 2011per Million Hours Worked (All Reported Data)

34

Fletcher Building

BramblesTreasury Wine Est.

OZ Minerals

Downer EDI

United Group

Origin

Incitec Pivot

Boart Longyear

Contact Energy

James Hardie

Stockland

Transfield

Newcrest

AWE

BHP Billiton

Amcor

Santos

Orica

Woodside

Oil Search

Source: Company data, Citi Investment Research and Analysis. Note: TRIFR – Total Recordable Injury Frequency Rate per 1 million hours worked

0 5 10 15 20 25 30 35 40 45 50

CSRQantas

Wesfarmers

WorleyParsons

CaltexPanAust

AGL Energy

Monadelphous

Hastie Group

FY11Dec YE

Australian Safety Benchmarking

Page 18: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

35

Oil Search Production (existing fields)

0

1

2

3

4

5

6

7

8

9

10

2009 2010 2011 2012 2013 2014

Net Production (mmboe)

7.668.12

(Forecast)

6.2-6.76.69

Hides GTESE ManandaSE Gobe

Gobe MainMoranKutubu

FY11 Performance

Continued world class safety performanceProduction

2011 production of 6.69 mmboe, at upper end of 2011 guidance of 6.2 – 6.7 mmboeOngoing production and value opportunities:

New gas injection strategy paying dividendsSuccessful Toro infill well at IDT 25, with discovery in deeper Koi Iange zoneNew pools discovered by Hedinia 10 and Agogo 6 wells, part of ongoing near field exploration and appraisal strategy

35+ successful development and near field wells in recent yearsWorkover programme has added more barrels

36

Page 19: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Hedinia 10 and Agogo 6

Complex and invisible - highly successful near-field exploration to date

37

Kutubu oil field

Sub-thrust forelimb

ST1

ST2ST3

37

Agogo oil field

Sub-thrust forelimb

2012/13 Development & Near-Field Appraisal Drilling Activity

38

PRL08

PPL240

PRL11

PDL7

PPL239 PDL1

PPL233

PPL219

PRL2

PDL2

PDL5PDL6

PRL09

PRL14

PPL260

APPL386

PDL4

PDL3

PDL4

PDL7

50km

Juha

Hides

SE Mananda

Barikewa

Kimu

Cobra

Iehi

PPL240

PPL233

6°S

143°E 144°E

7°S

Mananda 5

Usano2012 : ± 1 well, 1 workover

Kutubu2012 : ± 1 well, 4 workovers2013 : 1 well, 2 workovers

Agogo2012 : 1 well2013 : 1 well

Moran2012 : 1 well2013 : 1 well

SE Gobe2012 : 2 well interventions

Oil Field

Gas Field

Prospect

Oil Pipeline

Proposed Gas Pipeline

OSH Facility

LNG Facility

Major Road

PPL277

PDL8

PDL9

PRL11

Angore

Page 20: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

2012 Production Outlook

Underlying production from oil fields expected to remain strong, with 2012 production impacted by:

Significant contributions from successful 2011 wells and workoversNatural decline 16 day shutdown for tie-in of Associated Gas facilities completed in February

Production guidance for 2012 of 6.2 – 6.7 mmboe, unchanged from 2011, with production out to first LNG broadly flat, subject to success of work programmes

Robust workover and development drilling programme in 2012, coupled with continued focus on maturing near-field portfolio and appraising new pools identified following recent near-field successRig strategy:

Following P’nyang drilling, Rig 103 to be mobilised back to PDL 2Will provide optionality to pursue exploration and appraisal opportunities without potential adverse impact on development programme

39

Key 2012 Focus Areas

Maintain OSH’s industry-leading safety performance in very high activity environment across many sites

Manage cost pressures of a strong PNG market

Continue transformation of business towards reliable gas delivery:

Complete Associated Gas and Life Extension works

Continue optimisation of gas depletion plan

Align processes with gas supply obligations

Follow up near field successes in Agogo and Hedinia

Support PNG LNG Project to ensure success as onshore pipeline construction moves through key oil operational areas

4040

Page 21: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Associated Gas & Related Projects (AGRP)

Oil Search, as oil field Operator, is responsible for development and operation of facilities required to deliver oil field gas into PNG LNG Project and receive Project Condensate

Key objectives of AGRP are to deliver safely and within budget/schedule:

Commissioning gas to PNG LNG Project

Receipt, storage and export condensate from LNG Project HGCP with high reliability

Delivery of associated gas from oil production systems at CPF and GPF into LNG Project gas pipeline to LNG Plant

4141

CPF Scope of Work

424242

Associated Gas DeliveryEnhanced dehydration by replacing existing gas driers to improve gas quality and reduce emissionsAutomation of various wells for remote operation and upgrading plant inlet gas management system

Condensate StorageUpgrade pipework to allow inline mixing, loss prevention (particularly fire management) and control systems

Commissioning GasInstallation of skids to deliver early on-spec commissioning gas to pipeline and LNG Plant

UtilitiesImprovements to emergency shut down system and new control roomTie ins for new equipment into existing and improved utilities

Page 22: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

TEG DEHYDRATION UNITS

CONDENSATE HANDLING & LOSS PREVENTION – Southern Tank Farm

Control Room Building completed Q1/12

NEW CONTROL ROOM

Piping to rack in progressETC Q2/12

Wellhead footings and earthing in progress

ETC Q4/12

PRODUCTION / REINJECTION WELLHEAD SCOPE

COMMISSIONING GAS SKID

Pipework and instrumentation installation in progress

ETC Q2/12

THERMAL OXIDISER

TEG C mechanically complete, preparing for commissioning

ETC TEG C Q2/12TEG D Q2/13

Battery limit isolations & Tank A Outage completed, liquids handling equipment room in progress

ETC Q4/12

PAG Line installation in progress

ETC Q3/12

ASSOCIATED GAS PIPELINE

Piping and instrumentation Installation in progress

ETC Q2/12

FEED GAS COOLER

Battery limit isolations & Tank F Outage completed, pipe support footings in progress

ETC Q1/13

CONDENSATE HANDLING & LOSS PREVENTION – Northern Tank Farm

Electrical Feeder installed. Skid pad yet to commence

ETC Q4/12

GAS/COND METERING SKIDS (BY EXXON)

Civil works in progressETC Q4/12

ALT. FUEL GAS

Overall CPF ETC * early Q2/13 As at March 2012

ETC = Estimated Time of Completion* Excluding TEG A Demolition

CPF Scope of Work

43

Construction Progress

CPF works well advancedFirst plant shutdown successfully completed in August 2011, second completed on schedule in February 2012Commissioning gas unit on track for mid 2012 handoverReady for gas production, initially to pipeline and plant 2Q 2013

4444

TEG Dehydration Unit installation

New Control Room at CPF began operating in January 2012

Page 23: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

PL 2 Life Extension Project

Project to extend operating life and build more comprehensive management systems for PL 2 Liquids Export System:

Replace existing CALM buoy Install new tanker loading line between platform and buoyRejuvenate Kumul facilitiesLife extension of existing CPF to Kumul export lineKPS management and integrity system

45

New CALM Buoy being lowered into position

Pipelay Barge ‘Lewak Champion’ along side Kumul Terminal

First Offtake – March 2012

46

Page 24: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

47

Kurdistan Region of Iraq- Taza PSC

Material prospect in one of world’s hottest exploration regionsOil Search operator with WI of 60%, ShaMaran 20%, KRG 20% Very prospective location adjacent to four fieldsLarge, simple 4-way dip closure identified from 2010 seismic. Well planning underway for mid-2012 spud

4848

TazaProspect

Up to 180km2

Kor MorGas Field

PulkhanaOil Field

JamburOil Field

Taza PSC

Page 25: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Taza Seismic

49

Five regional reservoir targets:

JeribeEuphrates/SerikagniKirkuk GroupJaddalaShiranish

Estimates of recoverable resources in success case range from 200 to 400 mmbbl (mean estimate)Recoverable volumes dependent on recovery factors and phases present

Taza 1Proposed Location

Lower Fars

Upper Fars

Saliferous

2km

SW NE

Khor MorGas Field

PulkhanaOil Field

JamburOil Fielddowndip

Tunisia – Tajerouine PSC

2010 seismic evaluation complete. Infill seismic acquired late 2011Proven oil plays present and new deeper gas play developedPreferred prospect (Semda-1) confirmed. Has potential for >100 mmboeFiscal regime favourable –discovery would be materialWell planned for 2H 2012, after Taza

5050

~10km

Tajerouine

Page 26: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

DAY 3 – PNG Highlands

Overfly Trapia, HGCP, Komo

Visit Hides camp at Nogoli

Presentations on PNG Issues, Summary

Overfly Mananda 5, SE Mananda

To Port Moresby

5151Tagari Valley - Hides, Southern Highlands

52

52

Well head and production manifold, Kutubu,s

Page 27: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

PNG Issues

PNG has experienced unprecedented political uncertainty over past 6 months:

No impact to operationsContinued progress on all projectsSecurity and safety of staff paramount

Election in June 2012 with new government formed in August/September:

Anticipate no change to operating status but cautious and watchfulContinue push for transparency and governance regarding benefitsEnhance community engagement, including Health Foundation

Reaching peak of in-country activities, with continued but manageable stress on government systems, personnel and services availabilityOSH likely to be PNG’s largest single investor in 2012, with over US$2bn to be spent on development, appraisal exploration and operations

Significant vote of confidence in quality of assets and ability of Company to work with Government, bureaucrats and community and manage operating and investment risks

53

Summary

Strategic Review in 2010 highlighted potential of present portfolio to continue to deliver top quartile TSR performanceMajor areas for delivery:

PNG LNG Project in full construction, on track for 2014 LNG productionLNG growth initiatives focused on resource definition:

Hides drilling in 2012/13Highlands appraisal and exploration startedGulf potential confirmed, drilling preparations underway, partnering discussions commenced

PNG oil potential being accelerated, increased rig capacity will provide optionalityOil exploration in MENA (Kurdistan, Tunisia) Active programmes to address operating risks:

Transparency in benefitsCommunity engagementHealth Foundation activities commenced

Financial strength with continued optimisation of structure and debt

54

Page 28: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

2012 Outlook

Peak activity year for PNG LNG Project delivery in 2012:

Construction at PNG LNG plant site, HGCP and Komo Completion of Associated Gas and life extension projects Focus on management of in-country issues

Major drilling programme focused on gas expansion and resource underwriting. Potentially transformational for Oil Search

Hides evaluationP’nyang and Trapia wellsGulf area drilling

Active oil exploration programme:Near field opportunitiesKurdistan, Tunisia

Continued strong oil field production performance

55

2012 Outlook

Oil Search presently has unprecedented opportunity to underscore long term value growth from its portfolio of assets

Remain confident that country risks and challenges can be managed through 2012. Continue to work closely with Government, bureaucracy, communities and partners to manage operating risk

56

Page 29: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

Oil Search Production Outlook

57

2008 2009

8.607.66

2010

8.12

2011

6.69

2012 2013 2014 2015 2016 2018

25Net Production (mmboe)

0

5

10

15

20

MENAHides GTESE ManandaSE GobeGobe MainMoranKutubu

2017

6.2-6.7

(Forecast)

2012 Guidance

Production:6.2 – 6.7 mmboe

Operating costs US$21 - 24/boe (incl. corporate costs)Impacted by:

Major workover programme to maximise oil recoveriesbefore gas productionFOREXPNG inflation Associated Gas activitiesSustainability initiatives

Depreciation, depletion and amortisation:US$7 - 9/boeFuture DD&A profile will be impacted by life extension activities and development drilling opportunities

5858

Page 30: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

2012 Investment Outlook

59

US$’m

Investing :Exploration inc gas growthPNG LNGProductionCorporate (inc rigs)Business Development**

Financing :Dividends

2011 (A)

1451,287

1297

10

0** Dividend fully underwritten

** Previously included in Exploration# 20-25% of spend in MENA## Includes capitalised interest and fees

2012 (F)

240 – 280#

1,650 – 1,750##

130 – 150107

0*

Liquidity Outlook

Strong balance sheet, augmented by continued strength in oil production and high oil priceOutlook updated for 2011 financial results, forward prices & revised PNG LNG Project costLiquidity at 31 December 2011 ~US$1.3 billionCompany remains well placed to meet existing commitments and with sufficient liquidity to deliver on strategic plan initiatives

Key Assumptions:1. Brent Forward curve pricing as at 17 February 20122. PNG LNG Project on schedule and revised budget3. Train 3 FEED costs included, Train 3 construction costs excluded4. Production profiles, other Capex / Exploration based on OSL business plan5. Existing oil facility refinanced

60

2014

US

$m

m

Liquidity (cash plus undrawn bank debt)

Dec 2011

Page 31: OSH PARTICIPANTS Peter Botten Managing Director Gerea Aopi ... · Offshore pipelay – SEMAC I Offshore pipelay – SEMAC I LNG Plant - LNG storags r e s n e d n o C - t n a l P G

61

62

DISCLAIMER

While every effort is made to provide accurate and complete information, Oil Search Limited does not warrant that the information in this presentation is free from errors or omissions or is suitable for its intended use. Subject to any terms implied by law which cannot be excluded, Oil Search Limited accepts no responsibility for any loss, damage, cost or expense (whether direct or indirect) incurred by you as a result of any error, omission or misrepresentation in information in this presentation. All information in this presentation is subject to change without notice.

This presentation also contains forward-looking statements which are subject to particular risks associated with the oil and gas industry. Oil Search Limited believes there are reasonable grounds for the expectations on which the statements are based. However actual outcomes could differ materially due to a range of factors including oil and gas prices, demand for oil, currency fluctuations, drilling results, field performance, the timing of well work-overs and field development, reserves depletion, progress on gas commercialisation and fiscal and other government issues and approvals.

6262